HomeMy WebLinkAboutDAQ-2025-002134ChevronY
Jul 26,2024
Utah dept of Environrnental Quality - Div or Air Quality
Office of the Director
195 N 1950 W
PO Box 144820
Salt Lake city uT 84114
Director,
Please find the enclosed semi annual report for the Chevron Products Company Salt Lake City Marketing
Terrninal required under the reporting provisions of 40 CFR part63, Subpart R. This report includes the
semi annual emissions and CMS reports
Please feel free to contact me if you have any questions or need additional information.
Respectfully,
Shane Partain
OE/HES Specialist
Supplemental documentalion in chided wit/i the semi-annual MACT sumnary report:
A. Chevron Salt Lake Cify Marketing Terminal Light Product Throughput chart
B. VRU Shutdown and CMS ManualCalibration logs
C. CMS Excess Emissions and CMS Shutdown logs
D. Loading Rack Outage and Trailer Vapor Tightness Non-Compliance logs
E. 40 CFR 63 Subpar-t R -MACT Component Leak Inspection log
F.2023 Cylinder Gas Audit Forms - Primary and Secondary Vapor Control Units
Shane Partain
HSE Field Specialist
Portland OR
Salt Lake City UT
Eureka CA
Global Marketing
$-y-tr
Chevron Products Company
5531 NW Doane Ave
Portland OR 97210
Tel 503-221-7855
Cell 503-939-1197
prtn@chevron.com
I,TAH DEPAMMENT OF
EWTRONMENTAL OUALITY
AllG - 1 1"1'
DIVISION OF AIR QUALIP
REVIEWEDInitials: Date: Jan 29, 2025Compliance Status:OKFile #: 10119 (B2)
MACT SUMMARY REPORT (VRU)
GASEOUS AND OPACITY EXCESS EMISSION AND
CONTINUOUS MONITORING SYSTEM (CMS) PERFORMANCE
HAP: n/a (VOC's only)REPORTING PERIOD DATES FROM:January 1,2024 to June 30,2024
Emission Limit: 10mq/l Total Source Operating Time in this reporting period was 4367 hours.
The source was monitored bv the CMS for all but 15. hours of downtime.
Max Total Hours:
Comoanv Name:Chevron Products Comoanv - Salt Lake Citv Marketino
Address:2351 North 1100 West Salt Lake City, Utah 84116
Process Unit Description:Carbon Adsorption-Absorption Gasoline Vapor Recoverv Svstems (2)
Monitor Manufacturer and
Model number
Primary Unit: lnfrared lndustries 8400-DC Total hydrocarbon gas analyzer
Secondary Unit: lnfrared lndustries 8400-DC Total hvdrocarbon oas analvzer
Date of last CMS
Certification or Audit (CGA
or RATA):
Primary Unit CGA:
Secondary Unit CGA:
Primary Unit RATA: 12-13-23
Secondary Unit RATA: 12-13-23
5-31-23
5-31-23
Section l: Continuous Monitorino Svstem (CMS)
CMS EXCESS EMISSION DATA SUMMARY CMS PERFORMANCE SUMMARY
1. Duration of excess emissions (EE) in
reporting due to.
1. CMS Downtime in reporting due to:
a. Startup/Shutdown:
b. Control Equipment
Problems:
c. Process Problems
d. Other Known Causes
e. Unknown Causes
0 Hours
0 Hours
0 Hours
0 Hours
0 Hours
a. Monitoring equipment
malfunctions:
b. Non-Monitoring equipment
malfunctions:
c. Quality assurance calibration:
(Automatic)
d. Other known causes:
(Manual CMS Calibration)
e. Unknown causes:
0 Hours
0 Hours
15,0 Hours
0.0 Hours
Hours
2. Tolal Duration of Excess Emissions: 0.0 Hours 2. Total CMS Downtime: 15 Hours
3. Total EE DurationXl00/
Total Source Ooeratino Time = 0%
3. Total CMS DowntimeXl00/
Total Source Operatinq Time = <01%
UTAH DEPARTMENTOF
ENVIRONMENTAL QUALITY
AUG - 1 2424
DIVISION OF AIR OUALITY
A0 6_MACT_V R U_C M S_S u m m a ry_Re p o rt 2Q 2024. d ocx
Revised 713012024
1
Total Hours VRU Out of Service: 15 hours Total Hours VRU in Service: 4352 hours
Total Hours lN Service (Loadinq rack): 4352 hours = SOURCE OPERATING TIME
Total Hours Out of Service Rack): 15 hours
SECTION 1. VAPOR RECOVERY UNIT
NOTE: Any Work Performed or Downtime of VRU, CMS, and Loading Rack must be documented
NOTE: lF NOT lN ACCORDANCE WITH PLAN THEN REPORT ACTIONS WITHIN TWO (2) WORKING
DAYS FOLLOWED BY A LETTER WITHIN SEVEN (7) WORKING DAYS (SEE LETTERS AND FORMS AT
BACK OF STARTUP/SHUTDOWN MAINTENANCE PLAN).
406_MACT_V R U_C M S_S u m m a ry_Rep o rt 2 Q 2024 .docx
Revised 713012024
2
Out of Service Detail -VRU Hours
O/S due to startup or shutdown:0
O/S due to malfunction:0
O/S due to maintenance and repair 0
O/S due to unknown causes:0
VRU Out of Service (TOTAL):0
VRU/CMS STARTUP, SHUTDOWN, MALFUNCTION ACTIONS
(REFER TO STARTUP, SHUTDO\A/N MALFUNCTION PLAN LINKED IN A06 SOP)
DATE ACTIONS
IN ACCORDANCE
WITH PLAN?
No instances when the SSMP was used during this period.
EYES NNO
EYES NNO
EYES ENO
EYES ENO
f]YES NNo
EYES ENo
EYES [No
EYES ENo
EYES ENo
NYES ENo
CHANGES IN CMS, PROCESS, OR CONTROL
REPORTING PERTOD FROM 01tO1t201S TO 6/30/2019
I certify that, based on information provided and believe after reasonable inquiry, the information contained
in this report is true, accurate, and complete.
Report Prepared by:
Signature:
Title:HSE Soecialist
Date: Julv 26.2024
A06_MACT_VR U_C M S_S u m m a ry_Rep o rt 2Q 2024 .do cx
Revised 713012024
3
ffio CImOffOn
CYLINDER
Source ldentification:
Location:
Unit Description:
Date of CGA:
Start Time:
Tester's Name:
_$iJ(i$12120 Wickchester Ln, Suite 400
Houston, fX77079
(844) 746-1676
GAS AUDIT FORM
Chevron Salt Lake City
2351 N 1100W
Salt Lake City, UT 84116
tR8400D
18-Jan-24
End Time:
Casey Davin
CEM Analvzer Tvoe:tR8400D
Analvzer Serial Number:4303
Span Gas Cvlinder Number cc205256
Soan Gas Taq Value:P-1.8%M-4.5o/o
Analvzer Soan Gas Value:P-1.8%M-4.5o/o
Span Gas Prooane 11.80%Methane 14.50%
Measurement Ranoe:% or PPM, Note Which Ranqe 2o/o
Cal Gas Flow Rate:SCFM
Zero Gas 20-30% Audit Gas 50-60% Audit Gas
Cvlinder Number:CCB5661 FF16012 D712074
Ca = Calibration Gas Taq Value:0.00 0.5000 1.0000
Calibration Gas Expiration Date:N/A 4t1t2426 4t112026
Analyzer Response
(ppm or Vol %)
Run
1 0.00 0.54 1.05
2 0.00 0.54 1.05
J 0.00 0.55 1.05
Range of Analyzer Responses:0.00 0.01 0.00
Sum of Analyzer Responses:0.00 1.63 3.15
Average of Analyzer Responses:0.00 0.54 1.05
Percent lnaccuracy #VALUE!8.67 5.00
ls Unit Out of Control:(> 15%)#VALUE!NO NO
Perform Manual Drift Check upon
completion
Pass Drift Check YesYes or No
Verify Office PC SCADA-HMI Span Gas Value matches Span Gas Bottle
Value Y/N
COMMENTS. 20-30% cvlicler pressure = 1900 PSI/ 50-60% cvlinder pressure = 1900
Span Gas lnaccuracv=Averaqe of Analvzer Responses-Calibration Gas Taq Value X 100
Calibration Gas Taq Value
Rev: 3
2of2
,N:id{s{e a
Se ClmOffOn
W
, lr t: f{t '. (.11f-.riI.l"i rliij i{"'if*rl
CYLINDER GAS AUDIT FORM
Source ldentification. Chevron Salt Lake Citv
Location:2351 N 1100 W
Salt Lake City, UT 84116
Unit Description: |RB400D
Date of CGA: 18-Jan-24
Start Time: End Time:
Tester's Name:Casey Davin
12120 Wickchester Ln, Suite 400
Houston, fX77079
(844) 746-1676
CEM Analvzer Tvoe:lR8400D
Analvzer Serial Number:5235
Gas Cylinder Number:ccl10752
Span Gas Taq Value:P-1.8%M-4.5%
Analvzer Span Gas Value:P-1.8o/oM-4.5%
Span Gas Propane lr1.80%Methane l4.50oA
Measurement Ranqe:% or PPM, Note Which Ranqe 2%
CalGas Flow Rate:SCFM
Zero Gas 20-30% Audit Gas 50-60% Audit Gas
Cvlinder Number:E80077644 FF16012 D712074
Ca = Calibration Gas Taq Value:0.00 0.5000 1.0000
Calibration Gas Expiration Date:N/A 4t1t2026 4t1t2026
Run
Analyzer Response
(ppm or Vol %)
1 0.00 0.53 1.03
2 0.00 0.53 1.03
J 0.00 0.53 1.03
Range of Analyzer Responses:0.00 0.00 0.00
Sum of Analyzer Responses:0.00 1 .59 3.09
Average of Analyzer Responses:0.00 0.53 1.03
Percent lnaccuracy #VALUEI 6.00 3.00
ls Unit Out of Control:(> 15%)#VALUE!NO NO
Perform Manual Drift Check upon
completion
Pass Drift Check YesYes or No
Verify Office PC SCADA-HMI Span Gas Value matches Span Gas Bottle
Value Y/N
COMMENTS'. 20-30% cvlider pressure = 1900 PSI / 50-60% cvlinder oressure = 1900
Span Gas lnaccuracv=Averaqe of Analvzer Responses-Calibration Gas Taq Value X 100
Calibration Gas Taq Value
Rev. 3
Date.21912012 Form 0751-1-03 2of2
11025 Equity Drive, Suite 200
Houston, TX77041
o (844) 746-1676{:dIS"d /-ir1/{; j.t $J * rr Af* j{P *}rg y//7{}Af,{.stltl I "*
Source ldentification :
Location.
Unit Description:
Date of CGA:
Start Time:
Tester's Name:
9:00
CYLINDER GAS AUDIT FORM
Chevron Salt Lake City
2351 N 1100W
Salt Lake City, UT 84116
IRB4OOD
7-Jun-24
End Time:
Kyle Lundquist
9:30
CEM Analvzer Tvoe:IR84OOD
Analvzer Serial Number:4303
S Gas Cvlinder Number:cc83793
Soan Gas Tao Value:P-1.8%M-4.5%
Analvzer Soan Gas Value:P-1.8%M-4.5%
Span Gas Propane 11.80%Methane l4.50Yo
Measurement Ranqe:% or PPM, Note Which Ranqe 2%
Cal Gas Flow Rate:SCFM
Zero Gas 20-30% Audit Gas 50-60% Audit Gas
Cvlinder Number:cc85661 FF12207 EAo009976
Ca = Calibration Gas Taq Value:0.00 0.5000 1.0000
Calibration Gas Exoiration Date:N/A 4ht2a23 4t1t2023
Analyzer Response
(ppm or Vol %)
Run
1 0.00 0.52 1.00
2 0.00 0.52 1.00
0.00 0.52 1.00
Range of Analyzer Responses 0.00 0.00 0.00
Sum of Analyzer Responses:0.00 1 .56 3.00
Average of Analyzer Responses:0.00 0.52 1.00
Percent lnaccuracy #VALUE!4.00 0.00
ls Unit Out of Control.(> 15%)#VALUE!NO NO
Perform Manual Drift Check upon
completion
Pass Drift Check YesYes or No
Verify Office PC SCADA-HMI Span Gas Value matches Span Gas Botfle
Value Y/N
COMMENTS'. 20-30% cylider pressure = 800 PSI I 50-60% cvlinder pressure = 1300
Span Gas lnaccuracy=Averaqe of Analyzqr Responses-Calibration Gas Taq Value X 100
Calibration Gas Taq Value
Rev: 3
Date.2l912012 Form 0751-1-03 2of2
11025 Equity Drive, Suite 200
Houston, TX77041
(844) 746-1676
CYLINDER GAS AUDIT FORM
Source ldentification:
Location:
Unit Description:
Date of CGA:
Start Time:
Tester's Name:
Chevron Salt Lake Citv
2351 N 1100 W
Salt Lake City, UT 84116
IRB4OOD
7-Jun-24
End Time:
Kvle Lundquist
9:00
ff$rl f fAl$ ,{ t), Jqd l1/} # .f-fi,, y/Jtr$ilfll$S-A/ f " *
CEM Analvzer Tvoe:tR8400D
Analvzer Serial Number:5235
Gas Cvlinder Number:cc5371 6
Soan Gas Taq Value:P -1.8%M-4.5To
Analvzer Soan Gas Value:P-1.8%M-4.50h
Soan Gas Propane 11.80%Methane 14.50%
Measurement Ranoe:% or PPM, Note Which Ranse 2%
CalGas Flow Rate:2 SCFH
Zero Gas 20-30% Audit Gas 50-60% Audit Gas
Cvlinder Number:cc1 1 0798 FF12207 EAo009976
Ca = Calibration Gas Taq Value 0.00 0.5000 1.0000
Calibration Gas Expiration Date:N/A 4t1t2023 4t112023
Analyzer Response
(ppm or Vol %)
Run
1 0.00 0.53 1.03
2 0.00 0.54 1.04
J 0.00 0.54 1.04
Range of Analyzer Responses:0.00 0.01 0.01
Sum of Analyzer Responses:0.00 1.61 3.1 1
Average of Analyzer Responses:0.00 0.54 1.04
Percent lnaccuracy #VALUE!7.33 J.b /
ls Unit Out of Control:(> 15%)#VALUEI NO NO
Perform Manual Drift Check upon
completion
Pass Drift Check YesYes or No
Verify Office PC SCADA-HMI Span Gas Value matches Span Gas Bottle
Value Y/N
COMMENTS. 20-30% cvlider pressure = 800 PSI / 50-60% cvlinder oressure = 1300
Span Gas lnaccuracv=Averaqe of Analvzer Responses-Calibration Gas Taq Value X 100
Calibration Gas Tao Value
2of2
9VO Terminal 40CFR Part 63, Subpart R - 6asoline Drstribution MACI
Month & Year: 5a" )o)HCMS Excess Emission Log
Specify Date, Time, Duration, and Cause of each exceedance (10 mg/L limit).
o Startup/Shutdown. CEM Problems, pi6
Month&Year: !^^ +o>{
Out of Service Reason; CEM Malfunctions, Non-CEM Malfunctions, Quality Assurance Calibrations, Unknown Causes andDetail Reasons.
TIME (START)
chevron SvC
VRU Shutdorrwr Log
Terminal 40CFR Part 53, Subpart R - Gasoline Distribution MACT
Monthavear: FcL Joi\
i oere I ,.}'X^t,
TOTAL
HOURS REASONS
Reason Startup, Shuldown, Malfunction, Unknown Cause: Detail Reason for Condition.
Manual CMS Callbratlon Log Month
" r""r. Fzt )ortt
FINAL CEM READING
chevron 5LL Terminal
VRU Shutdown Log
TIME
(START)
Manual CMS Calibratlon Log
40CFR Part 53, Subpart R - Gasoline Distribution MACT
TOTAL
HOURS
TIME
(END)
Month&Ysar: fhar )od{
Month &year: (\ar )b)tl
Reason: startup, shutdown, Malfunction. unknown cause; Detail Reason for conditbn
FINAL CEM READING
FLOW ZERO
chevron (u C rerminar 40CFR Part 53, Subpart R - Gasoline Distribution MACT
VRU Shutdown Log
ffi T ioro,(END) HOURS
Reason. Startup Shutdown, Malfunction, Unknown Cause, Detail Reason for Condition.
Manual CMS Calibration Log
Month A vear: AOf lro ) \-T-
REASONS
Month & Year: ft ef ba tt
-
-l
FINAL CEM READING
S'v t-40CFR Part 63, Subpart R Gasoline Distribution MACT
VRU Shutdown Log
TOTAL
HOURS
Startup, Shutdown, Malfunction, Unknown Cause, Detail Reason for Condition.
Manual CMS Calibration Log
Month a vear: 0^a,l )o ).1
TIME
(END)
MonthaYear: fh(rw FJ1,
F]NAL CEM READING
chevron 5U t- Terminat
VRU Shutdown Log
Reason: Slartup, Shutdown, Malfunction, Unknown Cause, Detail Reason for Condition.
Manual CMS Calibration Log
4OCFR Part 53, Subpart R - Gasoline Distribution MACT
Month e vear: t'qn Do)u{
TIME
Month & YeaT; 5r'"" ?a 3 11
FINAL CEM READING
ch"rron SL L. Terminal
Truck and Traller Loading Rack Shutdown Log
TtME (START)TrME (END)io-reu I
S.
40CFR Part 63, Subpart R - Gasoline Distribution MACT
Month g yr.r. J,^^ )or\
Monthgy."r, J,,t,r )o{Trailer Loading Non Compliance Log
For documenting loading of trailers without Vapor Tightness Testing
chevron 5U C- Terminat
Truck and Trailer Loading Rack Shutdown Log
Trailer Loadlng Non Compllance Log
For documenting loadrng of trailers wlthout Vapor Tightness Testing
40CFR Part 63, Subpart R - Gasoline Distribution MACT
Month a vear: &Ff )D) t
Isonth t Year: frYr, >5).,1--
o,"rron 5 -L (- Terminat
Truck and Traller Loadlng Rack Shutdown Log
Trailer Loading Non Compliance Log
For documenting loading of trailers without Vapor Tighlness Testing
40CFR Part 53, Subpart R - Gasoline Diskibution MACI
'/illonth&Year: f4L )PlY
ilonth a vear, fl5 ),OlL1
r>,FI-ll<lf,ou
Lr- lolzlolal
-l.1
alU
NOcv
I
(5
<(
l>lu F-
IOJ=L{l
/sg/IF <I
/trH/IE >Ilc zl-Cl+trlr;i
I
E
u')cnN
g1
ft1
lr)
q
u1oan
Ptn
$
ID
(Yl
iotn
(n
(r')(fal,tn
$
8
tl
1'.N
lr')
N
u)lO
Otf;
^l(ndt
lnVIt
mm
N(nl/t
(ntn(\
q
erl
Ctt(n
o
anoN
<t
oi10nl
$
to'art
CNo$
'j(n
ftl
fr'l
N
(nN
$
E
,=
Eoa
o
G
oF
tlNoN 5
tlN
R
o
E
aN
R
a
rf(\
R
(!
=
rlN
R
-oo
tfN
R o
.9
o.'tr
tlo6