Loading...
HomeMy WebLinkAboutDDW-2024-007032 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled paper. State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF DRINKING WATER Nathan Lunstad, P.E. Director April 1, 2024 Andre Meacham Lagoon Investment Company 375 North Lagoon Drive Farmington, UT 84025 Subject: Monitoring Requirement Changes – Disinfection Byproducts and Lead & Copper, Lagoon Investment Company (UTAH06043) Andre Meacham: Due to recent updates to your system’s population count, your water monitoring requirements for Disinfection Byproducts (DBPs) and Lead and Copper have changed as described below: Disinfection Byproducts Monitoring Lagoon Investment Company has been moved to annual monitoring for DBPs based on updates to the population count served by the water system. This means the system must collect two (2) DBP samples every year. Each DBP sample must be a paired sample analyzed for both haloacetic acids and trihalomethanes. The next samples must be collected during the July 1 - September 30, 2024, monitoring period. Because of this change the water system will need to submit an updated DBP sample site plan to the Division within 30 days of this letter. Please use the attached DBP sample site plan template. Please contact Luke Treutel at ltreutel@utah.gov or at (385) 258-6084 if you have any questions regarding DBP monitoring and reporting. Lead & Copper Monitoring The lead and copper monitoring requirements for Lagoon Investment Company have changed based on an updated population of 15,000. This means the system must collect 30 first-draw lead and copper samples every 3 years. The next round of samples must be collected during the June 1, 2026 - September 30, 2026 Andre Meacham Page 2 of 22 April 1, 2024 monitoring period. Please contact Dylan Martinez at dylanmartinez@utah.gov or at (385) 278-3807 if you have questions about lead and copper monitoring and reporting requirements. Your monitoring requirements, including these updated requirements, are available to you online at waterlink.utah.gov. Additionally, a copy of your system’s monitoring schedule has been enclosed. Thank you for your efforts to maintain safe drinking water. Sincerely, Mark Berger Monitoring and Standards Section Manager Enclosure – Water System Monitoring Schedule DBP Sample Site Plan Template cc: ameacham@lagoonpark.com Jay Clark, Davis County Health Department, jsclark@co.davis.ut.us Luke Treutel, Utah Division of Drinking Water, ltreutel@utah.gov Dylan Martinez, Utah Division of Drinking Water, dylanmartinez@utah.gov Contacts Type: Administrative Contact Name: ANDRE MEACHAM Office: 801-451-8088 Emergency: Email: ameacham@lagoonpark.com Site Information Legal Contact: LAGOON INVESTMENT COMPANY Address: 375 NORTH LAGOON , FARMINGTON, UT 84025 Phone: 801-451-8082 County: DAVIS COUNTY System Type: Non-Transient Certification Required: D3 T3 Total Population: 15000 Site Updates Last Inventory Update: 08/08/2023 Last Surveyor Update: 06/01/2023 Surveyor: BRENT P ARNS Operating Period: 1/1 - 12/31 Last IPS Update: 03/21/2024 14:10:00 Political Districts Representative: 18 Senate: 22 Water Usage Information per ERC Total Ips Points: 0 Public Water System Water Monitoring ReportDEQ | Drinking Water Lagoon Investment Company PWS ID: UTAH06043 Rating: Approved 12/28/2011 Status: Active BACTERIOLOGICAL MONITORING Sample Count Type Frequency Schedule Begin Schedule End Analyte Name 15 Routine Monthly 06/01/2011 COLIFORM (TCR) 5 Routine Monthly 09/03/2011 COLIFORM (TCR) 1 Routine Monthly 04/01/2016 COLIFORM (TCR) DISINFECTION BYPRODUCT STAGE 2 MONITORING Sample Count Type Frequency Sample Label 1 Routine Yearly UTAH06043 DS001 Sample ID below Sample ID Site Last Sampled Next Sample Due MR001 DISTRIBUTION SYSTEM 08/15/2023 07/01/2024-09/30/2024 OTHER DISTRIBUTION MONITORING Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due LEAD AND COPPER DS001 10 Routine 3 Years 06/2021 06/01/2024-09/30/2024 CHLORINE RESIDUAL MONITORING ID Facility Name Sample Count Type Frequency Last Sampled Next Sample Due DS001 UTAH06043 DISTRIBUTION SYSTEM 15 Routine Monthly -- MONITORING REQUIREMENTS BY FACILITY ¹To fulfill the two pesticide sample requirements, systems are to submit the second pesticide sample in the quarter following the quarter in which the first sample was collected. ID Name Facility Details TP002 LAGOON GREEN SAND FILTERS, WS001 WS002 Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due ARSENIC 1 Routine Quarterly 02/20/2024 04/01/2024 - 06/30/2024 INORGANICS & METALS 1 Routine 3 Years 06/14/2022 01/01/2023 - 12/31/2025 NITRATE 1 Routine Yearly 08/15/2023 01/01/2024 - 12/31/2024 PESTICIDES¹2 Routine 3 Years 07/12/2022 01/01/2023-12/31/2025 SELENIUM 1 Routine Quarterly 02/20/2024 04/01/2024 - 06/30/2024 SULFATE,SODIUM,TDS 1 Routine 3 Years 06/14/2022 01/01/2023 - 12/31/2025 VOLATILE ORGANICS 1 Routine Yearly 08/15/2023 01/01/2024 - 12/31/2024 GROUPED SOURCE SAMPLING STATIONS Sample Group ID Sample Group Facility Details OPEN COMPLIANCE SCHEDULES Type Required Activities Severity Created Due Revised Total Coliform Rule SEASONAL STARTUP PROCEDURES 01/01/2022 06/01/2022 Lead Copper Rule Revisions COMPLETE INITIAL LSL INVENTORY 12/16/2021 10/16/2024 Lead Copper Rule Revisions SUBMIT LEAD SERVICE LINE INVENTORY 12/16/2021 10/16/2024 Revised 7/30/2021 Utah Div ision of Drinking Water Stage 2 Disinfectant Byproduct (DBP) Sampling Plan In accordance with State of Utah Rule R309-210-10(3): Any Community (COM) or Non-Transient Non-Community (NTNC) drinking water system that regularly applies a chemical disinfectant must develop and implement a DBP monitoring plan. The system must maintain current version of the plan on file and submit a copy of 1) the monitoring plan, 2) a schematic of the distribution system, and 3) the justification for site selection (IDSE water, modeling analysis, etc.) to the Division of Drinking Water. BASIC WATER SYSTEM INFO Water System Name: Water System #: Residual Disinfectant Type: ☐ Chlorine ☐ Chlorine Dioxide ☐ Ozone # of Service Connections: Population (# of customers): Sampling Schedule ( # of sampling locations): Per Quarter Per Year SITE SELECTION INFO Associated Rules: R309-210-9(2)(b)(i)(Q): A dual sample set (i.e., a TTHM and an HAA5 sample) must be taken at each monitoring location during each monitoring period. Associated Info: Disinfection By Product Sampling schedules are based on population and source water type. DBPs may be required quarterly, annually, or every three years. For a complete list of possible schedules please see associated DBP handout. •One dual sample set must be taken at the highest TTHM (trihalomethanes) sampling site, at a location that represents maximum residence time; typically in the furthest reaches of your distribution system, or where water is oldest. This location is denoted as MR001. •One dual sample set must be taken at the highest HAA5 (haloacetic acids) sampling site, at a location that represents the average residence time; typically located mid distribution system This location is denoted as MD001. R309-210-10(3)(ii): •Water system must identify which locations will be used for compliance monitoring by alternating selection of locations representing high TTHM and high HAA5 levels until the required number of compliance monitoring locations have been identified. Water system sampling schedules with sampling locations and details are available at any time at WaterLink.utah.gov SAMPLES Sample Code Specific sampling location ADDRESS Site Characteristics / Site Selection Justification (check those that apply) MR001 MR002 MR003 MR004 ☐Highest TTHM/HAA5 in prior data ☐Endpoint of distribution system and/or maximum water age ☐Other: MD001 MD002 MD003 MD004 ☐Highest TTHM/HAA5 in prior data ☐Midpoint of a large distribution system ☐Endpoint of distribution system and/or maximum water age ☐Other: Annual samples must be collected within a specific time frame in accordance with State of Utah Rules R309-210-10(2)(a)(ii)(N): All systems must monitor during months of highest DBP concentrations. R309-210-9(2)(b)(i)(R): The peak historical month is the month with the highest TTHM or HAA5 levels or the warmest water temperature. Source Water Types: ☐Ground water ☐Ground water purchasing from wholesale Water System #: UTAH ☐Ground water Under Direct Influence of surface water ☐Surface water ☐Surface water purchasing from wholesale Water System #: UTAH CERTIFICATION I certify that I am the person authorized to fill out this application and the information I have provided is accurate and complete to the best of my knowledge at the time it was completed. X X Printed Name Signature Date: Title: ☐ Administrative Contact ☐ Operator SUBMITTAL Mail the completed form to: Or Email: Division of Drinking Water Attn: DBP Rule Manager 195 N 1950 W PO BOX 144830 Salt lake City, UT 84114 DDWREPORTS@UTAH.GOV This application and related environmental information are available online at DrinkingWater.utah.gov For more information, or to answer questions, please contact the DBP Rule Manager, Luke Treutel at (385) 258-6084 ltreutel@utah.gov Revised 7/30/2021