Loading...
HomeMy WebLinkAboutDDW-2025-004117 May 1, 2025 J. Paul Wright, PE District Engineer, Southwest Utah District 620 S 400 E #400 St. George, UT 84770 Re: Certification of Rule Conformance – System #09105, File #20435 Under Canvas Bryce Canyon Water Tanks Modifications Dear Mr. Wright, All conditions of the Plan Approval for this project have been accomplished. Attached to this letter are the as-built drawings, which have been received by the water system, and the bacteriological samples reporting proper disinfection. The following changes were made to the site during construction. -piping configuration changes (See as-builts) -overflow pipe diameters are 2” -One float is provided for all tanks and is connected to a junction box attached to nearby post. All changes should not hinder the water system to operate a safe and functional service and conform with rules outlined in R309 of the Utah Administrative Code. Please let us know if anything else is required from the State. Sincerely, Russell Sprague, PE Engineer of Record