HomeMy WebLinkAboutDERR-2025-003163Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name CANYONLANDS CONOCO OF MONTICELLO
Address 651 South Main
BLANDING, UT 84511
Contact CANYONLANDS CONOCO OF MONTICELLO
Phone
Email startoday123@gmail.com
TANK LOCATION
Name CANYONLANDS CONOCO
Address 433 N MAIN ST
MONTICELLO, UT 84535
A Operator QUINN HOWE
Phone (435) 678-2249
B Operator SAME
Phone SAME
Facility ID: 5000443 Inspection Date: 04/15/2025
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1/2 Gasoline Yes Steel Flex in Sump None None Yes No None None
2 - 3/4 Gasoline Yes Steel Flex in Sump None None Yes No None None
3 - 5/6 Gasoline Yes Steel Flex in Sump None None Yes No None None
4 - 7/8 Gas/Diesel Yes Steel Flex in Sump None None Yes No None None
5 - 9/10 Diesel Yes Steel Flex in Sump None None Yes Yes None None
TANK DETAILS
Tank ID/Alt ID 1 / 1a
E-Gen/AST No / No
Siphon/Compart No / Yes
Tank Status Currently In Use
Installed/Cap/Loc June 20, 1996 / 7000 / North
Substance
Stored Gasoline / Premium
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350 CSLD No
Manifold
LTT Test April 10, 2024
LLD Test April 10, 2024
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1V
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Ball float
valve / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 2 / 2b
E-Gen/AST No / No
Siphon/Compart No / Yes
Tank Status Currently In Use
Installed/Cap/Loc June 20, 1996 / 10000 / Center
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350 CSLD
Manifolded
LTT Test April 10, 2024
LLD Test April 10, 2024
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model FE Petro MLD (blue)
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Ball float
valve / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
2025-04-15 Page 1 of 8
Tank ID/Alt ID 3 / 2c
E-Gen/AST No / No
Siphon/Compart No / Yes
Tank Status Currently In Use
Installed/Cap/Loc June 20, 1996 / 7000 / South
Substance
Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350 CSLD No
Manifold
LTT Test April 10, 2024
LLD Test April 10, 2024
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Vaporless LD2000
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Ball float
valve / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
Title: Diesel probe
probe out Nov, Dec 2024 & Jan 2025. No CSLD tests.
No Photos
Title: PVVs
Installed last year. Need invoice.
No Photos
2025-04-15 Page 2 of 8
FACILITY RESPONSES
Financial Responsibility
Financial responsibility method is ok?Yes
The above accurately represents the
facility's release detection records Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?No
Is the site unmanned?Yes
Is a sign posted in a conspicuous area
giving the name and telephone number
of a person in case of an emergency
and if the station is manned part of the
time, are C operators trained?
No
Does the site have emergency shutoff
device?Yes
TANK RESPONSES
Tank 1a Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 1a ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 1a Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 1a Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?No
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
No
Tank 1a Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 2b Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
2025-04-15 Page 3 of 8
Tank 1a ATG/IM
Does the ATG system have a valid
annual test?No
Tank 2b Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 2b ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 2b ATG/IM
Does the ATG system have a valid
annual test?No
Tank 2c Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 2b Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?No
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
No
Tank 2b Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 2c Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 2c Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?No
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
No
Tank 2c Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
2025-04-15 Page 4 of 8
Tank 2c ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 2c ATG/IM
Does the ATG system have a valid
annual test?No
DISPENSER RESPONSES
Dispenser 3/4
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 7/8
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
No
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1/2
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 5/6
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
2025-04-15 Page 5 of 8
Dispenser 9/10
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
MONTHLY LEAK DETECTION MONITORING
Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25
Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 3 Pass Pass Pass Pass Pass Pass Pass Not Avail Not Avail Not Avail Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
TANK 1a
No Photos
Question:Does the pressurized piping system have a valid line leak detector test?
Comments:None
TANK 1a
No Photos
Question:Does the pressurized piping system have a valid annual line tightness test or valid monthly
monitoring?
Comments:None
TANK 1a
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
TANK 2b
No Photos
Question:Does the pressurized piping system have a valid line leak detector test?
Comments:None
TANK 2b
No Photos
Question:Does the pressurized piping system have a valid annual line tightness test or valid monthly
monitoring?
Comments:None
TANK 2b
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
TANK 2c
No Photos
Question:Does the pressurized piping system have a valid line leak detector test?
Comments:None
TANK 2c
No Photos
Question:Does the pressurized piping system have a valid annual line tightness test or valid monthly
monitoring?
Comments:None
TANK 2c
2025-04-15 Page 6 of 8
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 2c
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
DISPENSER 7/8
Question:Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball
valves)
Comments:ball valve
FACILITY
No Photos
Question:Monthly checklist available and complete?
Comments:None
FACILITY
No Photos
Question:Is a sign posted in a conspicuous area giving the name and telephone number of a person in case of
an emergency and if the station is manned part of the time, are C operators trained?
Comments:None
2025-04-15 Page 7 of 8
Prepared by fueloperator.com
Inspection Information
Inspector:Wilson, David
Record Created:April 15, 2025, 3:19 p.m.
Inspection Date:April 15, 2025
2025-04-15 Page 8 of 8