Loading...
HomeMy WebLinkAboutDERR-2025-003191Customer:Test Location: Love's Travel Stops # 686 20 S 1550 W Street Brigham City, UT 84302 Customer Phone:Test Date: DDS Invoice #:Tester: Facility ID: SUMMARY OF UST TEST RESULTS UST System Testing Results:Due Next:Notes: Tanks Lines Leak Detectors Shear Valves ATG Certification Sensor Functionality Test X Overfill Pass 4/15/28 X Containment Pass 4/15/28 Stage I and II Testing Results:Due Next:Notes: Stage I EVR Certification Pressure Decay Static Torque Drop Tube/Drain Valve P/V Vent Cap Pressure Decay P/V Vent Cap Static Torque Other Activities Results:Due Next:Notes: Monthly Inspection Annual Walk Through Remote Fill Emergency Stop Helium Pinpoint Test Other Activities Comments: Reviewed By: Douglas LaCount Corporate Office: 127 E Arrow Hwy | San Dimas, CA 91773 | Phone (909) 394.1050 | Fax (909) 512.6610 Georgia Office: PO Box 944 | Loganville, GA 30052 | Phone (678) 620.3307 | Fax (678) 213.0972 (42) VST's 18 UDC Sumps, 9 STP Sumps & 6 Spill Buckets 6 Overfill Installed: DDS Environmental, Inc. thanks you for the opportunity to complete the above outlined work for you. Due next dates above are only considered recommendations from DDS Environmental, Inc. The customer is responsible for maintaining compliance with federal, state, and local regulations. 314.772.4501 14519 Love's Travel Stops Attn: Reva Fittro 10601 N Pennsylvania Ave Oklahoma City, OK 73120 4/15/2025 Justin Zimmerman / Max LaRou 100698 pei.org 55 Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities APPENDIX C-5 Tester’s Name (print) ___________________________________ Tester’s Signature __________________________________ UST OVERFILL EQUIPMENT INSPECTION AUTOMATIC SHUTOFF DEVICE AND BALL FLOAT VALVE Facility Name:Owner: Address:Address: City, State, Zip Code:City, State, Zip Code: Facility I.D. #:Phone #: Testing Company:Phone #:Date: This data sheet is for inspecting automatic shutoff devices and ball float valves. See PEI/RP1200 Section 7 for inspection procedures. Product Grade Tank Number Tank Volume, gallons Tank Diameter, inches Overfill Prevention Device Brand Type Automatic Shutoff Device Ball Float Valve Automatic Shutoff Device Ball Float Valve Automatic Shutoff Device Ball Float Valve Automatic Shutoff Device Ball Float Valve Automatic Shutoff Device Ball Float Valve Automatic Shutoff Device Ball Float Valve AUTOMATIC SHUTOFF DEVICE INSPECTION 1. Drop tube removed from tank? Yes No Yes No Yes No Yes No Yes No Yes No 2. Drop tube and float mecha- nisms free of debris? Yes No Yes No Yes No Yes No Yes No Yes No 3. Float moves freely without binding and poppet moves into flow path? Yes No Yes No Yes No Yes No Yes No Yes No 4. Bypass valve in the drop tube open and free of blockage (if present)? Yes No Not Present Yes No Not Present Yes No Not Present Yes No Not Present Yes No Not Present Yes No Not Present 5. Flapper adjusted to shut off flow at 95% capacity?* Yes No Yes No Yes No Yes No Yes No Yes No A “No” to any item in Lines 1-5 indicates a test failure. BALL FLOAT VALVE INSPECTION** 1. Tank top fittings vapor- tight and leak-free? Yes No Yes No Yes No Yes No Yes No Yes No 2. Ball float cage free of debris? Yes No Yes No Yes No Yes No Yes No 3. Ball free of holes and cracks and moves freely in cage? Yes No Yes No Yes No Yes No Yes No Yes No 4. Vent hole in pipe open and near top of tank? Yes No Yes No Yes No Yes No Yes No Yes No 5. Ball float pipe proper length to restrict flow at 90% capacity?*** Yes No Yes No Yes No Yes No Yes No Yes No A “No” to any item in Lines 1-5 indicates a test failure. Test Results Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Comments: Use manufacturer’s suggested procedure for determining if automatic shutoff device will shut off flow at 95% capacity. If a ball float is found to fail the inspection, another method of overfill must be used. Use manufacturer’s suggested procedure for determining if flow restriction device will restrict flow at 90% capacity. LOVES # 686 100698 20 S 1550 W ST BRIGHAM CITY UT 84302 DDS ENVIORMENTAL UNLEADED UNLEADED PREMIUM DIESEL DIESEL BIO DIESEL 1 2 3 4 5 6 19942 11624 7852 29780 29780 19942 65.66 66.58 77.19 65.73 65.37 47.77FRANKLINFRANKLINFRANKLINFRANKLINFRANKLINFRANKLIN Loves Travel Stops 1601 N Pennsylvania Ave Oklahoma City, OK. 73120 4-15-2025 Max LaRou UTAH SPILL PREVENTION TEST Spill Bucket Hydrostatic Test Form Tester’s Signature______________________________ Facility Name Facility ID Address Tester’s Name Test Date Phone Tank number Product Stored Capacity Manufacturer Construction Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Liquid and debris removed Yes No Yes No Yes No Yes No Yes No Yes No Visual Inspection No cracks, holes or separations. Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Tank riser cap included in test? Yes No Yes No Yes No Yes No Yes No Yes No Is drain valve included in test? Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Yes No N/A Start Level Start Time Ending Level End Time Test Period (Minimum of 1 hour) Change in Level Test Results Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Photos indicating water levels are attached?      Pass/fail criteria: Must pass visual inspection, test duration at least one hour, must include photos with this form, water level drop of less than 1/8 inch. Ref: PEI/RP 1200 6.2.5 Test Procedure How was the liquid disposed? Comments I certify under penalty of law that the above information is true, accurate and complete. Aug 2016 LOVES 4/15/25 1 2 3 4 5 6 UNLEADED UNLEADED PREMIUM DIESEL BIO DIESELDIESEL FRANKLIN FRANKLIN FRANKLIN FRANKLIN FRANKLIN FRANKLIN 5 5 5 5 55 686 20 S 1550 W ST 100698 BRINGHAM CITY, UT 84302 Max LaRou NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA N A NA NA NA NA NA NA NA NA NA NA Yes Tested the site with Dri-Sump Equipment UTAH CONTAINMENT SUMP TEST Hydrostatic Test Form Tester’s Signature______________________________ Facility Name Facility ID Address Tester’s Name Test Date Phone Type of containment Sump Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Sump ID (e.g. dispenser #, tank location, product, etc.) Sump Material Construction Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Liquid and debris removed Yes No Yes No Yes No Yes No Yes No Yes No Visual Inspection No cracks, holes or separations. Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Containment Sump Depth Height from bottom to top of highest penetration Start Level Start Time Ending Level End Time Test Period (Minimum of 1 hour) Water Level Change Test Results Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Photos indicating water levels attached?       Pass/fail criteria: Must pass visual inspection, test duration at least one hour, must include photos with this form, water level drop of less than 1/8 inch. Ref: PEI/RP 1200 6.5 Test Method How was the liquid disposed? Comments Aug 2016 I certify under penalty of law that the above information is true, accurate and complete. LOVES 20 S 1550 W ST 5,1*+$0&,7< UT 84302 4/15/25 686 UNLEADED UNLEADED PREMIUM DIESEL DIESEL DIESEL FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS 100698 Max LaRou NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NANANANANANA Yes Tested the site with Dri-Sump Equipment UTAH CONTAINMENT SUMP TEST Hydrostatic Test Form Tester’s Signature______________________________ Facility Name Facility ID Address Tester’s Name Test Date Phone Type of containment Sump Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Sump ID (e.g. dispenser #, tank location, product, etc.) Sump Material Construction Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Liquid and debris removed Yes No Yes No Yes No Yes No Yes No Yes No Visual Inspection No cracks, holes or separations. Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Containment Sump Depth Height from bottom to top of highest penetration Start Level Start Time Ending Level End Time Test Period (Minimum of 1 hour) Water Level Change Test Results Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Photos indicating water levels attached?       Pass/fail criteria: Must pass visual inspection, test duration at least one hour, must include photos with this form, water level drop of less than 1/8 inch. Ref: PEI/RP 1200 6.5 Test Method How was the liquid disposed? Comments Aug 2016 I certify under penalty of law that the above information is true, accurate and complete. %5,1*+$0&,7< UT 84302 LOVES 20 S 1550 W ST 4/15/25 BIO DIESEL FIBERGLASS DIESEL FIBERGLASS 1 FIBERGLASS 1,2 3,4 5,6 686 FIBERGLASS FIBERGLASS FIBERGLASS Max LaRou 100698 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Yes Tested the site with Dri-Sump Equipment UTAH CONTAINMENT SUMP TEST Hydrostatic Test Form Tester’s Signature______________________________ Facility Name Facility ID Address Tester’s Name Test Date Phone Type of containment Sump Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Sump ID (e.g. dispenser #, tank location, product, etc.) Sump Material Construction Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Liquid and debris removed Yes No Yes No Yes No Yes No Yes No Yes No Visual Inspection No cracks, holes or separations. Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Containment Sump Depth Height from bottom to top of highest penetration Start Level Start Time Ending Level End Time Test Period (Minimum of 1 hour) Water Level Change Test Results Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Photos indicating water levels attached?       Pass/fail criteria: Must pass visual inspection, test duration at least one hour, must include photos with this form, water level drop of less than 1/8 inch. Ref: PEI/RP 1200 6.5 Test Method How was the liquid disposed? Comments Aug 2016 I certify under penalty of law that the above information is true, accurate and complete. 7,8 9,10 11,12 13,14 15,16 17,18 FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS LOVES 686 20 S 1550 W ST 4/15/25 100698 BRINGHAM CITY, UT 84302 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Yes Tested the site with Dri-Sump Equipment Max LaRou UTAH CONTAINMENT SUMP TEST Hydrostatic Test Form Tester’s Signature______________________________ Facility Name Facility ID Address Tester’s Name Test Date Phone Type of containment Sump Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Sump ID (e.g. dispenser #, tank location, product, etc.) Sump Material Construction Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Liquid and debris removed Yes No Yes No Yes No Yes No Yes No Yes No Visual Inspection No cracks, holes or separations. Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Containment Sump Depth Height from bottom to top of highest penetration Start Level Start Time Ending Level End Time Test Period (Minimum of 1 hour) Water Level Change Test Results Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Photos indicating water levels attached?       Pass/fail criteria: Must pass visual inspection, test duration at least one hour, must include photos with this form, water level drop of less than 1/8 inch. Ref: PEI/RP 1200 6.5 Test Method How was the liquid disposed? Comments Aug 2016 I certify under penalty of law that the above information is true, accurate and complete. %5,1*+$0&,7< UT 84302 19,20 21,22 23,24 25,26 27,28 29,30 LOVES 4/15/25 20 S 1550 W ST 686 FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS 100698 Max LaRou NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Yes Tested the site with Dri-Sump Equipment UTAH CONTAINMENT SUMP TEST Hydrostatic Test Form Tester’s Signature______________________________ Facility Name Facility ID Address Tester’s Name Test Date Phone Type of containment Sump Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Dispenser Transition Tank Top Sump ID (e.g. dispenser #, tank location, product, etc.) Sump Material Construction Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Single walled Double walled Liquid and debris removed Yes No Yes No Yes No Yes No Yes No Yes No Visual Inspection No cracks, holes or separations. Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Containment Sump Depth Height from bottom to top of highest penetration Start Level Start Time Ending Level End Time Test Period (Minimum of 1 hour) Water Level Change Test Results Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Photos indicating water levels attached?       Pass/fail criteria: Must pass visual inspection, test duration at least one hour, must include photos with this form, water level drop of less than 1/8 inch. Ref: PEI/RP 1200 6.5 Test Method How was the liquid disposed? Comments Aug 2016 I certify under penalty of law that the above information is true, accurate and complete. %5,1*+$0&,7< UT 84302 LOVES 20 S 1550 W ST 4/15/25 686 FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS 31,32 33,34 35,36 100698 Max LaRou NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NANA NA NA NA NA Yes Tested the site with Dri-Sump Equipment Containment Tightness Test Report Date 04/16/2025 Report # US218217 Site Loves 686 20 S 1550 W Street Bringham UTAH 84302 USA Inspection Date 04/15/2025 E-mail: drisump@leightonobrien.com Website: www.leightonobrien.com Service Distributor: DDS Environmental, Inc. www.ddsenv.com/ Tel. 480-277-6991 EXECUTIVE SUMMARY All spill buckets and containment sumps passed the Dri-sump tests. Page 2 AIM To test all containment sumps on site for compliance purposes as part of the Leighton O'Brien service. METHODOLOGY Dri-sump Containment Tightness Test method uses the proprietary heavy vapor aerosol instead of water to completely fill the sump, interstice or vessel. When installed per the manufacturer's placement requirements this method allows for detecting heavy vapor egress from the containment at any point. The method automatically tests for adequate flow of air and vapor through the backfill each time the system is activated. Any stoppage of flow through the VST or backfill will cause increased vacuum on the View Chamber that is quickly identified by a significant collapse of the View Chamber side walls. A leak is determined by observation of a change in the specialized laser light beam from a dot to a line which is indicative of the presence of the proprietary heavy vapor. COMMENTS/DISCUSSIONS All spill buckets and containment sumps passed the Dri-sump tests. There are no recommendations. SUMMARY OF DRI SUMP COMMUNICATION ASSESSMENT Closed Hose Open Hose VST Connect 15.00 3.25 10.59 Page 3 SUMMARY OF DRI SUMP CONTAINMENT RESULTS AS TESTED Tank Number Product Dispenser Number 1,2 3,4 5,6 7,8 Sump Type Dispenser Sump Dispenser Sump Dispenser Sump Dispenser Sump Sump Capacity 100 100 100 100 Construction Single-Walled Single-Walled Single-Walled Single-Walled Liquid & Debris Removed Yes Yes Yes Yes Visual Inspection (No cracks, loose parts or sump/pipe separation points.) Yes Yes Yes Yes Test in Seconds 60 60 60 60 Laser Verification Dot (PASS) Dot (PASS) Dot (PASS) Dot (PASS) Final Test Results Pass Pass Pass Pass Tank Number Product Dispenser Number 9,10 11,12 13,14 15,16 Sump Type Dispenser Sump Dispenser Sump Dispenser Sump Dispenser Sump Sump Capacity 100 100 100 100 Construction Single-Walled Single-Walled Single-Walled Single-Walled Liquid & Debris Removed Yes Yes Yes Yes Visual Inspection (No cracks, loose parts or sump/pipe separation points.) Yes Yes Yes Yes Test in Seconds 60 60 60 60 Laser Verification Dot (PASS) Dot (PASS) Dot (PASS) Dot (PASS) Final Test Results Pass Pass Pass Pass Page 4 Tank Number Product Dispenser Number 17,18 19,20 21,22 23,24 Sump Type Dispenser Sump Dispenser Sump Dispenser Sump Dispenser Sump Sump Capacity 100 100 100 100 Construction Single-Walled Single-Walled Single-Walled Single-Walled Liquid & Debris Removed Yes Yes Yes Yes Visual Inspection (No cracks, loose parts or sump/pipe separation points.) Yes Yes Yes Yes Test in Seconds 60 60 60 60 Laser Verification Dot (PASS) Dot (PASS) Dot (PASS) Dot (PASS) Final Test Results Pass Pass Pass Pass Tank Number Product Dispenser Number 25,26 27,28 29,30 31,32 Sump Type Dispenser Sump Dispenser Sump Dispenser Sump Dispenser Sump Sump Capacity 100 100 100 100 Construction Single-Walled Single-Walled Single-Walled Single-Walled Liquid & Debris Removed Yes Yes Yes Yes Visual Inspection (No cracks, loose parts or sump/pipe separation points.) Yes Yes Yes Yes Test in Seconds 60 60 60 60 Laser Verification Dot (PASS) Dot (PASS) Dot (PASS) Dot (PASS) Final Test Results Pass Pass Pass Pass Page 5 Tank Number 1 2 Product Unleaded Unleaded Dispenser Number 33,34 35,36 Sump Type Dispenser Sump Dispenser Sump STP Sump STP Sump Sump Capacity 100 100 300 300 Construction Single-Walled Single-Walled Double-Walled Double-Walled Liquid & Debris Removed Yes Yes Yes Yes Visual Inspection (No cracks, loose parts or sump/pipe separation points.) Yes Yes Yes Yes Test in Seconds 60 60 60 60 Laser Verification Dot (PASS) Dot (PASS) Dot (PASS) Dot (PASS) Final Test Results Pass Pass Pass Pass Tank Number 3 4 5 6 Product Premium Diesel Diesel Diesel Dispenser Number Sump Type STP Sump STP Sump STP Sump STP Sump Sump Capacity 300 300 300 300 Construction Double-Walled Double-Walled Double-Walled Double-Walled Liquid & Debris Removed Yes Yes Yes Yes Visual Inspection (No cracks, loose parts or sump/pipe separation points.) Yes Yes Yes Yes Test in Seconds 60 60 60 60 Laser Verification Dot (PASS) Dot (PASS) Dot (PASS) Dot (PASS) Final Test Results Pass Pass Pass Pass Page 6 Tank Number 7 8 1 2 Product Diesel Bio Diesel Other... Other... Dispenser Number Sump Type STP Sump STP Sump Spill Bucket Spill Bucket Sump Capacity 300 300 5 5 Construction Double-Walled Double-Walled Single-Walled Single-Walled Liquid & Debris Removed Yes Yes Yes Yes Visual Inspection (No cracks, loose parts or sump/pipe separation points.) Yes Yes Yes Yes Test in Seconds 60 60 60 60 Laser Verification Dot (PASS) Dot (PASS) Dot (PASS) Dot (PASS) Final Test Results Pass Pass Pass Pass Tank Number 3 4 5 6 Product Other... Other... Other... Other... Dispenser Number Sump Type Spill Bucket Spill Bucket Spill Bucket Spill Bucket Sump Capacity 5 5 5 5 Construction Single-Walled Single-Walled Single-Walled Single-Walled Liquid & Debris Removed Yes Yes Yes Yes Visual Inspection (No cracks, loose parts or sump/pipe separation points.) Yes Yes Yes Yes Test in Seconds 60 60 60 60 Laser Verification Dot (PASS) Dot (PASS) Dot (PASS) Dot (PASS) Final Test Results Pass Pass Pass Pass Page 7 Tank Number 1 Product Other... Dispenser Number Sump Type Transition Sump Sump Capacity 300 Construction Double-Walled Liquid & Debris Removed Yes Visual Inspection (No cracks, loose parts or sump/pipe separation points.) Yes Test in Seconds 60 Laser Verification Dot (PASS) Final Test Results Pass LASER RESPONSE IMAGES AND SITE PHOTOS Site Photo Equipment Set-up VST Connected VST Closed Page 8 VST Open Dispenser Sump 1,2 Dispenser Sump 3,4 Dispenser Sump 5,6 Dispenser Sump 7,8 Dispenser Sump 9,10 Dispenser Sump 11,12 Dispenser Sump 13,14 Page 9 Dispenser Sump 15,16 Dispenser Sump 17,18 Dispenser Sump 19,20 Dispenser Sump 21,22 Dispenser Sump 23,24 Dispenser Sump 25,26 Dispenser Sump 27,28 Dispenser Sump 29,30 Page 10 Dispenser Sump 31,32 Dispenser Sump 33,34 Dispenser Sump 35,36 STP Sump 1 VST 1 STP Sump 1 VST 2 STP Sump 2 VST 1 STP Sump 2 VST 2 STP Sump 3 VST 1 Page 11 STP Sump 3 VST 2 STP Sump 4 VST 1 STP Sump 4 VST 2 STP Sump 5 VST 1 STP Sump 5 VST 2 STP Sump 6 VST 1 STP Sump 6 VST 2 STP Sump 7 VST 1 Page 12 STP Sump 7 VST 2 STP Sump 8 VST 1 STP Sump 8 VST 2 Spill Bucket 1 Spill Bucket 2 Spill Bucket 3 Spill Bucket 4 Spill Bucket 5 Page 13 Spill Bucket 6 Transition Sump 1 Transition Sump 1 RECOMMENDATIONS There are no recommendations. Page 14 ADDENDUM Technician Name Justin Zimmerman / Max LaRou Report Prepared by Jason Weber Leighton O’Brien Field Services are provided on the terms and conditions set out in the conditions of sale document. The Leighton O’Brien service is warranted to the invoiced value of services performed as covered in section 68a of the Trade Practices Act. SITE LOCATION