HomeMy WebLinkAboutDAQ-2025-002362Chevronv Troy Tortorach
Refinery Manager
Chevron Products Company
685 South Chevron Way
North Salt Lake, UT 84054
Tel (801) 539-7200
Fax (801) 539-7130
January 14,2025
CERTIFIED MAIL RETURN RECEIPT NO. 70I8 0680 OOOI 4890 0444
Mr. Bryce Bird
Director. Division of Air Quality
Utah Department of Environmental Quality
P.O. Box 144820
195 North 1950 West
Salt Lake city, uT 84114-4820
I
I-]IVISION OF AIR QL,lAI ITY
Attention:
UACR 4th Quarter 2024INSPS Subpart GGGa 2nd Semiannual2024 VOC Monitoring Report
Chevron Products Company, Salt Lake Cify, UT Refinery
Mr. Bird:
As required by R307-326-9(7) and 40 CFR 60.592a(e), Chevron Salt Lake Refinery (Chevron) is submitting
the 4'h Quarter 2024 VOC monitoring and leak data for UACR-regulated components, and 2'd Semiannual
2024 monitoring and leak data for NSPS-regulated components.
In compliance with the Consent Decree (C 03-04650 CRB), UACR-regulated valves in light-liquid and vapor
service are now being inspected quarterly (with the exception of valves in process units that are currently on
altemative skip monitoring rules as allowed under Appendix K of the consent decree).
Chevron certifies that all monitoring required by Utah Administrative Code Title R307-326-9 has been
conducted during the calendar quarter at the Salt Lake Refinery.
The remainder of this report provides additional information required by R307-326-9(7) and 40 CFR 60.487a.
Because the previous UACR quarterly report was submitted for period ending September 30,2024, this report
contains only 4'h Quarter 2024 UACR monitoring data. Additionally, this report contains monitoring data for
N SPS components for the period of July 1,2024 to Decembe r 3 1, 2024.
Please contact Tony Pollock at (801) 539-7162 for additional information regarding this report.
Sincerely,
--7,-)z'//' ( -/ *a ' ).1 l*?n'7 7.4""i'l^.
Troy Tortorich
REVIEWEDInitials:Date: May 1, 2025Complaince Status:OKFile # 10119 (B2)
Mr. Bryce Bird
Department of Environmental Quality
January 14,2025
Page 2 of 9
Table I - UACR Component Monitoring and Leak Data
4tr Quarter 2024 UAcR-regulated Vapor Components Inspection Summary:
Total VOC Components Tested:
VOC Components found leaking (includes S/D components):
Percent of VOC Components Found Leaking:
4tr Quarter 2024 UAcR-regulated Liquid Components Inspection Summata:
Total VOC Components Tested:
VOC Components found leaking (includes S/D components):
Percent of VOC Components Found Leaking:
4fr Quarter 2024 UACR-regulated Process Drains Inspection Summaly:
Total Process Drains Tested:
Process Drains found leaking (10,000 ppm leak definition):
Percent ofProcess Drains Found Leaking:
6692
2
0.03%
6385
l5
0.23%
0
0
0.00%
REVIEWEDInitials:Date: May 1, 2025Compliance Status:OKFile #: 10119 (B2)
Mr. Bryce Bird
Department of Environmental Quality
January 14,2025
Page 3 of9
Table 2 - Leaking Component Repair Activity
Number of Components on Shutdown Listing at Beginning-of-Period:
Number of Components added to Shutdown Listing during period (Note l):
Process Unit &
ID
Component Type VOC State Date Leak
Discovered
P37010 Pump Light Liquid 10fit2024
Note l: Includes components placed on Delay-of-Repair Listing as allowed
under rules specified in 10 CFR 60.182-9o.
Number of Components on Shutdown Listing repaired during period: I
Process Unit &
ID
Component Type VOC State Date Leak
Renaired
P37010 Pumn Lisht Liouid 1U14t2024
Number of Components on Shutdown Listing at End-of-Period:
Process Unit &
ID
Component Type VOC State Date Leak
Discovered
None to report
Number of leaks not repaired within l5 days as required by R307-326-9 (2) after
detection: R307-326-9 (7).
Process Unit & ID Date
Detected
Component
Tvoe
Details of Leak
None to Report
Process Unit &
ID
Component Type VOC State Date Leak
Renaired
None to reDorl
Mr. Bryce Bird
Department of Environmental Quality
January 14,2025
Page 4 of9
The remainder of this report is data for refinery components subject to 40 CFR 60 Subpart GGGa
(NSPS), and provides information required by 40 CFR 60.592a(e):
Number of Subpart GGGa Leakins Valves: 40 CFR 60.487a(cX2xi) (500 ppm leak definition)
Process Unit Julv Aueust September October November December
Alkv I 4 I 0 l0 4
Amine 0 0 0 0 0 0
Amine II 0 0 0 0 0 0
Boiler 0 0 0 0 0 0
Coker 0 0 0 0 0 0
Crude 0 0 0 0 0 0
FCC 0 0 0 0 0 0
FVR 0 0 0 0 0 0
HDN 0 0 0 0 0 0
HDS 4 0 0 0 0 0
Isom 0 0 3 0 0 0
Jet Treater 0 0 0 0 0 0
LPG 0 I 0 0 2 0
Reformer 2 0 0 2 0 0
Sulfur 0 0 0 0 0 0
Tankfield I 0 0 0 0
TCLR 0 0 0 0 0 0
VGO 0 0 0 0 0 0
Mr. Bryce Bird
Department of Environmental Quality
January 14,2025
Page 5 of9
Number of Subnart GGGa Leakins Pumos: 40 CFR 60.487a(c)(2)(iii)
Process Unit Julv Ausust September October November December
Alkv 0 0 1 0 0 2
Amine 0 0 0 0 0 0
Amine II 0 0 0 0 0 0
Boiler 0 0 0 0 0 0
Coker 0 0 0 0 0 0
Crude I 0 0 1
FCC 0 0 I 1 0
FVR 0 0 0 0 0 0
HDN 0 0 0 0 0 0
HDS 0 0 0 0 0 0
Isom 0 1 0 2 0 0
Jet Treater 0 0 0 0 0 0
LPG 0 0 0 0 1 0
Reformer 2 I 0 I 0 I
Sulfur 0 0 0 0 0 0
Tankfield 0 0 2 0 0
TCLR 0 0 0 0 0 0
VGO 0 0 0 0 0 0
Mr. Bryce Bird
Department of Environmental Quality
January 14,2025
Page 6 of9
Number of Subnart GGGa Leakins ComDressors: 40 CFR 60.487a(cX2Xv)
Process Unit Julv Aucust Seotember October November December
Alkv 0 0 0 0 0 0
Am ne 0 0 0 0 0 0
Am ne II 0 0 0 0 0 0
Boiler 0 0 0 0 0 0
Coker 0 0 0 0 0 0
Crude 0 0 0 0 0 0
FCC 0 2 0 0 0 0
FVR 0 0 0 0 0 0
HDN 0 0 0 0 0 0
HDS 0 0 0 0 0 0
Isom 0 0 0 0 0 0
Jet Treater 0 0 0 0 0 0
LPG 0 0 0 0 0 0
Reformer 0 0 0 0 0 0
Sulfur 0 0 0 0 0 0
Tankfield 0 0 0 0 0 0
TCLR 0 0 0 0 0 0
VGO 0 0 0 0 0 0
Mr. Bryce Bird
Department of Environmental Quality
January 14,2025
PageT of9
Number of Suboart GGGa Leakins Connectors: 40 CFR 60.487a(c)(2Xvii)
Process Unit Julv Aucust Seotember October November December
Alkv 0 0 0 0 0 0
Amine 0 0 0 0 0 0
Amine ll 0 0 0 0 0 0
Boiler 0 0 0 0 0 0
Coker 0 0 0 0 0 0
Crude 0 0 0 0 0 0
FCC 0 0 0 0 0 0
FVR 0 0 0 0 0 0
HDN 0 0 0 0 0 0
HDS 0 0 0 0 0 0
Isom 0 0 0 0 0 0
Jet Treater 0 0 0 0 0 0
LPG 0 0 0 0 0 0
Reformer 0 0 0 0 0 0
Sulfur 0 0 0 0 0 0
Tankfield 0 0 0 I 0 0
TCLR 0 0 0 0 0 0
VGO 0 0 0 0 0 0
Mr. Bryce Bird
Department of Environmental Qualify
January 14,2025
Page 8 of9
Number of Subpart GGGa Leaking Valves, Pumps, Compressoru, and Connectors not repaired
as required by $60.482-7a (d)(1), $60.482-2a (c)(l), $60.482-3a (gXl), and $60.482-lla(d) after
detection: 40 CFR 60.487a (cX2Xii). (iv) (vi) and (viii).
Process Unit Julv I Aueust September October November December
Alkv 0 0 0 0 0 0
Amine 0 0 0 0 0 0
Amine Il 0 0 0 0 0 0
Boiler 0 0 0 0 0 0
Coker 0 0 0 0 0 0
Crude 0 0 0 0 0 0
FCC 0 0 0 0 0 0
FVR 0 0 0 0 0 0
HDN 0 0 0 0 0 0
HDS 0 0 0 0 0 0
Isom 0 0 0 0 0 0
Jet Treater 0 0 0 0 0 0
LPG 0 0 0 0 0 0
Reformer 0 0 0 0 0 0
Sulfur 0 0 0 0 0 0
Tankfield 0 0 0 0 0 0
TCLR 0 0 0 0 0 0
VGO 0 0 0 0 0 0
Subpart GGGa components on the Delay of Repair Listing (during the reporting period; includes
components that have been repaired and removed from the Delay-of-Repair Listing): 40 CFR
60.487a(c)(2)(xi)
Process
Unit
TagNo.Description Type Date of
Origin
Reason(s) Delayed
Alky P36097B P-36097B-lsoButane
flush pump/west of C-
36030
Pump 0611012024 Equipment is isolated from
the process and does not
remain in VOC service.
Alky P3600 l P-360001 Alkaline
Flush Pump
Pump 06fi012024 Equipment is isolated from
the process and does not
remain in VOC service.
ISOM P370 r 0 P37010 D-lsobutanizer
reflux Pump
Pump 10t01t2024 Equipment is isolated from
the process and does not
remain in VOC service.
ISOM P370l2A P-37012A RX feed
Pump
Pump t010312024 Equipment is isolated from
the process and does not
remain in VOC service.
Mr. Bryce Bird
Department of Environmental Quality
January 14,2025
Page 9 of9
Drto of orocest unit shutdowns whlch occurrsd withln the rcoordnr Derlod: 40 CfR 60.4t7{cX3)
Unit Julv Ausust September October November December
Alkv 9t29-9/30 l0/l-10/31 t Ut-lt/12
Amine
Amine II
Boiler
Coker tt /21-t I130 t2fi-12/29
Crude
FCC
FVR
HDN tv6-
lt l8,l I125-
I l/30
12fi
HDS 09t23-09/25
Isom 9t7-9123 t012-10131 tl ll-lL lt3,
tUtT-1U26
Jet Treater
LPG
Reformer n/17-tt/24
Sulfur
Tankfield
TCLR
VGO 09/23-09125 tt/6-tl/8
REVIEWEDInitials:Date: May 1, 2025Compliance Status:OKFile #: 10119 (B2)