HomeMy WebLinkAboutDERR-2024-004963VCP/BROWNFIELDS SECTION – SITE VISIT REPORT
SITE NAME: Lelis Transmissions DATE: Jan 23, 2024
PROJECT MANAGER: Leigh Anderson
PURPOSE OF VISIT: Perform site visit in preparation to draft the EA Comments.
FIELD OBSERVATIONS: Primarily was interested in looking at potential sources (AST, Oil water
separator, and some of the drains in the main bay). Also observed hole cut in the floor with utility
valves in a room identified during the site visit as the transmission room, this hole appeared to go
directly to the soil. The AST seemed in good condition, though it is not clear where all the piping is
going. Bill has been interested also in buffing up some of the off-site samples, even if we otherwise
go immediately to RAP.
SPLIT SAMPLES COLLECTED?
YES NO COMMENTS:
IS THE WORK BEING PERFORMED IN A MANNER CONSISTENT WITH THE ACCEPTED WORKPLAN?
YES NO COMMENTS: No approved workplan yet
ATTACHMENTS (PHOTOS, MAPS, ETC.) YES NO