ERRL-1957-98
January 5, 1999
David Rickers, P.E.
Kleinfelder, Incorporated
2677 EastParley's Way
Salt Lake Ciry, Utah 84109
RE: Facility Identification No. 2000326, Release Site EHLR
Big-O Tires, located at 200 South Main Street, Richfield, Utah
Work Assignment #EHLR-S; Conduct a Risk-Based Corrective Action (RBCA) Tier 2
Risk Assessment and Subsequent Reporting
Dear Mr. Rickers:
The Utah Division of Environmental Response and Remediation (DERR) is requesting that
Kleinfelder, Incorporated ("Kleinfelder"), under contract#99-6340, complete the enclosed Work Assignment
toconductariskassessmentfortheabove-referencedfacility. Thescopeofwork,timescheduleandbudget
were verbally discussed and mutually agreed upon during a December 23,1998 phone conversation between
the Kleinfelder and DERR project managers. Please sign both copies of the Work Assignment and retum
a copy to the DERR.
If you have any questions conceming the enclosed Work Assignment in regards to the required scope
of work or the approved budget, please contact Dale T. Urban, the DERR Project Manager, at
(801) s36-4145.
Sincerely,
e7r*-*ZnJ'M,-
Bryan D. Whitaker, Manager and Conmact Officer
Utah Underground Storage Tank Branch
BDWtrTtI/srb
Enclosures
Hillary Mason, Contract Officer, DERR
Earl Conroy, Accounting, DERR
Paul Zahn, LUST Section Manager
WORK ASSIGNMENT EHLR.s
Contract:#99-6340
Work Assignment: Facility Identification No. 2000326, Release Site EHLR
Big-O Tires, located at 200 South Main Street, Richfield, Utah
Work Assignment EHLR-5; Conduct a Risk-Based Corrective Action (RBCA)
Tier 2 Risk Assessment and Subsequent Reporting
The contractor, Kleinfelder, Incorporated ("Kleinfelder") is requested to complete the following tasks for
this Work Assignment.
I WORK OBJECTIVES
TheWorkAssignmentobjectiveis toconductaRisk-BasedCorrectiveAction (RBCA)Tier2Risk
Assessment which entails conducting file review as needed, and completion and submittal of a risk
assessment report done in the standard RBCA reporting format as discussed herein, and includes
analyses of known site and subsurface conditions, risk factors, exposure pathways and transport
mechanisms, and other relevant items. The submitted report must also evaluate the need for, and
the associated costs of, site-specific cleanup activities, and provide appropriate site-specific
recommendations for conducting the minimum amount of additional work needed at the site which
may be necessary in order to obtain final site closure.
II TASKS AND BUDGET
The expense to the Department of Environmental Quality (DEQ) for the implementation and
completion of this Work Assignment shall not exceed $7,Sffi.ffi which includes project management,
contract management, and all other costs. Kleinfelder will notify the DEQ when coss for any task
have exceededT5To of thetotal costs specifiedin theapprovedWorkPlanorWorkAssignment, or
if Kleinfelder has reason to believe that the costs will be greater than the approved budget. DEQ
has identified the following specific tasks:
A. Conduct"ProjectManagement" necessary tocomplete the objectives and tasks of this Work
Assignment. The budget for this task is approved at $750.00.
B. A SiteConceptual ExposureModel (SCEM) shallbefilledoutcompletely and submittedto
the DERR project manager within two weeks of your receipt of this Work Assignment.
This initial approval of the SCEM by your project manager will help to ensure that the
resulting risk assessment report will evaluate all the necessary exposure pathways and other
risk characteristics, and minimize the need for any potential reworking of the risk
assessment.
C. TheRBCA evaluation shouldconsidertheduration andresults of thegroundwatermonitoring
program previously conducted at the release site in terms of documenting both gtoundwater
contaminant plume stability and the full extent and degree of the subsurface soil and
groundwater contamination. If plume stability cannot be determined based on existing data,
or minimum data requirements have not yet been met in accordance with the RBCA Tier 2
protocol, thenKleinfeldershall identify the minimumdatarequirements (such as additional
groundwater monitoring events, slug tests, pilot testing, additional soil samples, or other
environmental tests, etc.) required in order to document such release site conditions and
properly complete the risk assessment report.
The corrective action feasibility analysis should consider the results of any abatement
activities (such as enhanced fluid recovery) completed at the site to date, if any have been
completed, in evaluating the cost effectiveness of either initiating or conducting additional
abatement activities in an effort to reduce source concentrations in order to provide adequate
protection to human health and the environment at the release site. The feasibility analyses
should also discuss the advantages and disadvantages of conducting any abatement or
cleanup activities andtheir associatedcosts which may be identified as warranted for the site
during the RBCA evaluation process.
Collect one soil and one groundwater sample at depths and locations which would be
representative of "worst case" contaminant levels. Both samples are to be analyzed for
BTEXN and TPH. For the TPH analysis, follow the RBCA protocol for "fractionation".
Kleinfelder will follow the standard report format as outlined in "Guidelines for Utah's
Corrective Action Process for Leaking Underground Storage Tank Sites", and conduct the
risk assessment using the most appropriate site-specific option within the Tier 2 process."
The submitted report shall inctude all the necessary worksheets and supporting
documentation as described in appendices "A" through "C" of the RBCA document.
REPORTING REQUIREMENTS
A. Kleinfelder is required to report to the DEQ prior to proceeding with any task that will
overrun or can be projected to overrun the cost estimate defined in Section II above.
B. Kleinfelder is required to submit a final RBCA risk assessment report in accordance with
the work assignment objectives by March 31r1999.
CONFLICT OF INTEREST
Kleinfelderwill identify and describe anypossibleconflict of interestin fulfillingtherequirements of
the Work Assignment.
"\
D.
E.
F.
III
IY
Approved by:
UDEQ Project Manager:
UDEQ Contract Officer:
LUST Section Manager:
Kleinfelder Representative :
o*", \7 3D/7?>
oate: tl lzolq *
/Date: ,'/(t ' 77arr, . ,r''- ,//
Date:
Ifl KTETNFETDER
An emplovee owned company'
January 12,1999
Kleinfelder File No. 35-8263-05.001
Ms. Hillary Mason
Utah Department of Environmental Quality
Division of Environmental Response and Remediation
168 North 1950 West I't Floor
Salt Lake Ciry, Utah 84114
fJ HAIiD DELIVERED
Subject:Receipt of WorkAssignment EHLR-S
Conduct a RBCA Tier 2 Risk Assessment and Subsequent Reporting
Big-O Tires,200 South Main Street, Richfield, Utah
Facility ID #2000326, Release Site EHLR
Dear Ms. Mason:
Enclosed is a fully executed copy of Work Assignment EHLR-5. This work assignment
involves conducting a Risk-Based Corrective Action (RBCA) Tier 2 evaluation and
subsequent report preparation. The work will be completed under contract #99-6341. lf
you have any questions or comments concerning this letter or the project, please contact
me at (801) 466-6769.
Sincerely,
to"oKLEINFELDER, INC.?4-
David Rickers, P.E.
Project Engineer
?u 'ltfrlT\ u* z.Y' '*n{" f,*c *SkJ' '^ $\
-\c'JNpt" Y
;- aLczia A*
35-8263-05.00 l\35 l9L0l3
*e/t/ 11
Page I ofl January 12,1999
Copyright 1999 Kleinfelder, Inc.
KLEINFELDER 2677 EasI Parley',s Way, Salt Lake City, UT 84'l 0g-161 7 (801)466_6769 (801 ) 466-6788fax
WORK ASSIGNMENT EHLR.s
Contract:#99-6340
Work Assigument: Facility Identification No. 2000326, Release Site EHLR
Big-O Tires, located at200 South Main Street, Richfield, Utah
Work Assignment EHLR-5; Conduct a Risk-Based Corrective Action (RBCA)
Tier 2 Risk Assessment and Subsequent Reporting
The contractor, Kleinfelder, Incorporated ("Kleinfelder") is requested to complete the following tasks for
this Work Assignment.
I WORK OBJECTIVES
The Work Assignment objective is to conduct a Risk-Based Corrective Action (RBCA) Tier 2 Risk
Assessment which entails conducting file review as needed, and completion and submittal of a risk
assessment report done in the standard RBCA reporting format as discussed herein, and includes
analyses of known site and subsurface conditions, risk factors, exposure pathways and transport
mechanisms, and other relevant items. The submitted report must also evaluate the need for, and
the associated costs of, site-specific cleanup activities, and provide appropriate site-specific
recommendations for conducting the minimum amount of additional work needed at the site which
may be necessary in order to obtain final site closure.
II TASKS AND BUDGET
The expense to the Department of Environmental Quality (DEQ for the implementation and
completionofthisWorkAssignmentshallnotexceed$7,5fi).00whichincludesprojectmanagement,
contract management, and all other costs. Kleinfelder will notify the DEQ when costs for any task
have exceededT 5Vo of the total costs specified in the approved Work Plan or Work Assignment, or
if Kleinfelder has reason to believe that the costs will be greater than the approved budget. DEQ
has identified the following specific tasks:
A. Conduct "ProjectManagement" necessary to complete the objectives and tasks of this Work
Assignment. The budget for this task is approved at $750.00.
B. A Site Conceptual Exposure Model (SCEM) shall be filled out completely and submitted to
the DERR project manager within two weeks of your receipt of this Work Assignment.
This initial approval of the SCEM by your project manager will help to ensure that the
resultingrisk assessmentreportwill evaluate all thenecessary exposurepathways and other
risk characteristics, and minimize the need for any potential reworking of the risk
assessment.
C. The RBCA evaluation shouldconsiderthe duration andresults of the groundwatermonitoring
program previously conducted at the release site in terms of documenting both groundwater
contaminant plume stability and the full extent and degree of the subsurface soil and
groundwater contamination. If plume stability cannot be determined based on existing data,
orminimum datarequirements have notyetbeenmetin accordance with theRBCATier2
-
protocol, thenKleinfeldershall identifytheminimumdatarequirements (such as additional
groundwater monitoring events, slug tests, pilot testing, additional soil samples, or other
environmental tests, etc.) required in order to document such release site conditions and
properly complete the risk assessment report.
The corrective action feasibility analysis should consider the results of any abatement
activities (such as enhanced fluid recovery) completed at the site to date, if any have been
completed, in evaluating the cost effectiveness of either initiating or conducting additional
abatementactivities in an effortto reduce source concentrations in ordertoprovide adequate
protection to human health and the environment at the release site. The feasibility analyses
should also discuss the advantages and disadvantages of conducting any abatement or
cleanup activities and their associated costs which may be identified as wa:ranted for the site
during the RBCA evaluation process.
Collect one soil and one groundwater sample at depths and locations which would be
representative of "worst case" contaminant levels. Both samples utre to be analyzed for
BTEXN and TPH. For the TPH analysis, follow the RBCA protocol for "fractionation".
Kleinfelder will follow the standard report format as outlined in "Guidelines for Utah's
Corrective Action Process for Leaking Underground Storage Tank Sites", and conduct the
risk assessment using the most appropriate site-specific option within the Tier 2 process."
The submitted report shall include all the necessary worksheets and supporting
documentation as described in appendices "A" through "C" of the RBCA document.
REPORTING REQUIREMENTS
A. Kleinfelder is required to report to the DEQ prior to proceeding with any task that will
ovelrun or can be projected to ovemrn the cost estimate defined in Section II above.
B. Kleinfelder is required to submit a final RBCA risk assessment report in accordance with
the work assignment objectives by March 31,1999.
CONFLICT OF INTEREST
Kleinfelderwill identify and describe anypossibleconflictof interestinfulfillingtherequirements of
the Work Assignment.
D.
E.
F.
III
Iv
Approved by:
UDEQ Project Manager:
UDEQ Contract Officer:
LUST Section Manager:
Kleinfelder Representative :
eup, r>f ur/4h
oate: alzo lq%
out", 1/?/?7
o"", lf {
Ifl KLEINFETDER
?'4
David Nckers, P.E.
Project Engineer
35-826305401/35 19L035
KLETNFELDER 2677 East Parley',s Way, Salt Lake City, UT 84109-16'l 7 (Bo1) 466-6769 (801) 466-6788fax
An employee o*-ned companv
January 25,1999
Kleinfelder File No. 35-8263-05.00 I
Ms. Hillary Mason
Utah Department of Environmental Quality
Division of Environmental Response and Remediation
168 North 1950 West ls Floor
Salt Lake City, Utah 84114
Subject:Receipt of Work Assignment EHLR-s.l
Conduct a RBCA Tier 2 Risk Assessment and Subsequent Reporting
Big-O Tires,200 Squth Main Street, Richfield, Utah
Faciliry V*ZOOuS2! Rebase Site EHLR
Dear Ms. Mason:
Enclosed is a fully executed copy of Work Assignment EHLR-S. This work assignment
involves conducting groundwater monitoring and reporting in conjunction with a RBCA
Tier 2 evaluation at the above referenced facility. The work will be completed under
contract #99-6340. If you have any questions or comments concerning this letter or the
project, please contact me at (801) 466-6769.
Sincerely,
KLEINFELDER. INC.
,tr*rfi'r&#ir;
WORK ASSIGNMENT AMENDMENT # EHLR.s.l
Conffact #99-6340
Work Assignment #EHLR-5: ConductaRisk-BasedCorrectiveAction (RBCA) TierZRiskAssessment
and Subsequent Reporting
Change in Scope of Work at: Big-O Tires, located at200 South Main Street, Richfield, Utah.
Facility Identification No. 2000326, Release Site EHLR
The contractor (Kleinfelder. Incorporated) is requested to complete the following items as Work
Assignment Amendment #EHLR-S.1. The following changes are hereby made to Work Assignment
#EHLR-5, which was originally approved by the DERR on January 5,1999.
Due to the elapsed time since the last groundwater monitoring round at the site in
conjunction with the intent of the Work Assignment, it has come to the DERR's attention
that a current round of samples will need to be taken in order to facilitate the completion
of the risk assessment analyses as required by the original work assignment. The original
work assignment inadvertently did not specify this work or associated budget.
Kleinfelder shall conduct groundwater monitoring from B-5, B-7, B-9 and B-10 using
proper sampling protocol pursuant to Utah Admin. Code R311-205. Groundwater
samples shall be analyzed for the presence of Dissolved Oxygen (DO), Oxygen
Reduction Potential (ORP), Total Petroleum Hydrocarbons (TPH), Benzene, Toluene,
Ethylbenzene, Xylenes, MTBE, and Naphthalene. Perform the TPH fractionation on the
groundwater sample obtained from B-5 as described in the original work assignment.
The reporting for this work assignment amendment shall be combined with the risk
assessment report and should contain a section which details the groundwater conditions
at the site which should include, but not be limited to the following:
the adjusted depth to water;
site map showing well locations, utilities,
relevant items;
structures, property lines and other
groundwater flow direction;
actual laboratory results and chain of custody forms;
isoconcentration maps for benzene and naphthalene in groundwater;
and, any other applicable item associated with typical monitoring reports such
free product thickness.
1.
2.
aJ.
a.
b.
c.
d.
I-
The sum of $E50.00 is hereby added to the total Work Assignment cost. The total adjusted work
assignment cost approved to date is therefor effectively amended from $7,500.00 to the final approved
amount of S8"350.00. The work shall be performed in the same character as provided for in the Conffact.
This change in the scope of work does not change the March 3lr 1999 report due date.
Approved by:
LJDERR Project Manager
UDERR Contract Officer
LUST Section Manager
Kleinfelder Representative
Date: tfnlql
Date: ,/r,
Date: /
-a r fi,r
Michael O. [ravitt
Govemor
Dianne R. Nielson, Ph.D.
Executive Director
Kent P. Gray
Director
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION
168 North 1950 West
P.O. Box 1,14840
Salt Lake City, Utah 84114-4840
(801) 5364100
(801) 359-8853 Fax
(801) 5364414 T.D.D.
www.deq.starc.ut.us Web
ERRL-0063-99
January 22,1999
David Rickers, P.E.
Kleinfelder, Incorporated
2677 East Parley's Way
Salt Lake City, Utah 84109
RE: Facility Identification No. 2000326, Release Sire EIILR
Big-O Tires,located at200 South Main Street, Richfield, Utah
Work Assignment Amendment #EIILR-S.l; Conduct Groundwater Monitoring for the
Risk-Based Corrective Action (RBCA) Tier 2 Risk Assessment and Subsequent Reporting
Dear Mr. Rickers:
The Utah Division of Environmental Response and Remediation (DERR) is requesting that
Kleinfelder, Incorporated ("Kleinfelder"), under contract #99-6340, complete the enclosed Work
Assignment to conduct groundwater monitoring in conjunction with completing the site-specific risk
assessment for the above-referenced facility. Please sign both copies of the Work Assignment and return
a copy to the DERR.
If you have any questions concerning the enclosed Work Assignment in regards to the required
scope of work or the approved Budget, please contact Dale T. Urban, the DERR Project Manager, at
(801) 536-414s.
Sincerely,
'&r/Z/
Paul D. Zahn, Section Manager
Utah Underground Storage Tank Branch
PDZ[ffisrb
Enclosures
Hillary Mason, Contract Officer, DERR
Earl Conroy, Accounting, DERR
PaulZahn, LUST Section Manager
l-(
WORK ASSIGNMENT AMENDMENT # EHLR.s.l
Contract #99-6340
Work Assi-enment #EHLR-5: Conduct a Risk-Based Corrective Action (RBCA) Tier 2 Risk Assessment
and Subsequent Reporting
Change in Scope of Work at: Big-O Tires, located at 200 South Main Street, Richfield, Utah.
Facility Identification No. 2000326, Release Site EHLR
The contractor (Kleinfelder. Incorporated) is requested to complete the following items as Work
Assignment Amendment #EHLR-5.1. The following changes are hereby made to Work Assignment
#EHLR-5, which was originally approved by the DERR on January 5,1999.
J.
Due to the elapsed time since the last groundwater monitoring round at the site in
conjunction with the intent of the Work Assignment, it has come to the DERR's attention
that a current round of samples will need to be taken in order to facilitate the completion
of the risk assessment analyses as required by the original work assignment. The original
work assignment inadvertently did not specify this work or associated budget.
Kleinfelder shall conduct groundwater monitoring from B-5, B-7, B-9 and B-10 using
proper sampling protocol pursuant to Utah Admin. Code R3l l-205. Groundwater
samples shall be analyzed for the presence of Dissolved Oxygen (DO), Oxygen
Reduction Potential (ORP), Total Petroleum Hydrocarbons (TPH), Benzene, Toluene,
Ethylbenzene, Xylenes, MTBE, and Naphthalene. Perform the TPH fractionation on the
groundwater sample obtained from B-5 as described in the original work assignment.
The reporting for this work assignment amendment shall be combined with the risk
assessment report and should contain a section which details the groundwater conditions
at the site which should include, but not be limited to the following:
the adjusted depth to water;
site map showing well locations, utilities, structures, property lines and other
relevant items;
groundwater fl ow direction:
actual laboratory results and chain of custody forms;
isoconcentration maps for benzene and naphthalene in groundwater;
f. and, any other applicable item associated with typical monitoring reports such
free product thickness.
l.
1
a.
b.
c.
d.
e.
-
The sum of $850.00 is hereby added to the total Work Assignment cost. The total adjusted work
assignment cost approved to date is therefor effectively amended from $7,500.00 to the final approved
amount of $8r350.fi). The work shall be performed in the same character as provided for in the Contracl
This change in the scope of work does not change the March 31, 1999 report due date.
Approved by:
a
UDERR Project Manager
UDERR Contract Officer
LUST Section Manager
Kleinfelder Representative
1tl-i00' T4r.>t
,- '' ':_' .'4 / '/
Date: Yn/ffi
-
Date: tfrqfql
Date:
Date:
a ^t
FILE fru,'I
',1I
Michael O. Leavitt
Govemor
Dianne R. Nielson. Ph.D.
Ex4ul.ive Director
Kent P. Gray
Drrector
DEPARTMENT OF ENVIRONMENTAL QUALITY
DTVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION
168 North 1950 West
P.O. Box 144840
Salt Lake City, Utah 841144840
(8ol) 5364100
(801) 359-8853 Fax
(801) 5364414 T.D.D.
www.deq.state.ut.us Web
ERRL-o172.99
February 8,1999
Randy Christensen
Big O Tires
208 South Main Street
Richfield, Utah 84701
RE: Facility Identification No. 2000326, Release Site EHLR
Big-O Tire, located at 208 South Main Street, Richfield, Utah
Site Status Update and Request for Consent to Access Property
Dear Mr. Christensen:
As you are already aware, the Division of Environmental Response and Remediation (DERR) has
initiated the work necessary to protect human health and the environment at the above-referenced release
site ("Site") and is pursuing the required investigation and remediation with LUST Trust or State funds. The
DERR may then proceed to recover, from responsible parties, all expenditures associated with investigation,
abatement, and corrective action at the Site as provided in Utah Code Ann.. 19-6-420 (2XbXiv).
The investigative phase of the work has now been completed, and the next phase of work currently
in progress is evaluating the site for closure. This risk-based closure evaluation requires the collection of
some additional soil and groundwater samples from the release site to determine current levels of
contamination which remain at the property. The DERR is sending you another, more detailed access
agreement for your signature which extends the time frame to accomplish the described work.
Please sign the access agreement, and return it to the DERR within two weeks of your receipt of this
letter. If you have any questions regarding this matter, please contact the state-assigned Project Manager,
Dale T. Urban at (801) 536-4145.
tP., Et'6cutive Secretary (UST)
Utah Solid and Hazardous Waste Control Board
KPG/Ml&tsrb
Enclosure
Robert Resendes, M.B.A., M.T., Director, central utah public Health Depaftment
Roger Foisy, DEQ District Engineer
Sincerely,
Michael O. kaviu
Govemor
Dianne R. Nielson, Ph.D.
Executive Diretor
Kent P. Gray
Director
DEPARTMENT OF ENVIRONMENTAL QUALITY
DTVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION
168 North 1950 West
P.O. Box lul4840
Salt take Ciry, Utah 84114-4840
(801) 5364r00
(801) 359-8853 Fax
(801) 5364414 T.D.D.
www.deq.state.ut.us Web
ERRL-O172.99
February 8, 1999
Randy Christensen
Big O Tires
208 South Main Street
Richfield, utah 84701
RE: Facility Identification No. 2000326, Release Site EHLR
Big-O Tire, located at 208 South Main Street, Richfield, Utah
Site Status Update and Request for Consent to Access Property
Dear Mr. Christensen:
As you are already aware, the Division of Environmental Response and Remediation (DERR) has
initiated the work necessary to protect human health and the environment at the above-referenced release
site ("Site") and is pursuing the required investigation and remediation with LUST Trust or State funds. The
DERR may then proceed to recover, from responsible parties, all expenditures associated with investigation,
abatement, and corrective action at the Site as provided in Utah Code Ann.. 19-6-420 (2XbXiv).
The investigative phase of the work has now been completed, and the next phase of work currently
in progress is evaluating the site for closure. This risk-based closure evaluation requires the collection of
some additional soil and groundwater samples from the release site to determine current levels of
contamination which remain at the property. The DERR is sending you another, more detailed access
agreement for your signature which extends the time frame to accomplish the described work.
Please sign the access agreement, and return it to the DERR within two weeks of your receipt of this
letter. If you have any questions regarding this matter, please contact the state-assigned Project Manager,
Dale T. Urban at (801) 536-4145.
Utah Solid andHazardous Waste Control Board
KPG/DTU/srb
Enclosure
Robert Resendes, M.B.A., M.T., Director, Central Utah Public Health Department
Roger Foisy, DEQ District Engineer
Sincerely,
t{;;. il$, E/cutive secretary (usr)
a 1 illqii
EN\,. -,I{MENTAL RISPUi
DIVISION OF ENVIRONMENTAL RESPONSE
GRANT OF ACCESS TO PRO
Randy Christensen, is the owner ("Owner") of record, tit
record owner of certain real property located at208 South Main Street, rucnnetfi UtafrJffiilS1.
The Owner hereby grants to the officers, employees, authorized representatives and consultants
of the Utah Division of Environmental Response and Remediation ("DERR") access, including ingress
and egress, to the Property for the following purposes:
1. Conduct groundwater and soil monitoring and sampling from the on-site groundwater
monitoring wells. To conduct subsurface investigation studies to determine and define
the extent and degree of subsurface petroleum contamination originating from an
Underground Storage Tank ("UST") system. This may include soil borings, drill or hand
auger holes for soil sampling, and installation of groundwater monitoring wells for water
sampling.
2. Any other such actions related to the definition, or cleanup of the subsurface petroleum
contamination on the Property.
The tasks described above may be altered if conditions change or if the DERR obtains additional
information requiring further investigation. The DERR will notify the Owner in writing of any new
planned tasks.
It is anticipated that the work described herein will be performed between January I,1999 and
December 31, 2000. If it becomes necessary to perform the work at other times, the DERR will notify
the Owner by telephone at least twenty four hours before it intends to enter the Property. By granting
access to the DERR, the Owner makes no admission of liability or responsibility for any petroleum
contamination which may be found on the Property.
This grant of access shall remain in effect until, and only terminate upon, the completion of the
investigation, any clean up activities and any additional tasks resulting from new information as noted
above.
Owner's Signature:
Title:
Date:
/
//' ,
' *//o "5
,(,ro-., //. fi- Q.*o-
Michael O. Lravin
Covemr
Dianne R. Nielson. Ph.D.
Executive Director
Kent P. Gray
DiEtor
168 North 1950 West, lst Floor
Salt Lake City, Utah 841l6
(801) 536-4100
(801) 359-8853 Fax
(801) 536-4414 T.D.D.
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION
FILE COPT
z_y>z_:b4*
FACILITY I.D. # _
Enclosed is the information you requested regarding:
Tank Notification Form
Tank Closure Plan
Tank Closure Notice
Certified Tank Installers, Removers, Testers
UST Certifi ed Laboratories
Certified UST Consultants
Certified Groundwater & Soil Samplers
PST Fund or PST Claims Information
Risk-Based Corrective Action Information
Dare , z/w/11
rro*,D- UrlFA{J
Utah UST Administrative Rules
Utah UST Act (Legislative Statute)
EPA UST Regulations 40 CFR 280
UST Fees/Fund Billing Information
Release/Leak Detection Information
LUST Informational Pamph let( s)
LUST Customer Guide Book(s)
LUST Remediation Schedule(s)
LUST General Information
* other:
-_
Message
Ifyou have any questions regarding this i
Sincerely, . r\ ^'*;L
4 dl*
f-.ut/rS Underground Storage Tank Section
ion, please contact me at (801) 53 oo or slo- tlt6
.-".E
L-u'
DEPARTMENT OF ENVIRONMENTAL QUALITY
DTVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION
168 North 1950 West
P.O. Box 144840
Salt L:ke City, Uuh 841144840
(801) 536-4100
(801) 359-8853 Fax
(801) 5364414 T.D.D.
www.deq.state.ut.us Web
{
Michael O. Leavin
Govemor
_ Dianne R. Nielson, Ph.D.
Exeutive Director
Kent P. Grav
Diretrir
ERRL-0355-99
March 12,1999
David Rickers, P.E.
Kleinfelder, Incorporated
2677 EastParley's Way
Salt Lake Ciry, Utah 84109
RE: Facility Identification No. 2000326, Release Site EHLR
Big-O Tires, located at200 South Main Street, Richfield, Utah
Work Assignment Amendment #EHLR-S.2; Additional Environmental Sampling to
Conduct a Risk-Based Corrective Action (RBCA) Tier 2 Risk Assessment and Subsequent
Reporting
Dear Mr. Rickers:
The Division of Environmental Response and Remediation (DERR) is requesting that Kleinfelder,
Incorporated ("Kleinfelder"), under contract #99-6340, complete the enclosed Work Assignment to
conduct additional environmental sampling in conjunction with completing the site-specific risk
assessment for the above-referenced facility. Please sign both copies of the Work Assignment and return
a copy to the DERR.
If you have any questions concerning the enclosed Work Assignment in regards to the required
scope of work or the approved budget, please contact Dale T. Urban, the DERR Project Manager, at
(801) 536-4145.
Sincerely,
},-t*- 24ry
Dale E. Marx, Manager and Contract Officer
Utah Underground Storage Tank Branch
DEMIDTWsTb
Enclosures
Hillary Mason, Contract Officer, DERR
PatlZahn, LUST Section Manager
v
WORK ASSIGNMENT AMENDMENT #EHLR.s.2
Contract #99-6340 Work Assignment Amendment #EHLR-5; Conduct a Risk-Based
Corrective Action (RBCA) Tier 2 Risk Assessmenr and Subsequent
Reporting
Change in Scope of Work ac Big-O Tires, located at200 South Main Street, Richfield, Utah
Facility Identification No. 2000326, Release Site EHLR
The contractor (Kleinfelder, Incorporated) is requested to complete the following items as Work
Assignment Amendment # EHLR-5.2. The following changes are hereby made to Work Assignment
#EHLR-5, which was originally approved by the DERR on January 5,1999.
Due to upcoming administrative proceedings which may involve apportionment of
liability between potentially responsible parties, the DERR has identified a need to
conduct additional environmental sampling. Specifically, soil samples need to be
collected to test for the presence of total lead. The two soil samples for lead testing
should come from a contaminated area at the on-site source area (near B-5 at the same
location used for TPH fractionation sampling) and at an up-or downgradient "clean" area
in order to determine the difference between levels that may be naturally occurring and
considered "background", and those areas which may have been impacted by the release
of leaded gasoline in the past. The soil and groundwater samples for TPH fractionation
shall be submitted to American West Analytical Laboratories in Salt Lake City, Utah and
marked as "Utah TPH Fractionation" for the analytical method to be used.
Due to the destruction of some of the critical groundwater monitoring wells during recent
construction activities, the final sampling and analysis plan has been modified as shown
below:
v
t.
2.
Sample Location(s)Medium or
Matrix
Purpose Analytical Method
Geoprobe near B-9 soil &
groundwater
Current Contaminant
Levels
8020/8015M
B-5, B-7 & B-11 groundwater Current Contaminant
Irvels
8020/8015M
Geoprobe near B-5 soil &
groundwater
TPH Fractionation 8260t8270
(AWAL)
Geoprobe near B-5
("source")
soil Total Lead Analyses 6010
Upgradient geoprobe
("clean")
soil Total Lead Analyses 6010
3. The reporting for this work assignment amendment shall be combined with the risk
assessment report and should contain a discussion of the lead and fractionation results in
terms of product Upe(s) and other contaminant characteristics which may aid in the
determination of multiple releases from the same property or mixed releases from
different properties to assist the DERR in future cleanup funding and apportionment of
liability decisions.
The sum of $750.00 is hereby added to the total work assignment cost. The total adjusted work
assignment cost approved to date is therefor effectively amended from $8,350.00 (e.g., the amount
authorized by Work Assignment #EHLR-5.l) to the final approved amount of $9,100.00. The work shall
be performed in the same character as provided for in the Contract. This change in the scope of work
changes the original March 31, 1999 report due date to April 19,1999.
Approved by:
UDERR Project Manager
UDERR Contract Officer
LUST Section Manager
Kleinfelder Representative
Date: .
Date:
Date:
Date:
Is| KLEINFELDER
An entpl<tyee owned comp.tny'
March 19,1999
Kleinfelder File No. 35-8263-05.001
Ms. Hillary Mason
Utah Department of Environmental Quality
Division of Environmental Response and Remediation
168 North 1950 West 1't Floor
Salt Lake City, Utah 84114
Subject:Receipt of Work Assignment EHLR-5.2
Additional Environmental Sample Collection for the RBCA Tier 2
Risk Assessment and Subsequent Reporting
Big-O Tires,200 South Main Street, Richfield, Utah
Facility ID #2000326, Release Site EHLR
Dear Ms. Mason:
Enclosed is a fully executed copy of Work Assignment EHLR-5.2. This work
assignment involves collection and analyses of additional environmental samples in
conjunction with a RBCA Tier 2 evaluation at the above referenced facility. The work
will be completed under contract #99-6340. If you have any questions or comments
concerning this letter or the project, please contact me at (801) 466-6769.
Sincerely,i_ ffi
KLEINFELDER, INq.i eilvlnonurnrAr
1Fli,q i!!E & RErrt E D tATr 0rr iENiERED
David Rickers, P.E.
Project Engineer
35-8263-05.001\3519L081 Page I of I March 19,1999
Copy.ght 1999 Kleinfelder, Inc.
KLETNFELDER 2677 East Parley',s Way, Salt Lake City, UT 84109-1617 $O1\466-6769 (801) 466-6788fax
?
WORK ASSIGNMENT AMENDMENT #EHLR.s.2
Contract #99-6340 Work Assignment Amendment #EHLR-5; Conduct a Risk-Based
corrective Action (RBCA) Tier 2 Risk Assessment and subsequent
Reporting
Change in Scope of Work at: Big-O Tires,located atz}O South Main Street, Richfield, Utah
Facility Identification No. 2000326, Release Site EHLR
The contractor (Kleinfelder, Incorporated) is requested to complete the following items as Work
Assignment Amendment # EHLR-5.2. The following changes are hereby made to Work Assignment
#EHLR-5, which was originally approved by the DERR on January S,lgg9.
Due to upcoming administrative proceedings which may involve apportionment of
liability between potentially responsible parties, the DERR has identified a need to
conduct additional environmental sampling. Specifically, soil samples need to be
collected to test for the presence of total lead. The two soil samples for lead testing
should come from a contaminated area at the on-site source area (near B-5 at the same
location used for TPH fractionation sampling) and at an up-or downgradient "clean" area
in order to determine the difference between levels that may be naturally occurring and
considered "background", and those areas which may have been impacted by the release
of leaded gasoline in the past. The soil and groundwater samples for TPH fractionation
shall be submitted to American West Analytical Laboratories in Salt Lake City, Utah and
marked as "utah rPH Fractionation" for the analytical method to be used.
Due to the destruction of some of the critical groundwater monitoring wells during recent
construction activities, the final sampling and analysis plan has been modified as shown
below:
1.
2.
Sample Location(s)Medium or
Matrix
Purpose Analytical Method
Geoprobe near B-9 soil &
groundwater
Current Contaminant
Levels
8020/801sM
B-5, B-7 & B-11 groundwater Current Contaminant
Levels
8020/8015M
Geoprobe near B-5 soil &
groundwater
TPH Fractionation 8260t8270
(AWAL)
Geoprobe near B-5
("source")
soil Total Lead Analyses 6010
Upgradient geoprobe
("clean")
soil Total Lead Analyses 6010
3. The reporting for this work assignment amendment shall be combined with the risk
assessment report and should contain a discussion of the lead and fractionation results in
terms of product Upe(s) and other contaminant characteristics which may aid in the
determination of multiple releases from the same property or mixed releases from
different properties to assist the DERR in future cleanup funding and apportionment of
liability decisions.
The sum of $750.00 is hereby added to the total work assignment cost. The total adjusted work
assignment cost approved to date is therefor effectively amended from $8,350.00 (e.g., the amount
authorized by work Assignment#EHlR-5.1) to the final approved amount of $9,100.00. The work shall
be performed in the same character as provided for in the Contract. This change in the scope of work
changes the original March 31,1999 report due date to April lgrlggg.
Approved by:
LJDERR Project Manager
UDERR Contract Officer
LUST Section Manager
Kleinfelder Representative
Date: >/*)qq
Date: s/+ lqq
Date: t/{
Date: 7 i
DEPARTMENT OF ENVIRONMENTAL QUALMY
DIVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION
168 North 1950 West
P.O. Box 144840
Salt Lake City, Utah 841t4-4840
(801) s36-4100
Fax (801) 536-4242 a-l3zc
FAX COVER SHEET
\
Agency/Firm:
FAX Number:
Date:
RE:
From:
f urgent N For Review
-
prease comment
-
prease Reply
-
As Requested
-L
pages to Follow
Comments:
TL Y6''f tJ'1
y^,E_
,,' '' : ::
DEPARTMENT OF ENVIRONMENTAL QUALMY
DIVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION
168 North 1950 West
P.O. Box 144840
Salt Lake City, Utah 84114-4840
(801) 536-4100
Fax (801) 536-4242
*..toot/rzyn/
5w
Agency/Firm:
FAX Number:
Date:
RE:
From:
3/zz/71
zbL- rt?l / zt,b -attb / zut- 8o68
-
Urgent X
As Reoucsted
For Revierv _ Please Comment _ Please Reply
Conrmcnts:
FAX COVER SHEET
04 /06./99 JtlE 10:16 FAX 801 488_67881 KLEINFELDER
Ifl KLEINFELDER 4>zu
,ll
FAX . FAX . F'AX . FAX . FAX . FAX o FAX . FA)(
t-ta
PROJECT NO; s5-8263-05.001
To: Dale Urban From: Dave Rickers
DERR-LAST
Kleinfelder, Inc,
267'l fustParley's Way
Salt Lake City, Utah 84119
Phone: 801-456-6769
Fax: 801-466-6788
4-6-99
Re;
Fax #:
TPH-Frac Resul*
359-EEss
(includirrg cover sheet)
COMMENTS: Dale,
Here are the results for Big-O Tire.
doing what you do with these results!
I)ave
Let me know if you have any questions, and have fun
@ oor
Total pages: lI
lFo:
ri: : .'
Li'--i:
4/06/9s TL.!E.10:16 FAX 801 468d788
Clienu Kleinfelder-SlL
Date Sampled: March 10, 1999
AMERICAN Field Sarrple ID:wEsr Brc-o rrRFl3s.e:r63os
ANALYTICAL ortose-to
I-ABOKA-IORIES
TOTAL METATS
Lead
KLEINFELDER
INORGAI\IC AI.IALYSIS REPORT
E ooz
Contactr Dave Rickers
Date Received: March 12, 1999
Analvtical Results
-r-L_..'!!!UtIrlt = trlg/Kg
Analysis
Date:
03115t99
Method
Used:
60108
Reporting
Limit:
3.0
Amount
Detected:
12.
463 West 3600 South
salt Lake city, utah
84115
(801) 263-8686
Toll Free (EE8) 263-8686
Fax (E01) 26}8,687
Released By:
Report Date: March 15, 1999 lofl
a4/ aB / 9g
A},IERICAN
WEST
ANALYTICAL
LABORATORIES
463 West36OO South
Salt Lake City, Utah
84115
(Eol) 263-8686
Toll Free (6EE) 263-8686
Fax (801) 263-ffi87
Client Kleinfelder-Slc
Date Sampledl March LO,lggg
Field Sample IDt
BIG-O TIRE/35{263.05
03r090-12
TOTAL METALS
Lead
Coutact; Dave Rickers
Date Received: March 12,l99g
TtrE 10:17 FAx 801 48%q788 KLEINFELDER
INORGAI\ilC ANALYSIS REPORT
@ ooe
Analvtical Results
Method ReportingUsed: Limit:
Analysis
Date:
01n5t99
Amount
Detected:
60108 3.0 L2.
Report Date: March 16, 1999 1of1
04/06199 TtrE 10:17 FAX 801 4864788 KLEINFELDER
' Report Date: 3/26/99
ORGANIC ANALYSIS REPORT
lient: Kleinfelder'- SLC
Date Sampled: 3 I lQ/ 1999
Lab Set ID: L36430
AMERICAN
WEST
ANA.LYTTCAL
LABORATO@ AnalvsisMethod:
TpH Fractionation EpA Sw.E46 #82604
Prcp:50304
Lab Sample ID.: Eield Samole ID.:
463 West 3ooo sout*36430-t
Salt Lake City, Utah
e11fr.n alytical Results
031099-t2
Big - O Tire/35-8263-05
Page 1 of 1
Contact: Dave Rickers
Date Received: 3/1211999
Received By: Rebekah Richardson
Date Analvzed:
March ?3,1999
Volatile Fractionation
@ ool
Units -ppb (ug&e)
Compotutd:
(801) 263-E6sMethyl tert-butyl ether
Toil Free (888) 263-S6EBenzene
Fax(801) 2@ffitolu"ne
Ethylbenzene
m&p-Xylene
o- Xylene
Naphthalene
Cg &ClO Alkyl Benzenes = t I
Reporting Amor:nt
Limit: Detecred:
24 <24
630 9900
1300 64000
1300 25000
1300 120000
1300 41000
2500 es00
1300 270000
C5 & C6 Aliphatic hydrocarbons e 4 4 13000 64000
C? &, CB Aliphatic hydrocarbons = * , 13000 77OOOO
C9 & C10 Aliphatic hydrocarbons = $ (. 13000 340000
Surrogatc Q. C,o/oRecovery QC Limits
Toluerre-dt 97.3o/o 52 to l4l
Footnotes:
E Estimated value. The amount exceeds the linear working range of the instument.
T Trace Value. The result is below the detectiou limit.
Rereasedby: 7an-
Laboratory Supervisor
o4/06/s; TITE 10:17 FAX 801 469rq788
Client: Kleinfelder-SLC
Date Sarnpled,: 3ll0lt999
Lab Set ID: L36430
An4lysis Requested:
TPH Fractionation
Lab Sample tD.:
L36430. t
Analytical Results
KLEINFELDER
Anallisis Method;
EPA SW-Bi 6 fl82708
Prcp. Mcrhed; 3550A Moditied
Field.$ample ID.'
03 t099-12
Big-O Tire/35-E263-05
@ oos
Conract: Dave Rickcrs
Date Receivedz 3l 12/ 1999
Received By: Rebekeh Richardson
AMERICAN
WEST
ANALYTICAL
LABORATORIES
Date Exrracred:
March 15, 1999
Date Analvzed:
MErch t7, 1999
Semi-Volatile Fractiotrstion463 Wesi 360o South
Salt Lake City, Utah
E4115
Units = ppb (u/ke)
Compound:
Ilrd<tr {
'2-M.thylouphthalene \ o .
I-Methylnaphthalene / c
Repofiing
Limit:
120
120
t20
t20
t20
QA
l20
t20
t20
120
t20
t20
t20
t20
120
t20
120
120
zto
210
2t0
210
210
210
Amount
Detected:
<120
1 100
450
< 120
< 120
< 120
< 720
< 120
< 120
< 120
< 120
< 120
< 120
< t20
< 120
< tzo
< 120
< 120
16000
4000
1000
r 6000
460
< 210
(801) 253-8686 Acenaphthylene \
Totl Free (9EE) 263-86f36 Acenaphthene \Fax(Eo1)263'tn87
IIJJffi;. )Anthracene IFluoranthen. ( ,h_ 2.,Pyrene ( J
Benz(a)Anthracene \Chrysene IBeruo(b)Fluoranthene
IBenzoft)Fluorandrene I
Benzo(a)forene I
Ideno(I,2,3-Cd)Pyrcne /
Dibenz(a,h)Anthracene /
Benzo(g,h,i)Perylene / .. 4
CI I to Cl2 Aliphatics = * t
Cl3 to Cl6 Aliphatics z * $
Cl7 to C21 Aliphatics -- l? I
C22to C35 Alipharics z {P tO
Total Dimethyl Naphthalene \
Total Trimethyl Naphthalun" )* Z
lurro,grtc Q, C.r/oRecovery QC Linrq
IerDh€nvl-dl4 36.9%lBro 137
FootNotest
E Estimsrcd value. 'fhe amounr exceeds thc linear working range of rhe ingrrumenr
T Trusc Valuc, Thc result is bclow rhc dcecrion limit-
Released by:
Laboratory Supervisor
o4/o6/ss TtrE 10:18 FAX 801 486/q788 KLEINFELDER ,
' Report Date: 3/26199
OBGANIC ANALYSIS REPORT
lient Kleinfelder - SLC
@ ooo
Page 1 of 1
L36430-S
463 West 3500 South
Salt Lake City, Utatt
E411A.n alytical Resu lts
03 1099-17
Big - O Tire/35-8263-05
Date Sampled: 3110/1999
Lab Set ID: L36430
AMERICA\I
WEST
A\IALYTICAL
LABORATO@ AnalvsisMethod:
TpH Fractignatlon EpA Sw_846 #E2d0A
Prep: 5030A
Lab Sample tD.: Field Sample ID.:
Contact Dave Rickers
Date Receive d: 3ll2ll999
Received By: Rebekah Richardson
Date Analy?ed:
March 22,1999
Volatile Fractiouation
Uuits = ppb (uyl)
Comporr$C:
Reporting Amount
Limit Detected:
20 <20
t0 350
20 53
20 31
20 ll0
20 23
410
2 150
20 100
20 100
20 13
(801) 263_s#ethyl ten-butyl ether
rou Free ie8a1 zogs6SB eDzene
Fax (801 ) 263€68f o1rr",r"
Ethylbenzene
m&p-Xylene
o- Xylene
Naphthalene
C9 & C10 Alkyl Benzenes
CS & C6 Aliphatic hydrocarbons
C7 & C8 Aliphatic hydrocarbons
C9 &, C10 Aliphatic hydrocarbons
Surrogate Q. C.ToRecovety QC Limia
IoluencdE 91.4%52 ra l4l
Footnotes:
E Estimated value. The amount exceeds the linear working rango of thc instnrment.
T Tracc Valuc. Thc result is below the detection limit.
Released by:
04/06/99 TtrE 10:18 FAX 801 466/q788
Client: Kleinfelder-SLC
Date Sampled: 3l l0lt999
Lab Set ID: L16430
Anal:rqiq.Reoue.sred:
TPH Fractionation
Lab Samole [D.:
L36430-s
KLEINFELDER
Analy$is Method.
EPA Sw-8,{6 #81?oB
Prcp. Mcurod; 15l0A Modificd
Field SamFle IP.:
03 1099-0 l7
Big-O Tire/35-8263-05
Contact: Dave Rickers
Date Received: 3/ l2lt999
Rcccivcd By: Rebekah Richerdson
Date E?$racted:
March 15, 1999
I\qte Analyzed:
Much 17, 1999
Semi-Volutile Fractionfl tion
E ooz
AMERICANI
WEST
ANALYTICAL
LABORATORIES
453 West 3600 South
Salt Lake City, Utah
84115
Results
Units = ppb (ugll,)
(801) 263-8686
Toll Free (888) 26$8686
Fax(8o1) 263-868.7
9omnound:
Indene
2-Methylnaphthalene
I-Methylnaphthalene
Acenaphthylene
Acenaphrhene
Fluorene
Phenantfuene
Antbracene
Fluoronthene
Pyrene
Ben{a)Anthracene
Chrysene
Benzo(b)Fluoranrhene
Berzo(k)Fluoranthene
Benzo(a)flrene
ldeno( 1,2,3-Cd)Pyrene
Dibenz(4h)Anthracene
Benzo(B,Li)Perylene
C1l to Cl2 Aliphatics
Cl3 to Cl6 Aliphatics
CI7 to C2l Aliphatics
C22ro C35 Alipharics
Total Dimethyl Naphthalene
Total Trimethy I Naphthalen e
Reponing
Limit:
3
3
3
3
3
3
3
3
5
3
3
3
3
3
3
3
3
3
5
5
5
5
)
5
Amount
Detecterl:
<3
<3
<?
<3
<3
<3
<3
<3
<1
<3
<3
<3
<3
<3
<3
<3
<3
<3
4_8
<5
<5
<5
<5
<5
turrot.tC Q, C.%Rccovery @Limis
rc?hcnyl-d l4 41.$a/o JJ to l4t
FootNotes.
E Estima:ed value. ThC urount cxcceds the lineor working rang6 of rhc instrumcnLT Troce Vuluc. Thc rczult is below the rletcqtion limit.
Released by:
Laboratory Supervisor
o4/o$/ss TITE 10:18 FAX 801 486{88 KLEINFELDER
ORGAIUC ANALYSIS REFORT
@ ooe
03109+14
lryEvlbd Results BTIO.I/TPH-E463 West 3600 South'H,?:il"',ffI;f,
84115
C lient : Kleinfelder-SlC
Date Sampled: March 10, 1999
. - _Date Reciived: March li, L999AMERICAN
WESTAnalvsis Reouested:AI{ALYTICALffi
LABOIIAJIoRIESToIaI Petroleum Hydrocarbons
Field Sample IDI
BIG-O TIR935{263{5
Contact: Dave Rickers
Date Extacted: March 15, 1999
Date Analyzed: March L1, L999
Method Ref.Number:Wmodified
(Exnaction-SeErential GC/PID-FID)
I-ab Samole ID:B6$Al-
Repo4ing
Lrmlt:
(801) 263-8666
Toll Free (888) 263{686
Fax(601) 263ffi7
Compound:
Benzene
Toluene
Ethylbenzene
Total Xylene
Naphthalene
Total Petroleum Hydrocarbons
0.10
0.10
0.t0
0.10
20.
Amouot
Detected:
< 0.10
< 0,10
< 0.10
< 0.10
< 0.10
9S.
0.10
% Moisnue 17.%
{' All compounds are rcportcd ot a dry weighr basis.
Repon Dap: March 19, 1999 lofl
04/ 06 / SS TITE 10 : 19 FAX 801 466{88 KLETNFELDER E oos
oRGANIC AIVALYSIS REPORT
Client: Kleinfelder-SlC
Date Sampled: March 10, 1999
AMER'.AN Date Received: March li, lggg
ANALYrmlffi
LABORATORIES Total hggeable Hydrocarbons
Contact: Dave Rickers
Date Analyzed: March 17,
Method Ref.Number:ffiA(Puge & Trap GCMS)
0,010
0.020
0.020
0.m0
0.040
0.20
1999
Amount
Detected:
0.23
<0.020
0.38
0.16
0.27
36.
Field Samnle ID:
03109!Ll5
BIG-O TIRE/35_8263{5
-tt',,Tfrtffi,tii$
84115 R+prt]ng
Llmlt:Compound:
(807)263.8,6tt6
Toll Free (6EB) 26T8686
Fax (801) 26Ytrc87
Benzene
Toluene
Ethylbenzene
Total Xylene
Naphthalsss
Total Purgeable Hydrocarbons
'pH)2
Released By:
Rcpon Darc: Matrh 18, 1999 lofl
--'.-r rhi..^---^,,..-^r-^^d6.<lhllhvo\e^lfrrrllci,,..Era^mrne^rin.-*ri,r^.^Jr^.-^rl-.i"i^---l ,!iSr-l-.-.tAi^t-hA-.,.t..^rll-.'.1..-r-a-..---
o4/o$/9s TtrE 10:19 FAX 801 4664788 KLEINFELDER
ORGA}IC AT..{ALYSIS REPORT
E oro
BIGO TIRE/35,6263{5
tnalytical Results BT)OVTPH-P4J1ry"*ry9s-"r+
SaIt Lake City, Utah
84115
Client: Kleinfelder-Slc
Date Sampled: March 11, 1999
^ - - Dae Rece:ived: March li, LgggAMERICAN
WEST Analvsis Reouested:ANALYTICALM
LABOMIIORIES Total Purgeable Hydrocarbons
Field Samole ID;
031199-21
Conuct: Dave Rickers
Darc Analyzed: March L7, L999
Lab Samole ID:trtEfitotr--
Amount
Derccred:
(801) 263€586
Toll Free (888) 263€6,86
Fax(801) 26}.E667
Compound:
Benzene
Toluene
Eilrylbenzene
Total Xylene
Napbftralene
Total Rrrgeable Hydrocarboru
0,020
0.020
0.020
0.040
0.20
0.54
0.033
0.2L
0.069
0.19
16.
Rcport Date: March 18, 1999 tofl
04/06/sg TtrE 10:19 FAX 801 406/q78e KLEINFELDER
ORGANIC A|.IALYSIS REPORT
@ orr
AMERI.CAN
WEST
ANALYTICAL
LABORJ.TORIES
463 West 36O0 South
Salt Lake City, Utah
841r.5
(Eo1) 26H685
Toll Free (888) 263-8686,
Fax(801) 26Y8@7
Client: Kleinfelder-Slc
Date Saurpled: March 11, 1999
Date Rece:ived: March L2, lgig
Analysis Reouested:
Yolatrle Aromatlcs
Total Purgeable Hydrocarbons
eompound:
Benzene
Toluene
Ethylbenzene
Total Xylene
Naphthalene
Total Purgeable Hydrocarbous
/,f-
Coutact: Dave Rickers
Date Analyzedl March tt, l99g
Method Ref.Nrrmber:@(huge & Trap GC/MS)
lab Samole ID:trtfita,-
Erc{) TrRB/35-t263{5
Alalgric{ Results BTm{/TpII_p
Repo4ing
Lrturt:
,",
0,002
0.002
o.0u2
0.004
0.020
Amount
Detected:
0.11 E
0.00E1
0.024
0.040
0.011
4.3
E Estimared value. The aurolun excceds :he linear working range of rhe hstruneDr.
Releascd By:
Repon Date: March 18, 1999 I of I
$tt9+22
04/23/99 FRI 12:38 FAX 801 466 6788
1
KLEINFELDER +++ UDEQ,/DERR @ oor
Ifl KTEINFELDEB zV3ZU
FAxoFAx.FAXoFAx.FAx.FAx.FAxoFA)(a:'
PROJECT NO:
To: Da.Q U r b^.^ From:
Date:
Re:
Fax #:
4lrgl$
fh'ne - eq't'{*l/
Kleinfeldcr, Inc-
2677 FastParleY's WaY
Salt Lake city, utah 84119
Phone: 801466-6769
For: 801-466'6788
Total pages:
(including cover sheet)
@ ooz+++ UDEQ,/DERRKLEINFELDER04/23/99 FRI 12:38 FAX 801 466 6788
^\
...
t
c:'
I
It.,
o6
i3
93TI
=iE!9>cor;
g
!!lro8t!a{{
TF
EEFa dt
3EE: ..i
a
3
jjj
a-aitlE.-.
iE3
11;il:!Eg
iti
ila
iiFrti
i13:i3tI!lit
ir,-
3I
E,g
3o
t?
P}6i
i
I.
I{
h,'
i..
[4'
13: '
{o
-o
oosl:*(,
o
o
oo
=ooE-co
mxEoo
ci
o
=ooo
aog
=oq,
o
3
oq,
r066
iaII
tsos0:J
.|t o\N',oN)
t\.\\
N
ffi
04/30/Sg FRI 10:33 FAX 801 466 6788
^
KI.EINFELDER B oot"
Ifl KLEINFELDER
FAx . FAx . FAx o FAX o FAX o FAx o FAx . FA)(
-
PROJECT NO:
-::'2'
Total pages:
(including cover sheet)
'- t '' >)"L -COMMENTS: I 1,s-nta
ro: ,l>a,t, Urlr^ From: /Wr,A M
Kleinfelder,Inc"
2677 FastParley's Way
SaltlakeCity, Utah 84f 19
Phone: 801466-6769
Fax: 801-466-6788
Date:
Re:
Fax #:
4f z"fqq
nispriirsi & REi',:D! i\i i-nli
@oozKLEINFELDERFRI 10:34 FAX 801 466 6788o4/ 30 /99
\
\\-$
-.$
Y-"N,S)l\[\8\N.S:as\
\,,\,-L
t
3e ie9G
J! ao o.gIt('o
og
Eo
Es
g
o
E
oEo
=aCIaaIatI
. ._jl
, .,]
aY
5
. -<=s= 5r
EEf,Ial rfl!aga
.ti:E I
T=Ea9 aE=i
at:'
It
Ca!o
?
I EiI :il
IIEIHo
Hr
iE
ga
Eq9ai=
sS
{b
\\
NY
oLtaocxlrl
6
o.oocoo
o
=o
c,+
oo
dT
o
=
Michael O. [ravin
Govsmor
Dianne R. Nielson, Ph.D.
Executive Diretor
Kent P. Gray
Director
DEPARTMENT OF ENVIRONMENTAL QUALITY
DTVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION
168 North 1950 West
P.O. Box 144840
Salt L^ake Cirt,. Utah 841l4-4840
(801) 536-t100
(801) 359-8853 Fax
(801) 5364-ll.l T.D.D.
www.deq.smte.ut.us Web
ERRL-1027-99
lune2l,1999
David Rickers, P.E.
Kleinfelder, Incorporated
2677 EastParley's Way
Salt Lake City, Utah 84109
ZY>Lb
RE: Closure of Work Assignments EIILR-S, EFLU-9, EFBK-8, and EGZI-I Under Contract #99-6340
Dear Mr. Rickers:
The Division of Environmental Response and Remediation (DERR) is providing Kleinfelder,
Incorporated, notice of termination for all of the above-referenced Work Assignments, as outlined in the contract,
as well as the beginning of the l0 day period for any necessary consultation with the DERR. All of these Work
Assignments will be terminated after the l0 day period. Please submit the final invoices (marked as ,.final',), as
well as any outstanding deliverables, for all previous Work Assignments within 30 days of this termination noti"..
If you have any questions concerning this matter, please conract Dale T. Urban at (801) 536-4100.
Sincerely,
D.r- t ,v\.n
Dale E. Marx, Manager
Underground Storage Tank Branch
DEM/DTU/stt
Hillary Mason, Contract Officer, DERR
Roy Baron, DERR Accounting Services
Paul Zatrn, LUST Section Manager
DEPARTMENT OF ENVIRONMENTAL QUALITY
DTVISION OF ENVIRONMENT,^L RESPONSE AND
I68 Nonh 1950 West
P.O. Box 144840
Salt L-ake CiN. tirah 841 1.1+8.10
( 801 ) 536-+l 00
i80l) 359-8853 Frr
(801) 536-4411T.D.D
www.deq.snte.ut.us Web
June 21, 1999
REMEDIATION
\'lichael O. l-eavin
Govemor
Dianne R. Nielson. Ph.D.
Executive Director
Kent P. Cray
Director
ERRL-1029-99
Les Pennington, President
Wasatch Environmental, Incorporated
2410 West California Avenue
Salt Lake City, Urah 84104-4109
zYYt-v
RE: closure of work Assignments EICr-16, Erco-l0, EIUe-8, EHLR-TS, EFBK-TS, EFLU-TS,
EFGH'TS, EHDF-TS, and EGKA-TS Under Contracts #95-l281,and/or #gg-G234
Dear Mr. Pennington:
The Division of Environmental Response and Remediation (DERR) is providing Wasatch
Environmental, Incorporated, notice of termination for all of the above-referenced Work Assifrrments, as
outlined in the contract, as well as the beginning of the 10 day period for any necessary consultation with theDERR. All of these Work Assignments will be terminated after the 10 day period. Fl"^" submit the final
invoices (marked as "final"), as well as any outstanding deliverables, forail previous Work Assignments
within 30 days of this termination norice.
If you have any quesdons concerning this matter, please conracr Dale T. Urban ar (g01) 536-4100.
Sincerely,
T).r-- 5 A+
Dale E. Marx, Manager
Underground Storage Tank Branch
DEM/DTUistt
Hillary Mason, Contract Officer. DERR
Roy Baron, DERR Accounting Services
Paul Zatrn, LUST Section Manager
,-5ii:i". r,t:' iYu: g,, l,:
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION
168 North 1950 West
P.O. Box 144840
Salt Lake Citv. Utah 84114-4840
(aor) sgo-+r0o
Fax (801) 536-4242
FAX COVER SHEET
To:
Agency/Firm:
FAX Number:
Date:
RE:
From:
-
Urgent $ For Revierv
-
Please Comment
Comnrcnts:
LKj:22
Please Reolv
-?llb/zbl -Bc;,-.b
-,U
A.^'D*ry
07/07/99 08:41 FAX E oor
**** ***t:C****8*8*!S*8*
a*8 TX REP0RT ***
*8** *8****8****a8!8**S
TRANSUISSION OK
TXIRI N0 0299
CONMCTION TEL 946667S8
SIIBADDRESS
CONNECTION ID KLEINFELDER
ST. TIilE 07/07 08:40
USAGE T OO'44
PGS. SEI{T 1
RESULT OK
$i til.t# rii- [--ltr]h
DEPARTMENT OF ENVIRONMENTAL QUALITY
DTVISION OF E}-I-VIRONMENTAL RESPONSE A}ID REMEDIATION
168 North 1950 West
P.O. Box 1M840
Salt Lake City, Utah 841144840
(801) s36-4100
Fax (801) 5364242
FAX COVER SHEET
To:
Agency/Firm:
FAX Number:
Date:
RE:
From:
Ursent
{t"rt
Y fo, Review
-
Please Comment
-
Please Reply
-
As Reouested Pases to Follow
Comnrents:
07/07/99 08:42 FAX @ oor
* + ********* *88 !& ******
*ff* TX REP0RT **B
8*S**8*S8S8tt*S*S8**8
TRANSMISSION OK
TXIRX NO
CONNECTION TEL
SUBADDRESS
CONNECTION ID
ST. TIITE
USAGE T
PGS. SEI.IT
RESULT
0300
92661671
07 /07 08:41
00'53
1
OK
$jt{}fl* {"}{" {Jt;rh
DEPARTMENT OF ENVIRONMENTAL QUALITY
DTVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION
168 North 1950 West
P.O. Box 14/;840
Salt Lake Ciry, Utah 84114-4840
(801) 536-4100
Fax (801) 536-4242
FAX COVER SHEET
To:
AgencylFirm:
FAX Nurnber:
Date:
RE:
From:
-
Urgent Y For Review _ Pleasr
.tlorrtt
Y nor Review
-
please Comment _ please Reply
Comnrents:
07/07/99 08:47 FAtr @ oor
**s*sa*t***8sst88*8** -
*8* TX REP0RT **8
**8t *a* * ***** *tt t8*!F*
TRANSMISSION OK
TXIRX NO
CONNECTION TEL
SUBADDRESS
CONMCTION ID
ST. TIUE
USAGE T
PGS. SE}IT
RESULT
0301
99728459
07 /07 08:46
00'54
1
OK
$i tiltffi * f" {J tit"h
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION
i68 North 1950 West
P.O. Box 144840
{t r\'To:
Agency/Firm:
FAX Number:
Date:
RE:
From:
Ureent
salt Lake city, Utah 841144840
(801) s36-4100
Fax (801) 536-4242
FAX COVER SHEET
"l For Revierv
-
Please Comrnent
-
Please Reply'-
Comnrents:
b u\Xlg) [.]- ,.r- srou',L
07/07/99 08:45 FAX @ oor
*r*a8t 8*:&** *88**t***8
8s* TX REP0RT ***
s*************8ss****
TRANSUISSION OK
TXIRX NO 0302
CONNECTION TEL 92667118
SUBADDRESS
CONNECTION ID SECOR SLC
ST. TIilE 07/07 08:44
USAGE T OO'45
PGS. SENT 1
RESULT OK
$it#t# {}f {-Jtr}?:
DEPARTMENT OF ENVIRONMENTAL QUALTTY
DTVISION OF ENVIRONMENTAL RESPONSE AND REMEDIATION
168 North 1950 West
P.O. Box 1,14840
Salt Lake City, Utatr 84114-4840
(801) 536-4100
Fax (801) 536-4242
-
Urgent )L For Review
-
Please Comment
-
Please Reply
-
As Requested
Comrnents:
FAX COVER SHEET
.t}"r\'
Agency/Firm:
FAX Number:
Date:
RE:
From:
6D<- q uiJb u\trE) t !
Pages to Follow
07/07/gg 08:46 FAI @ oo1
*:s**8 * *** ** **8 {r *8* ** *
*** TX REP0RT ***
* * *8* SS****** S8t *ts**
TRANSUISSION OK
TXIRX NO
CONNECTION TEL
SUBADDRESS
CONNECTION ID
ST. TIUE
USAGE T
PGS. SEI\IT
RESULT
0303
92618068
07/07 08:45
00'38
1
OK
S tl*r# {i f { Itr} h
DEPARTMENT OF ENVIRONMENTAL QUALITYDIVISION OF E}WIRONMENTNT NTSPONSE AND REMEDIATION
168 North 1950 West
P.O. Box IMB4O
.Salt Lake Ciry, Utah 841l4-4g40(8ot) s36-4160
Fax (801) 5364242
FAX COVER SHEET
To:
Agency/Firm:
FAX Nurnber:
Date:
RE:
From:
-
Urgent Y For Review _ pleasr
-t}"rt'
V fo, Review
-
please Comment _ please Reply