HomeMy WebLinkAboutDAQ-2024-011082
DAQE-AN124340005-24
{{$d1 }}
Kirt Rasmussen
Urban Oil and Gas Group, LLC
1000 East 14th Street, Suite 300
Plano, TX 75074
krasmussen@urbanoilandgas.com
Dear Mr. Rasmussen:
Re: Approval Order: Administrative Amendment to Approval Order DAQE-AN2434001-03 dated
February 12, 2003, for a 10-year Review and Permit Updates
Project Number: N124340005
The attached Approval Order (AO) is issued pursuant to the Division of Air Quality conducting a
10-year administrative review of this source and its respective AO. Urban Oil and Gas Group, LLC
must comply with the requirements of this AO, all applicable state requirements (R307), and Federal
Standards.
The project engineer for this action is John Persons, who can be contacted at (385) 306-6503 or
jpersons@utah.gov. Future correspondence on this AO should include the engineer's name as well as the
DAQE number shown on the upper right-hand corner of this letter.
Sincerely,
{{$s }}
Bryce C. Bird
Director
BCB:JP:jg
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820
Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 536-4414
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF AIR QUALITY
Bryce C. Bird
Director
September 25, 2024
STATE OF UTAH
Department of Environmental Quality
Division of Air Quality
{{#s=Sig_es_:signer1:signature}}
{{#d1=date1_es_:signer1:date:format(date, "mmmm d, yyyy")}}
{{#d2=date1_es_:signer1:date:format(date, "mmmm d, yyyy"):align(center)}}
APPROVAL ORDER
DAQE-AN124340005-24
Administrative Amendment to Approval Order
DAQE-AN2434001-03 dated February 12, 2003,
for a 10-year Review and Permit Updates
Prepared By
John Persons, Engineer
(385) 306-6503
jpersons@utah.gov
Issued to
Urban Oil and Gas Group, LLC - C-3 Compression Station - Carbon County
Issued On
{{$d2 }}
Issued By
{{$s }}
Bryce C. Bird
Director
Division of Air Quality
September 25, 2024
TABLE OF CONTENTS
TITLE/SIGNATURE PAGE ....................................................................................................... 1
GENERAL INFORMATION ...................................................................................................... 3
CONTACT/LOCATION INFORMATION ............................................................................... 3
SOURCE INFORMATION ........................................................................................................ 3
General Description ................................................................................................................ 3
NSR Classification .................................................................................................................. 3
Source Classification .............................................................................................................. 3
Applicable Federal Standards ................................................................................................. 3
Project Description.................................................................................................................. 3
SUMMARY OF EMISSIONS .................................................................................................... 4
SECTION I: GENERAL PROVISIONS .................................................................................... 4
SECTION II: PERMITTED EQUIPMENT .............................................................................. 5
SECTION II: SPECIAL PROVISIONS ..................................................................................... 5
PERMIT HISTORY ..................................................................................................................... 6
ACRONYMS ................................................................................................................................. 7
DAQE-AN124340005-24
Page 3
GENERAL INFORMATION
CONTACT/LOCATION INFORMATION
Owner Name Source Name
Urban Oil and Gas Group, LLC Urban Oil and Gas Group, LLC - C-3 Compression Station - Carbon County
Mailing Address Physical Address
1000 East 14th Street, Suite 300 6825 South 5300 West
Plano, TX 75074 Price, UT 84501
Source Contact UTM Coordinates
Name: Kirt Rasmussen 507309 m Easting
Phone: (435) 820-9801 4372438 m Northing
Email: krasmussen@urbanoilandgas.com Datum NAD83
UTM Zone 12
SIC code 4922 (Natural Gas Transmission)
SOURCE INFORMATION
General Description
Urban Oil and Gas Group, LLC operates a compressor station in Carbon County, Utah. The station
consists of fifteen (15) electrical compressor engines, five (5) glycol dehydration units, and two (2) amine
units.
NSR Classification
10-Year Review
Source Classification
Located in Attainment Area
Carbon County
Airs Source Size: B
Applicable Federal Standards
None
Project Description
This project is a 10-year review of Approval Order DAQE-AN2434001-03 dated February 12, 2003.
DAQE-AN124340005-24
Page 4
SUMMARY OF EMISSIONS
The emissions listed below are an estimate of the total potential emissions from the source. Some
rounding of emissions is possible.
Criteria Pollutant Change (TPY) Total (TPY)
Carbon Monoxide 0 11.62
Nitrogen Oxides 0 13.84
Particulate Matter - PM10 0 1.05
Particulate Matter - PM2.5 0 1.05
Sulfur Dioxide 0 0.08
Volatile Organic Compounds 0 0.92
Hazardous Air Pollutant Change (lbs/yr) Total (lbs/yr)
Lead (CAS #7439921) 0 20
Change (TPY) Total (TPY)
Total HAPs 0 0.01
SECTION I: GENERAL PROVISIONS
I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in
the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions
refer to those rules. [R307-101]
I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401]
I.3 Modifications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401-1]
I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, shall be made available to the Director or Director's representative upon request, and the records shall include the two-year period prior to the date of the request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401-8]
I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators
shall, to the extent practicable, maintain and operate any equipment approved under this AO, including associated air pollution control equipment, in a manner consistent with good air
pollution control practice for minimizing emissions. Determination of whether acceptable
operating and maintenance procedures are being used will be based on information available to
the Director which may include, but is not limited to, monitoring results, opacity observations,
review of operating and maintenance procedures, and inspection of the source. All maintenance
performed on equipment authorized by this AO shall be recorded. [R307-401-4]
I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns. [R307-107]
I.7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories.
[R307-150]
DAQE-AN124340005-24
Page 5
SECTION II: PERMITTED EQUIPMENT
II.A THE APPROVED EQUIPMENT
II.A.1 Compressor Station
II.A.2 Fifteen (15) Electric Compressor Engines
II.A.3 Five (5) Glycol Dehydration Units Capacity: 20 MMSCF/day (each)
II.A.4 Two (2) Amine Units
Capacity: 30 MMSCF/day (each)
SECTION II: SPECIAL PROVISIONS II.B REQUIREMENTS AND LIMITATIONS II.B.1.a The owner/operator shall not consume more than 128 MMSCF of natural gas per day. [R307-401-8]
II.B.1.a.1 The owner/operator shall: A. Determine natural gas consumption through billing records. B. Record natural gas consumption on a daily basis. C. Keep the natural gas consumption records onsite at all times the facility is in operation. [R307-401-8] II.B.1.b The owner/operator shall only use pipeline-quality natural gas as fuel. [R307-401-8]
II.B.1.c All records referenced in this AO, which are required to be kept by the owner/operator, shall be made available to the Director or Director's representative upon request, and the records shall include the two-year period prior to the date of the request. Records shall be kept for the following minimum periods: A. Used oil consumption: Three (3) years. B. Emission inventories: Five (5) years from the due date of each emission statement or until the next inventory is due, whichever is longer. C. All other records: Two (2) years. [R307-401-8]
DAQE-AN124340005-24
Page 6
PERMIT HISTORY
This Approval Order shall supersede (if a modification) or will be based on the following documents: Supersedes AO DAQE-AN2434001-03 dated February 12, 2003 Incorporates Additional Information dated May 24, 2023 Incorporates Additional Information dated July 12, 2024
DAQE-AN124340005-24
Page 7
ACRONYMS
The following lists commonly used acronyms and associated translations as they apply to this document:
40 CFR Title 40 of the Code of Federal Regulations
AO Approval Order
BACT Best Available Control Technology
CAA Clean Air Act
CAAA Clean Air Act Amendments
CDS Classification Data System (used by Environmental Protection Agency to classify
sources by size/type)
CEM Continuous emissions monitor
CEMS Continuous emissions monitoring system
CFR Code of Federal Regulations
CMS Continuous monitoring system
CO Carbon monoxide
CO2 Carbon Dioxide
CO2e Carbon Dioxide Equivalent - Title 40 of the Code of Federal Regulations Part 98,
Subpart A, Table A-1
COM Continuous opacity monitor
DAQ/UDAQ Division of Air Quality
DAQE This is a document tracking code for internal Division of Air Quality use
EPA Environmental Protection Agency
FDCP Fugitive dust control plan
GHG Greenhouse Gas(es) - Title 40 of the Code of Federal Regulations 52.21 (b)(49)(i)
GWP Global Warming Potential - Title 40 of the Code of Federal Regulations Part 86.1818-
12(a)
HAP or HAPs Hazardous air pollutant(s)
ITA Intent to Approve
LB/YR Pounds per year MACT Maximum Achievable Control Technology MMBTU Million British Thermal Units NAA Nonattainment Area NAAQS National Ambient Air Quality Standards NESHAP National Emission Standards for Hazardous Air Pollutants NOI Notice of Intent
NOx Oxides of nitrogen
NSPS New Source Performance Standard
NSR New Source Review
PM10 Particulate matter less than 10 microns in size
PM2.5 Particulate matter less than 2.5 microns in size
PSD Prevention of Significant Deterioration
PTE Potential to Emit
R307 Rules Series 307
R307-401 Rules Series 307 - Section 401
SO2 Sulfur dioxide
Title IV Title IV of the Clean Air Act
Title V Title V of the Clean Air Act
TPY Tons per year
UAC Utah Administrative Code
VOC Volatile organic compounds
DAQE-
RN124340005 July 12, 2024 Kirt Rasmussen
Urban Oil and Gas Group, LLC 1000 E 14th St, Suite 300 Plano, TX 75074
krasmussen@urbanoilandgas.com Dear Kirt Rasmussen,
Re: Engineer Review - 10-Year Review and Permit Updates: Administrative Amendment to Approval Order DAQE-AN2434001-03 dated February 12, 2003, for a 10-year Review and Permit Updates. Project Number: N124340005 The DAQ requests a company representative review and sign the attached Engineer Review (ER). This ER identifies all applicable elements of the New Source Review (NSR) permitting program. Urban Oil and Gas Group, LLC should complete this review within 10 business days of receipt. Urban Oil and Gas Group, LLC should contact John Persons at (385) 306-6503 if there are questions or
concerns with the review of the draft permit conditions. Upon resolution of your concerns, please email John Persons at jpersons@utah.gov the signed cover letter. Upon receipt of the signed cover letter, the DAQ will prepare an Approval Order (AO) for signature by the DAQ Director. If Urban Oil and Gas Group, LLC does not respond to this letter within 10 business days, the project will move forward without source concurrence. If Urban Oil and Gas Group, LLC has concerns that cannot
be resolved and the project becomes stagnant, the DAQ Director may issue an Order prohibiting construction. Approval Signature Kirt Rasmussen 9/16/2024_______________________
(Signature & Date)
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820
Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978
www.deq.utah.gov
Printed on 100% recycled paper
Department of Environmental Quality
Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director
State of Utah
SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor
Engineer Review N124340005: Urban Oil and Gas Group, LLC- C-3 Compression Station - Carbon County July 12, 2024 Page 1
UTAH DIVISION OF AIR QUALITY
ENGINEER REVIEW
SOURCE INFORMATION
Project Number N124340005 Owner Name Urban Oil and Gas Group, LLC Mailing Address 1000 E 14th St, Suite 300
Plano, TX, 75074 Source Name Urban Oil and Gas Group, LLC- C-3 Compression Station -
Carbon County Source Location 6825 South 5300 West Price, UT 84501
UTM Projection 507,309 m Easting, 4,372,438 m Northing UTM Datum NAD83 UTM Zone UTM Zone 12 SIC Code 4922 (Natural Gas Transmission) Source Contact Kirt Rasmussen Phone Number (435) 820-9801 Email krasmussen@urbanoilandgas.com Billing Contact Kirt Rasmussen
Phone Number (435) 820-9801 Email krasmussen@urbanoilandgas.com
Project Engineer John Persons, Engineer Phone Number (385) 306-6503 Email jpersons@utah.gov
Notice of Intent (NOI) Submitted July 14, 2022 Date of Accepted Application April 22, 2024
Engineer Review N124340005: Urban Oil and Gas Group, LLC- C-3 Compression Station - Carbon County July 12, 2024 Page 2
SOURCE DESCRIPTION General Description
Urban Oil and Gas operates a compressor station in Carbon County, Utah. The station consists of fifteen (15) electrical compressor engines, five (5) glycol dehydration units, and two (2) amine units.
NSR Classification: 10 Year Review Source Classification Located in an Attainment Area Carbon County Airs Source Size: B Applicable Federal Standards None
Project Proposal Administrative Amendment to Approval Order DAQE-AN2434001-03 dated February 12, 2003,
for a 10-year Review and Permit Updates. Project Description
This project is a 10-year review of Approval Order DAQE-AN2434001-03 dated February 12, 2003. EMISSION IMPACT ANALYSIS This is a 10-Year Review. No changes to equipment or emissions are being made at this time. Therefore, a modeling analysis is not required. [Last updated June 14, 2023]
Engineer Review N124340005: Urban Oil and Gas Group, LLC- C-3 Compression Station - Carbon County July 12, 2024 Page 3
SUMMARY OF EMISSIONS
The emissions listed below are an estimate of the total potential emissions from the source. Some rounding of emissions is possible.
Criteria Pollutant Change (TPY) Total (TPY) Carbon Monoxide 0 11.62 Nitrogen Oxides 0 13.84
Particulate Matter - PM10 0 1.05
Particulate Matter - PM2.5 0 1.05
Sulfur Dioxide 0 0.08
Volatile Organic Compounds 0 0.92
Hazardous Air Pollutant Change (lbs/yr) Total (lbs/yr) Lead (CAS #7439921) 0 20 Change (TPY) Total (TPY)
Total HAPs 0 0.01
Note: Change in emissions indicates the difference between previous AO and proposed modification.
Engineer Review N124340005: Urban Oil and Gas Group, LLC- C-3 Compression Station - Carbon County July 12, 2024 Page 4
Review of BACT for New/Modified Emission Units 1. BACT review regarding 10-Year Review
This is a 10-Year Review. No changes to equipment or emissions are being made at this time. Therefore, a BACT analysis is not required. [Last updated June 14, 2023]
SECTION I: GENERAL PROVISIONS
The intent is to issue an air quality AO authorizing the project with the following recommended conditions and that failure to comply with any of the conditions may constitute a violation of the AO. (New or Modified conditions are indicated as “New” in the Outline Label):
I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-101]
I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401] I.3 Modifications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401-1]
I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by
the owner/operator, shall be made available to the Director or Director's representative upon request, and the records shall include the two-year period prior to the date of the request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401-8] I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this AO,
including associated air pollution control equipment, in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available
to the Director which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R307-
401-4] I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns. [R307-107]
I.7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories. [R307-150]
Engineer Review N124340005: Urban Oil and Gas Group, LLC- C-3 Compression Station - Carbon County July 12, 2024 Page 5
SECTION II: PERMITTED EQUIPMENT The intent is to issue an air quality AO authorizing the project with the following recommended conditions and that failure to comply with any of the conditions may constitute a violation of the
AO. (New or Modified conditions are indicated as “New” in the Outline Label): II.A THE APPROVED EQUIPMENT
II.A.1 NEW Compressor Station
II.A.2 NEW Fifteen (15) Electric Compressor Engines II.A.3 NEW Five (5) Glycol Dehydration Units Capacity: 20 MMSCF/day (each)
II.A.4 NEW Two (2) Amine Units Capacity: 30 MMSCF/day (each)
SECTION II: SPECIAL PROVISIONS
The intent is to issue an air quality AO authorizing the project with the following recommended conditions and that failure to comply with any of the conditions may constitute a violation of the AO. (New or Modified conditions are indicated as “New” in the Outline Label): II.B REQUIREMENTS AND LIMITATIONS
II.B.1.a
NEW
The owner/operator shall not consume more than 128 MMSCF of natural gas per day. [R307-
401-8] II.B.1.a.1 NEW The owner/operator shall: A. Determine natural gas consumption through billing records
B. Record natural gas consumption on a daily basis
C. Keep the natural gas consumption records onsite at all times the facility is in
operation. [R307-401-8] II.B.1.b NEW The owner/operator shall only use pipeline quality natural gas as fuel. [R307-401-8]
Engineer Review N124340005: Urban Oil and Gas Group, LLC- C-3 Compression Station - Carbon County July 12, 2024 Page 6
II.B.1.c NEW All records referenced in this AO, which are required to be kept by the owner/operator, shall be made available to the Director or Director's representative upon request, and the records shall include the two-year period prior to the date of the request. Records shall be kept for the
following minimum periods:
A. Used oil consumption: Three (3) years
B. Emission inventories: Five (5) years from the due date of each emission statement
or until the next inventory is due, whichever is longer. C. All other records: Two (2) years. [R307-401-8]
Engineer Review N124340005: Urban Oil and Gas Group, LLC- C-3 Compression Station - Carbon County July 12, 2024 Page 7
PERMIT HISTORY When issued, the approval order shall supersede (if a modification) or will be based on the
following documents: Supersedes AO DAQE-AN2434001-03 dated February 12, 2003
Incorporates Additional Information dated May 24, 2023 Incorporates Additional Information dated July 12, 2024
REVIEWER COMMENTS 1. Comment regarding Emissions Updates: During the course of this 10-Year Review the PM2.5 emissions for this source were estimated and added this this AO. For a conservative estimate PM2.5 emissions estimated to be equal to PM10 emissions. [Last updated June 26, 2024] 2. Comment regarding Title V Applicability: Title V of the 1990 Clean Air Act (Title V) applies to the following: 1. Any major source 2. Any source subject to a standard, limitation, or other requirement under Section 111 of the Act,
Standards of Performance for New Stationary Sources; 3. Any source subject to a standard or other requirement under Section 112 of the Act, Hazardous Air Pollutants. 4. Any Title IV affected source. This source is not a major source or a Title IV affected source. This source isn't subject to any requirements of sections 111 or 112 of the CAA. Therefore, Title V does not apply to this source. [Last updated June 14, 2023]
Engineer Review N124340005: Urban Oil and Gas Group, LLC- C-3 Compression Station - Carbon County July 12, 2024 Page 8
ACRONYMS The following lists commonly used acronyms and associated translations as they apply to this document:
40 CFR Title 40 of the Code of Federal Regulations AO Approval Order BACT Best Available Control Technology
CAA Clean Air Act CAAA Clean Air Act Amendments CDS Classification Data System (used by EPA to classify sources by size/type) CEM Continuous emissions monitor CEMS Continuous emissions monitoring system CFR Code of Federal Regulations CMS Continuous monitoring system CO Carbon monoxide CO2 Carbon Dioxide CO2e Carbon Dioxide Equivalent - 40 CFR Part 98, Subpart A, Table A-1 COM Continuous opacity monitor
DAQ/UDAQ Division of Air Quality DAQE This is a document tracking code for internal UDAQ use EPA Environmental Protection Agency
FDCP Fugitive dust control plan GHG Greenhouse Gas(es) - 40 CFR 52.21 (b)(49)(i) GWP Global Warming Potential - 40 CFR Part 86.1818-12(a)
HAP or HAPs Hazardous air pollutant(s) ITA Intent to Approve LB/HR Pounds per hour
LB/YR Pounds per year MACT Maximum Achievable Control Technology MMBTU Million British Thermal Units
NAA Nonattainment Area NAAQS National Ambient Air Quality Standards NESHAP National Emission Standards for Hazardous Air Pollutants NOI Notice of Intent NOx Oxides of nitrogen NSPS New Source Performance Standard NSR New Source Review PM10 Particulate matter less than 10 microns in size
PM2.5 Particulate matter less than 2.5 microns in size PSD Prevention of Significant Deterioration PTE Potential to Emit
R307 Rules Series 307 R307-401 Rules Series 307 - Section 401 SO2 Sulfur dioxide
Title IV Title IV of the Clean Air Act Title V Title V of the Clean Air Act TPY Tons per year
UAC Utah Administrative Code VOC Volatile organic compounds
6/14/23, 10:37 AM State of Utah Mail - UDAQ C3 Compression Station Air Permit Review
https://mail.google.com/mail/u/0/?ik=6400efa1da&view=pt&search=all&permthid=thread-a:r7795067077760017122&simpl=msg-a:r779671956097670…1/4
John Persons <jpersons@utah.gov>
UDAQ C3 Compression Station Air Permit Review
4 messages
John Persons <jpersons@utah.gov>Tue, May 23, 2023 at 12:51 PM
To: justin.d.amyx@conocophillips.com
To whom it may concern,
The Utah Division of Air Quality is conducting a 10-year review of ConocoPhillips Company's C3 Compression Station
and the Approval Order (AO) associated with it (AO DAQE-AN2434001-03). This review will update the formatting and
language of this AO to make it similar to modern permits. The permit requirements are subject to change if the state or
federal laws referenced have changed since the permit was issued. You or your company will not be charged anything for
this project. Additionally, if this site is no longer operational the permit can be revoked. Please respond to the following
questions as soon as possible.
Is the site still operational?
Are you still the best person to contact regarding the AO? If not, then who?
Are these addresses still correct?
Mailing:
6825 South 5300 West
Price, Utah 84501
Physical:
Route 6 to exit 241. Highway 10 to Hiawatha (approx. 7 miles south of Price). Go 2 miles and turn right at the sign for
Wattis. Travel over the dry creek bed and take the first paved road to the left. Follow signs to the office.
Let me know if you have any questions about this process. Thanks.
- Best Regards
John Persons
--
John Persons
Environmental Engineer | Minor NSR Section
M: (385) 306-6503
airquality.utah.gov
Amyx, Justin <Justin.D.Amyx@conocophillips.com>Wed, May 24, 2023 at 8:29 AM
To: John Persons <jpersons@utah.gov>, "Shammer@urbanoilandgas.com" <Shammer@urbanoilandgas.com>
John,
Thank you for your email. The information below all looks correct. The asset is now managed by
Urban Oil & Gas. I have added Shaun's contact information to the bottom of this email. He should
6/14/23, 10:37 AM State of Utah Mail - UDAQ C3 Compression Station Air Permit Review
https://mail.google.com/mail/u/0/?ik=6400efa1da&view=pt&search=all&permthid=thread-a:r7795067077760017122&simpl=msg-a:r779671956097670…2/4
be able to assist you with the information you need.
Thank you. Have a great day.
Shammer@urbanoilandgas.com
Cell 435-650-5932
Office 435-636-2403
Justin Amyx
HSE Specialist
Delaware Basin
ConocoPhillips
M: 435-820-1987
From: John Persons <jpersons@utah.gov>
Sent: Tuesday, May 23, 2023 12:52 PM
To: Amyx, Justin <Justin.D.Amyx@conocophillips.com>
Subject: [EXTERNAL]UDAQ C3 Compression Station Air Permit Review
CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
[Quoted text hidden]
John Persons <jpersons@utah.gov>Wed, May 24, 2023 at 11:21 AM
To: "Amyx, Justin" <Justin.D.Amyx@conocophillips.com>
Cc: "Shammer@urbanoilandgas.com" <Shammer@urbanoilandgas.com>
Justin and Shaun,
Thanks for confirming this information. I will update the permit to include Shaun as the primary point of contact and leave
the other information unchanged. Was the change to urban oil and gas an ownership change? Just let me know. Thanks.
- Best Regards
John Persons
[Quoted text hidden]
Shaun Hammer <shammer@urbanoilandgas.com>Thu, Jun 1, 2023 at 6:36 AM
To: John Persons <jpersons@utah.gov>
6/14/23, 10:37 AM State of Utah Mail - UDAQ C3 Compression Station Air Permit Review
https://mail.google.com/mail/u/0/?ik=6400efa1da&view=pt&search=all&permthid=thread-a:r7795067077760017122&simpl=msg-a:r779671956097670…3/4
Cc: Kirt Rasmussen <KRasmussen@urbanoilandgas.com>
John,
See my responses to your questions regarding the C3 Compressor Station below.
Also, can you confirm there will be no charges to our company for this project? For similar updates
in prior years we were charged a few thousand dollars to make the changes.
Is the site still operational?
The site is still operational.
Are you still the best person to contact regarding the AO? If not, then who?
Contact either –
Kirt Rasmussen,
Superintendent of Operations
435-820-9801
krasmussen@urbanoilandgas.com
Shaun Hammer
Production Foreman
435-650-5932
shammer@urbanoilandgas.com
Are these addresses still correct?
Mailing:
PO Box 894
Price, Utah 84501
6825 South 5300 West
Price, Utah 84501
Physical:
Production Office
6825 South 5300 West
Price, UT 84501
6/14/23, 10:37 AM State of Utah Mail - UDAQ C3 Compression Station Air Permit Review
https://mail.google.com/mail/u/0/?ik=6400efa1da&view=pt&search=all&permthid=thread-a:r7795067077760017122&simpl=msg-a:r779671956097670…4/4
You don't often get email from jpersons@utah.gov. Learn why this is important
C3 site is 1 mile west of the production office.
Updated travel instructions to the office -
Travel on US 6 to exit 241 in Price. Take highway 10 south to Utah 122 and turn west toward
Hiawatha (approx. 7 miles south of Price). Go west 2 miles and turn right at the sign for Wattis.
Travel approximately 1 mile North. Immediately after crossing the small bridge, take the first
paved road to the left. Follow signs to the office.
Route 6 to exit 241. Highway 10 to Hiawatha (approx. 7 miles south of Price). Go 2 miles and turn right at the sign for
Wattis. Travel over the dry creek bed and take the first paved road to the left. Follow signs to the office.
Was the change to urban oil and gas an ownership change?
Urban Oil and Gas acquired ConocoPhillips’ interest and operatorship on March 1, 2023
Feel free to contact Kirt Rasmussen or me if you need more information.
Shaun Hammer
Urban Oil and Gas
Utah Operations
435-650-5932
From: John Persons <jpersons@utah.gov>
Sent: Wednesday, May 24, 2023 11:22 AM
To: Amyx, Justin <Justin.D.Amyx@conocophillips.com>
Cc: Shaun Hammer <shammer@urbanoilandgas.com>
Subject: Re: [EXTERNAL]UDAQ C3 Compression Station Air Permit Review
**Attention: External Email**
[Quoted text hidden]