HomeMy WebLinkAboutDDW-2025-004429Utah Department Of Environmental Quality Division Of Drinking Water Sanitary Survey Sanitary Survey General System Information Exception Granted: R309-550-7 | A 3-inch diameter sewer force main will cross above a 6-inch diameter culinary water pipeline. All construction is new and both pipes are HDPE SDR 11. The force main will be encased in a 6-inch diameter PVC pipe. Crossings are perpendicular and the vertical distance between the water and sewer pipes is 4 ft. This is located inside the IPSC power generation site and access is limited. The area of the crossings will likely never need to be dug up in the future, eliminating the potential of accidentally digging into either the sewer or water lines. Site Visit Date Surveyor Name 03/05/2025 Brent Arns INTERMOUNTAIN POWER SERVICE CORP PWS ID: UTAH14050 Rating: Approved 04/09/1996 Active 1 Admin Contact (AC) [ eMail address is REQUIRED ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: DAHL *Last Name: DALTON *Organization: *Address: Redacted *City: DELTA *State: UT *Zip: 84624 *Email: trevor.johnson@ipsc.com *Phone: 435-864-4414 2 Legal Contact (LC) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: *Last Name: *Organization: INTERMTN POWER SERV CORP *Address: 850 W BRUSH WELLMAN Rd *City: DELTA *State: UT *Zip: 84624 *Email: trevor.johnson@ipsc.com *Phone: 435-864-4414 DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 1 of 37 Site Visit Info 3 Owner Contact (OW) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: *Last Name: *Organization: INTERMTN POWER SERV CORP *Address: 850 W BRUSH WELLMAN Rd *City: DELTA *State: UT *Zip: 84624 *Email: trevor.johnson@ipsc.com *Phone: 435-864-4414 4 Direct Operator in Charge (DO) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: TREVOR *Last Name: JOHNSON *Organization: *Address: 850 W BRUSH WELLMAN RD *City: DELTA *State: UT *Zip: 84624 *Email: trevor.johnson@ipsc.com *Phone: 435-864-6489 5 Does the system serve a Residential population?N 6 Does the system serve a Transient population? (A transient population is a rotating population that is served by a water system that does not remain in the jurisdiction of the water system for long periods of time. Examples of a transient population include, but are not limited to, campers at a campground, users of a highway rest stop, skiers at a ski resort, guests at a hotel, or patrons of a restaurant or a shopping center.) N 7 Does the system serve a Non-Transient population? (A non-transient population is a population served by a water system that is the same population being served by the system for at least six months of the year, but is not a resident in the system. Examples of a non-transient population include, but are not limited to, employees of a restaurant, shop, or ski resort; teachers and students at a school, day-care center, or church; doctors, nurses, and other employees at a hospital or healthcare clinic.) Y 7A Population - Non-Transient 557 7B Operating Period (Start Date) - Non-Transient 01/01 7C Operating Period (End Date) - Non-Transient 12/31 8 Population - Wholesale :0 9 Residential Connections:0 10 Commercial Connections:0 11 Industrial Connections:10 12 Agricultural Connections:0 DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 2 of 37 Management and Operations 13 Date of Survey (First Day of Field Work)03/05/2025 14 Date of Survey (Last Day of Field Work) ** this should match the Date of Survey in the header ** 03/05/2025 15 Date final report sent to system (questionnaire, deficiency report and capacity spreadsheet) 03/31/2025 16 Water system representative present during the survey:Yes 17 How much time was spent to prepare survey documents prior to field survey? (Round up to nearest quarter hour) 4 18 How much time was spent to complete the field survey (arrival to completion; include travel time between water system facilities)? (Round up to nearest quarter hour) 4 19 How much time was spent traveling from the office to system and back again at the end of the field survey? (Round up to nearest quarter hour) 2 20 How much time did it take to finish the Survey Report? (Round up to nearest quarter hour) 4 21 Did you survey multiple water systems in one trip? ... if yes, answer the following question(s) N 22 For a community water system with water sources that require power to produce sufficient flow, system is equipped with standby power option. SIG | 25pts | SO | S033 | R309-515-6(2)(a) | Rule requires a community water system without naturally flowing water sources, such as springs or flowing wells, to have one or more of the system's sources equipped for operation during power outages. To ensure continuous service when the primary power has been interrupted, a redundant power supply is required. A redundant power supply may include a transfer switch for auxiliary power such as a generator or a power supply service with coverage from two independent substations. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 23 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through or in process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a different question] SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 24 Are there any individual home booster pumps installed in the distribution system (not for fire suppression)? SIG | 50pts | SM | M008 | R309-550-11(3) | R309-550-11(3) C 25 Does the system haul water?N 26 For a community system serving 100 or more connections, at least 2 water sources are available. SIG | 50pts | SO | TGR7 | R309-515-4(3) | Rule requires Community Water Systems serving more than 100 connections to have a minimum of two sources except where served by a water treatment plant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 3 of 37 Cross Connection and Operator Certification 27 Does system have a consecutive connection to another water system not listed in the SOURCE section of Waterlink Report? If yes, answer the following question(s) N 28 Does the system have a deficiency meeting the required source capacity? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 29 Does the system have a deficiency meeting the required storage capacity DUE SOLELY TO FIRE SUPPRESSION NEEDS? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 30 Does the system have a deficiency meeting the required equalization storage capacity for indoor/outdoor demands (but not because of fire suppression needs)? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 31 Does your water system have an Emergency Response Plan? REC | 0pts | SM | M001 | R309-105-18 | All suppliers are advised to develop contingency plans to cope with possible emergency situations. In many areas of the state the possibility of earthquake damage shall be realistically considered. Y 32 Does your Emergency Response Plan address cybersecurity? (required for systems over 3,300 population) MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. Y 33 Does your water system use any computers, laptops, phones, tablets, or any other computer systems to manage, operate, or maintain the PWS (SCADA or Industrial Control Systems)? This includes any water sources, treatment, distribution or any process related to operation function Y 34 Does your water system use any computer systems in regular business operations such as accounting, billing, payroll, human resources, or management? Y 35 Legally adopted authority statement MIN | 15pts | SM | M003 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes a legally adopted and functional local authority to enforce the program (i.e., ordinance, bylaw, or policy). C 36 Documentation of annual public awareness and/or employee training MIN | 15pts | SM | M004 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes providing public education or awareness material or presentations. C 37 Documentation of personnel trained to manage the program (ALL COMUNITY WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING) MIN | 15pts | SM | M005 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes an operator with adequate training in the area of cross connection control or backflow prevention. C 38 Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps installed within the system) MIN | 15pts | SM | M006 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes written records of cross connection control activities. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 4 of 37 General Maintenance and Environment Distribution 39 Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. C 40 Operator meets required level of certification for water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT ) SIG | 50pts | OC | C001 | R309-105-11, R309-300-5(3) | Rule requires every community and NTNC water system and public water systems that utilize treatment/filtration to have at least one operator certified at the classified grade of the water system. Certification must be appropriate for the type of system operated (treatment and/or distribution). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 41 Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT ) MIN | 0pts | OC | C002 | R309-300-5(14) | Rule requires the operator to be within 1 hour travel time, under normal work and home conditions, of each drinking water system for which he is considered in direct responsible charge. C 42 Are there any visual indications of unsanitary conditions? SIG | 50pts | SM | M017 | R309-200-6, R309-105-18, R309-215-4(3) | R309-200-6 The Secondary Maximum Contaminant Levels for public water systems deals with substances which affect the aesthetic quality of drinking water. They are presented here as recommended limits or ranges and are not grounds for rejection. The taste of water may be unpleasant and the usefulness of the water may be impaired if these standards are significantly exceeded. R309-105-18 The Director or the local health department shall be informed by telephone by a water supplier of any "emergency situation". The term "emergency situation... R309-215-4(3) If the water fails to meet minimum standards, then certain public notification procedures shall be carried out, as outlined in R309-220. Water suppliers shall also keep analytical records in their possession, for a required length of time, as outlined in R309-105-17. C 43 No unprotected connection between the distribution system and a source of contamination. (If there is an unprotected connection, describe the location in detail.) SIG | 50pts | DS | D009 | R309-550-5(11) | R309-550-5(11) C 44 Are air release/vacuum valves in the distribution system? ... if yes, answer the following question(s) N 45 Water system has a program to maintain, operate, or control the use of fire hydrants. REC | 0pts | DS | D012 | N/A | Fire hydrants provide a direct access to the water in the distribution system. In order to protect the quality and integrity of the water, fire hydrant access should be controlled. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 5 of 37 General Disinfection PF005 - RENEWED UNITS 3&4 BOOSTER PUMP - Proposed 46 Blow offs or air release valves are not directly connected to a sanitary sewer line. SIG | 50pts | DS | D013 | R309-550-6(5)(a), R309-550-6(6)(c) and (7)(a) | Rule states blow-offs or air relief valves shall not be connected directly to a sewer. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 47 Blow offs or air release valves do not discharge below flood level in ditches or streams. SIG | 50pts | DS | D016 | R309-550-9(1) and (2), R309-550-13(2) | R309-550-9(1 & 3) C 48 All water mains installed after 1995 that provide fire flow are at least 8 inches in diameter. MIN | 15pts | DS | D019 | R309-550-5(4) & (5) | Rule states that the minimum line size serving a fire hydrant lateral shall be 8-inch diameter unless a hydraulic analysis indicates that required flow and pressures can be maintained by 6-inch lines. C 49 Distribution system capable of providing minimum pressure of 20 psi at all service connections. SIG | 50pts | DS | D003 | R309-105-9, R309-550-5(1) | Rule states the distribution system shall maintain minimum pressures as required by R309-105-9 at all points of connection under all flow conditions. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 50 Was the water system constructed or new portions added after January 1, 2007? ... if yes, answer the following question(s) Y 50A Distribution system capable of maintaining the following pressures at all service connections: (a) 20 psi during fire flow and fire demand during peak day demand; (b) 30 psi during peak instantaneous demand; and (c) 40 psi during peak day demand. SIG | 50pts | DS | D010 | R309-105-9, R309-550-5(1) | Rule states that unless otherwise specifically approved by the Director, public water systems constructed after January 1, 2007, shall be designed and shall meet the following minimum water pressures at points of connection: (a) 20 psi during conditions of fire flow and fire demand experienced during peak day demand; (b) 30 psi during peak instantaneous demand; and (c) 40 psi during peak day demand. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 51 Water system follows AWWA disinfection procedures for new, repaired, or seasonal water mains and tanks. SIG | 25pts | MR | D018 | R309-550-8(10) | All new and repaired water mains and appurtenances shall be disinfected in accordance with AWWA Standard C651. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 52 How often do you periodically disinfect any or all parts of your water system (i.e. batch disinfection) other than for repairs or maintenance? SIG | 50pts | SM | G006 | R309-105-6(1)(a), R309-500-6 | R309-105-6(1) Approval of Engineering Plans and Specifications R309-500-6 Plan Approval Procedure. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 6 of 37 ST005 - RENEWED UNITS 3&4 STORAGE - Proposed Exception Granted: R309-545-14 | The basis for your request for an exception to R309-545-14, Access Openings, is a small, prefabricated storage tank will be used for the that for the potable water system at the renewed units 3 & 4. This tank will only hold 14,440 gallons of water. The tank comes with a vent at the top and an access opening at the base of the tank, above the outlet to the distribution system, that can be used to clean out the tank when it is drained. The tank will be NSF/ANSI 61 certified. However, to retrofit the tank, with a hatch that meets the rules, would be difficult given the small size of the tank. The retrofit could also compromise the integrity of the storage tank. You propose that the existing access at the base of the tank will meet the intent of R309-545-14. TP005 - RENEWED UNITS 3& 4 ARSENIC TREATMENT - Proposed WS004 - WELL #3 WS004 - Inactive (AB - ABANDONED) 54 Is this facility in operation without an Operating Permit? SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 54A When is the anticipated date to request an Operating Permit? Explain in comments...Upon Completion of Project 55 Is this facility in operation without an Operating Permit? SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 55A When is the anticipated date to request an Operating Permit? Explain in comments...Upon Completion of Project 56 Is this facility in operation without an Operating Permit? SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 56A When is the anticipated date to request an Operating Permit? Explain in comments...Upon Completion of Project 53 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. Y DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 7 of 37 WS001 - WELL #4 WS001 - Active 53A Is the facility incapable of allowing water or contamination to enter the drinking water system? Yes(compliant) No(complete full question set for facility type and notify DDW) SIG | 100pts | SM | A100 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. Y 53B Is the facility physically disconnected from supplying water to the distribution system? Guidance: Is the equipment, pipe, etc, physically removed, disconnected. Yes(compliant) No(complete full question set for facility type and notify DDW) SIG | 50pts | SM | A075 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. Y 57 Is this facility Active or Inactive?A 58 Operating Period (Start Date)01/01 59 Operating Period (Ending Date)12/31 60 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 61 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 62 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 63 Is the well casing vented? ... if yes, answer the following question(s)N 64 Does the well have a pump to waste line? ... if yes, answer the following question(s)N DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 8 of 37 65 Water level is measured and recorded periodically MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 66 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 67 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 68 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 69 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 70 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 71 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 72 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 73 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 9 of 37 WS002 - WELL #1 WS002 - Active 74 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 75 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) N 76 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 77 Does well require oil-lubrication?N 78 Is this facility Active or Inactive?A 79 Operating Period (Start Date)01/01 80 Operating Period (Ending Date)12/31 81 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 82 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 83 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 84 Is the well casing vented? ... if yes, answer the following question(s)N 85 Does the well have a pump to waste line? ... if yes, answer the following question(s)N DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 10 of 37 86 Water level is measured and recorded periodically MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 87 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 88 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 89 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 90 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 91 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 92 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 93 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 94 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 11 of 37 WS003 - WELL #2 WS003 - Active 95 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 96 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) N 97 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 98 Does well require oil-lubrication?N 99 Is this facility Active or Inactive?A 100 Operating Period (Start Date)01/01 101 Operating Period (Ending Date)12/31 102 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 103 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 104 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 105 Is the well casing vented? ... if yes, answer the following question(s)N 106 Does the well have a pump to waste line? ... if yes, answer the following question(s)N DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 12 of 37 107 Water level is measured and recorded periodically MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 108 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 109 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 110 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 111 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 112 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 113 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 114 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 115 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 13 of 37 WS005 - WELL #3 WS004 REPL-1 - Active 116 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 117 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) N 118 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 119 Does well require oil-lubrication?N 120 Is this facility Active or Inactive?A 121 Operating Period (Start Date)01/01 122 Operating Period (Ending Date)12/31 123 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 124 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 125 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 126 Is the well casing vented? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 14 of 37 126A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 126B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 126C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 127 Does the well have a pump to waste line? ... if yes, answer the following question(s)N 128 Water level is measured and recorded periodically MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 129 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 130 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 131 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 132 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 15 of 37 ST001 - MAN CAMP TANK - Active 133 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 134 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 135 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 136 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 137 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 138 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) N 139 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 140 Does well require oil-lubrication?Y 140A Well shaft lubricants are food grade mineral oil? SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 141 Is this facility Active or Inactive?A DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 16 of 37 142 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 180000 143 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 144 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 145 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 146 Are air vents present? ... if yes, answer the following question(s)Y 146A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 146B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 146C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 146D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 17 of 37 147 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 147A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 147B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 147C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 148 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 149 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 150 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 151 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 152 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 18 of 37 ST002 - SERVICE AND FIRE WATER 1A TANK - Active 153 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 153A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 153B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 153C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 154 Are the drain line and overflow combined?Y 155 Is this facility Active or Inactive?A 156 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 500000 157 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 158 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 19 of 37 159 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 160 Are air vents present? ... if yes, answer the following question(s)Y 160A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 160B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 160C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 160D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 161 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 161A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 161B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 20 of 37 161C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 162 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 163 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 164 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 165 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 166 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 167 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 167A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 167B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 21 of 37 ST003 - SERVICE AND FIREWATER 1B - Active 167C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 168 Are the drain line and overflow combined?N 168A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 169 Is this facility Active or Inactive?A 170 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 500000 171 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 172 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 173 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 174 Are air vents present? ... if yes, answer the following question(s)Y 174A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 22 of 37 174B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 174C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 174D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 175 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 175A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 175B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 175C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 176 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 23 of 37 177 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 178 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 179 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 180 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 181 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 181A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 181B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 181C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 182 Are the drain line and overflow combined?N DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 24 of 37 PF001 - MAN CAMP BOOSTER -- Pump Stations - Active 182A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 183 Is this facility Active or Inactive?A 184 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 185 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Centrifugal 186 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 186A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 187 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 188 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 25 of 37 PF002 - TREATMENT PLANT BOOSTER -- Pump Stations - Active 189 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 190 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) N 191 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 192 Is this facility Active or Inactive?A 193 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 194 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Centrifugal 195 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 195A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 196 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 197 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 26 of 37 TP003 - ARSENIC WATER TREATMENT PLANT -- Treatment General - Active 198 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 199 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) N 200 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 201 Is this facility Active or Inactive?A 202 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 203 Operating Period (Start Date)01/01 204 Operating Period (Ending Date)12/31 205 What is the objective of the treatment process and how do you know it is working? (e.g., surface water treatment, disinfection, arsenic removal, TDS removal etc.) Arsenic Removal 206 Walk me through the different process steps of your treatment plant. What is the purpose of each step? Show me how you determine you are meeting your Treatment Requirements. Compliant 207 What Chemicals are used? Why?None 208 How is the chemical dose adjusted with flow and water quality? Prompts: What flow rate is used for the adjustment (influent, effluent, CFE)? What water quality parameters would make you change dose rate? Flow Rate 209 Does influent flow rate vary?Y 209A If yes, why does influent flow rate vary?Well Pump Rates 209B If yes, does chemical dose rate adjust to remain compliant at different flow conditions?Yes 210 Process control testing is consistent with the specific treatment process MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 211 There is a means to accurately measure the quantities of chemicals used. SIG | 25pts | TR | TD99 | R309-525-11(7)(d)(iv) | Provisions shall be made for measuring the quantities of chemicals used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 27 of 37 212 Treatment plant properly secured to protect the quality of the treated water, R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 213 Are liquid chemicals used? ... if yes, answer the following question(s)N 214 Treatment chemicals meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 215 Are all chemical feeders properly verified for accuracy? SIG | 25pts | TR | TG21 | R309-525-11(7)(a)(i) | Feeders shall supply, at all times, the necessary amounts of chemicals at an accurately controlled rate, throughout the anticipated range of feed. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 216 Spare parts are available for all chemical feeders MIN | 15pts | TR | TX09 | R309-525-11(7)(b)(i) and (ii) | R308-525-11(8)(b)(i) states that a means consistent with the nature of the chemical solution shall be provided in a solution tank to maintain a uniform strength of solution. Continuous agitation shall be provided to maintain slurries in suspension. 2 dem C 217 Incompatible chemicals stored separately SIG | 25pts | TR | TG19 | R309-525-11(7)(a)(iv) | Rule prohibits chemicals that are incompatible from being fed, stored, or handled together. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 218 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 219 Raw water compliance samples are collected before any treatment. R309-215-4(4) SIG | 25pts | TR | T006 | R309-525-15(10)(a)(i) | R309-525-15(10)(a)(i) Y 219A If yes, was location shown?Yes 220 Where are finished water quality monitoring samples collected?End of train 221 Does water system have a DEQ/DWQ (UPDES permit) discharge permit for the proper disposal of treatment plant waste to land or water? MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6 C 222 Which parameters are watched when running treatment plant?Turbity, Headloss 223 What type of alarm system is used?Scada DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 28 of 37 TPPOU - POU DEVICE ARSENIC REMOVAL -- Treatment General - Active 224 Does treatment plant have a SCADA system?Y 224A Can operators respond to all alarms in a normal day, or do they have to silence legitimate alarms? Yes 224B How are alarm set points adjusted and how are changes recorded?Hand 225 Proper lab equipment on site to support required operations & maintenance of the plant? SIG | 25pts | TR | T019 | R309-525-17(1) | Sufficient laboratory equipment shall be provided to assure proper operation and monitoring of the water plant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 226 Is this facility Active or Inactive?A 227 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 228 Operating Period (Start Date)01/01 229 Operating Period (Ending Date)12/31 230 What is the objective of the treatment process and how do you know it is working? (e.g., surface water treatment, disinfection, arsenic removal, TDS removal etc.) Arsenic Removal 231 Walk me through the different process steps of your treatment plant. What is the purpose of each step? Show me how you determine you are meeting your Treatment Requirements. Compliant 232 What Chemicals are used? Why?None 233 How is the chemical dose adjusted with flow and water quality? Prompts: What flow rate is used for the adjustment (influent, effluent, CFE)? What water quality parameters would make you change dose rate? Flow Rate 234 Does influent flow rate vary?N 235 Process control testing is consistent with the specific treatment process MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 236 There is a means to accurately measure the quantities of chemicals used. SIG | 25pts | TR | TD99 | R309-525-11(7)(d)(iv) | Provisions shall be made for measuring the quantities of chemicals used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 29 of 37 237 Treatment plant properly secured to protect the quality of the treated water, R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 238 Are liquid chemicals used? ... if yes, answer the following question(s)N 239 Treatment chemicals meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 240 Are all chemical feeders properly verified for accuracy? SIG | 25pts | TR | TG21 | R309-525-11(7)(a)(i) | Feeders shall supply, at all times, the necessary amounts of chemicals at an accurately controlled rate, throughout the anticipated range of feed. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 241 Spare parts are available for all chemical feeders MIN | 15pts | TR | TX09 | R309-525-11(7)(b)(i) and (ii) | R308-525-11(8)(b)(i) states that a means consistent with the nature of the chemical solution shall be provided in a solution tank to maintain a uniform strength of solution. Continuous agitation shall be provided to maintain slurries in suspension. 2 dem C 242 Incompatible chemicals stored separately SIG | 25pts | TR | TG19 | R309-525-11(7)(a)(iv) | Rule prohibits chemicals that are incompatible from being fed, stored, or handled together. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 243 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 244 Raw water compliance samples are collected before any treatment. R309-215-4(4) SIG | 25pts | TR | T006 | R309-525-15(10)(a)(i) | R309-525-15(10)(a)(i) Y 244A If yes, was location shown?Yes 245 Where are finished water quality monitoring samples collected?End of Train 246 Does water system have a DEQ/DWQ (UPDES permit) discharge permit for the proper disposal of treatment plant waste to land or water? MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6 C 247 Which parameters are watched when running treatment plant?Headloss 248 What type of alarm system is used?Scada DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 30 of 37 TP001 - MAN CAMP HYPOCHLORINATOR -- Treatment - Chlorination General - Active 249 Does treatment plant have a SCADA system?Y 249A Can operators respond to all alarms in a normal day, or do they have to silence legitimate alarms? Yes 249B How are alarm set points adjusted and how are changes recorded?Hand 250 Proper lab equipment on site to support required operations & maintenance of the plant? SIG | 25pts | TR | T019 | R309-525-17(1) | Sufficient laboratory equipment shall be provided to assure proper operation and monitoring of the water plant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 251 Is this facility Active or Inactive?A 252 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 253 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 254 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 255 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 256 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 257 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 31 of 37 258 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 259 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 260 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 260A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent Flow 261 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 262 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 263 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 263A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 263B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 263C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 263D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 263E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 264 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 32 of 37 TP002 - SERVICE WATER HYPOCHLORINATOR -- Treatment - Chlorination General - Active 265 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 266 Is this facility Active or Inactive?A 267 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 268 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 269 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 270 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 271 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 272 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 273 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 33 of 37 TP001 - MAN CAMP HYPOCHLORINATOR -- Liquid Hypochlorination - Active 274 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 275 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 275A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent Flow 276 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 277 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 278 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 278A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 278B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 278C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 278D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 278E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 279 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 280 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 34 of 37 TP002 - SERVICE WATER HYPOCHLORINATOR -- Liquid Hypochlorination - Active 281 Is this facility Active or Inactive?A 282 Operational means provided to avoid injection of significantly decayed hypochlorite, such as solution strength testing and delivery records MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C 283 Solution tank is covered to minimize corrosive vapors MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept covered. C 284 Where concentrated hypochlorite solutions (5% or greater) are handled in containers LARGER than 55 gallons: emergency eyewash station and a safety shower present SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 285 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or LESS: some method of emergency eyewash provided (a full eyewash station and shower is not required) SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 286 Hypochlorite solution storage area is protected from excessive heat and direct sunlight MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall be designed to minimize the decay in strength of concentrated hypochlorite solutions from excessive heat or direct sunlight. C 287 Records are kept to minimize the use of decayed hypochlorite solution MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C 288 There are adequate spill containment provisions for acid and caustic liquids. MIN | 15pts | TR | TG59 | R309-525-11(6)(a)(iv)(B), R309-525-11(8)(b)(viii) | Rule requires liquid chemical storage tanks to have an overflow and receiving basin or drain capable of receiving accidental spills or overflows, and meeting all the requirements of R309-525-23. C 289 Is this facility Active or Inactive?A 290 Operational means provided to avoid injection of significantly decayed hypochlorite, such as solution strength testing and delivery records MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 35 of 37 TP003 - ARSENIC WATER TREATMENT PLANT -- Ion Exchange 291 Solution tank is covered to minimize corrosive vapors MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept covered. C 292 Where concentrated hypochlorite solutions (5% or greater) are handled in containers LARGER than 55 gallons: emergency eyewash station and a safety shower present SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 293 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or LESS: some method of emergency eyewash provided (a full eyewash station and shower is not required) SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 294 Hypochlorite solution storage area is protected from excessive heat and direct sunlight MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall be designed to minimize the decay in strength of concentrated hypochlorite solutions from excessive heat or direct sunlight. C 295 Records are kept to minimize the use of decayed hypochlorite solution MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C 296 There are adequate spill containment provisions for acid and caustic liquids. MIN | 15pts | TR | TG59 | R309-525-11(6)(a)(iv)(B), R309-525-11(8)(b)(viii) | Rule requires liquid chemical storage tanks to have an overflow and receiving basin or drain capable of receiving accidental spills or overflows, and meeting all the requirements of R309-525-23. C 297 Salt used for the brine solution is certified to meet the ANSI/NSF 60 standard SIG | 25pts | TR | T080 | R309-525-11(5), R309-525-25(1), R309-535-11(5)(d) | Rule requires that all chemicals added to water being treated for use in a public water system for human consumption comply with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 298 Make-up water inlet is protected from back-siphonage SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 36 of 37 TPPOU - POU DEVICE ARSENIC REMOVAL -- Reverse Osmosis 299 Overflows are protected with corrosion resistant screens and terminate with a down turned discharge with at least 6 inches of clearance from the floor SIG | 50pts | TR | TX08 | R309-525-11(8)(b)(v), R309-525-11(9)(b)(iii) | R309-525- 11(9)(b) For an ion exchange facility where the overflow discharge piping is not protected with a corrosion resistant screen or is not terminated with a downturned bend with adequate clearance to prevent cross connection 10 points shall be assess C 300 There is a brine measuring tank or a means of metering proper dilution MIN | 15pts | TR | TX09 | R309-525-11(7)(b)(i) and (ii) | R308-525-11(8)(b)(i) states that a means consistent with the nature of the chemical solution shall be provided in a solution tank to maintain a uniform strength of solution. Continuous agitation shall be provided to maintain slurries in suspension. 2 dem C 301 Does media type require regeneration or periodic replacement?N 302 Operational differential pressure is monitored and recorded? SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. At a minimum, this shall include turbidimeters. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 303 What is the treatment objective?Arsenic Removal 304 Is the treatment process adequate and operating such that it is meeting the treatment objective? Y 305 Pressure gauges on the upstream and downstream side of the filter? R309-535- 8(2)(b)(ii) MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6 C 306 Conductivity meter present at the site? R309-535-8(2)(b)(ii) MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6 Y 307 Does the system conduct direct integrity testing of the membranes? (If yes, list frequency and method used.) NA (Notes: Quarterly Replacement) 308 Does the system conduct continuous indirect integrity testing of the membranes? (If yes, list frequency and method used.) NA (Notes: Quarterly Replacement) 309 Where does rejected water go?Head of Train 310 Does system use a routine cleaning process? R309-535-8(2)(b)(iv) MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6 C 311 On what basis is chemical cleaning initiated? (Describe.)Quarterly Replacement 312 Membrane system isolated from potable water system during chemical cleaning to prevent cross-connection issues? SIG | 50pts | TR | TG35 | R309-520-7(1)(h), R309-525-11(9)(a) and (b) | Pre- and post-chlorination systems must be independent to prevent possible siphoning of partially treated water into the clear well. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 313 If the system recycles filter reject water, is it being operated per DDW plan approval specifications? (If no, describe in notes.) No Recycle water DEQ | Drinking Water Run Date: 03/31/2025 11:13:53 | Rating: Approved UTAH14050 INTERMOUNTAIN POWER SERVICE CORP page 37 of 37