HomeMy WebLinkAboutDSHW-2024-008361Deq submit <dwmrcsubmit@utah.gov>
Fwd: closure activity to date at Water Recovery under sundry: #103555, request
OGM to forward application for re-cycling permit
1 message
Brian Speer <bspeer@utah.gov>Thu, Sep 19, 2024 at 9:50 AM
To: Deq submit <dwmrcsubmit@utah.gov>
This may be filed under the Duchesne County Miscellaneous facility in EQDocs.
---------- Forwarded message ---------
From: Todd Bro <ToddBro@itltanklines.com>
Date: Thu, Sep 19, 2024 at 9:29 AM
Subject: closure activity to date at Water Recovery under sundry: #103555, request OGM to forward application for re-
cycling permit
To: Trudy Tubbs <TrudyTubbs@itltanklines.com>
Cc: owallace@utah.gov <owallace@utah.gov>, Brian Speer <bspeer@utah.gov>, Cahoon, Brad R.
<brad.cahoon@dentons.com>
Attached is a detailed account of closure work done through 9/16/2024. Because
our plan for WR is to apply for the new OGM Re-cycling permit when finalized, we
have left untouched any assets that will be required in the future to re-cycle
produced water. Those assets include:
-all double lined skim and evaporative ponds
-all buried HDPE 12” piping connecting the concrete unloading vaults with the evap.
ponds.
-3 concrete unloading vaults
-truck unloading station
-yard lighting
-ticket shack
-perimeter fencing
-electrical power
-natural gas source
-centrifuge equipment
-centrifuge building
-2 glycol heating systems
-air jammer equipment on evap. ponds
9/19/24, 12:53 PM State of Utah Mail - Fwd: closure activity to date at Water Recovery under sundry: #103555, request OGM to forward application f…
https://mail.google.com/mail/b/AEoRXRQt_stDUByJIOdy09rW6htkxq8Rw4gwXvkFJat_GooYyV07/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…1/2
Todd bro
Water Recovery final Closure Log June 2024.xlsx
11K
9/19/24, 12:53 PM State of Utah Mail - Fwd: closure activity to date at Water Recovery under sundry: #103555, request OGM to forward application f…
https://mail.google.com/mail/b/AEoRXRQt_stDUByJIOdy09rW6htkxq8Rw4gwXvkFJat_GooYyV07/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…2/2
WATER RECOVERY CLOSURE LOG, 6/2024
DATE DESCRIPTION TIME INVOICE PHOTOS
CARDS
Jul-23 sold 2 glycol heaters Berry
Aug-23 sold 2- 750 bbl tanks to Doug Betts doug Betts
Jun-22 sold 43 400 bbl crude oil storage tanks to Ironman Salvage Ironman Salvage
May, 2024 started removing canvas from 2 quansits, pick up junk 23.25hr. EEI
june 1-15 finished removing canvas from 2 quansits, picked up all old hoses, policed area, 3 employ EEI
emptied buildings, loaded dump truck hauled 2 loads to land fill "jim smart, land fill
rented loader from EEI to load all small tanks onto dump truck, haul to land fill 2 employ EEI
disconnect heat coils to remove from concrete vaults, waiting for fork lift rental "EEI
remove bird netting, disconnect pumps, motors, hoses, "EEI
contracted with Ironman Salvage to remove all metal pipe, buildings, steel, fittings none
called Berry Petro. They have 20 more tanks to remove
hired hot oil unit to heat concrete bunkers and 12' of slop oil in tank Central Mtn. Hot oil
Hired ITL to suck out slop oil from concrete bunkers and haul to EEI for disposal ITL, EEI
Hired ITL to suck slop oil out of one 400 bbl tank and haul to EEI for disposal ITL, EEI
June 16-30 rented extendable fork lift to remove all heating coils from 3 concrete valuts 2 employ Sunbelt Rental
piled all parts, hoses, fittings, pump parts, electrical parts, loaded on truck to Blue bench 2 employ EEI, Jim Smart
fill concrete bunkers with soil 3 employee EEI
Berry removed last 20 400 bbl oil tanks
total man hours for June 263.75 hrs.
july 1-31 no work
August 1-31 Gave 2 quansit buildings with good canvas covers to Wayne Robb to be removed this fall.
september 1-31 Dug up all black waste around old tank farm and stock piled to haul to cell #7 EEI.2 employee EEI,
Piled more garbage, waste lumber, plastic remnants, electric lighting parts -truck to Blue Bench 2 employee EEI, Jim Smart
Stripped wind blown liner off berms for removal 2 employee EEI,
prepare to pour concrete in 6" slab to seal concrete vaults