HomeMy WebLinkAboutDAQ-2025-002234/ilNEg!g/.
Dern P. Anderson
Vice Prcsident
Tesoro Refining & Marketing Compaay LLC
Tesoro Refining &
Marketing Company LLC
A subsidiary of Marathon Petroleum Corporation
474 W 900 N
Salt La&e City, tIT E4103
IN PERSON SUBITTITTAL
January 24,2025
Mr. Bryce Bird, Director
Attn: Jeremy Marsigli
Utah Division of Air Quality
195 North 1950 Wcst
P.O. Box 144820
Salt Lake city, uT 841144820
Fourth Ouarter VOC Monitoring Renort
Title V Operatins Permit 3500008002 Condition II.8.4.a.3 &
Annroval Order: DAOE-AN10335007$18
40 CFR 60 Suboart GGGa 660.487a
40 CFR 63 Subnart CC Q63.655
Attached is the fourth quarter 2024VOC monitoring report for the Tesoro Refining & Marketing Company
LLC's (TMRC) Salt Lake City Refinery and Tesoro Logistics Operations, LLC (TLO). The information
contained herein is for the reporting period October l, 2024, through December 31, 2024. This report is
required semiannually; however, TMRC Salt Lake City Refinery and TLO report quarterly.
Pursuant to 40 CFR $60.487a(c)(l-3) this report includes monitoring information pertaining to leaking
components, process unit shutdowns, components placed on Delay of Rcpair (DOR), and applicable
revisions to component inventories. This information is contained in the attached Tables l.l through 4.
During routine monitoring, four Open-Endcd Lines (OELs) were discovered. Each OEL was immediately
resolved by adding plugs.
If you have any questions regarding this matter, please contact James Beardall 801-521-4914.
I certiff under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are sigrrificant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
Dean P. Anderson
Vice President
Tesoro Refining & Marketing Company LLC
UI,{H DI-T}AIIIMENT OF
B-2-10335
Mr. Bryco Bird, Director
Ianuary 24. 2025
Attrchments: Table I . I - Monitoring lnformation for Hydrocarbon Processing Division - North
Table 1.2- Monitoring lnformation for Hydrocarbon Processing Division - South
Table 1.3- Monitoring lnformation for Oil Movements Division
Table 2.1- Revisions to lnitiaUSemiannual Report - HPDN
Table2.2- Revisions to InitiaVSemiannual Report - HPDS
Table 2.3- Revisions to [nitiaVSemiannual Rcport - OMD
Table 3.1- Dates of Process Unit Shutdowns IIPDN
Table 3.2- Dates of hocess Unit Shutdowns HPDS
Table 3.3- Dates of Process Unit Shutdowns OMD
Tablc 4- Components on Delay of Repair
Mr. Scou H. Pateficld, Branch Chief
USEPA Region 8
Enforcement and Compliance Assurance Division
8ENF-AT- Air and Toxics Enforcement Branch
1595 Wynkoop Street
Denver, Colorado 80202-1 129
Via USPS
' Tcsoro Rcflning Markcting Company ILC Salt Lakc City Refinery and Tesoro logistics Operations ILC
salt Lake city, uT
Subpart GGGa VOC Monitoring Rcport
Hydrocarbon Processing Divlslon - North (HPDN)
Iable 1.1: Monltorlng lnformation - S40 CFR 60.487a(cX2)
Requlrcment ALKY FCCU GHT POLY VRU
Oct Nov Dcc Oct Nov O.c O€t Nov D.c Oct NoY Drc Oct Nov D.c
Valver - No. of leaks detected per
160.482- 7a(b)
Valver - No. ol leaks not repaired
rcr S60.482-7a(dX1)
11
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
3
0
0
0
0
0
Pump: . No. of leaks detected per
$60.482-2a(b), (d)(4XiiXA) or (B)
Pumpe - No. ol leaks not repalred
rer 560.482-2a(c)(r) and (dX6)
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
GGGa comprGrorer - No. of
eaks detected p€r 560.482-3a(0
Comprcssors . No. of leaks not
'epaired per 560.,182-3a(g)(1 )
0
0
0
0
0
0
No Applicable
Compressors
No Applicable
Compressors
No Applicable
Compressors
0
0
0
0
0
0
Table 2.1: Revlslons to lnitial/ Semiannual Report - S40 CFR 60.t87a(cX4)
Requlrement ALKY FCCU GHT POLY VRU
Valves2'' subject to
$60.482-7a(a). Valvcs Added
. valvas Removed
3170
't6
14
1428
0
0
1049
0
0
802
2
2
1903
5
1
Pumps!'7 subject to
560.482-2a. PumpsAdded
. PumpE Removed
35
0
0
1'l
0
0
5
0
0
4
0
0
13
0
0
Compressor:+' subject to
$60.482-3a. CompressoBAdded
o Compressors Removed
1
0
0
0
0
0
0
0
0
0
0
0
1
0
0
Table 3.1: Datee ol Process Unit Shutdownss - S4o cFR 60.4s7a(c)(3)
Process Unlt Dates of Shutdowns Scheduled (Y/N)
ALKY No Shutdo,vns N/A
FCCU 12t5t24 - 12t26t24 N
GHT No Shutdowns N/A
POLY No Shutdowns N/A
VRU No Shutdowns N/A
Page 1 of4
Tesoro Refining Marketing Company LLC Salt Lake City Refinery and Tesoro Logistics Operatlons LLC
Subpart Je:,i* iY;,,'"I"n Report
Hydrocarbon Processlng Dlvlslon - South (HPDS)
Iable 1.2: Monltorlng lnformatlon - S40 CFR 60.'f87a(c)(2)
Rcquiremcnt BSU DOU FGR N2C UFU vNs
Oct Nov Oac Oct ilov O.c Oct Nov D.€Ocl l{oY D.c Oct NoY D.c Ocl Nov O.c
y'elvcr . No. ot lsaks dotgcted
>er 560.482- 7a(b)
y'alvcr . No. of l6aks not
epaired per 560.a82-7a(d)(1 )
0
0
0
0
0
0 0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
11
0
0
0
0
0
1
0
0
0
,ump3 - No. of leaks
,6tocted per $60.a82-2a(b),
dXaXii)(A) or (B)
rumpr - No. of l€aks not
apaired per $60 .482-2a(cl(1 )
md (dX6)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3GGe Comprcssorr - No. ot
oaks detscted per $60.482-
]a(f)
lomprcraon. No. of leakg
rct repaired per $60.482-
)a(sX1)
No Applicable
Compressors
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
No Applicable
Compressors
Table 2.2: Revlslons to lnltlal / Semlannual Report - S40 CFR 60.t187a(cX4)
Tabte 3.2: Dates of Process Unlt Shutdownst g4o CFR 60.4s7a(cX3)
Page2 ol 4
Requirement BSU DDUT FGR N2Cr UFU vNs
Velvcr2'' subject to
$60.a82-7a(a)
. Valvg! Added
. Vafun Removed
1291
0
0
1452
0
0
275
0
0
20/,8
2
1
't920
5
2
7U
2
0
Pumprl' subject to
$60.482-2a
. ftmp! Addod
. Pumps Removsd
11
0
0
5
0
0
2
0
o
11
0
0
12
0
0
10
0
0
Comprcrors4 7 subject to
$60.482-3a. Compre3rtr3 Addod
. Comprcssm Romovod
0
0
0
3
0
0
3
0
0
1
0
0
3
0
0
0
0
0
Process Unit Dates of Shutdowns Scheduled (Y/N)
BSU 10t1t24 - 1431t24
ODU No Shutdourns i.l/A
FGR No Shuldowns N/A
N2C No Shutdowns N/A
UFU No Shutdowns N/A
VNS No Shutdowns i.l/A
Oll MovemenB Dlvlslon (OilD)
Tablo 1.3: Monltorlng Informatlon - S40 CFR 60.487a(c)(2)
Requlrement BLR COGEN RTF sRu TKF TLR
Oct ilov O.c Oct Irlov D.c G Nov O.c Oct l{ov O.c Oct NoY D.c Oct l{ov D.c
t/elvcr . No. of leaks
,etoc{ed per 560.482. 7a(b)
Velvcr . No. of l6aks not
epaired per $60.482.7a(dX 1 )
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
Pumpr - No. of leaks
J€toct€d per 560.482-2a(b),
ld)(aXiiXA) or (B)
Pumpr . No. of leaks not
€pairod per 560.182-2a(cX1 )
md (dX6)
0
0
0
0
0
0
No Applicable
Light Liquid
Pumps
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
GoGr Comprcrorrt - No.
of l6aks detected per $60.482,
3a(0
Comprc:ron . No. of leaks
not ropairod per $60.482.
3a(s)(r)
0
0
0
0
0
0
0
0
0
0
0
0
No Applicable
Compressors
No Applicable
Compressors
No Applicable
Compressors
No Applicable
Compressors
Tesoro Refining Marketing Company LLC Salt Lake Gity Refinery and Tesoro Logistics Operations LLC
Salt Lake City, UT
Subpart GGGa VOC Monitoring Report
Table 2.3: Revlslons to lnltlal / Semlannua! Report - S40 CFR 60.t187a(c)(4)
Requlremcnt BLR COGEN RTF sRu TKF TLR
Velvclr'r subjsct to
$60.482-7a(a)
. ValvesAdded
. VdHRemved
1258
0
o
186
o
0
821
o
o
525
0
0
3337
2
0
1944
2
0
Pumprl T subject to
$60.482-2a. PumpsAdded
. Pump8 Rgmovad
11
'l
1
0
0
0
9
0
o
2
0
0
73
0
0
44
0
0
Comprc:ron4 7 subject to
$60.482-3a
. CompreEsors Added
. Compaagso€Removod
2
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Table 3.3: Dates of Process Unlt Shutdownsr - 940 CFR 60.487a(c)(3)
Process Unit Dates of Shutdowns Scheduled (Y/N)
BLR No Shutdo'rl,ns I.UA
E COGEN No Shutdowns N/A
W COGEN No Shutdowns N/A
SRU No Shutdowns N/A
TLR No Shutdowns N/A
Paoe 3 ol 4
' Tesoro Reflning Marketing Company LtC Salt Lake City Refinery and Tesoro Logistics Operations LLC
Salt Lake City, UT
Subpart GGGa VOC Monitoring Report
Iable 4: Components Added to Detay of Repair (DoRlc -S40 CFR 60.4S7a(cX2Xxi)
Procrss Unlt Componcnt Type LDAR Tag il l{onltorlng Date Date Placod on
DOR Date Repalred Date Rcmoved from DOR
Alky Pump 232338 10t28t2024 11t12t2024 12t5t2024 12t5t2024
Page 4 of 4
Tesoro Reflning Marketing Company LLC Salt Lake Clty Refinery and Tesoro Logistics Operations LLC
Salt Lake City, UT
Subpart GGGa VOC Monitoring Report
Table Notes
1 - Existing compressors in ALKY, COGEN, DDU, and N2C units were constructed prlor to November 7 , 2006. Tesoro has not conducted any
construction, modification, or reconstruction activities that would trigger GGGa applicabilig for these compressors; however due to the Utah
State lmplementatlon Plan Section lX, Part H.11(gxiv) all affected equipment is required to comply with the provisions of 60.590a to 60.593a
no later than January 1, 2016 . The Utah SIP was adopted by the Air Qualig Board on December 2,2015.
2 - Excluding those valves designated for no detectable emissions under the provisions of $60,482-7a(f),
3 - Excluding those pumps designated for no detectable emissions under the provisions of $60.482-2a(e) and those pumps complying with
560.a82-2a(0.
4 - Excluding those compressors designated for no detectable emissions under the provisions of $60.482-3a(i), S60.482-3a(h), and
60.593a(b)(1). Tesoro demonstrates compressors are in hydrogen service per 60.593a(b)(3)(i).
5 - Process unit shutdown means a work practice or operational procedure that stops production from a process unit or part of a process unit
during which it is technically feasible to clear process material from a process unit or part of a process unit consistent with safety constraints
and during which repairs can be accomplished. The following are not considered process unit shutdowns:
(a) An unscheduled work practice or operational procedure that stops production from a process unit or part of a process unit for less than 24 hours.
(b) An unscheduled urork practice or operational procedure that would stop production from a process unil or part of a process unit for a shorter period
of time than would be required to clear the process unit or part of the process unit ol materials and starl up the unit, and would result in greater
emissions than delay of repair of leaking components until the next scheduled process unit shutdown.
(c) The use of epare equipment and technically feasible bypassing of equipment without stopping production.
6 - For leaking components that remain in VOC service the delay of repair designation will be removed once two consecutive monthly
moniloring instrument readings are below the leak definition.
7 - Component changes involving CLVS, PRVs, Heavy Liquids, or a Process Unit switch do not show up as 'added'or "removed" because
they have been in seMce; only the component class or Unit identifier has been changed.
8-During routine monitoring, four OELs were discovered (two in the DDU and two ln the N2C). Each OEL was immediately resolved by adding
plugs.
- Tdsdro Refinlng Marketing Company LLG Salt Lake Clty Refinery and Tesoro Logistics Operations LLC
Salt Lake Caty, UT
Subpart GGGa VOC Monitoring Report
The followlng ls a llst of codes to descrlbe component q/pes ln the rcport:
AVO - Audio, Visual, Olfactory
COMP - Compressor
CLVS - Closed Vent Vapor Recovery System
DTM - Difficult to Monitor
GV - Components ln Gas Vapor service
LL - Components in Light Liquid Service
PMP - Pump
PRV - Pressure Relief Valve
UTM - Unsafe to Monitor
VLV - Valve
OOS - Out of Service or not ln VOC service.
OEL - Open Ended Line
'Heavy Liquid" or'HL" denotes @mponents in heavy liquid service.
"Light Liquid'or "LL" denotes components in light liquid service.
"Vapor" or'G\f denotes components in gas vapor service.
The followlng ls a llst of codes used to descrlbe process unlts ln the report:
ALKY - Alkylation Unit
BSU - Benzene Saturation Unit
BLR - Butane Loading Rack
BP - Boiler Plant
COGEN - Cogeneration Unit (East and West)
DDU - Distillate Desulfurization Unit
FCCU - Fluid Catalytic Cracking Unit
FGR- Flare Gas Recovery Unit
GHT - Gasoline Hydrotreater Unit
N2C - Crude Unit #2
POLY - Polydebutanizer Unit
RTF - Remote Tank Farm
SRU - Sulfur Recovery Unit
TKF - Tank Farm
TLR - Transport Loading Rack
UFU - Ultraformer
VNS - Virgin Naphtha Stabilizer
VRU - Vapor Recovery Unit
I-rl\/lSlON OF AtR Ot,n LtTy