HomeMy WebLinkAboutDDW-2024-007028
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830
Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4414
www.deq.utah.gov
Printed on 100% recycled paper.
State of Utah
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF DRINKING WATER
Nathan Lunstad, P.E.
Director
April 1, 2024
Bradley Roundy
Mapleton City
125 West Community Center Way
Mapleton, UT 84664
Subject: Monitoring Requirement Changes – Disinfection Byproducts and Lead & Copper,
Mapleton City (UTAH25018)
Bradley Roundy:
Due to recent updates to your system’s population count, your water monitoring requirements for
Disinfection Byproducts (DBPs) and Lead and Copper have changed as described below:
Disinfection Byproducts Monitoring
Mapleton City has been moved to annual monitoring for DBPs based on updates to the population count
served by the water system. This means the system must collect two (2) DBP samples every year. Each
DBP sample must be a paired sample analyzed for both haloacetic acids and trihalomethanes. The next
samples must be collected during the July 1 - September 30, 2024, monitoring period. Because of this
change the water system will need to submit an updated DBP sample site plan to the Division within 30
days of this letter. Please use the attached DBP sample site plan template. Please contact Luke Treutel at
ltreutel@utah.gov or at (385) 258-6084 if you have any questions regarding DBP monitoring and reporting.
Lead & Copper Monitoring
The lead and copper monitoring requirements for Mapleton City have changed based on an updated
population of 12,414. This means the system must collect 30 first-draw lead and copper samples every 3
years. The next round of samples must be collected during the June 1, 2024 - September 30, 2024
Bradley Roundy
Page 2 of 22
April 1, 2024
monitoring period. Please contact Dylan Martinez at dylanmartinez@utah.gov or at (385) 278-3807 if you
have questions about lead and copper monitoring and reporting requirements.
Your monitoring requirements, including these updated requirements, are available to you online at
waterlink.utah.gov. Additionally, a copy of your system’s monitoring schedule has been enclosed.
Thank you for your efforts to maintain safe drinking water.
Sincerely,
Mark Berger
Monitoring and Standards Section Manager
Enclosure – Water System Monitoring Schedule
DBP Sample Site Plan Template
cc: broundy@mapleton.org
Daymon Swenson, Utah County Health Department, daymons@utahcounty.gov
Luke Treutel, Utah Division of Drinking Water, ltreutel@utah.gov
Dylan Martinez, Utah Division of Drinking Water, dylanmartinez@utah.gov
Contacts
Type: Administrative Contact
Name: BRADLEY C ROUNDY
Office: 801-489-6253
Emergency:
Email:
broundy@mapleton.org
Site Information
Legal Contact: MAPLETON
Address: 125 WEST COMMUNITY
CENTER WAY , MAPLETON, UT
84664
Phone: 801-489-5655
County: UTAH COUNTY
System Type: Community
Certification Required: D3
Total Population: 12414
Site Updates
Last Inventory Update: 11/14/2023
Last Surveyor Update: 10/12/2022
Surveyor: CODY GRIFFITH
Operating Period: 1/1 - 12/31
Last IPS Update: 03/21/2024 14:10:00
System is required to disinfect as of
03/08/2022
Political Districts
Representative: 65
Senate: 27
Water Usage Information per ERC
Total Ips Points: 0
Public Water System Water Monitoring ReportDEQ | Drinking Water
Mapleton City PWS ID: UTAH25018 Rating: Approved 06/05/1998 Status: Active
BACTERIOLOGICAL MONITORING
Sample Count Type Frequency Schedule Begin Schedule End Analyte Name
10 Routine Monthly 02/01/2017 COLIFORM (TCR)
DISINFECTION BYPRODUCT STAGE 2 MONITORING
Sample Count Type Frequency Sample Label
1 Routine Yearly UTAH25018 DS001 Sample ID below
Sample ID Site Last Sampled Next Sample Due
MR001 2000 W HARVEST PKWY 08/10/2023 07/01/2024-09/30/2024
OTHER DISTRIBUTION MONITORING
Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due
LEAD AND COPPER DS001 20 Routine 3 Years 07/2021 06/01/2024-09/30/2024
CHLORINE RESIDUAL MONITORING
ID Facility Name Sample Count Type Frequency Last Sampled Next Sample Due
DS001 UTAH25018 DISTRIBUTION SYSTEM 12 Routine Monthly --
TP003 SEAL WELL CHLORINATOR 1 Routine Daily --
Sample Point Location Count
EP003 ENTRY POINT IN WELL HOUSE 1
MONITORING REQUIREMENTS BY FACILITY
¹To fulfill the two pesticide sample requirements, systems are to submit the second pesticide sample in the quarter following the quarter in which the first sample was
collected.
ID Name Facility Details
WS005 #2 WESTWOOD WELL Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 9 Years 08/20/2019 01/01/2020 - 12/31/2028
NITRATE 1 Routine Yearly 08/10/2023 01/01/2024 - 12/31/2024
PESTICIDES¹2 Routine 3 Years 04/26/2023 01/01/2026-12/31/2028
RADS - COMPLIANCE 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025
SULFATE,SODIUM,TDS 1 Routine 9 Years 08/20/2019 01/01/2020 - 12/31/2028
VOLATILE ORGANICS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025
WS006 #3 CARNESECCA WELL Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025
NITRATE 1 Routine Yearly 08/10/2023 01/01/2024 - 12/31/2024
PESTICIDES¹2 Routine 3 Years 04/26/2023 01/01/2026-12/31/2028
RADS - COMPLIANCE 1 Routine 6 Years 08/20/2019 01/01/2020 - 12/31/2025
SULFATE,SODIUM,TDS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025
VOLATILE ORGANICS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025
WS007 #4 SEAL WELL Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025
NITRATE 1 Routine Yearly 08/10/2023 01/01/2024 - 12/31/2024
PESTICIDES¹2 Routine 3 Years 04/26/2023 01/01/2026-12/31/2028
RADS - COMPLIANCE 1 Routine 9 Years 08/27/2019 01/01/2020 - 12/31/2028
SULFATE,SODIUM,TDS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025
VOLATILE ORGANICS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025
WS008 CROWD CANYON WELL Hide Details
Name Sample Required Type Frequency Last Sample Next Sample Due
INORGANICS & METALS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025
NITRATE 1 Routine Yearly 08/10/2023 01/01/2024 - 12/31/2024
PESTICIDES¹2 Routine 3 Years 04/26/2023 01/01/2026-12/31/2028
RADS - COMPLIANCE 1 Routine 6 Years 08/19/2014 01/01/2020 - 12/31/2025
SULFATE,SODIUM,TDS 1 Routine 3 Years 07/19/2022 01/01/2023 - 12/31/2025
VOLATILE ORGANICS 1 Routine Yearly 08/10/2023 01/01/2024 - 12/31/2024
GROUPED SOURCE SAMPLING STATIONS
Sample Group ID Sample Group Facility Details
7948 UTAH SAMPLING STATION SS948 Hide Details
Source ID Source Name Sample Group Details System
WS002 DUNHAM SPRINGS UTAH25018 MAPLETON CITY
WS001 RIGHT HAND FORK SPRING UTAH25018 MAPLETON CITY
WS004 SERVICEBERRY SPRING UTAH25018 MAPLETON CITY
OPEN COMPLIANCE SCHEDULES
Type Required Activities Severity Created Due
REQUIRED TO DISINFECT CORRECTIVE ACTION PLAN GWR CORRECT DEFICIENCY 30 DAYS SIG 04/06/2023 04/06/2024
Lead Copper Rule Revisions COMPLETE INITIAL LSL INVENTORY 12/16/2021 10/16/2024
Lead Copper Rule Revisions SUBMIT LEAD SERVICE LINE INVENTORY 12/16/2021 10/16/2024
CCR SCHEDULES Submit Consumer Confidence Report 01/01/2024 07/01/2024
CCR SCHEDULES Submit CCR Certification Letter 01/01/2024 10/01/2024
Revised 7/30/2021
Utah Div ision of Drinking Water
Stage 2 Disinfectant Byproduct (DBP) Sampling Plan
In accordance with State of Utah Rule R309-210-10(3): Any Community (COM) or Non-Transient Non-Community
(NTNC) drinking water system that regularly applies a chemical disinfectant must develop and implement a DBP
monitoring plan. The system must maintain current version of the plan on file and submit a copy of 1) the monitoring
plan, 2) a schematic of the distribution system, and 3) the justification for site selection (IDSE water, modeling analysis,
etc.) to the Division of Drinking Water.
BASIC WATER SYSTEM INFO
Water System Name: Water System #:
Residual Disinfectant Type: ☐ Chlorine ☐ Chlorine Dioxide ☐ Ozone
# of Service Connections:
Population (# of customers):
Sampling Schedule ( # of sampling locations):
Per Quarter Per Year
SITE SELECTION INFO
Associated Rules:
R309-210-9(2)(b)(i)(Q): A dual sample set (i.e., a TTHM and an HAA5 sample) must be
taken at each monitoring location during each monitoring period.
Associated Info:
Disinfection By Product Sampling
schedules are based on
population and source water
type. DBPs may be required
quarterly, annually, or every
three years. For a complete list of
possible schedules please see
associated DBP handout.
•One dual sample set must be taken at the
highest TTHM (trihalomethanes) sampling
site, at a location that represents
maximum residence time; typically in the
furthest reaches of your distribution
system, or where water is oldest.
This location is denoted as MR001.
•One dual sample set must be taken
at the highest HAA5 (haloacetic
acids) sampling site, at a location
that represents the average
residence time; typically located mid
distribution system
This location is denoted as MD001.
R309-210-10(3)(ii):
•Water system must identify which locations will be used for compliance monitoring
by alternating selection of locations representing high TTHM and high HAA5 levels
until the required number of compliance monitoring locations have been identified.
Water system sampling
schedules with sampling
locations and details are available
at any time at
WaterLink.utah.gov
SAMPLES
Sample
Code
Specific sampling location
ADDRESS
Site Characteristics / Site Selection Justification
(check those that apply)
MR001
MR002
MR003
MR004
☐Highest TTHM/HAA5 in prior data
☐Endpoint of distribution system and/or maximum water age
☐Other:
MD001
MD002
MD003
MD004
☐Highest TTHM/HAA5 in prior data
☐Midpoint of a large distribution system
☐Endpoint of distribution system and/or maximum water age
☐Other:
Annual samples must be collected within a specific time frame in accordance with State of Utah Rules
R309-210-10(2)(a)(ii)(N): All systems must monitor during months of highest DBP concentrations.
R309-210-9(2)(b)(i)(R): The peak historical month is the month with the highest TTHM or HAA5 levels or the
warmest water temperature.
Source Water Types:
☐Ground water
☐Ground water purchasing from wholesale Water System #: UTAH
☐Ground water Under Direct Influence of surface water
☐Surface water
☐Surface water purchasing from wholesale Water System #: UTAH
CERTIFICATION
I certify that I am the person authorized to fill out this application and the information I have provided is
accurate and complete to the best of my knowledge at the time it was completed.
X X
Printed Name Signature
Date: Title: ☐ Administrative Contact
☐ Operator
SUBMITTAL
Mail the completed form to:
Or Email:
Division of Drinking Water
Attn: DBP Rule Manager
195 N 1950 W
PO BOX 144830
Salt lake City, UT 84114
DDWREPORTS@UTAH.GOV
This application and related environmental information are available online at DrinkingWater.utah.gov
For more information, or to answer questions, please contact the DBP Rule Manager, Luke Treutel at (385) 258-6084
ltreutel@utah.gov
Revised 7/30/2021