Loading...
HomeMy WebLinkAboutDERR-2024-004620SPILL PREVENTION TEST Spill Bucket Hydrostatic Test Form Facility Name Facility ID Address Tester's Name Test Date Phone Tank Number Product Stored Capacity Manufacturer Construction Liquid and Debris Removed Visual Inspection No cracks, holes, or separations Tank Riser Cap Included in Test Is Drain Valve Included in Test Start Level Start Time Ending Level End Time Test Period (minimum of 1 hour) Change in Level Test Results Photos indicating water Levels are Attached? Pass / Fail Criteria: Must pass visual inspection, test duration at least one hour, must include photos with this form, water level drop of less than 1/8 inch. Ref: PEI / RP 1200 6.2.5 Test Procedure How was Liquid Disposed? Comments I certify under penalty of law that the above information is true, accurate and complete Tester's Signature HOLLOW MOUNTAIN 2000316 40 NORTH SR 95 HANKSVILLE, UTAH STEVEN MARTIN AES TESTING 2-22-2024 801-540-9258 1 R/UL 10 G MORRISON SWS YES PASS NO YES 4 1/4 14:14 4 1/4 15:36 1 HR 22 MIN 0 PASS NO 2 S/UL 10 G MORRISON SWS YES PASS NO YES 4 1/4 13:11 4 1/4 14:11 1 HR 0 PASS NO 3 DSL 10 G MORRISON SWS YES PASS NO YES 4 7/16 12:02 4 7/16 13:02 1 HR 0 PASS NO REUSED TESTER UT 0121 PHOTOS AVAILABLE UPON REQUEST SPILL CONTAINMENTS ARE ABOVEGROUND AND 100% VISABLE Digitally signed by STEVEN B MARTIN cn=STEVEN B MARTIN, o=AES, c=US Date: 2024.02.25 11:05:16 -07'00' Reason: I am the author of this document