Loading...
HomeMy WebLinkAboutDERR-2024-005617 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144840 • Salt Lake City, UT 84114-4840 Telephone (801) 536-4100 • Fax (801) 359-8853 • T.D.D. (801) 536-4284 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION Brent H. Everett Director ERRP-115-24 March 28, 2024 Dennis Ostermiller Logan Regional Hospital 500 East 1400 North Logan, Utah 84321 Re: Underground Storage Tanks One-Time Drop Logan Regional Hospital, located at 500 East 1400 North, Logan, Utah Facility Identification No. 0100119 Dear Mr. Ostermiller: According to the provisions of the Utah Underground Storage Tank Act (Act), Utah Code Annotated (UCA), Section 19-6-412, all owners and operators of petroleum underground storage tanks (USTs) must have a certificate of compliance. Any person who delivers or accepts delivery of petroleum to a tank that does not have a certificate of compliance will be subject to a civil penalty of up to $500.00 per occurrence (19-6-416, UCA). The Utah UST rules, Utah Admin. Code (UAC) R311-206-8(e), allow the Division Director to authorize a delivery of petroleum for ballasting tanks at installation or testing tanks prior to issuing a certificate of compliance. The Division of Environmental Response and Remediation (DERR) has received your request to receive a delivery of fuel to fill your tanks in order to test (or set) them. This letter satisfies the requirement for written authorization for a delivery in accordance with UAC R311- 206-8(e). The authorization applies to fuel being delivered by Pilot Thomas Logistics for the period of April 1, 2024 through April 5, 2024 and is NOT a certificate of compliance. In order to obtain a certificate of compliance you must still provide: 1. A properly completed EPA Notification for Underground Storage Tanks. 2. A completed Application for Certificate of Compliance. 3. Payment of all UST Fees and, if applicable Petroleum Storage Tank Fund Fees. Facility ID# 0100119 Page 2 4. Passing results for the following: a. Tank tightness test(s), b. Line tightness test(s), c. Line leak detector test(s), d. Spill bucket tightness test(s), e. Secondary containment tightness test(s), f. Overfill prevention device inspection/test(s), g. Automatic tank gauge test(s). 5. A completed Previous Pollution Incident Form. 6. A completed as-built drawing, including placement of UST(s). 7. A completed Manufacturer’s tank installation checklist. The enclosed packet provides additional information and forms to assist you in providing the required documents. If after the DERR review, the Division Director determines your tanks are in substantial compliance with Federal and State rules and regulations, a certificate of compliance may be issued. If you have any questions, please contact DeAnn Rasmussen, the DERR project manager, at (385) 251-0936. Sincerely, Brent H. Everett, Director Division of Environmental Response and Remediation BHE/DR/ss Enclosure: Certificate of Compliance Packet cc: Jordan Mathis, Health Officer, Bear River Health Department Bob Nielsen, PetroWest Incorporated Jeff Andrews, Logan Regional Hospital UST Correspondence Sign-Off Sheet ERRP# Author Subject File Name on Google Drive Enclosures Attached Specify Enclosure Needed By Special Instructions and email addresses Draft Approval Process Project Manager Section Manager Final Approval Process Section Secretary Author Branch Secretary Administrative Secretary Section Secretary Certified Mail Enclosures Included ccs Mailed Mailed By Scan # in D2 DR DeAnn Rasmussen One time drop 0100119 Yes No Within a Week 03/22/2024 CoC packet 03/22/2024  115-24 03/25/2024 DR 03/26/2024 03/27/2024 03/27/2024