Loading...
HomeMy WebLinkAboutDSHW-2025-002173Site Information Finalized Yes Facility Name Wonsit Disposal Facility Facility_ID SW0387 Facility Name Wonsit Disposal Facility Street Address 355 South1000 East City Vernal ZIP Code 84078 County Uintah County Inspection Date 04-11-2025 Type of Visit Routine Oversite Is the Visit Announced?Yes Weather Conditions Sunny. High of 55 degrees during the inspection. Inspection Goal To determine compliance with the facility’s permit and solid waste rules. Facility Contact Kendal Hacking Spencer Merrill Participants Kendal Hacking (Dalbo) Spencer Merrell (Dalbo) Bryan Watt (DWMRC) Follow Up Inspection Needed?No Recommended Follow Up Date Depart Office Date 04-11-2025 Depart Office time 07:00 AM (-6 GMT) Return to Office Date 04-11-2025 Return to Office time 12:30 PM (-6 GMT) 1. Pre-Inspection Review 1.1 Permit Review Yes Comment Permit was reviewed prior to the inspection. 1.2 Annual Report Review No Comment Annual report was not reviewed prior to the inspection. 1.3 Previous Inspection Review Yes Comment Previous inspection was reviewed prior to the inspection. 1.4 Facility Contacts Confirmed Yes Date Submitted: 04-22-2025 01:42 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 1 of 8 Comment Facility contacts confirmed. 1.5 Facility Contacted (If an announced inspection) Yes Comment Facility always contacted prior to the inspection. 1.6 Local Health Contacted No Comment Health department was not contacted prior to the inspection. 1.7 Other N/A Comment No additional comments. 2. Facility / Operational Controls (1-Good, 5-Poor) 2.1 Litter 1 2.2 Roads 1 2.3 Gate House Operations 1 2.4 Vectors NA 2.5 Communications 1 2.6 Recycling Area NA 2.7 Fugitive Dust Control 1 2.8 Waste Inspection Area 1 2.9 Scavenging Control NA 2.10 Open Burning NA 2.11 Fences, Gates, Locks, Access Control 1 2.12 Working Face NA 2.13 Daily - Soil NA 2.14 Daily - Alternative NA 2.15 Leachate Collection System NA 2.16 Other NA Comment (Required)Excellent facility controls. 3. Signs Required / Properly Posted 3.1 Operating Days / Hours Yes 3.2 Directions & Procedures Yes 3.3 Emergency Numbers Yes 3.4 List of Unacceptable Materials Yes 3.5 Other N/A Date Submitted: 04-22-2025 01:42 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 2 of 8 Comment (Required)Operations are in good working order. New access gate and camera. 4. Operator / Representative / Employees 4.1 On-site While Open Yes 4.2 Training Yes 4.3 Other N/A Comment (Required)Operator was onsite during the inspection Employee training taking place. 5. Monitoring 5.1 Methane N/A 5.2 Random Inspections N/A 5.3 Leachate N/A 5.4 Ground Water N/A 5.5 Other N/A Comment (Required)No monitoring of methane, ground water, or leachate required at this facility. 6. Drainage / Erosion 6.1 Water Run-on Yes 6.2 Water Run-off Yes 6.3 Other N/A Comment (Required)Water run on and runoff controls have been installed throughout the facility; primarily using berms. Surface water pond and connecting drainage in good working order. 7. Proper Storage / Isolation / Disposal 7.1 Special Waste N/A 7.2 Batteries N/A 7.3 Hazardous Waste N/A 7.4 Infectious Waste N/A 7.6 Dead Animals N/A 7.7 Asbestos N/A 7.8 Bulky Waste N/A 7.9 Contaminated Soil N/A 7.10 Ash N/A 7.11 Sludge N/A 7.12 Other N/A Date Submitted: 04-22-2025 01:42 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 3 of 8 Comment (Required)This facility only accepts E&P waste derived from oil and gas production. 8. Cover 8.1 Intermediate N/A 8.2 Final N/A 8.3 Vegetation N/A 8.4 Other N/A Comment (Required)No cover required at this time. 9. Inspection Records 9.1 Random Inspection Report N/A 9.2 Gas Monitoring System N/A 9.3 Surface Drainage Control Yes 9.4 Daily Records Yes 9.5 Weight or Volumes Yes 9.6 Intermediate Cover N/A 9.7 Final Cover N/A 9.8 Self Inspection (Quarterly Reports) Yes 9.9 Deviation From Plans N/A 9.10 Permit, Permit Application, and Rules Available Yes 9.11 Other N/A Comment (Required)Facility is inspected on a regular basis. 10. Monitoring / Sampling / Analysis Records 10.1 Explosive Gas Monitoring N/A 10.2 Leachate Sampling & Treatment N/A 10.3 Ground Water Sampling Results N/A 10.4 Other N/A Comment (Required)Explosive gas, leachate, and groundwater sampling reports not required at this facility. 11. Special Waste Records 11.1 Lab Analysis Results N/A 11.2 Manifests N/A 11.3 Treatment Certification N/A Date Submitted: 04-22-2025 01:42 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 4 of 8 11.4 Paint Filter Test Results N/A 11.5 Onsite Treatment Documentation N/A 11.6 Other N/A Comment (Required)Waste water and solid waste are not treated. 12. Waste Tires 12.1 Acceptance procedures for Waste Tires N/A 12.2 Waste Tire Pile Segregated N/A 12.3 Estimated Quanitity of Waste Tires No Number of Tires 12.4 Waste Tire Fund Training N/A Comment (Required)No waste tires are not accepted at this facility. 13 Other Items 13.1 Notice of Inspections Form Completed and Signed N/A 13.2 N/A 13.3 N/A 13.4 N/A Comment (Required)No notice of inspection form required at this time. 14. Special Permit Requirements 14.1 N/A 14.2 N/A 14.3 N/A Comment (Required)No other special permit requirements examined during this inspection. General Comments Comments Leak detection was also checked at the facility and no leaks were detected. DWMRC Inspector Signature DWMRC Inspector Name Bryan Watt Date Submitted: 04-22-2025 01:42 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 5 of 8 Date/Time 04-22-2025 Photos Attach Photos Now facility gate and camera. Wonsit facility Landfill Cell 2. Run-on and runoff controls (berms) near Pond 8. Signage at Pond 5 reclamation area signed off by DOGM and the EPA. Date Submitted: 04-22-2025 01:42 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 6 of 8 Wonsit Facility map. Wonsit facility offload area. Wonsit facility Landfill Cell 1. Storage tanks, chemical tank, and secondary containment berms. Date Submitted: 04-22-2025 01:42 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 7 of 8 Wonsit facility skim pond. Date Submitted: 04-22-2025 01:42 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 8 of 8