HomeMy WebLinkAboutDERR-2025-003086VCP/Brownfields Section - Site Visit Report 091219
SITE NAME: Chromalox
SITE LOCATION: Ogden
Personnel: Chris Howell (DERR), Larry Bertsch (RPS),
DATE OF SITE VISIT: September 12, 2019
PURPOSE OF SITE VISIT: Observe drilling of monitoring wells, setting wells, and collecting soil samples
FIELD OBSERVATIONS: Fieldwork began with Earthprobe (drillers) on 9/11/19 with the instillation of
MW-12 shallow and deep. Todays work moved inside of the building to the location of MW-14. The
deep well was geoprobed first to log and collect samples. After logging a 6 3/4” auger was advanced to
40’ to set the 2” PVC well (screen 35-40’). When moving the auger flight up it appears a sand bridge
occurred and also pulled up the PVC. The PVC had to be completely removed from the boring and the
boring redrilled in order to set the well. The shallow well was then logged and sampled at MW-14.
SPLIT SAMPLES COLLECTED: Yes Soil at MW-14D (15-17’ bgs) @1145
IS THE WORK BEING PERFORMED IN A MANNER CONSISTENT WITH THE ACCEPTED WORKPLAN?
Yes