HomeMy WebLinkAboutDAQ-2025-002231^i\ws/.
Dean P. Anderson
Vice President
Tesoro Refining & Marketing Company LLC
Tesoro Refining &
ing Company LLC
subsidiary of Marathon Potroleum Corporation
W9OON
Lake City, UT 8410
January 8,2025
Mr. Bryce Bird
Attn: Jeremy Marsigli
Utah Division of Air Quality
195 North 1950 West
P.O. Box 144820
Salt Lake City, UT 84114-4820 Suei,trreo tt,l pensoil
Fourth Quarter 2024 R307-326-9(7) VOC Monitorinq Reoort
Title V Ooeratino Permit 3500008002 Condition II.B.4.i.3 &
Approval Order DAQE-ANl 03350075-1 8
Dear Mr. Bird:
This is theJourth quarter 2024VOC monitoring report for Tesoro Refining & Marketing Company, LLC's
Salt Lake City Refinery and Tesoro Logistics Operations, LLC. This report includes quarterly monitoring
information from October 1,2024, through December 31,2024.
During the reporting period, 22,560 components were inspected using Method 21. Of these components, 3
were identified as leaking at a rate greater than or equal to 10,000 ppm. Details for components placed on
Delay of Repair during this period are included below:
1 ln addition to R307-326-9, Tesoro Salt Lake City, is subject to 40 CFR Part 60 Subpart GGGa, and as such leak definitions for
- components in gas vapor and light liquid service are limited to 500 ppm for valves and 2,000 ppm for pumps.2 Components requiring a unit shutdown are removed from the Delay of Repair list per 40 CFR eO.aAZ-Sa1q.
All monitoring has been conducted as stipulated in Utah Administrative Rute R3O7-326-9. lf you havequestions regarding this matter, please contact James Beardall at801-s214g14.
I certify under penalty of law that this document was prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate, andcomplete. I am aware that there are significant penalties for submitting false information, including thepossibility of fine and imprisonment for knowing violations.
Singqrely, Iy--o,L-
Dean P. Anderson
Vice President
Tesoro Refining & Marketing Company LLC
NI\/ISION OF AIR OUALITY
Delay of Repair (DOR) List
Process
Unit
Component
Type
LDAR
Taq #Leak Definitionl Date Placed
on DOR DOR Designation Date
Repaired2
Alky Pump 232338 2000 11t12t24 J413D Southeast Corner
of K-401 12t5t24
B-2-10335