HomeMy WebLinkAboutDDW-2024-007035System Name:
System Number:
Address:
City, State, Zip:
105
Name:
Title:
Address:
City, State, Zip:
Phone No.:
E-mail Address:
Name:
Company:
Address:
City, State, Zip:
Phone No.:
E-mail Address:
Name:
Company:
Address:
City, State, Zip:
E-mail Address:
Name:
Duration (hrs):2
Jun-24
james.s@jonesanddemille.com
R309-511-4(1)(ii)
Price, UT 84501
1675 S Highway 10
(435) 637-8266Phone No.:
8b. If YES, specify rule reference below [R309-511-4(1)(a)(i)-(iv)]:
Phone No.:(801) 372-1862
Dave Frandsen
9. State or Federal Agency Funding:
8a. Is the project exempt from the Hydraulic Model Report requirement? [see
R309-511-4(1)(a)(i) through (iv)]
[ERC = Equivalent Residential Connection; SRF = State Revolving Fund]
(707) 738-5996
Oct-24
3. Professional Engineer (PE) Responsible for System Oversight (if
applicable)
4. Professional Engineer (PE) Responsible for Design of this Project
Begin Construction:
Complete Construction:
7. Anticipated Construction Schedule (if applicable):
Advertise for Bids:
5. Local Fire Code Official & Required Fire Flow for Proposed Project
Apr-24
2. Name and Address for Official Correspondence (Mayor, Public Works
Director, Administrative Contact, etc.)
Submit (preferably by email) the completed PNF with plans and specifications to DDW.
Email completed form & documents to ddwpnf@utah.gov or mail to: Utah Division of Drinking Water
P.O. Box 144830, Salt Lake City, Utah 84114-4830, (801) 536-4200
Leamington, UT 84638
PO Box 38101
1. Public Water System (PWS) Information
Leamington Town Water
14012
Req'd flow (gpm):1750
Loan #
City, State, Zip:Leamington, UT 84638
E-mail Address:
PROJECT NOTIFICATION FORM (PNF)
Utah Division of Drinking Water (DDW)
Present No. of ERCs system is obligated to serve:
No. of ERCs this project will add:
265
0
Population Served:
6. Project Description (provide a unique facility name, location, and sufficient
details to specifically identify the project):
DDW - Plan Review File No.:
DDW - Date Received:
Please provide the following information for a proposed Public Drinking Water Project.
For a new public water system (PWS) also complete a New PWS Application Form (see DDW website).
May-24
rkjfinny1@yahoo.com
Jones and DeMille Engineering Bid Opening:
https://deq.utah.gov/drinking-water/plan-review-program-tools
Checklists for use in preparing plans for review by DDW are available at:
The project includes the construction of a new 200,000 gallon buried concrete water
tank near existing tanks, installation of 8,580 L.F. 6-inch well fill line, installation of
4,150 L.F. of 12-inch distribution line, and the replacement of 122 culinary water
meters.
Leamington, UT 84638
James Saunders
Russ Finlinson
PO Box 38101
Mayor
Yes No
Drinking Water Board (SRF or FSRF)
Community Impact Board (CIB)
None
Other (Specify)
DDW- Eng-0004 Page 1 of 1 3/22/2018