HomeMy WebLinkAboutDDW-2025-004318
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830
Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4414
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
SPENCER J. COX
Governor
DIEDRE HENDERSON
Lieutenant Governor
Department of
Environmental Quality
Tim Davis
Executive Director
DIVISION OF DRINKING WATER
Nathan Lunstad, Ph.D., P.E.
Director
May 6, 2025
Jeffrey Richins
Price River WID
PO Box 903
Price, UT 84501
Jeffrey Richins:
Subject: Reduced Disinfection Byproduct Monitoring for Price River WID, UTAH04020
This letter is to inform you that the Utah Division of Drinking Water has changed the disinfection
byproduct (DBP) sampling schedule for Price River WID because the water system now qualifies for
reduced DBP monitoring based on sample results from the previous year.
DBP Monitoring Requirements
The water system is now required to collect two (2) DBP samples per year. Each sample must be a dual
sample set of total trihalomethanes (TTHMs) and haloacetic acids (HAA5). The next DBP samples must be
collected during the July 1 - September 30, 2025, monitoring period. The specific sites that need to be
monitored can be found on the system’s WaterLink page under the water monitoring section.
If you have any questions, please contact Luke Treutel at (385) 258-6084 or ltreutel@utah.gov.
Sincerely,
Mark Berger
Monitoring & Standards Section Manager
cc: jeffprwid@emerytelcom.net
Orion rogers, Southeast Utah Health Department, orogers@utah.gov
Luke Treutel, Division or Drinking Water, ltreutel@utah.gov
Curtis Page, DEQ District Engineer, cmpage@utah.gov