First Ouarter VOC Monitorins Renort
Title V Oneratinp Permit 350000E002 Condition II.8.4.a.3 &
Aonroval Order: DAOE-AI\II 0335007S I 8
40 CFR 60 Subnart GGGI 860.4874
40 CFR 63 Subpart CC 863.655
Attached is the first quarter 2025 VOC monitoring report for the Tesoro Refining & Marketing Company
LLC's (TMRC) Salt Lake City Refinery and Tesoro Logistics Operations, LLC (TLO). The information
contained herein is for the reporting period January 1,2025, through March 31,2025. This report is required
semiannually; however, TMRC Salt Lake City Refinery and TLO report quarterly.
Pursuant to 40 CFR $60.a87a(c)(l-3) this report includes monitoring information pertaining to leaking
components, process unit shutdowns, components placed on Delay of Repair (DOR), and applicable
revisions to component inventories. This information is contained in the attached Tables l.l through 4.
If you have any questions regarding this matter, please contact James Beardall 801-5214914.
I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware that there are sigrrificant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
''"S:el..
Dean P. Anderson
Vice President
Tesoro Refining & Marketing Company LLC
474 W 900 N
DEPAT]TMENT OF
ENVIRONMENTAL OUAUTY
APR 1 1 '.tl1s
B-2-10335
Mr. Bryce Bird, Director
April 14,2025
Attachments: Table l.l- Monitoring Information for Hydrocarbon Processing Division - North
Table 1.2- Monitoring Information for Hydrocarbon hocessing Division - South
Table 1.3- Monitoring lnformation for Oil Movements Division
Table 2.1- Revisions to lnitiaUSemiannual Report - HPDN
Table2.2- Revisions to InitiaVSemiannual Report - HPDS
Table 2.3- Revisions to lnitiaUSemiannual Report - OMD
Table 3.1- Dates of Process Unit Shutdowns HPDN
Table 3.2- Dates of Process Unit Shutdowns IIPDS
Table 3.3- Dates of Process Unit Shutdowns OMD
Table 4- Components on Delay of Repair
Mr. Scott H. Patefield, Branch Chief
USEPA Region 8
Enforcement and Compliance Assurance Division
SENF-AT- Air and Toxics Enforcement Branch
1595 Wynkoop Street
Denver, Colorado 80202-1129
Via USPS
Hydrocarbon Processing Division - North (HPDN)
Iable 1.1: Monitoring lnformation - S40 CFR 60.lt87a(c)(2)
Requlrement ALKY FCCU GHT POLY VRU
Jan F.b tar Jan Fcb llar Jan Fcb llar Jrn F.b tal Jan Fcb trar
/alver - No. of leaks detected per
i60.482- 7a(b)
y'alver - No. of leaks not repaired
pr 560.482-7a(dX1)
8
0
2
0
0
0
0
0
0
0
1
0
0
0
0
0
1
0
0
0
0
0
0
0
4
0
0
0
0
0
,umpc - No. of leaks detected per
i60.482-2a(b), (dX4XiiXA) or (B)
,umpe - No. of leaks not repaired
rcr $60.482-2a(c)(1) and (d)(6)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
SGGa Gompreesorsl - No. of
eaks detected per 560.482-3a(f)
)ompressors - No. of leaks not
epaired per $60.482-3a(gX1 )
0
0
0
0
0
0
No Applicable
Compressors
No Applicable
Compressors
No Applicable
Compressors
0
0
0
0
0
0
Tcsoro Rcfining Markcting Company LIC Sah Lakc City Rcltncry and Tcsoro togistics Opcrations LLC
Sah Lakc City, UT
Subpart GGGa VOC Monitoring Report
Table 2.1: Revisions to lnitial / Semiannual Report - S40 CFR 60.487a(cX4)
Requlrement ALKY FCCU GHT POLY VRU
Valvesz'7 subject to
S60.482-7a(a). Valves Added
. Valves Removed
3169
11
12
1421
0
7
't049
0
0
805
5
2
't904
I
0
Pumps3'7 subject to
$60.482-2a. Pumps Added
. Pumps Removed
35
0
0
11
0
0
5
0
0
4
0
0
13
0
0
compreesors'' 7 subject to
$60.482-3a. Compressors Added
. Compressors Removed
1
0
0
0
0
0
0
0
0
0
0
0
1
0
0
Table 3.1: Dates of Process Unit Shutdowns- - 940 CFR 60.4E7 u^r,
Process Unlt Dates of Shutdowns Scheduled (Y/N)
ALKY No Shutdowns N/A
FCCU No Shutdowns N/A
GHT 312t2025 - 3t4t2025
POLY No Shutdowns N/A
VRU No Shutdowns N/A
rII\/I:iIC)N OF AIR QUALITY
Page 1 of4
Hydrocarbon Processlng Dlvlslon - South (HPDS)
Table 1.2: Monltorlng lnformatlon - S40 CFR 60.'187a(c)(2)
Requirement BSU DDU FGR N2C UFU vNs
Jan F.b mar Jan F.b ll.r Jan F.b Har Jan F.b mar Jan F.b llar Jan F.b ilar
Valves - No. of leaks detected
rcr 560.482- 7a(b)
t/alver - No. of leaks not
'epaired per $60.a82-7a(d)(1 )
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
,|
0
0
0
3
0
11
0
3
0
0
0
,|
0
0
0
Pumps. No. of leaks
l€tected per 560.482-2a(b),
,dXaXii)(A)or (B)
Pumps - No. of leaks not
epaired per $60 .482-2a(c)(1 )
rnd (dX6)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
SGOa Comprcssorsr - No. of
eaks detected per 560.482-
la(0
lompressors - No. of leaks
rot ropaired per $60.482-
la(g)(1 )
No Applicable
Compressors
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
No Applicable
Compressors
. Tesoro Refining Marketing Company LLC Salt Lake City Refinery and Tesoro Logistics Operations LLC
Salt Lake City, UT
Subpart GGGa VOC Monitoring Report
Table 2.2: Revlslons to lnltlal / Semlannual Report - S40 CFR 60.487a(c)(4)
Requirement BSU DDU FGR N2C UFU vNs
Valvcs2'7 subject to
$60.482-7a(a)
. Valves Add6d
. Valves Removod
1291
0
0
1452
2
2
276
1
0
2060
21I
1913
1
8
733
0
1
Pumps3'7 subject to
$60.482-2a
. Pumps Addod
. Pumps Removed
11
0
0
5
0
0
2
0
0
1',!
0
0
12
0
o
10
0
0
Comprcssorsa' 7 subject to
$60.482-3a. Compressors Added
. Compressors Ramoved
0
0
0
3
0
0
3
0
o
1
0
0
3
0
0
0
0
0
able 3.2: Dates of Process Unlt Shutdowns" 540 CFR 60.487
Process Unit Dates of Shutdowns Scheduled (Y/N)
BSU 1t1t2025 - 3t31t2025
DDU No Shutdowns N/A
FGR No Shutdowns N/A
N2C 3110t2025 - 3t11t2025
UFU No Shutdowns N/A
VNS 3110t2025 - 3t11t2025
Page? ot 4
Oll Movements Dlvlslon (OMD)
Iable 1.3: Monltorlng lnformatlon - S40 CFR 60.487a(cX2)
Requirement BLR COGEN RTF sRu TKF TLR
J.n F.b llar Jan F.b trr Jan F.b llar Jan F.b Irr Jan Fob llar Jan F.b mar
y'alvcs - No. of leaks
letected per 560.482- 7a(b)
y'alves - No. of leaks not
'epaired per $60.482-7a(dXl )
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
3
0
0
0
0
0
0
0
,umps - No. of leaks
jetected per 560.482-2a(b),
,dXaXiiXA) or (B)
,umps - No. of leaks not
'epaired p€r 560.482-2a(cXl )
rnd (dXG)
0
0
0
0
0
0
No Applicable
Light Liquid
Pumps
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
GGGa Compresgorsr - No.
of leaks detected per $60.482.
3a(f)
Comprcssors - No. of leaks
not repaired per 560.482-
3a(sXl )
0
0
0
0
0
0
0
0
0
0
0
0
No Applicable
Compressors
No Applicable
Compressors
No Applicable
Compressors
No Applicable
Compressors
. Tesoro Refining Marketing Company LLC Salt Lake City Refinery and Tesoro Logistics Operations LLC
Salt Lake City, UT
Subpart GGGa VOC Monitoring Report
Table 2.3: Revlslons to lnltlal / Semlannual Report - S40 CFR 60.487a(c)(4)
Requirement BLR COGEN RTF SRU TKF TLR
Valves2'7 subiect to
$60.a82-7a(a)
. Valves Addsd
. Valves Removed
't260
17
15
186
0
0
821
1
1
525
0
0
3346
71
62
194',!
0
0
Pumps3'7 subject to
$60.482-2a. Pumps Added
. Pumps Removed
11
0
0
0
0
0
I
0
0
2
0
0
73
0
0
44
0
0
Comprcssors4 7 subject to
S60.482-3a
. Comprsssors Added
. compressors Removed
2
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Table 3.3: Dates of Process Unit Shutdowns'- 040 CFR 60.487
Process Unit Dates of Shutdowns Scheduled (Y/N)
BLR No Shutdowns N/A
E COGEN No Shutdowns N/A
W COGEN 3t23t2025 - 3t27t2025
SRU No Shutdowns N/A
TLR No Shutdowns N/A
Page 3 of 4
. Tesoro Refining Marketing Company LLC Salt take City Refinery and Tesoro Logistics Operations LLC
Salt Lake City, UT
Subpart GGGa VOC Monitoring Report
Iabte 4: Components Added to Delay of Repair (DOR)6.S40 CFR 6O.4S7a(cX2Xxi)
Process Unlt Component Type LDAR Tag #Monltorlng Date Date Placed on
DOR Date Repalred Date Removed from DOR
None
Page 4 of 4
' Tesoro Relining Marketing Company LLC Salt Lake City Refinery and Tesoro Logistics Operations LLG
salt Lake city, uT
Subpart GGGa VOC Monitoring Report
Table Notes
1 - Existing compressors in ALKY, COGEN, DDU, and N2C units were constructed prior to November 7,2006. Tesoro has not conducted any
construction, modification, or reconstruction activities that would trigger GGGa applicability for these compressors; however due to the Utah
State lmplementation Plan Section lX, Part H.1 1 (gxiv) all affected equipment is required to comply with the provisions of 60.590a to 60.593a
no later than January 1,2016. The Utah SIP was adopted by the Air Quality Board on December 2,2015.
2 - Excluding those valves designated for no detectable emissions under the provisions of S60.482-7a(0,
3 - Excluding those pumps designated for no detectable emissions under the provisions of $60.482-2a(e) and those pumps complying with
560.a82-2a(0.
4 - Excluding those compressors designated for no detectable emissions under the provisions of 560.482-3a(i), S60.482-3a(h), and
60.593a(bX1). Tesoro demonstrates compressors are in hydrogen service per 60.593a(b)(3)(i).
5 - Process unit shutdown means a work practice or operational procedure that stops production from a process unit or part of a process unit
during wtrich it is technically feasible to clear process material from a process unit or part of a process unit consistent with safety constraints
and during which repairs can be accomplished. The following are not considered process unit shutdowns:
(a) An unscheduled work practice or operational procedure that stops production from a process unit or part of a process unit for less than 24 hours.
(b) An unscheduled work practice or operational procedure that would stop production from a process unit or part of a process unit for a shorter period
of time than would be required to clear lhe process unit or part of the process unit of materials and start up the unit, and would result in greater
emissions than delay of repair of leaking components until the next scheduled process unit shutdown.
(c) The use of spare equipment and technically feasible bypassing of equipment without stopping production.
6 - For leaking components that remain in VOC service the delay of repair designation will be removed once two consecutive monthly
moniloring instrument readings are below the leak definition.
7 - Component changes involving CLVS, PRVs, Heavy Liquids, or a Process Unit switch do not show up as "added'or'removed' because
they have been in service; only the component class or Unit identifier has been changed.
'Tesoro Refining Marketing Company LLC Salt Lake City Refinery and Tesoro Logistics Operations LLC
Salt Lake City, UT
Subpart GGGa VOC Monitoring Report
The lollowlng ls a llst of codes to descrlbe component types ln the report:
AVO - Audio, Visual, Olfactory
COMP - Compressor
CLVS - Closed Vent Vapor Recovery System
DTM - Difficult to Monitor
GV - Components in Gas Vapor service
LL - Components in Light Liquid Service
PMP - Pump
PRV - Pressure Relief Valve
UTM - Unsafe to Monitor
VLV - Valve
OOS - Out of Service or not in VOC service.
OEL - Open Ended Line
'Heavy Liquid" or'HL'denotes components in heavy liquid service.
"Light Liquid" or'LL'denotes components in light liquid service.
'Vapor" or'GV" denotes components in gas vapor service.
The followlng ls a llst of codes used to descrlbe process unlts In the report:
ALKY - Alkylation Unit
BSU - Benzene Saturation Unit
BLR - Butane Loading Rack
BP - Boiler Plant
COGEN - Cogeneration Unit (East and West)
DDU - Distillate Desulfurization Unit
FCCU - Fluid Catalytic Cracking Unit
FGR- Flare Gas Recovery Unit
GHT - Gasoline Hydrotreater Unit
N2C - Crude Unit #2
POLY - Polydebutanizer Unit
RTF - Remote Tank Farm
SRU - Sulfur Recovery Unit
TKF - Tank Farm
TLR - Transport Loading Rack
UFU - Ultraformer
VNS - Virgin Naphtha Stabilizer
VRU - Vapor Recovery Unit