Loading...
HomeMy WebLinkAboutDDW-2025-003911 March 13th, 2025 Shawn Robinson Taylorsville-Bennion ld PO Box 18579 Taylorsville, Utah 84118 Dear Shawn Robinson: Subject: Public Drinking Water Requirements for Taylorsville-Bennion ID, UTAH18021 According to the Division of Drinking Water’s records, Taylorsville-Bennion ID is a Community water system that now serves a population of about 67,098 people. This population change results in changes to your system’s bacteriological sampling and operator certification requirements described below. In addition, the disinfection byproducts (DBP) monitoring requirements have changed because the system qualifies to be moved to reduced DBP monitoring based on the system’s DBP sample results from 2024. The changes to DBP monitoring are described below. Bacteriological Sampling The total number of bacteriological samples for this system has decreased to 70 each month. It is still your responsibility to send a copy of all results to our office by the 10th of the following month. In the event of a coliform positive result, you are required to take three repeat samples and a triggered source E.coli sample for each ground water source in service at the time of the original positive sample. The system is required to submit an updated written sample site plan that identifies sampling sites and sample collection schedules that are representative of water throughout the distribution system. For any questions regarding the Total Coliform rule or Groundwater rule, contact Sitara Federico at (385) 515-1459 or sfederico@utah.gov. This new sample schedule will take effect on May 1st, 2025. 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4284 www.deq.utah.gov Shawn Robinson Page 2 of 2 Disinfection Byproducts (DBPs) Sampling The water system’s DBP sampling requirement has changed. The system is now required to collect four (4) samples every quarter. Each sample must be a dual sample set of total trihalomethanes (TTHMs) and haloacetic acids (HAA5). The next DBP samples must be collected during the January 1 - March 31, 2025, monitoring period . For any questions regarding the DBP rule contact Luke Treutel at (385) 258-6084 or ltreutel@utah.gov. Visit ddwopcert.utah.gov for more information regarding the R309-300 Certification Rules for Water Supply Operators, how to become a certified operator, or to post a job position for operators. For questions, contact Dawnie Jacobo at 385-272-5038 or ddwopcert@utah.gov A current monitoring schedule for your system has been enclosed. If this letter is in error please contact me at (801) 641-6457 or mberger@utah.gov within 30 days. Thank you for your efforts in maintaining a safe drinking water system. Sincerely, Mark Berger Monitoring and Standards Section Manager Enclosure: Monitoring Schedule Revised Total Coliform Rule (RTCR) Sample Site Plan cc: Shawn Robinson, shawn@tbid.gov Matthias Neville Sitara Federico Luke Treutel Page 2 of 4 Contacts Type: Administrative Contact Name: SHAWN DAVID ROBINSON Office: 801-580-6175 Emergency: Email: shawn@tbid.gov Site Information Legal Contact: TAYLORSVILLE- BENNION IMPROVEMENT DIST Address: P.O. Box 18579 , TAYLORSVILLE, UT 84118-0579 Phone: 801-968-9081 County: SALT LAKE COUNTY System Type: Community Certification Required: D4 Total Population: 67098 Local Health District: Salt Lake Valley Health Department Site Updates Last Inventory Update: 03/04/2025 Last Surveyor Update: 02/18/2025 Surveyor: CHRISTOPHER RAY BOWLES Operating Period: 1/1 - 12/31 Last IPS Update: 03/13/2025 07:10:00 Political Districts Legislative District Map Water Usage Information per ERC Standard as of: 03/31/2023 Peak Day Demand per ERC (gal/day/ERC): 1646.0 Average Annual Demand per ERC (gal/ERC): 278017.0 Equalization Storage per ERC (gal/ERC): 760.0 Total Ips Points: 5 Public Water System Water Monitoring ReportDEQ | Drinking Water Taylorsville-Bennion Id PWS ID: UTAH18021 Rating: Approved 03/11/1980 Status: Active BACTERIOLOGICAL MONITORING Sample Count Type Frequency Schedule Begin Schedule End Analyte Name 80 Routine Monthly 03/01/2017 COLIFORM (TCR) DISINFECTION BYPRODUCT STAGE 2 MONITORING Sample Count Type Frequency Sample Label 4 Routine Quarterly UTAH18021 DS001 Sample ID below Sample ID Site Last Sampled Next Sample Due MD040 1905 W 4247 S 12/11/2024 01/01/2025-03/31/2025 MD022 4404 W 5950 S 12/11/2024 01/01/2025-03/31/2025 MD008 3560 W 5139 S 12/11/2024 01/01/2025-03/31/2025 MD020 3905 W 5721 S 12/11/2024 01/01/2025-03/31/2025 Sample during the following months: November, February, May, August OTHER DISTRIBUTION MONITORING Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due LEAD AND COPPER DS001 30 Routine 3 Years 08/2023 06/01/2026-09/30/2026 ASBESTOS DS001 1 Routine 9 Years 08/2022 01/01/2029 - 12/31/2037 https://waterlink.utah.gov/reports.html?systemId=1494 1/4 Page 2 of 4 CHLORINE RESIDUAL MONITORING ID Facility Name Sample Count Type Frequency Last Sampled Next Sample Due DS001 UTAH18021 DISTRIBUTION SYSTEM 80 Routine Monthly -- EP002 POINT OF ENTRY FOR TP002 12 Routine Monthly -- TP026 RAWSON CHLORINATOR 3 Routine Weekly -- Sample Point Location Count EP026 DISCHARGE PIPING EXITING WELL HOUSE 3 https://waterlink.utah.gov/reports.html?systemId=1494 2/4 Page 2 of 4 MONITORING REQUIREMENTS BY FACILITY ID Name Facility Details SS028 SAMPLING STATION - 16 17 18 28 Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 3 Years 07/18/2024 01/01/2026 - 12/31/2028 NITRATE 1 Routine Yearly 07/18/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 07/19/2022 01/01/2023-12/31/2025 RADS - COMPLIANCE 1 Routine 3 Years 07/15/2022 01/01/2023 - 12/31/2025 SULFATE,SODIUM,TDS 1 Routine 3 Years 07/18/2024 01/01/2026 - 12/31/2028 VOLATILE ORGANICS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025 SS029 SAMPLING STATION - 05 21 23 24 29 Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 3 Years 07/18/2024 01/01/2026 - 12/31/2028 NITRATE 1 Routine Yearly 07/18/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 07/19/2022 01/01/2023-12/31/2025 RADS - COMPLIANCE 1 Routine 3 Years 07/15/2022 01/01/2023 - 12/31/2025 SULFATE,SODIUM,TDS 1 Routine 3 Years 07/18/2024 01/01/2026 - 12/31/2028 VOLATILE ORGANICS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025 WS002 TAYLORSVILLE EAST WELL Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 9 Years 07/18/2024 01/01/2029 - 12/31/2037 NITRATE 1 Routine Yearly 07/18/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 08/09/2022 01/01/2023-12/31/2025 RADS - COMPLIANCE 1 Routine 9 Years 06/22/2016 01/01/2020 - 12/31/2028 SULFATE,SODIUM,TDS 1 Routine 9 Years 07/18/2024 01/01/2029 - 12/31/2037 VOLATILE ORGANICS 1 Routine 3 Years 08/09/2022 01/01/2023 - 12/31/2025 WS003 BARKER WELL Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 9 Years 07/18/2024 01/01/2029 - 12/31/2037 NITRATE 1 Routine Yearly 07/18/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 09/29/2022 01/01/2023-12/31/2025 RADS - COMPLIANCE 1 Routine 6 Years 07/08/2020 01/01/2026 - 12/31/2031 SULFATE,SODIUM,TDS 1 Routine 9 Years 07/18/2024 01/01/2029 - 12/31/2037 VOLATILE ORGANICS 1 Routine 3 Years 07/15/2022 01/01/2023 - 12/31/2025 WS026 RAWSON WELL Hide Details https://waterlink.utah.gov/reports.html?systemId=1494 3/4 Page 2 of 4 ¹To fulfill the two pesticide sample requirements, systems are to submit the second pesticide sample in the quarter following the quarter in which the first sample was collected. ID Name Facility Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 9 Years 07/11/2024 01/01/2029 - 12/31/2037 NITRATE 1 Routine 9 Years 07/11/2024 01/01/2029 - 12/31/2037 PESTICIDES¹2 Routine 9 Years 07/11/2024 01/01/2025-03/31/2025 RADS - COMPLIANCE 1 Routine 9 Years 07/11/2024 01/01/2029 - 12/31/2037 SULFATE,SODIUM,TDS 1 Routine 9 Years 07/11/2024 01/01/2029 - 12/31/2037 VOLATILE ORGANICS 1 Routine 9 Years 07/11/2024 01/01/2029 - 12/31/2037 GROUPED SOURCE SAMPLING STATIONS Sample Group ID Sample Group Facility Details 8264.0 UTAH18021-06 View Details 8028.0 UTAH SAMPLING STATION SS028 View Details 8029.0 UTAH SAMPLING STATION SS029 View Details OPEN COMPLIANCE SCHEDULES Type Required Activities Severity Created Due Water Use Data WUD STANDARD SET, RESET DUE IN 3 YEARS 04/06/2023 04/06/2026 Lead Consumer Notice SUBMIT LCN CERTIFICATE 06/01/2023 12/29/2023 Physical deficiency schedule END OF WELL PUMP-TO-WASTE LINE LACKS NO. 4 SCREEN SIG 02/23/2025 06/23/2025 Physical deficiency schedule WELL LACKS THE REQUIRED WELL SEAL SIG 02/23/2025 06/23/2025 Physical deficiency schedule STORAGE TANK SUBJECT TO CONTAMINATION DUE TO UNSEALED OPENINGS ON TANK ROOF OR SIDEWALLS SIG 02/23/2025 06/23/2025 CCR SCHEDULES Submit Consumer Confidence Report 01/01/2025 07/01/2025 CCR SCHEDULES Submit CCR Certification Letter 01/01/2025 10/01/2025 https://waterlink.utah.gov/reports.html?systemId=1494 4/4