HomeMy WebLinkAboutDAQ-2025-002132Company Name:
Address:
City:
Machine Identification:
`2025
Perchloroethylene (PCE) Dry Cleaner
Compliance Calendar
State of Utah
Department of Environmental Quality
Division of Air Quality
WHY IS EPA REGULATING DRY CLEANERS?
The Clean Air Act of 1990 directs the United States Environmental Protection
Agency (EPA) to regulate the emissions of 188 chemical compounds
designated as Hazardous Air Pollutants (HAPs). Perchloroethylene, also
known as “perc”, “pce” or “tetrachloroethylene”, is on the list of HAPs and is the
most commonly used chemical solvent at dry cleaners. In September 1993, the
EPA issued national regulations to control air emissions of “PCE” from dry
cleaners which they revised in July and September 2006. Remember these
rules only apply to dry cleaners using PCE.
IS YOUR BUSINESS AFFECTED?
How the business is affected depends on the date of machinery installation, the
amount of “PCE” purchased each year and the type of machines at the facility.
December 9, 1991 and December 21, 2005 are important dates for these
regulations. When a machine is installed determines applicable rules and the
types of control devices that are required.
If a facility has machines initially installed before December 9, 1991 the machine
will be classified as “existing”. If a facility has machines initially installed on or
after December 9, 1991, the source will be classified as “new”. The amount of
PCE purchased determines the facility size: small area, large area or major.
Small area sources use less than 140 gallons in a year for a dry-to-dry machine
or 200 gallons for a transfer machine.
WHAT REQUIREMENTS APPLY?
✓Air pollution equipment is required for ALL PCE dry cleaning equipment
EXCEPT: (1) transfer machines installed prior to September 23, 1993 and
which use less than 200 gallons per year AND (2) dry-to-dry machines
installed prior to October 9, 1991 and use less than 140 gallons per year.
✓Operate and maintain system according to manufacturer's specifications and
recommendations. Maintain, onsite, a copy of the design specifications and
operating manual for each machine and control device.
✓Refrigerated condensers installed on dryers, dry-to-dry machines or
reclaimers may not vent to the atmosphere while the drum is rotating.
✓Keep machine doors closed at all times - except when transferring clothes.
✓Store all PCE solvent and waste in sealed containers.
✓Drain cartridge filters in their housings or other sealed container for 24 hours
before disposing of them as a hazardous waste.
✓Inspect equipment every week (large sources using 140 gallons or more) or
every two weeks (small sources using less than 140 gallons) for perceptible
leaks, those obvious to sight, smell, or touch, while the dry cleaning system
is operating. ONCE each month the inspection must be conducted with a
hand-held detector/gas analyzer. Record all inspection and repair findings.
✓Repair perceptible leaks within 24 hours. Parts must be ordered within two
working days and installed within five days of receipt. Record all repairs.
IS MONITORING AND RECORDKEEPING REQUIRED?
✓Maintain on-site, for five years, records of inspection dates, name and location
of system components where leaks are found, inspection method, dates of
repair and record of written or verbal part orders. Record “no leaks” or “leak
found”, as applicable and record repair method e.g. “repaired by tightening
nuts” in a maintenance log.
✓Record your PCE purchases in a log and at the first of each month total the
volume purchased in the previous 12 months. Keep purchase receipts and
log on-site for a minimum of five years. If the usage exceeds that reported in
your initial compliance status, your location changes, or additional machines
added, then submit a new Notification of Compliance.
✓For a refrigerated condenser (RC), the primary evaluation method records
and evaluates the high and low pressure readings on the compressor unit.
The alternate method, when no pressure gauges are present: measure and
record weekly the air temperature after the RC. If the RC outlet air
temperature is greater than 45º F (7.2º C) during the end of the dry cycle,
make repairs and adjustments to meet this requirement.
✓For a Carbon adsorber, the amount of PCE vapor in the exhaust and dry
cleaner drum need to be measured and recorded weekly. A colorimetric tube
is acceptable for these measurements. Take exhaust duct PCE
concentration measurement at the end of the last dry cleaning cycle before
carbon is desorbed and make repairs or adjustments if the concentration
exceeds 100 parts per million (ppm). Take drum PCE concentration
measurement at the end of the dry cleaning cycle and make repairs or
adjustments if the concentration exceeds 300 ppm.
PERCHLOROETHYLENE (PCE) DRY CLEANERS FACT SHEET
IS THERE PAPERWORK TO SUBMIT?
All new dry cleaning machinery must have a Notification of Compliance form
submitted within 30 days of startup, including an estimate of PCE usage. An
updated Notification is required when significant changes occur at a facility.
There is a reporting form (rev 12/20086) on the second to last page of this
calendar and it indicates what significant changes prompt a new submittal.
OTHER REGULATIONS
Utah Division of Waste Management and Radiation Control -
(801) 536-0200
https://deq.utah.gov/waste-management-and-radiation-
control/hazardous-waste-management-program
Basic, onsite hazardous waste training is also available through
this program.
✓If you generate less than 220 pounds of hazardous waste per month, you
are a Conditionally Exempt Small Quantity Generator. This allows you to
dispose of the hazardous waste at a permitted disposal facility when prior
approval is obtained from the facility owner/operator.
✓If you generate more than 220 pounds of hazardous waste per month, your
facility is more stringently regulated. ALL hazardous waste shipped to a
disposal facility must be manifested. The paperwork must be properly filled
out with the applicable signatures of the generator, transporter and
disposer. You must keep the manifest onsite for a minimum of three years.
Contact the Division for further information if you fall within this category.
✓If ANY of your solid waste contains PCE, it is ALL considered hazardous.
This waste may include still residues, spent cartridges and separator water.
These wastes are an EPA F002 listed hazardous waste.
✓All containers holding hazardous waste must be labeled with the words
"HAZARDOUS WASTE" and must be kept completely closed except when
adding to or taking from a container.
Utah Division of Environmental Response and Remediation -
(801) 536-4100
https://deq.utah.gov/division-environmental-response-
remediation
✓Any underground storage tank that holds 110 gallons or more of a petroleum
product or of a CERCLA hazardous substance (e.g. PCE) must be
registered. You will need to register the tanks, pay tank fees and do a one-
time minimum site assessment. Also:
✓The underground tank system must be double walled or have
secondary containment and the owner/operator needs to perform
and keep records of monthly monitoring of the interstitial space.
✓If the tank or piping is made of metal, the system must be
cathodically protected. The cathodic protection system must be
tested every 3 years and results of the last two cathodic protection
tests must be maintained for inspection.
✓If these requirements apply, visit our website for information on leak
detection monitoring requirements.
Utah Division of Water Quality – UPDES Engineering Section
801-536-4300https://deq.utah.gov/division-water-quality
✓Separator water from your dry cleaning system contains PCE. It cannot be
discharged to a sewer or storm sewer system. There are commercially
available misters and evaporators with filters that remove the trace amounts
of PCE before the water is evaporated. Or, the separator water can go into
the sludge bin and be disposed of as hazardous waste.
✓If you have an existing floor drain connected to a septic tank and leach field
or dry well, call us to plan the best course of action to monitor or eliminate
this type of system. This system is NOT allowed in new construction.
✓If your wastewater discharges directly to a ditch or a stream, give us a call
for permit requirements.
✓If wastes from floor cleaning, etc. drain to a floor sump connected to a
municipal water and sewer system, make sure you are aware of and comply
with any pretreatment and cross connection prevention programs. Call your
city or local sewer district for more information.
JANUARY 2025
Weekly RC PRESSURE/TEMPERATURE and Carbon Adsorber [PCE] PCE PURCHASES 12-MONTH TOTAL
(New Small and Large Area Cleaners) Use pressure if pressure gauges are present on refrigeration unit
DATE
PRESSURE TEMP
(º F or º C)
Is pressure within
mfr specs? Or is
temp 45º F (7.2º C)
or less?
[PCE] in
CA
Exhaust
(ppm)
[PCE] in
Drum
(ppm)
TOTAL FROM LAST MONTH
DECEMBER 2024High Low
Y N SUBTRACT PCE
PURCHASED LAST YEAR
during JANUARY 2024 -
Y N SUBTOTAL
Y N PURCHASE
DATE
PURCHASE
AMOUNT
12 MONTH
RUNNING
TOTAL
Y N +
Y N +
LEAK INSPECTIONS (TEST METHODS: sight smell (ss) or with a leak detector (ld))
(Small Area Cleaners every other week; Large Area Cleaners every week)
** ONCE EACH MONTH the inspection is REQUIRED to be conducted using a hand-held leak detector, regardless of facility size or equipment
installation date **
COMPONENT INSPECTED LEAKING?
Date DATE PARTS DATE PARTS DATE
TEST METHOD ORDERED RECEIVED REPAIRED
Hose + Pipe Connections N Y N Y N Y N Y N Y
Door Gaskets + Seating N Y N Y N Y N Y N Y
Pump N Y N Y N Y N Y N Y
Solvent Tanks + containers N Y N Y N Y N Y N Y
Water Separators N Y N Y N Y N Y N Y
Muck Cooker N Y N Y N Y N Y N Y
Still N Y N Y N Y N Y N Y
Exhaust Dampers N Y N Y N Y N Y N Y
Diverter Valves N Y N Y N Y N Y N Y
Filter Gaskets + Seating N Y N Y N Y N Y N Y
All Filter Housings N Y N Y N Y N Y N Y
Waste Containers N Y N Y N Y N Y N Y LABELED Y N DATED Y N
JANUARY 2025
Su M Tu W Th F Sa
4
5 6 8 9 10 11
12 13 14
Temp logged Inspect logged
15 16 17 18
19 20 21
Temp logged Inspect logged
22 23 24 25
26 27 28
Temp logged Inspect logged
Dry Cleaner Compliance Calendar
Utah Department of Environmental Quality
Division of Air Quality
1 2 3
7
TTemp l emp logoggegedd IIns nspepect ct llog oggegedd
29 30 31
February 2025
Weekly RC PRESSURE/TEMPERATURE and Carbon Adsorber [PCE] PCE PURCHASES 12-MONTH TOTAL
(New Small and Large Area Cleaners) Use pressure if pressure gauges are present on refrigeration unit
DATE PRESSURE TEMP (º F or º C) Is pressure within mfr specs? Or is temp 45º F (7.2º C) or less?
[PCE] in CA Exhaust (ppm)
[PCE] in Drum (ppm)
TOTAL FROM LAST MONTH JANUARY 2025High Low
Y N SUBTRACT PCE PURCHASED LAST YEAR during FEBRUARY 2024 -
Y N SUBTOTAL
Y N PURCHASE DATE PURCHASE AMOUNT
12 MONTH RUNNING TOTAL
Y N +
Y N +
LEAK INSPECTIONS (TEST METHOD: sight smell (ss) or with a leak detector (ld))
(Small Area Cleaners every other week, Large Area Cleaners every week)** ONCE EACH MONTH the inspection is REQUIRED to be conducted using a hand-held leak detector, regardless of facility size or equipment installation date **
COMPONENT INSPECTED LEAKING? Date DATE PARTS DATE PARTS DATE TEST METHOD ORDERED RECEIVED REPAIRED
Hose + Pipe Connections N Y N Y N Y N Y N Y
Door Gaskets + Seating N Y N Y N Y N Y N Y
Pump N Y N Y N Y N Y N Y
Solvent Tanks + containers N Y N Y N Y N Y N Y
Water Separators N Y N Y N Y N Y N Y
Muck Cooker N Y N Y N Y N Y N Y
Still N Y N Y N Y N Y N Y
Exhaust Dampers N Y N Y N Y N Y N Y
Diverter Valves N Y N Y N Y N Y N Y
Filter Gaskets + Seating N Y N Y N Y N Y N Y
All Filter Housings N Y N Y N Y N Y N Y
Waste Containers N Y N Y N Y N Y N Y LABELED Y N DATED Y N
FEBRUARY 2025
Su M Tu W Th F Sa
1
2 3 4
Temp logged
Inspect logged
5 6 7 8
9 10 11
Temp logged
Inspect logged
12 13 14 15
16 17 18
Temp logged
Inspect logged
19 20 21 22
23
Dry Cleaner Compliance Calendar
Utah Department of Environmental Quality
Division of Air Quality
24 25
Temp logged Inspect logged
26 27 28
MARCH 2025
Weekly RC PRESSURE/TEMPERATURE and Carbon Adsorber [PCE] PCE PURCHASES 12-MONTH TOTAL
(New Small and Large Area Cleaners) Use pressure if pressure gauges are present on refrigeration unit
DATE
PRESSURE TEMP
(º F or º C)
Is pressure within
mfr specs? Or is
temp 45º F (7.2º C)
or less?
[PCE] in
CA
Exhaust
(ppm)
[PCE] in
Drum
(ppm)
TOTAL FROM LAST MONTH
FEBRUARY 2025High Low
Y N SUBTRACT PCE
PURCHASED LAST YEAR
during MARCH 2024 -
Y N SUBTOTAL
Y N PURCHASE
DATE
PURCHASE
AMOUNT
12 MONTH
RUNNING
TOTAL
Y N +
Y N +
LEAK INSPECTIONS (TEST METHOD: sight smell (ss) or with a leak detector (ld))
(Small Area Cleaners every other week, Large Area Cleaners every week)
** ONCE EACH MONTH the inspection is REQUIRED to be conducted using a hand-held leak detector, regardless of facility size or equipment
installation date **
COMPONENT INSPECTED LEAKING?
Date DATE PARTS DATE PARTS DATE
TEST METHOD ORDERED RECEIVED REPAIRED
Hose + Pipe Connections N Y N Y N Y N Y N Y
Door Gaskets + Seating N Y N Y N Y N Y N Y
Pump N Y N Y N Y N Y N Y
Solvent Tanks + containers N Y N Y N Y N Y N Y
Water Separators N Y N Y N Y N Y N Y
Muck Cooker N Y N Y N Y N Y N Y
Still N Y N Y N Y N Y N Y
Exhaust Dampers N Y N Y N Y N Y N Y
Diverter Valves N Y N Y N Y N Y N Y
Filter Gaskets + Seating N Y N Y N Y N Y N Y
All Filter Housings N Y N Y N Y N Y N Y
Waste Containers N Y N Y N Y N Y N Y LABELED Y N DATED Y N
MARCH 2025
Su M Tu W Th F Sa
1
2 3 4
Temp logged
Inspect logged
5 6 7 8
9 10 11
Temp logged
Inspect logged
12 13 14 15
16 17 18
Temp logged
Inspect logged
19 20 21 22
23 24 25
Temp logged
Inspect logged
Dry Cleaner Compliance Calendar
Utah Department of Environmental Quality
Division of Air Quality
26 27 28 29
30 31
APRIL 2025
Weekly RC PRESSURE/TEMPERATURE and Carbon Adsorber [PCE] PCE PURCHASES 12-MONTH TOTAL
(New Small and Large Area Cleaners) Use pressure if pressure gauges are present on refrigeration unit
DATE
PRESSURE TEMP
(º F or º C)
Is pressure within
mfr specs? Or is
temp 45º F (7.2º C)
or less?
[PCE] in
CA
Exhaust
(ppm)
[PCE] in
Drum
(ppm)
TOTAL FROM LAST MONTH
MARCH 2025High Low
Y N SUBTRACT PCE
PURCHASED LAST YEAR
during APRIL 2024 -
Y N SUBTOTAL
Y N PURCHASE
DATE
PURCHASE
AMOUNT
12 MONTH
RUNNING
TOTAL
Y N +
Y N +
LEAK INSPECTIONS (TEST METHOD: sight smell (ss) or with a leak detector (ld))
(Small Area Cleaners every other week, Large Area Cleaners every week)
** ONCE EACH MONTH the inspection is REQUIRED to be conducted using a hand-held leak detector, regardless of facility size or equipment
installation date **
COMPONENT INSPECTED LEAKING?
Date DATE PARTS DATE PARTS DATE
TEST METHOD ORDERED RECEIVED REPAIRED
Hose + Pipe Connections N Y N Y N Y N Y N Y
Door Gaskets + Seating N Y N Y N Y N Y N Y
Pump N Y N Y N Y N Y N Y
Solvent Tanks + containers N Y N Y N Y N Y N Y
Water Separators N Y N Y N Y N Y N Y
Muck Cooker N Y N Y N Y N Y N Y
Still N Y N Y N Y N Y N Y
Exhaust Dampers N Y N Y N Y N Y N Y
Diverter Valves N Y N Y N Y N Y N Y
Filter Gaskets + Seating N Y N Y N Y N Y N Y
All Filter Housings N Y N Y N Y N Y N Y
Waste Containers N Y N Y N Y N Y N Y LABELED Y N DATED Y N
APRIL 2025
Su M Tu W Th F Sa
5
6 7 8
Temp logged
Inspect logged
9 10 11 12
13 14 15
Temp logged
Inspect logged
16 17 18 19
20 21 22
Temp logged
Inspect logged
23 24 25 26
27 28 29
Temp logged
Inspect logged
Dry Cleaner Compliance Calendar
Utah Department of Environmental Quality
Division of Air Quality
1
Temp logged
Inspect logged
2 3 4
30
MAY 2025
Weekly RC PRESSURE/TEMPERATURE and Carbon Adsorber [PCE] PCE PURCHASES 12-MONTH TOTAL
(New Small and Large Area Cleaners) Use pressure if pressure gauges are present on refrigeration unit
DATE
PRESSURE TEMP
(º F or º C)
Is pressure within
mfr specs? Or is
temp 45º F (7.2º C)
or less?
[PCE] in
CA
Exhaust
(ppm)
[PCE] in
Drum
(ppm)
TOTAL FROM LAST MONTH
APRIL 2025High Low
Y N SUBTRACT PCE
PURCHASED LAST YEAR
during MAY 2024 -
Y N SUBTOTAL
Y N PURCHASE
DATE
PURCHASE
AMOUNT
12 MONTH
RUNNING
TOTAL
Y N +
Y N +
LEAK INSPECTIONS (TEST METHOD: sight smell (ss) or with a leak detector (ld))
(Small Area Cleaners every other week, Large Area Cleaners every week)
** ONCE EACH MONTH the inspection is REQUIRED to be conducted using a hand-held leak detector, regardless of facility size or equipment
installation date **
COMPONENT INSPECTED LEAKING?
Date DATE PARTS DATE PARTS DATE
TEST METHOD ORDERED RECEIVED REPAIRED
Hose + Pipe Connections N Y N Y N Y N Y N Y
Door Gaskets + Seating N Y N Y N Y N Y N Y
Pump N Y N Y N Y N Y N Y
Solvent Tanks + containers N Y N Y N Y N Y N Y
Water Separators N Y N Y N Y N Y N Y
Muck Cooker N Y N Y N Y N Y N Y
Still N Y N Y N Y N Y N Y
Exhaust Dampers N Y N Y N Y N Y N Y
Diverter Valves N Y N Y N Y N Y N Y
Filter Gaskets + Seating N Y N Y N Y N Y N Y
All Filter Housings N Y N Y N Y N Y N Y
Waste Containers N Y N Y N Y N Y N Y LABELED Y N DATED Y N
MAY 2025
Su M Tu W Th F Sa
3
4 5 6
Temp logged
Inspect logged
7 8 9 10
11 12 13
Temp logged
Inspect logged
14 15 16 17
18 19 20
Temp logged
Inspect logged
21 22 23 24
25 26 27
Temp logged
Inspect logged
Dry Cleaner Compliance Calendar
Utah Department of Environmental Quality
Division of Air Quality
1 2
28 29 30 31
JUNE 2025
Weekly RC PRESSURE/TEMPERATURE and Carbon Adsorber[PCE] PCE PURCHASES 12-MONTH TOTAL
(New Small and Large Area Cleaners) Use pressure if pressure gauges are present on refrigeration unit
DATE
PRESSURE TEMP
(º F or º C)
Is pressure within
mfr specs? Or is
temp 45º F (7.2º C)
or less?
[PCE] in
CA
Exhaust
(ppm)
[PCE] in
Drum
(ppm)
TOTAL FROM LAST MONTH
MAY 2025High Low
Y N SUBTRACT PCE
PURCHASED LAST YEAR
during JUNE 2024 -
Y N SUBTOTAL
Y N PURCHASE
DATE
PURCHASE
AMOUNT
12 MONTH
RUNNING
TOTAL
Y N +
Y N +
LEAK INSPECTIONS (TEST METHOD: sight smell (ss) or with a leak detector (ld))
(Small Area Cleaners every other week, Large Area Cleaners every week)
** ONCE EACH MONTH the inspection is REQUIRED to be conducted using a hand-held leak detector, regardless of facility size or equipment
installation date **
COMPONENT INSPECTED LEAKING?
Date DATE PARTS DATE PARTS DATE
TEST METHOD ORDERED RECEIVED REPAIRED
Hose + Pipe Connections N Y N Y N Y N Y N Y
Door Gaskets + Seating N Y N Y N Y N Y N Y
Pump N Y N Y N Y N Y N Y
Solvent Tanks + containers N Y N Y N Y N Y N Y
Water Separators N Y N Y N Y N Y N Y
Muck Cooker N Y N Y N Y N Y N Y
Still N Y N Y N Y N Y N Y
Exhaust Dampers N Y N Y N Y N Y N Y
Diverter Valves N Y N Y N Y N Y N Y
Filter Gaskets + Seating N Y N Y N Y N Y N Y
All Filter Housings N Y N Y N Y N Y N Y
Waste Containers N Y N Y N Y N Y N Y LABELED Y N DATED Y N
JUNE 2025
Su M Tu W Th F Sa
7
8 9 10
Temp logged
Inspect logged
11 12 13 14
15 16 17
Temp logged
Inspect logged
18 19 20 21
22 23 24
Temp logged
Inspect logged
25 26 27 28
29 30
Dry Cleaner Compliance Calendar
Utah Department of Environmental Quality
Division of Air Quality
1 2 3 4 5 6
Temp loggedInspect logged
JULY 2025
Weekly RC PRESSURE/TEMPERATURE and Carbon Adsorber [PCE] PCE PURCHASES 12-MONTH TOTAL
(New Small and Large Area Cleaners) Use pressure if pressure gauges are present on refrigeration unit
DATE
PRESSURE TEMP
(º F or º C)
Is pressure within
mfr specs? Or is
temp 45º F (7.2º C)
or less?
[PCE] in
CA
Exhaust
(ppm)
[PCE] in
Drum
(ppm)
TOTAL FROM LAST MONTH
JUNE 2025High Low
Y N SUBTRACT PCE
PURCHASED LAST YEAR
during JULY 2024 -
Y N SUBTOTAL
Y N PURCHASE
DATE
PURCHASE
AMOUNT
12 MONTH
RUNNING
TOTAL
Y N +
Y N +
LEAK INSPECTIONS (TEST METHOD: sight smell (ss) or with a leak detector (ld))
(Small Area Cleaners every other week, Large Area Cleaners every week)
** ONCE EACH MONTH the inspection is REQUIRED to be conducted using a hand-held leak detector, regardless of facility size or equipment
installation date **
COMPONENT INSPECTED LEAKING?
Date DATE PARTS DATE PARTS DATE
TEST METHOD ORDERED RECEIVED REPAIRED
Hose + Pipe Connections N Y N Y N Y N Y N Y
Door Gaskets + Seating N Y N Y N Y N Y N Y
Pump N Y N Y N Y N Y N Y
Solvent Tanks + containers N Y N Y N Y N Y N Y
Water Separators N Y N Y N Y N Y N Y
Muck Cooker N Y N Y N Y N Y N Y
Still N Y N Y N Y N Y N Y
Exhaust Dampers N Y N Y N Y N Y N Y
Diverter Valves N Y N Y N Y N Y N Y
Filter Gaskets + Seating N Y N Y N Y N Y N Y
All Filter Housings N Y N Y N Y N Y N Y
Waste Containers N Y N Y N Y N Y N Y LABELED Y N DATED Y N
JULY 2025
Su M Tu W T h F Sa
5
6 7 8
Temp logged
Inspect logged
9 10 11 12
13 14 15
Temp logged
Inspect logged
16 17 18 19
20 21 22
Temp logged
Inspect logged
23 24 25 26
27 28 29
Temp logged
Inspect logged
30
Dry Cleaner Compliance Calendar
Utah Department of Environmental Quality
Division of Air Quality
1
Temp logged Inspect logged
2 3 4
31
AUGUST 2025
Weekly RC PRESSURE/TEMPERATURE and Carbon Adsorber [PCE] PCE PURCHASES 12-MONTH TOTAL
(New Small and Large Area Cleaners) (Use pressure if pressure gauges are present on refrigeration unit
DATE
PRESSURE TEMP
(º F or º C)
Is pressure within
mfr specs? Or is
temp 45º F (7.2º C)
or less?
[PCE] in CA
Exhaust
(ppm)
[PCE] in
Drum
(ppm)
TOTAL FROM LAST MONTH
JULY 2025High Low
Y N SUBTRACT PCE
PURCHASED LAST YEAR
during AUGUST 2024 -
Y N SUBTOTAL
Y N PURCHASE
DATE
PURCHASE
AMOUNT
12 MONTH
RUNNING
TOTAL
Y N +
Y N +
LEAK INSPECTIONS (TEST METHOD: sight smell (ss) or with a leak detector (ld))
(Small Area Cleaners every other week, Large Area Cleaners every week)
** ONCE EACH MONTH the inspection is REQUIRED to be conducted using a hand-held leak detector, regardless of facility size or equipment
installation date **
COMPONENT INSPECTED LEAKING?
Date DATE PARTS DATE PARTS DATE
TEST METHOD ORDERED RECEIVED REPAIRED
Hose + Pipe Connections N Y N Y N Y N Y N Y
Door Gaskets + Seating N Y N Y N Y N Y N Y
Pump N Y N Y N Y N Y N Y
Solvent Tanks + containers N Y N Y N Y N Y N Y
Water Separators N Y N Y N Y N Y N Y
Muck Cooker N Y N Y N Y N Y N Y
Still N Y N Y N Y N Y N Y
Exhaust Dampers N Y N Y N Y N Y N Y
Diverter Valves N Y N Y N Y N Y N Y
Filter Gaskets + Seating N Y N Y N Y N Y N Y
All Filter Housings N Y N Y N Y N Y N Y
Waste Containers N Y N Y N Y N Y N Y LABELED Y N DATED Y N
AUGUST 2025
Su M Tu W Th F Sa
2
3 4 5
Temp logged
Inspect logged
6 7 8 9
10 11 12
Temp logged
Inspect logged
13 14 15 16
17 18 19
Temp logged
Inspect logged
20 21 22 23
24 25 26
Temp logged
Inspect logged
Dry Cleaner Compliance Calendar
Utah Department of Environmental Quality
Division of Air Quality
1
27 28 29 30
31
SEPTEMBER 2025
Weekly RC PRESSURE/TEMPERATURE and Carbon Adsorber [PCE] PCE PURCHASES 12-MONTH TOTAL
(New Small and Large Area Cleaners) Use pressure if pressure gauges are present on refrigeration unit
DATE
PRESSURE TEMP
(º F or º C)
Is pressure within
mfr specs? Or is
temp 45º F (7.2º C)
or less?
[PCE] in
CA
Exhaust
(ppm)
[PCE] in
Drum
(ppm)
TOTAL FROM LAST MONTH
AUGUST 2025High Low
Y N SUBTRACT PCE
PURCHASED LAST YEAR
during SEPTEMBER 2024 -
Y N SUBTOTAL
Y N PURCHASE
DATE
PURCHASE
AMOUNT
12 MONTH
RUNNING
TOTAL
Y N +
Y N +
LEAK INSPECTIONS (TEST METHOD: sight smell (ss) or with a leak detector (ld))
(Small Area Cleaners every other week, Large Area Cleaners every week)
** ONCE EACH MONTH the inspection is REQUIRED to be conducted using a hand-held leak detector, regardless of facility size or equipment
installation date **
COMPONENT INSPECTED LEAKING?
Date DATE PARTS DATE PARTS DATE
TEST METHOD ORDERED RECEIVED REPAIRED
Hose + Pipe Connections N Y N Y N Y N Y N Y
Door Gaskets + Seating N Y N Y N Y N Y N Y
Pump N Y N Y N Y N Y N Y
Solvent Tanks + containers N Y N Y N Y N Y N Y
Water Separators N Y N Y N Y N Y N Y
Muck Cooker N Y N Y N Y N Y N Y
Still N Y N Y N Y N Y N Y
Exhaust Dampers N Y N Y N Y N Y N Y
Diverter Valves N Y N Y N Y N Y N Y
Filter Gaskets + Seating N Y N Y N Y N Y N Y
All Filter Housings N Y N Y N Y N Y N Y
Waste Containers N Y N Y N Y N Y N Y LABELED Y N DATED Y N
SEPTEMBER 2025
Su M Tu W Th F Sa
5 6
7 8 9
Temp logged
Inspect logged
10 11 12 13
14 15 16
Temp logged
Inspect logged
17 18 19 20
21 22 23
Temp logged
Inspect logged
24 25 26 27
28 29
Dry Cleaner Compliance Calendar
Utah Department of Environmental Quality
Division of Air Quality
1 2
Temp logged
Inspect logged
3 4
30
Temp logged
Temp Inspected
OCTOBER 2025
Weekly RC PRESSURE/TEMPERATURE and Carbon Adsorber [PCE] PCE PURCHASES 12-MONTH TOTAL
(New Small and Large Area Cleaners) Use pressure if pressure gauges are present on refrigeration unit
DATE
PRESSURE TEMP
(º F or º C)
Is pressure within
mfr specs? Or is
temp 45º F (7.2º C)
or less?
[PCE] in
CA
Exhaust
(ppm)
[PCE] in
Drum
(ppm)
TOTAL FROM LAST MONTH
SEPTEMBER 2025High Low
Y N SUBTRACT PCE
PURCHASED LAST YEAR
during OCTOBER 2024 -
Y N SUBTOTAL
Y N PURCHASE
DATE
PURCHASE
AMOUNT
12 MONTH
RUNNING
TOTAL
Y N +
Y N +
LEAK INSPECTIONS (TEST METHOD: sight smell (ss) or with a leak detector (ld))
(Small Area Cleaners every other week, Large Area Cleaners every week)
** ONCE EACH MONTH the inspection is REQUIRED to be conducted using a hand-held leak detector, regardless of facility size or equipment
installation date **
COMPONENT INSPECTED LEAKING?
Date DATE PARTS DATE PARTS DATE
TEST METHOD ORDERED RECEIVED REPAIRED
Hose + Pipe Connections N Y N Y N Y N Y N Y
Door Gaskets + Seating N Y N Y N Y N Y N Y
Pump N Y N Y N Y N Y N Y
Solvent Tanks + containers N Y N Y N Y N Y N Y
Water Separators N Y N Y N Y N Y N Y
Muck Cooker N Y N Y N Y N Y N Y
Still N Y N Y N Y N Y N Y
Exhaust Dampers N Y N Y N Y N Y N Y
Diverter Valves N Y N Y N Y N Y N Y
Filter Gaskets + Seating N Y N Y N Y N Y N Y
All Filter Housings N Y N Y N Y N Y N Y
Waste Containers N Y N Y N Y N Y N Y LABELED Y N DATED Y N
OCTOBER 2025
Su M Tu W Th F Sa
4
5 6 7
Temp logged
Inspect logged
8 9 10 11
12 13 14
Temp logged
Inspect logged
15 16 17 18
19 20 21
Temp logged
Inspect logged
22 23 24 25
26 27 28
Temp logged
Inspect logged
Dry Cleaner Compliance Calendar
Utah Department of Environmental Quality
Division of Air Quality
1 2 3
29 30 31
NOVEMBER 2025
Weekly RC PRESSURE/TEMPERATURE and Carbon Adsorber [PCE] PCE PURCHASES 12-MONTH TOTAL
(New Small and Large Area Cleaners) Use pressure if pressure gauges are present on refrigeration unit
DATE
PRESSURE TEMP
(º F or º C)
Is pressure within
mfr specs? Or is
temp 45º F (7.2º C)
or less?
[PCE] in
CA
Exhaust
(ppm)
[PCE] in
Drum
(ppm)
TOTAL FROM LAST MONTH
OCTOBER 2025High Low
Y N SUBTRACT PCE
PURCHASED LAST YEAR
during NOVEMBER 2024 -
Y N SUBTOTAL
Y N PURCHASE
DATE
PURCHASE
AMOUNT
12 MONTH
RUNNING
TOTAL
Y N +
Y N +
LEAK INSPECTIONS (TEST METHOD: sight smell (ss) or with a leak detector (ld))
(Small Area Cleaners every other week, Large Area Cleaners every week)
** ONCE EACH MONTH the inspection is REQUIRED to be conducted using a hand-held leak detector, regardless of facility size or equipment
installation date **
COMPONENT INSPECTED LEAKING?
Date DATE PARTS DATE PARTS DATE
TEST METHOD ORDERED RECEIVED REPAIRED
Hose + Pipe Connections N Y N Y N Y N Y N Y
Door Gaskets + Seating N Y N Y N Y N Y N Y
Pump N Y N Y N Y N Y N Y
Solvent Tanks + containers N Y N Y N Y N Y N Y
Water Separators N Y N Y N Y N Y N Y
Muck Cooker N Y N Y N Y N Y N Y
Still N Y N Y N Y N Y N Y
Exhaust Dampers N Y N Y N Y N Y N Y
Diverter Valves N Y N Y N Y N Y N Y
Filter Gaskets + Seating N Y N Y N Y N Y N Y
All Filter Housings N Y N Y N Y N Y N Y
Waste Containers N Y N Y N Y N Y N Y LABELED Y N DATED Y N
NOVEMBER 2025
Su M Tu W Th F Sa
1
2 3 4
Temp logged
Inspect logged
5 6 7 8
9 10 11
Temp logged
Inspect logged
12 13 14 15
16 17 18
Temp logged
Inspect logged
19 20 21 22
23 24
Dry Cleaner Compliance Calendar
Utah Department of Environmental Quality
Division of Air Quality
25
Temp loggedInspect logged
26 27 28 29
30
DECEMBER 2025
Weekly RC PRESSURE/TEMPERATURE and Carbon Adsorber [PCE] PCE PURCHASES 12-MONTH TOTAL
(New Small and Large Area Cleaners) (Use pressure if pressure gauges are present on refrigeration unit
DATE
PRESSURE TEMP
(º F or º C)
Is pressure within
mfr specs? Or is
temp 45º F (7.2º C)
or less?
[PCE] in
CA
Exhaust
(ppm)
[PCE] in
Drum
(ppm)
TOTAL FROM LAST MONTH
NOVEMBER 2025High Low
Y N SUBTRACT PCE
PURCHASED LAST YEAR
during DECEMBER 2024 -
Y N SUBTOTAL
Y N PURCHASE
DATE
PURCHASE
AMOUNT
12 MONTH
RUNNING
TOTAL
Y N +
Y N +
LEAK INSPECTIONS (TEST METHOD: sight smell (ss) or with a leak detector (ld))
(Small Area Cleaners every other week, Large Area Cleaners every week)
** ONCE EACH MONTH the inspection is REQUIRED to be conducted using a hand-held leak detector, regardless of facility size or equipment
installation date **
COMPONENT INSPECTED LEAKING?
Date DATE PARTS DATE PARTS DATE
TEST METHOD ORDERED RECEIVED REPAIRED
Hose + Pipe Connections N Y N Y N Y N Y N Y
Door Gaskets + Seating N Y N Y N Y N Y N Y
Pump N Y N Y N Y N Y N Y
Solvent Tanks + containers N Y N Y N Y N Y N Y
Water Separators N Y N Y N Y N Y N Y
Muck Cooker N Y N Y N Y N Y N Y
Still N Y N Y N Y N Y N Y
Exhaust Dampers N Y N Y N Y N Y N Y
Diverter Valves N Y N Y N Y N Y N Y
Filter Gaskets + Seating N Y N Y N Y N Y N Y
All Filter Housings N Y N Y N Y N Y N Y
Waste Containers N Y N Y N Y N Y N Y LABELED Y N DATED Y N
DECEMBER 2025
Su M Tu W Th F Sa
5 6
7 8 9
Temp logged
Inspect logged
10 11 12 13
14 15 16
Temp logged
Inspect logged
17 18 19 20
21 22 23
Temp logged
Inspect logged
24 25 26 27
28 29 30
Temp logged
Inspect logged
Dry Cleaner Compliance Calendar
Utah Department of Environmental Quality
Division of Air Quality
1 2
Temp logged
Inspect logged
3 4
31
RECORDKEEPING INSTRUCTIONS
TOTAL FROM LAST
MONTH- June 2025 55
SUBTRACT PCE PURCHASED
July 2024 -10
SUBTOTAL 45
PURCHASE
DATE
PURCHASE
AMOUNT
12 MONTH
RUNNING
TOTAL
7/12 +15 60
+
Record the date you
purchased PCE this
month, if any.
If you bought PCE this month, record
the amount and add it to the subtotal.
This amount will also go on next year’s
calendar for this same month on the
“SUBTRACT PCE PURCHASED” line.
If you bought none write in “0”.
Enter the amount of PCE you
bought during this month last year
(2024), from last year’s records or
calendar.
Subtract last years PCE purchases
for this month, July 2024 the
purchased PCE was 10 gallons, so 55
- 10 = 45. This is your 12 month
running total if you do not buy any
PCE this month.
This is your new 12 month running
total if you bought PCE this month.
Record the bottom number in this
column on next month’s form on the
“TOTAL FROM LAST MONTH” line.
July 2025
PCE Purchases Running Total
You may use this calendar to keep records required
for air quality compliance. Keep these records at
your facility for 5 years.
REFRIGERATED CONDENSER (RC)
EVALUATION, Inspect the RC control device each
week using the pressure method or if pressure
gauges are not present use the temperature method.
Record date, readings and findings in the space
provided.
Refrigeration System Pressure Method: Evaluate
the high and low pressure readings on the
compressor unit during the drying phase. Compare
readings to manufactures specifications.
RC Outlet Temperature Method: Check the outlet
temperature of the refrigerated condenser. Is the
temperature less than or equal to 45º F (7.2º C)?”
Check “Y” for “yes” or “N” for “no”. If you checked
“N,” the machine must be repaired.
LEAK INSPECTIONS-Once each month a hand-
held leak detector must be used at each facility
If you buy less than 140 gallons of PCE per year,
you must conduct and record leak inspections at
least every other week.
If you buy 140 gallons or more of PCE per year, you
must conduct and record inspections EVERY week.
Record the results of the inspections on the
calendar. If leaks are found, they must be repaired
within 24 hours. Indicate in the “DATE REPAIRED”
block when repairs are completed.
If parts must be purchased, indicate the date(s) they
are ordered and the date(s) installed. Parts must be
ordered within 2 working days of leak detection
and installed within 5 working days of receipt.
Enter 12 month running total
from last month (June 2025).
Dry Cleaner Perchloroethylene NESHAP Notification of Compliance
1.Perchloroethylene (PCE) Dry Cleaning Facility Owner and Business Information:
Print or type the following for each separately located dry cleaning facility. The owner of more than one
facility must fill out a separate form for each facility.
Owner/Operator
Company Name
Mailing Address
City State Zip
Phone Number Fax E-mail
Facility Address (If different from the above mailing address)
Street Address
City State Zip
Phone Number Fax
Comments:
2.Yearly PCE solvent purchase: Write in the total volume of PCE solvent purchased for the facility, for
a year (from the current 12 month rolling total):
Gallons Highest expected 12 month total __________ Gallons
3.Facility’s source classification based on the PCE used at this facility (Dry to Dry){Transfer}:
Small Area Source (use less than 140 {200} gallons of PCE per year)
Large Area Source (use 140 - 2,100 {200 – 1,800} gallons of PCE per year)
Major Source (use greater than 2,100 {1,800} gallons of PCE per year)
4.List all machines located at this facility:
Manufacturer Model Serial Number Installed (mm-dd-yy) Control Device
Dry Cleaner Perchloroethylene NESHAP Notification of Compliance
5.Circle one:
Collocated residential (located in a building with residential units). Number of Residential Units_________
Collocated commercial (located in a building with commercial)
Standalone
6.Halogenated hydrocarbon detector or PCE gas analyzer available? Y N Type___________
7.Comments:
8.Compliance Certification
□By checking this box you are certifying the above equipment is in compliance with all applicable
requirements of 40 CFR Part 63 Subpart M NESHAP for Perchloroethylene Dry Cleaning
Facilities, including performing all inspections and recordkeeping.
Print or type the name and title of the Responsible Official for the dry cleaning facility:
Name of Responsible Official Title
I CERTIFY THE INFORMATION CONTAINED IN THIS REPORT TO BE ACCURATE AND TRUE TO THE
BEST OF MY KNOWLEDGE.
Signature of Responsible Official Date
This notification is to be submitted to the Utah Division of Air Quality within 30 days of any of
these events (please check all that apply):
_____ start-up of a new location
_____ old machines are replaced or additional dry cleaning machines are added to a facility
_____ the amount of PCE purchased in a year exceeds the threshold previously reported in #3
_____ change of location or ownership
Mail the signed and completed Notification of Compliance status form to:
Utah Division of Air Quality
Minor Source Compliance Section
P.O. Box 144820
Salt Lake City, UT 84114-4820
October 2019
Instructions for Completing the Notification of Compliance
This notice is required for dry cleaners subject to the 40 CFR 63 Subpart M NESHAP
for Perchloroethylene Dry Cleaning Facilities. This notice is for existing and new
machines using perchloroethylene (PCE). If you need to submit compliance
information for a transfer machine or a system that is located in a building with a
residence, please contact the Utah Division of Air Quality, Small Business
Environmental Assistance Program 801-536-4000 or 800-270-4440.
This notification is to be submitted to the Division of Air Quality on or before 30 days
after start-up of new or used dry cleaning machines, if PCE use increases or if
additional dry cleaning machines are added to a facility which has previously filed.
Copies of regulations and guidance documents are available from the Utah Division of
Air Quality, Small Business Environmental Assistance Program 801-536-4000 or 800-
270-4440.
1.Dry Cleaning Facility Address and Location
Owner/Operator - The name of the corporation, agency or individual that has
ownership or control of the dry cleaning facility for which this notification is submitted.
Owner/Facility Address - Write in the mailing address of the owner and the facility.
2. Yearly PCE solvent consumption:
Write in the total amount, in gallons, of PCE consumed (purchased) at the facility
during the previous twelve months. The total amount is for all machines, new and
existing, at the facility. New owners of used machines should obtain solvent purchase
records from the previous owner. If this is a new machine, don’t include the initial PCE
charge to fill the tank in the consumption calculation. Contact the manufacturer of the
machine to estimate the PCE consumption based on future usage. Note: If this is a
new facility or dry cleaning machine the consumption will be an estimate of future
consumption.
3. Facility’s source classification based on the PCE used at this facility:
Using the amount of PCE written in No. 2 above, select the facility's classification:
Indicate with an "X" which classification applies to the facility.
4. List the machines located at this facility:
List all the machines for this location. For each machine located at the facility, list the
make, model, serial number (if it can be found), installed date and the control device
required for the machine. Use ‘Control Device Requirements’ table below for
guidelines for control device requirements. Write the date of the machine’s installation
in the date-month-year (dd-mm-yy) format.
If a machine listed as an ‘existing’ machine is moved to another location, it becomes
new installation and must meet all the applicable requirements. Note: A facility can
have both new and old machines at the same location. Different machines can have
different control and reporting requirements at the same location.
If a facility has machines initially installed before December 9, 1991 the machine will
be classified as “existing”. If a facility has machines initially installed on or after
December 9, 1991, the source will be classified as “new”.
Control Device Requirements
Classification Control Device
Existing Small Area Source None Required
Existing Large Area Source Refrigerated Condenser
(Carbon Adsorbers if machine installed before 11-22-93)
New Small and Large Area Source Refrigerated Condenser
Major and ALL New Area Sources after December 21, 2005. Refrigerated
Condenser and pass the air-PCE gas-vapor stream from inside the dry cleaning
machine drum through a non-vented carbon adsorber or equivalent control device
immediately before the door of the dry cleaning machine is opened.
5.Collocated means located in a building with residential or commercial.
6.Halogenated hydrocarbon detector or PCE gas analyzer available?
Indicate Yes or No and the type, make and model.
7.Comments: If this notification is a change of owner, address or name change
include a comment explaining this on the ‘Comments’ line.
8. Compliance certification: Indicate with an "X" if you are in compliance.
Compliance means using the required control devices, performing the required
pollution prevention, recordkeeping and reporting as required by the Subpart M
NESHAP for Perchloroethylene Dry Cleaning Facilities.
Responsible Official Certification
Print or type the name of the responsible official and his/her title. The
responsible official must sign and date this form.
A Responsible Official can be:
•The president, vice president, secretary or treasurer of the company that owns
the dry cleaning facility,
•An owner of the dry cleaning facility,
•The manager of the dry cleaning facility, or,
•A government official, if the dry cleaning facility is owned by the Federal, State,
City or County government,
•A ranking military officer, if the dry cleaning facility is located at a military base.
Make a copy of the completed form for your records.
Mail the signed and completed Notification of Compliance status form to:
Utah Division of Air Quality
Minor Source Compliance Section
P.O. Box 144820
Salt Lake City, UT 84114-4820
Small Business Environmental Assistance Program
Utah Division of Air Quality
P.O. Box 144820
Salt Lake City, UT 84114-4820
Presorted
Standard
U.S. Postage
PAID
Salt Lake City, UT
Permit No. 4621
Notes:
A hand-held hydrocarbon detector or PCE gas analyzer is required to be used ONCE
EACH MONTH to conduct the required equipment leak inspections, regardless of the size
of the facility (small, large, major) or the installation date(s) of the dry cleaning equipment.
Each dry cleaning system installed after December 21, 2005 at an area source shall route
the air-PCE gas-vapor stream contained within each dry cleaning machine through a
refrigerated condenser and pass the air-PCE gas-vapor stream from inside the dry
cleaning machine drum through a non-vented carbon adsorber or equivalent control
device immediately before the door of the dry cleaning machine is opened. The carbon
adsorber must be desorbed in accordance with manufacturer's instructions.
References: Title 40 Code of Federal Regulations Part 63 Subpart M (National
Perchloroethylene Air Emission Standards for Dry Cleaning Facilities) [last
revised July 11, 2008]
Utah SBEAP Website: https://deq.utah.gov/air-quality/small-business-environmental-assistance-
program-air-quality-research-program
EPA Website: https://www.epa.gov/stationary-sources-air-pollution/clean-air-act-guidelines-and-
standards-solvent-use-and-surface
Need Help?
For additional information on Dry Cleaning operations, please contact Utah’s
Small Business Environmental Assistance Program at:
1-800-270-4440 or 1-801-536-4000