HomeMy WebLinkAboutDERR-2025-003656 SITE VISIT REPORT DATE: 5/14/2025 SITE: The Paxton VCP #129 SITE ADDRESS: 215 Paxton Avenue, Salt Lake City, UT PREPARED BY: Allison Stanley Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West Salt Lake City, UT 84116 ATTENDEES: Allison Stanley (DERR), Kendra Caskey (Geosyntec) ARRIVAL TIME: 11:40 AM - DEPARTURE TIME: 12:00 PM Split Samples Collected: NA Is the work being performed in a manner consistent with the accepted workplan? Yes SUMMARY: The required 30-day public comment period for the Remedial Action Plan (RAP) for The Paxton VCP commenced on April 11, 2025 and concluded on May 11, 2025. The DERR received no public comments and subsequently accepted the RAP on May 13, 2025. This was the first site visit for remedial action at the site. When the DERR arrived on-site, the contractor had finished monitoring well abandonment, which was overseen by a Geosyntec Environmental Professional. Geosyntec confirmed that all wells were abandoned according to the approved workplan, including MW-6 which could not be found during the site characterization sampling event in 2024. DERR and Geosyntec walked the site in preparation for excavation work scheduled for the following week. A 55-gallon drum is located on the site and is labeled as Investigative Derived Waste (IDW) for Geosyntec. No additional groundwater samples under the scope of the RAP were taken before the monitoring wells were abandoned. PHOTO LOG: Photo 1: Abandoned monitoring well (MW-8). Photo 2: 55-gallon drum on the property identified as IDW. Photo 3: Building foundations will be removed within the scope of the RAP. Photo 4: View of the site looking west.