HomeMy WebLinkAboutDDW-2025-003867 April 23, 2025 Carrie Zenger Power Mountain Water and Sewer Improvement District P.O. Box 6156 Clearfield, Utah 84089 Subject:Plan Approval, Mary’s 1.5 Million Gallon Storage Tank (ST005); Powder Mountain Water and Sewer Improvement District, System #29028, File #20600 Dear Carrie Zenger:The Division of Drinking Water (the Division) received the plans and specifications for the proposed Mary’s 1.5-Million Gallon (MG) Storage Tank from your consultant, Robert Rousselle, P.E. with Ensign Engineering, on April 2, 2025. Written review comments were provided on April 11, 2025, and responses were received on April 14, 2025. This project has met the conditions for receiving a plan approval. Our understanding of the project is the construction of a 1.5-MG buried concrete storage (identified as ST005 in the Division’s database). The Mary’s 1.5-MG Storage Tank will connect to the hydraulic elevations of the existing Hidden Lake Tank (ST004) and will supply future connections in this pressure zone. The tank will be supplied by a future 16-inch transmission line which will be supplied by the Hidden Lake Well (WS008) and Bloomington Well (WS009). We have completed our review of the plans and specifications, stamped and signed byRobert Rousselle, P.E., dated April 2, 2025, and find they basically comply with the applicable portions of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for Mary’s 1.5-MG Storage Tank (ST005) are hereby approved. This approval pertains to construction only. An Operating Permit must be obtained from the Director before Mary’s 1.5-MG Storage Tank (ST005) may be put in service. A checklist outlining the items required for operating permit issuance is enclosed for your information.Approvals or permits from the local authority or the county may be necessary before beginning construction of this project. As the project proceeds, notice of any changes in the approved design, as well as any change affecting the quantity or quality of the delivered water, must be submitted to the Division. We may also conduct interim and final inspections of this project. Please notify us when actual construction begins so that these inspections can be scheduled. This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter. If you have any questions regarding this approval, please contact Julie Cobleigh, P.E., of this office, at (385) 214-9770, or me at (385) 515-1464. Sincerely, Michael Newberry, P.E. Permitting and Engineering Support Manager JJC/mrn/mdbEnclosures –Operating Permit Checklistcc:Ryan Klinge, Weber-Morgan Health Department, rklinge@webercountyutah.govRobert Rousselle, P.E., Ensign Engineering, rrousselle@ensignutah.comGreg Seegmiller, JUB Engineers, gseegmiller@jub.comCarrie Zenger, Powder Mountain WSID, czenger@pmwsid.orgRoy Watts, Powder Mountain WSID, rwatts@pmwsid.gov Julie Cobleigh, P. E., Division of Drinking Water, jjcobleigh@utah.govHunter Payne, P.E., Division of Drinking Water, hnpayne@utah.govCameron Draney, P.E., Division of Drinking Water, cdraney@utah.govjcobleigh 29028 20600 ST005 PA Utah Division of Drinking Water ― Checklist for Issuing Operating PermitsWater System Name:System Number: Project Description:File Number: Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7 and is not required to obtain an Operating Permit). Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating Permit if the water system has received items 1 and 4 below.☐1.Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished, and if applicable, changes made during construction were in conformance with rules R309-500 through 550☐2.As-built or record drawings incorporating all changes to approved plans and specifications (unless no changes were made to the previously approved plans during construction)☐3.Confirmation that as-built or record drawings have been received by the water system☐4.Satisfactory bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards: ☐ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water MainsTwo consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch)☐ANSI/AWWA C652-11 AWWA Standard for Disinfection of Water-Storage FacilitiesOne or more samples, none positive☐ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment PlantsTwo consecutive samples per unit, none positive, no less than 30 minutes apart☐ANSI/AWWA C654-13 AWWA Standard for Disinfection of WellsTwo consecutive samples, none positive, no less than 30 minutes apart☐5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.]☐6.If applicable, all other documentation that may have been required during the plan review process☐7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility☐8.If applicable, location data of new storage tank, treatment facility, or source