HomeMy WebLinkAboutDAQ-2025-002362Chevronv Troy Tortorach Refinery Manager Chevron Products Company 685 South Chevron Way North Salt Lake, UT 84054 Tel (801) 539-7200 Fax (801) 539-7130 January 14,2025 CERTIFIED MAIL RETURN RECEIPT NO. 70I8 0680 OOOI 4890 0444 Mr. Bryce Bird Director. Division of Air Quality Utah Department of Environmental Quality P.O. Box 144820 195 North 1950 West Salt Lake city, uT 84114-4820 I I-]IVISION OF AIR QL,lAI ITY Attention: UACR 4th Quarter 2024INSPS Subpart GGGa 2nd Semiannual2024 VOC Monitoring Report Chevron Products Company, Salt Lake Cify, UT Refinery Mr. Bird: As required by R307-326-9(7) and 40 CFR 60.592a(e), Chevron Salt Lake Refinery (Chevron) is submitting the 4'h Quarter 2024 VOC monitoring and leak data for UACR-regulated components, and 2'd Semiannual 2024 monitoring and leak data for NSPS-regulated components. In compliance with the Consent Decree (C 03-04650 CRB), UACR-regulated valves in light-liquid and vapor service are now being inspected quarterly (with the exception of valves in process units that are currently on altemative skip monitoring rules as allowed under Appendix K of the consent decree). Chevron certifies that all monitoring required by Utah Administrative Code Title R307-326-9 has been conducted during the calendar quarter at the Salt Lake Refinery. The remainder of this report provides additional information required by R307-326-9(7) and 40 CFR 60.487a. Because the previous UACR quarterly report was submitted for period ending September 30,2024, this report contains only 4'h Quarter 2024 UACR monitoring data. Additionally, this report contains monitoring data for N SPS components for the period of July 1,2024 to Decembe r 3 1, 2024. Please contact Tony Pollock at (801) 539-7162 for additional information regarding this report. Sincerely, --7,-)z'//' ( -/ *a ' ).1 l*?n'7 7.4""i'l^. Troy Tortorich REVIEWEDInitials:Date: May 1, 2025Complaince Status:OKFile # 10119 (B2) Mr. Bryce Bird Department of Environmental Quality January 14,2025 Page 2 of 9 Table I - UACR Component Monitoring and Leak Data 4tr Quarter 2024 UAcR-regulated Vapor Components Inspection Summary: Total VOC Components Tested: VOC Components found leaking (includes S/D components): Percent of VOC Components Found Leaking: 4tr Quarter 2024 UAcR-regulated Liquid Components Inspection Summata: Total VOC Components Tested: VOC Components found leaking (includes S/D components): Percent of VOC Components Found Leaking: 4fr Quarter 2024 UACR-regulated Process Drains Inspection Summaly: Total Process Drains Tested: Process Drains found leaking (10,000 ppm leak definition): Percent ofProcess Drains Found Leaking: 6692 2 0.03% 6385 l5 0.23% 0 0 0.00% REVIEWEDInitials:Date: May 1, 2025Compliance Status:OKFile #: 10119 (B2) Mr. Bryce Bird Department of Environmental Quality January 14,2025 Page 3 of9 Table 2 - Leaking Component Repair Activity Number of Components on Shutdown Listing at Beginning-of-Period: Number of Components added to Shutdown Listing during period (Note l): Process Unit & ID Component Type VOC State Date Leak Discovered P37010 Pump Light Liquid 10fit2024 Note l: Includes components placed on Delay-of-Repair Listing as allowed under rules specified in 10 CFR 60.182-9o. Number of Components on Shutdown Listing repaired during period: I Process Unit & ID Component Type VOC State Date Leak Renaired P37010 Pumn Lisht Liouid 1U14t2024 Number of Components on Shutdown Listing at End-of-Period: Process Unit & ID Component Type VOC State Date Leak Discovered None to report Number of leaks not repaired within l5 days as required by R307-326-9 (2) after detection: R307-326-9 (7). Process Unit & ID Date Detected Component Tvoe Details of Leak None to Report Process Unit & ID Component Type VOC State Date Leak Renaired None to reDorl Mr. Bryce Bird Department of Environmental Quality January 14,2025 Page 4 of9 The remainder of this report is data for refinery components subject to 40 CFR 60 Subpart GGGa (NSPS), and provides information required by 40 CFR 60.592a(e): Number of Subpart GGGa Leakins Valves: 40 CFR 60.487a(cX2xi) (500 ppm leak definition) Process Unit Julv Aueust September October November December Alkv I 4 I 0 l0 4 Amine 0 0 0 0 0 0 Amine II 0 0 0 0 0 0 Boiler 0 0 0 0 0 0 Coker 0 0 0 0 0 0 Crude 0 0 0 0 0 0 FCC 0 0 0 0 0 0 FVR 0 0 0 0 0 0 HDN 0 0 0 0 0 0 HDS 4 0 0 0 0 0 Isom 0 0 3 0 0 0 Jet Treater 0 0 0 0 0 0 LPG 0 I 0 0 2 0 Reformer 2 0 0 2 0 0 Sulfur 0 0 0 0 0 0 Tankfield I 0 0 0 0 TCLR 0 0 0 0 0 0 VGO 0 0 0 0 0 0 Mr. Bryce Bird Department of Environmental Quality January 14,2025 Page 5 of9 Number of Subnart GGGa Leakins Pumos: 40 CFR 60.487a(c)(2)(iii) Process Unit Julv Ausust September October November December Alkv 0 0 1 0 0 2 Amine 0 0 0 0 0 0 Amine II 0 0 0 0 0 0 Boiler 0 0 0 0 0 0 Coker 0 0 0 0 0 0 Crude I 0 0 1 FCC 0 0 I 1 0 FVR 0 0 0 0 0 0 HDN 0 0 0 0 0 0 HDS 0 0 0 0 0 0 Isom 0 1 0 2 0 0 Jet Treater 0 0 0 0 0 0 LPG 0 0 0 0 1 0 Reformer 2 I 0 I 0 I Sulfur 0 0 0 0 0 0 Tankfield 0 0 2 0 0 TCLR 0 0 0 0 0 0 VGO 0 0 0 0 0 0 Mr. Bryce Bird Department of Environmental Quality January 14,2025 Page 6 of9 Number of Subnart GGGa Leakins ComDressors: 40 CFR 60.487a(cX2Xv) Process Unit Julv Aucust Seotember October November December Alkv 0 0 0 0 0 0 Am ne 0 0 0 0 0 0 Am ne II 0 0 0 0 0 0 Boiler 0 0 0 0 0 0 Coker 0 0 0 0 0 0 Crude 0 0 0 0 0 0 FCC 0 2 0 0 0 0 FVR 0 0 0 0 0 0 HDN 0 0 0 0 0 0 HDS 0 0 0 0 0 0 Isom 0 0 0 0 0 0 Jet Treater 0 0 0 0 0 0 LPG 0 0 0 0 0 0 Reformer 0 0 0 0 0 0 Sulfur 0 0 0 0 0 0 Tankfield 0 0 0 0 0 0 TCLR 0 0 0 0 0 0 VGO 0 0 0 0 0 0 Mr. Bryce Bird Department of Environmental Quality January 14,2025 PageT of9 Number of Suboart GGGa Leakins Connectors: 40 CFR 60.487a(c)(2Xvii) Process Unit Julv Aucust Seotember October November December Alkv 0 0 0 0 0 0 Amine 0 0 0 0 0 0 Amine ll 0 0 0 0 0 0 Boiler 0 0 0 0 0 0 Coker 0 0 0 0 0 0 Crude 0 0 0 0 0 0 FCC 0 0 0 0 0 0 FVR 0 0 0 0 0 0 HDN 0 0 0 0 0 0 HDS 0 0 0 0 0 0 Isom 0 0 0 0 0 0 Jet Treater 0 0 0 0 0 0 LPG 0 0 0 0 0 0 Reformer 0 0 0 0 0 0 Sulfur 0 0 0 0 0 0 Tankfield 0 0 0 I 0 0 TCLR 0 0 0 0 0 0 VGO 0 0 0 0 0 0 Mr. Bryce Bird Department of Environmental Qualify January 14,2025 Page 8 of9 Number of Subpart GGGa Leaking Valves, Pumps, Compressoru, and Connectors not repaired as required by $60.482-7a (d)(1), $60.482-2a (c)(l), $60.482-3a (gXl), and $60.482-lla(d) after detection: 40 CFR 60.487a (cX2Xii). (iv) (vi) and (viii). Process Unit Julv I Aueust September October November December Alkv 0 0 0 0 0 0 Amine 0 0 0 0 0 0 Amine Il 0 0 0 0 0 0 Boiler 0 0 0 0 0 0 Coker 0 0 0 0 0 0 Crude 0 0 0 0 0 0 FCC 0 0 0 0 0 0 FVR 0 0 0 0 0 0 HDN 0 0 0 0 0 0 HDS 0 0 0 0 0 0 Isom 0 0 0 0 0 0 Jet Treater 0 0 0 0 0 0 LPG 0 0 0 0 0 0 Reformer 0 0 0 0 0 0 Sulfur 0 0 0 0 0 0 Tankfield 0 0 0 0 0 0 TCLR 0 0 0 0 0 0 VGO 0 0 0 0 0 0 Subpart GGGa components on the Delay of Repair Listing (during the reporting period; includes components that have been repaired and removed from the Delay-of-Repair Listing): 40 CFR 60.487a(c)(2)(xi) Process Unit TagNo.Description Type Date of Origin Reason(s) Delayed Alky P36097B P-36097B-lsoButane flush pump/west of C- 36030 Pump 0611012024 Equipment is isolated from the process and does not remain in VOC service. Alky P3600 l P-360001 Alkaline Flush Pump Pump 06fi012024 Equipment is isolated from the process and does not remain in VOC service. ISOM P370 r 0 P37010 D-lsobutanizer reflux Pump Pump 10t01t2024 Equipment is isolated from the process and does not remain in VOC service. ISOM P370l2A P-37012A RX feed Pump Pump t010312024 Equipment is isolated from the process and does not remain in VOC service. Mr. Bryce Bird Department of Environmental Quality January 14,2025 Page 9 of9 Drto of orocest unit shutdowns whlch occurrsd withln the rcoordnr Derlod: 40 CfR 60.4t7{cX3) Unit Julv Ausust September October November December Alkv 9t29-9/30 l0/l-10/31 t Ut-lt/12 Amine Amine II Boiler Coker tt /21-t I130 t2fi-12/29 Crude FCC FVR HDN tv6- lt l8,l I125- I l/30 12fi HDS 09t23-09/25 Isom 9t7-9123 t012-10131 tl ll-lL lt3, tUtT-1U26 Jet Treater LPG Reformer n/17-tt/24 Sulfur Tankfield TCLR VGO 09/23-09125 tt/6-tl/8 REVIEWEDInitials:Date: May 1, 2025Compliance Status:OKFile #: 10119 (B2)