HomeMy WebLinkAboutDDW-2025-003911 March 13th, 2025
Shawn Robinson
Taylorsville-Bennion ld
PO Box 18579
Taylorsville, Utah 84118
Dear Shawn Robinson:
Subject: Public Drinking Water Requirements for Taylorsville-Bennion ID, UTAH18021
According to the Division of Drinking Water’s records, Taylorsville-Bennion ID is a Community
water system that now serves a population of about 67,098 people. This population change
results in changes to your system’s bacteriological sampling and operator certification
requirements described below.
In addition, the disinfection byproducts (DBP) monitoring requirements have changed because
the system qualifies to be moved to reduced DBP monitoring based on the system’s DBP sample
results from 2024. The changes to DBP monitoring are described below.
Bacteriological Sampling
The total number of bacteriological samples for this system has decreased to 70 each
month. It is still your responsibility to send a copy of all results to our office by the 10th of the
following month. In the event of a coliform positive result, you are required to take three repeat
samples and a triggered source E.coli sample for each ground water source in service at the time
of the original positive sample. The system is required to submit an updated written sample site
plan that identifies sampling sites and sample collection schedules that are representative of
water throughout the distribution system. For any questions regarding the Total Coliform rule or
Groundwater rule, contact Sitara Federico at (385) 515-1459 or sfederico@utah.gov. This new
sample schedule will take effect on May 1st, 2025.
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830
Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4284
www.deq.utah.gov
Shawn Robinson
Page 2 of 2
Disinfection Byproducts (DBPs) Sampling
The water system’s DBP sampling requirement has changed. The system is now required to
collect four (4) samples every quarter. Each sample must be a dual sample set of total
trihalomethanes (TTHMs) and haloacetic acids (HAA5). The next DBP samples must be
collected during the January 1 - March 31, 2025, monitoring period . For any questions
regarding the DBP rule contact Luke Treutel at (385) 258-6084 or ltreutel@utah.gov.
Visit ddwopcert.utah.gov for more information regarding the R309-300 Certification Rules for
Water Supply Operators, how to become a certified operator, or to post a job position for
operators. For questions, contact Dawnie Jacobo at 385-272-5038 or ddwopcert@utah.gov
A current monitoring schedule for your system has been enclosed. If this letter is in error please
contact me at (801) 641-6457 or mberger@utah.gov within 30 days. Thank you for your efforts
in maintaining a safe drinking water system.
Sincerely,
Mark Berger
Monitoring and Standards Section Manager
Enclosure: Monitoring Schedule
Revised Total Coliform Rule (RTCR) Sample Site Plan
cc: Shawn Robinson, shawn@tbid.gov
Matthias Neville
Sitara Federico
Luke Treutel
Page 2 of 4
Contacts
Type: Administrative Contact
Name: SHAWN DAVID ROBINSON
Office: 801-580-6175
Emergency:
Email:
shawn@tbid.gov
Site Information
Legal Contact: TAYLORSVILLE-
BENNION IMPROVEMENT DIST
Address: P.O. Box 18579 ,
TAYLORSVILLE, UT 84118-0579
Phone: 801-968-9081
County: SALT LAKE COUNTY
System Type: Community
Certification Required: D4
Total Population: 67098
Local Health District: Salt Lake Valley
Health Department
Site Updates
Last Inventory Update: 03/04/2025
Last Surveyor Update: 02/18/2025
Surveyor: CHRISTOPHER RAY
BOWLES
Operating Period: 1/1 - 12/31
Last IPS Update: 03/13/2025 07:10:00
Political Districts
Legislative District Map
Water Usage Information per ERC
Standard as of: 03/31/2023
Peak Day Demand per ERC
(gal/day/ERC): 1646.0
Average Annual Demand per ERC
(gal/ERC): 278017.0
Equalization Storage per ERC
(gal/ERC): 760.0
Total Ips Points: 5
Public Water System Water Monitoring ReportDEQ | Drinking Water
Taylorsville-Bennion Id PWS ID: UTAH18021 Rating: Approved 03/11/1980 Status: Active
BACTERIOLOGICAL MONITORING
Sample Count Type Frequency Schedule Begin Schedule End Analyte Name
80 Routine Monthly 03/01/2017 COLIFORM (TCR)
DISINFECTION BYPRODUCT STAGE 2 MONITORING
Sample Count Type Frequency Sample Label
4 Routine Quarterly UTAH18021 DS001 Sample ID below
Sample ID Site Last Sampled Next Sample Due
MD040 1905 W 4247 S 12/11/2024 01/01/2025-03/31/2025
MD022 4404 W 5950 S 12/11/2024 01/01/2025-03/31/2025
MD008 3560 W 5139 S 12/11/2024 01/01/2025-03/31/2025
MD020 3905 W 5721 S 12/11/2024 01/01/2025-03/31/2025
Sample during the following months: November, February, May, August
OTHER DISTRIBUTION MONITORING
Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due
LEAD AND COPPER DS001 30 Routine 3 Years 08/2023 06/01/2026-09/30/2026
ASBESTOS DS001 1 Routine 9 Years 08/2022 01/01/2029 - 12/31/2037
https://waterlink.utah.gov/reports.html?systemId=1494 1/4
Page 2 of 4
CHLORINE RESIDUAL MONITORING
ID Facility Name Sample Count Type Frequency Last Sampled Next Sample Due
DS001 UTAH18021 DISTRIBUTION SYSTEM 80 Routine Monthly --
EP002 POINT OF ENTRY FOR TP002 12 Routine Monthly --
TP026 RAWSON CHLORINATOR 3 Routine Weekly --
Sample Point Location Count
EP026 DISCHARGE PIPING EXITING WELL HOUSE 3
https://waterlink.utah.gov/reports.html?systemId=1494 2/4
Page 2 of 4
MONITORING REQUIREMENTS BY FACILITY
ID Name Facility Details
SS028 SAMPLING STATION - 16 17 18 28 Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 3 Years 07/18/2024 01/01/2026 - 12/31/2028
NITRATE 1 Routine Yearly 07/18/2024 01/01/2025 - 12/31/2025
PESTICIDES¹2 Routine 3 Years 07/19/2022 01/01/2023-12/31/2025
RADS - COMPLIANCE 1 Routine 3 Years 07/15/2022 01/01/2023 - 12/31/2025
SULFATE,SODIUM,TDS 1 Routine 3 Years 07/18/2024 01/01/2026 - 12/31/2028
VOLATILE ORGANICS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025
SS029 SAMPLING STATION - 05 21 23 24 29 Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 3 Years 07/18/2024 01/01/2026 - 12/31/2028
NITRATE 1 Routine Yearly 07/18/2024 01/01/2025 - 12/31/2025
PESTICIDES¹2 Routine 3 Years 07/19/2022 01/01/2023-12/31/2025
RADS - COMPLIANCE 1 Routine 3 Years 07/15/2022 01/01/2023 - 12/31/2025
SULFATE,SODIUM,TDS 1 Routine 3 Years 07/18/2024 01/01/2026 - 12/31/2028
VOLATILE ORGANICS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025
WS002 TAYLORSVILLE EAST WELL Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 9 Years 07/18/2024 01/01/2029 - 12/31/2037
NITRATE 1 Routine Yearly 07/18/2024 01/01/2025 - 12/31/2025
PESTICIDES¹2 Routine 3 Years 08/09/2022 01/01/2023-12/31/2025
RADS - COMPLIANCE 1 Routine 9 Years 06/22/2016 01/01/2020 - 12/31/2028
SULFATE,SODIUM,TDS 1 Routine 9 Years 07/18/2024 01/01/2029 - 12/31/2037
VOLATILE ORGANICS 1 Routine 3 Years 08/09/2022 01/01/2023 - 12/31/2025
WS003 BARKER WELL Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 9 Years 07/18/2024 01/01/2029 - 12/31/2037
NITRATE 1 Routine Yearly 07/18/2024 01/01/2025 - 12/31/2025
PESTICIDES¹2 Routine 3 Years 09/29/2022 01/01/2023-12/31/2025
RADS - COMPLIANCE 1 Routine 6 Years 07/08/2020 01/01/2026 - 12/31/2031
SULFATE,SODIUM,TDS 1 Routine 9 Years 07/18/2024 01/01/2029 - 12/31/2037
VOLATILE ORGANICS 1 Routine 3 Years 07/15/2022 01/01/2023 - 12/31/2025
WS026 RAWSON WELL Hide Details
https://waterlink.utah.gov/reports.html?systemId=1494 3/4
Page 2 of 4
¹To fulfill the two pesticide sample requirements, systems are to submit the second pesticide sample in the quarter following the quarter in which the first sample was
collected.
ID Name Facility Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 9 Years 07/11/2024 01/01/2029 - 12/31/2037
NITRATE 1 Routine 9 Years 07/11/2024 01/01/2029 - 12/31/2037
PESTICIDES¹2 Routine 9 Years 07/11/2024 01/01/2025-03/31/2025
RADS - COMPLIANCE 1 Routine 9 Years 07/11/2024 01/01/2029 - 12/31/2037
SULFATE,SODIUM,TDS 1 Routine 9 Years 07/11/2024 01/01/2029 - 12/31/2037
VOLATILE ORGANICS 1 Routine 9 Years 07/11/2024 01/01/2029 - 12/31/2037
GROUPED SOURCE SAMPLING STATIONS
Sample Group ID Sample Group Facility Details
8264.0 UTAH18021-06 View Details
8028.0 UTAH SAMPLING STATION SS028 View Details
8029.0 UTAH SAMPLING STATION SS029 View Details
OPEN COMPLIANCE SCHEDULES
Type Required Activities Severity Created Due
Water Use Data WUD STANDARD SET, RESET DUE IN 3 YEARS 04/06/2023 04/06/2026
Lead Consumer Notice SUBMIT LCN CERTIFICATE 06/01/2023 12/29/2023
Physical deficiency
schedule
END OF WELL PUMP-TO-WASTE LINE LACKS NO. 4 SCREEN SIG 02/23/2025 06/23/2025
Physical deficiency
schedule
WELL LACKS THE REQUIRED WELL SEAL SIG 02/23/2025 06/23/2025
Physical deficiency
schedule
STORAGE TANK SUBJECT TO CONTAMINATION DUE TO UNSEALED OPENINGS ON
TANK ROOF OR SIDEWALLS
SIG 02/23/2025 06/23/2025
CCR SCHEDULES Submit Consumer Confidence Report 01/01/2025 07/01/2025
CCR SCHEDULES Submit CCR Certification Letter 01/01/2025 10/01/2025
https://waterlink.utah.gov/reports.html?systemId=1494 4/4