Loading...
HomeMy WebLinkAboutDERR-2024-005597Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name UTAH STATE FUEL NETWORK Address 4315 S 2700 W SALT LAKE CITY, UT 84129 Contact UTAH STATE FUEL NETWORK Phone Email brettgurney@utah.gov TANK LOCATION Name WEBER STATE UNIVERSITY MOTOR POOL Address 4760 OLD POST DRIVE OGDEN, UT 84403 A Operator None Phone None B Operator SAME Phone SAME Facility ID: 1200672 Inspection Date: 04/03/2024 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1/2 Gas/Diesel Yes Not in contact with soil July 31, 2019 None No No None None 2 - 3/4 Gas/Diesel Yes Not in contact with soil July 31, 2019 None No No None None TANK DETAILS Tank ID/Alt ID 1 / 1A E-Gen/AST No / Yes Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc July 31, 2019 / 8000 / Substance Stored Gasoline / Regular Tank Material- Mod Asphalt Coated or Bare Steel- Double-Walled ATG / LTT Test None LLD Test None Pipe Material- Mod Bare Steel / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Not in contact with soil LLD Model Spill/Overfill/Sm Delivery Dry Connect Fitting / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankTightness PipeLineTightness / PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 2 / 1B E-Gen/AST No / Yes Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc July 31, 2019 / 4000 / Substance Stored Diesel / Tank Material- Mod Asphalt Coated or Bare Steel- Double-Walled ATG / LTT Test None LLD Test None Pipe Material- Mod Bare Steel / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Not in contact with soil LLD Model Spill/Overfill/Sm Delivery Dry Connect Fitting / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankTightness PipeLineTightness / PipeLineTightness CP Tank Test None CP Pipe Test None INSPECTION COMMENTS 2024-04-03 Page 1 of 4 None 2024-04-03 Page 2 of 4 FACILITY RESPONSES Financial Responsibility Financial responsibility method is ok?Yes The above accurately represents the facility's release detection records Yes TANK RESPONSES Tank 1A Pressure Piping Leak Detection Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 1B Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank 1B Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Tank 1A Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank 1A Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Tank 1B Pressure Piping Leak Detection Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes DISPENSER RESPONSES Dispenser 3/4 Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1/2 Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes MONTHLY LEAK DETECTION MONITORING Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Tank 1 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 2 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS All items are in compliance. 2024-04-03 Page 3 of 4 Prepared by fueloperator.com Inspection Information Inspector:Ottley, Melissa Record Created:April 3, 2024, 10:12 a.m. Inspection Date:April 3, 2024 2024-04-03 Page 4 of 4