Loading...
HomeMy WebLinkAboutDAQ-2025-001019 DAQE-GN142430005-25 {{$d1 }} Nicki Coates TM Crushing, LLC 1850 North 1450 West Lehi, UT 84043 ncoates@tmcrushing.com Dear Ms. Coates: RE: Revocation of Approval Order DAQE-AN0142430002-11 dated August 9, 2011 Project Number: N142430005 The Division of Air Quality (DAQ) received your request to revoke Approval Order (AO) DAQE-AN0142430002-11 on February 10, 2025. TM Crushing, LLC requested this AO be revoked due to the site being developed into a subdivision and the aggregate facility permanently ceasing operations. The DAQ has revoked the above-referenced AO effective as of the date of this letter. As authorized by the Utah Legislature, the fee for revoking an AO is the actual time spent by the review engineer and all other staff on the project. Payment should be made to the DAQ upon receipt of the invoice. If you have any questions, please contact Lucia Mason who can be reached at (385) 707-7669, or email at lbmason@utah.gov. Sincerely, {{$s }} Bryce C. Bird Director BCB:LM:jg cc: EPA Region 8 Salt Lake County Health Department {{#d1=date1_es_:signer1:date:format(date, "mmmm d, yyyy")}} {{#s=Sig_es_:signer1:signature}} 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director February 18, 2025 DAQC-1229-21 Site ID 14243 (B1) TO: THROUGH: FROM: DATE: SUBJECT: MEMORANDUM FILE — TM Crushing, LLC- West Jordan Pit Rik Ombach, Minor Source Compliance Section Manager Jared James, Environmental Scientist 4,4 September 14, 2021 Full Compliance Evaluation, Minor, Salt Lake County SOURCE CONTACTS: DAQ C- 2021- 0120 74 September 9, 2021 7800 South Highway 111 West Jordan, UT 84044 Brady Barney, Division Manager: 801-766-7611 bbarney@tmcrushing.com Temporarily down. Aggregate pit. A jaw crusher, cone crusher, screen, generator and miscellaneous mobile equipment are located on site. Sources of emissions include those from the crushing and screening process, haul roads, loader traffic, stockpile and disturbed area wind erosion and fuel combustion. Primary Crushing process: This operation involves extraction, processing, conveying and stockpiling. Material is delivered to a crusher by front-end loader. One or more conveyors or belt feeders transfer the crushed material to a triple deck screen that classifies the material by size. Material from the screen goes to different stockpiles via conveyors and/or stackers. Material that cannot pass through the first set of screens is transferred to a secondary crusher. Secondary Crushing process: The secondary crushing process is actually a sub-process of the primary. Material that does not pass through the triple deck screen can be sent to the secondary crusher for further size reduction. The crushed material is transferred by conveyors back to the triple deck screen for size classification. Secondary crushing is an optional step and may be added or removed as necessary. Screening process: Screening is the process of classifying material that has been crushed. In most cases, the screen unit is comprised of three decks, each with a different mesh screen. Material comes from the crusher and is classified by the screen. 1 INSPECTION DATE: SOURCE LOCATION: OPERATING STATUS: PROCESS DESCRIPTION: Hauling: The material is taken from the site to the crusher, or loaded at the crushing site and either stockpiled or taken offsite for use in other proj ects. APPLICABLE REGULATIONS: Approval Order (AO) DAQE-AN0142430002-11, dated August 9, 2011 NSPS (Part 60), A: General Provisions NSPS (Part 60), 000: Standards of Performance for Nonmetallic Mineral Processing Plants NSPS (Part 60), IIII: Standards of Performance for Stationary Compression Ignition Internal Combustion Engines MACT (Part 63), A: General Provisions MACT (Part 63), ZZZZ: National Emissions Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines Title V (Part 70) Area Source SOURCE EVALUATION: The source has not operated since 2019 according to Mr. Barney. No equipment is on site. TM is planning to close out the AO at some point but are waiting to see if they can produce aggregate for the subdivision going in, in the approximate area EMISSION INVENTORY: The emissions listed below are an estimate of the total potential emissions from TM Crushing, LLC- West Jordan Pit on the Approval Order (AO) DAQE-AN0142430002-11, dated August 9, 2011. The following information was supplied for supplemental Purposes only. Estimated Criteria Pollutant Potential Emissions Carbon Monoxide Nitrogen Oxides Particulate Matter - PM10 Particulate Matter - PM25 Sulfur Dioxide Volatile Organic Compounds Estimated Hazardous Air Pollutant Potential Emissions Generic HAPs (CAS #GHAPS) 7.26 tons/yr 14.19 tons/yr 9.80 tons/yr 8.57 tons/yr 0.51 tons/yr 0.89 tons/yr 20 lbs/yr PREVIOUS ENFORCEMENT ACTIONS: No enforcement actions within the past five years. COMPLIANCE STATUS & RECOMMENDATIONS: No compliance determination since the facility has not operated for the last three years. HPV STATUS: Not Applicable. RECOMMENDATION FOR NEXT INSPECTION: Inspect as normal to verify if the site has started operation or closed out the AO. 2 RECOMMENDATION FOR NSR PERMITTING REVIEW: None. ATTACHMENTS: None. 3 DAQE-AN0142430002-11 August 9, 2011 John Hadfield TM Crushing, LLC P.O. Box 437 Lehi, UT 84043 Dear Mr. Hadfield: Re: Approval Order: The West Jordan Aggregate Processing Facility Project Number: N014243-0002 The attached document is the Approval Order for the above-referenced project. Future correspondence on this Approval Order should include the engineer's name as well as the DAQE number as shown on the upper right-hand corner of this letter. The project engineer for this action is Enqiang He, who may be reached at (801) 536-4010. Sincerely, Bryce C. Bird, Executive Secretary Utah Air Quality Board BCB:EH:dn cc: Salt Lake Valley Health Department 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled paper State of Utah GARY R. HERBERT Governor GREG BELL Lieutenant Governor Department of Environmental Quality Amanda Smith Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director STATE OF UTAH Department of Environmental Quality Division of Air Quality APPROVAL ORDER: The West Jordan Aggregate Processing Facility Prepared By: Enqiang He, Engineer Phone: (801) 536-4010 Email: ehe@utah.gov APPROVAL ORDER NUMBER DAQE-AN0142430002-11 Date: August 9, 2011 TM Crushing, LLC West Jordan Pit Source Contact: Mr. Scott Roberts Phone: (801) 766-7611 Bryce C. Bird Executive Secretary Utah Air Quality Board Abstract TM Crushing, LLC (TM Crushing) has submitted a Notice of Intent to operate a new aggregate processing plant in West Jordan in Salt Lake County. Annual production is limited to 250,000 tons of processed aggregate. Equipment includes two crushers, a screen, conveyors/stackers, and a generator. Salt Lake County is a nonattainment area of the NAAQS for PM10, PM2.5 and SO2, and a maintenance area for CO (Salt Lake City only) and ozone. NSPS and MACT regulations apply to this source. Title V of the 1990 Clean Air Act applies to this source. A dispersion modeling analysis was performed for the source, and the predicted total NO2 concentrations are less than the NAAQS. The emissions, in tons per year, will be as follows: PM10 9.80, PM2.5 8.57, NOx 14.19, SO2 0.51, CO 7.26, VOC 0.89 and total HAPs 0.01. This air quality AO authorizes the project with the following conditions and failure to comply with any of the conditions may constitute a violation of this order. This AO is issued to, and applies to the following: Name of Permittee: TM Crushing, LLC P.O. Box 437 Lehi, UT 84043 Permitted Location: West Jordan Pit 7604 South Highway 111 West Jordan, UT 84044 UTM coordinates: 410,280 m Easting, 4,496,040 m Northing, UTM Zone 12 SIC code: 1429 (Stone, Crushed & Broken, NEC) Section I: GENERAL PROVISIONS I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-101] I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401] I.3 Modifications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401-1] I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, shall be made available to the Executive Secretary or Executive Secretary's representative upon request, and the records shall include the two-year period prior to the date of the request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401-8] I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this AO, including associated air pollution control equipment, in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Executive Secretary which may include, but is not limited to, monitoring results, opacity DAQE-AN0142430002-11 Page 3 observations, review of operating and maintenance procedures, and inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R307-401-4] I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Unavoidable Breakdowns. [R307-107] I.7 The owner/operator shall comply with UAC R307-150 Series. Inventories, Testing and Monitoring. [R307-150] Section II: SPECIAL PROVISIONS II.A The approved installations shall consist of the following equipment: II.A.1 West Jordan Aggregate Processing Facility II.A.2 Primary Crusher One (1) crusher rated at 600 tons per hour (tph); manufactured in 1977 II.A.3 Secondary Crusher One (1) crusher rated at 350 tph; manufactured in 1998 II.A.4 Screen One (1) screen rated at 300 tph; manufactured in 2002 II.A.5 Generator One (1) diesel-fired generator rated at 700 kW; manufactured after 4/1/2006 II.A.6 Conveyors and Stackers Eight (8) conveyors and stackers II.B Requirements and Limitations II.B.1 Site-wide Requirements and Limitations II.B.1.a TM Crushing shall notify the Executive Secretary in writing when the installation of the equipment listed in Condition II.A has been completed and is operational. To ensure proper credit when notifying the Executive Secretary, send your correspondence to the Executive Secretary, attn: Compliance Section. [R307-401-18] II.B.1.a.1 If the construction and/or installation have not been completed within 18 months from the date of this AO, the Executive Secretary shall be notified in writing on the status of the construction and/or installation. At that time, the Executive Secretary shall require documentation of the continuous construction and/or installation of the operation and may revoke the AO. [R307-401-18] DAQE-AN0142430002-11 Page 4 II.B.1.b The following production and consumption limits shall not be exceeded: A. 250,000 tons of aggregate processed per rolling 12-month period B. 2,700 hours of operation per rolling 12-month period for the diesel-fired generator. [R307-401-8] II.B.1.b.1 To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous 12 months. Records of production shall be kept for all periods when the plant is in operation. Production shall be determined by the belt scale records near the initial feeder, or any other methods approved by the Executive Secretary. Production records shall be maintained using an operations log. Hours of operation shall be determined by supervisor monitoring and maintaining of an operations log. The records of production and hours of operation shall be kept on a daily basis. [R307-401-8] II.B.1.c Visible emissions from the following emission points shall not exceed the following values: A. All crushers - 15% opacity B. All screens - 10% opacity C. All conveyor transfer points - 10% opacity D. All conveyor drop points - 20% opacity E. All other points - 20% opacity [R307-401-8] II.B.1.c.1 Opacity observations of emissions from stationary sources shall be conducted according to 40 CFR 60, Appendix A, Method 9. For equipment subject to NSPS, opacity shall be determined by conducting observations in accordance with 40 CFR 60.11(b) and 40 CFR 60, Appendix A, Method 9. Initial visible emission observations shall be conducted according to 40 CFR 60.11 and 40 CFR 60.675. A certified observer must be used for these observations. Emission points which are subject to the initial observations are those as defined in 40 CFR60.670. [R307-401-8] II.B.2 Conditions on Fugitive Dust Emissions II.B.2.a TM Crushing shall comply with an FDCP acceptable to the Executive Secretary for control of all dust sources associated with the aggregate processing operations. TM Crushing shall submit the FDCP to the Executive Secretary, attention: Compliance Section, for approval within 30 days of the date of this AO. [R307-309] II.B.2.b The unpaved haul road length shall not exceed 0.25 miles. The owner/operator shall use chemical suppressant and/or water to control fugitive dust emissions from the above haul road. Application frequencies for chemical treatment and/or water spray shall follow the requirements in the FDCP. [R307-401-8] DAQE-AN0142430002-11 Page 5 II.B.2.b.1 The owner/operator shall cover all unpaved haul roads and wheeled-vehicle operational areas with road base material and shall use water and/or chemical suppressant applications to maintain opacity limits listed in this AO. If the temperature is below freezing, the owner/operator may stop applying water to the unpaved haul roads and wheeled-vehicle operational areas. Records of water application shall be kept for all periods when the plant is in operation. The records shall include the following items: A. Date and time treatments were made B. Number of treatments made and quantity of water applied C. Rainfall amount received, if any D. Records of temperature, if the temperature was below freezing. [R307-401-8] II.B.2.b.2 Visible fugitive dust emissions from unpaved haul-road traffic and mobile equipment in unpaved operational areas shall not exceed 20% opacity at any point. Visible emission determinations shall use procedures similar to Method 9. The normal requirement for observations to be made at 15-second intervals over a six-minute period, however, shall not apply. Visible emissions shall be measured at the densest point of the plume but at a point not less than 1/2 vehicle length behind the vehicle and not less than 1/2 the height of the vehicle. [R307-401-8] II.B.2.c Water sprays or chemical dust suppression sprays shall be installed at the following points to control fugitive dust emissions: A. All crushers B. All screens C. All conveyor transfer points The sprays shall operate to meet the opacity limits or as determined by the Executive Secretary. [R307-401-8] II.B.2.d The storage piles shall be watered to maintain opacity limit listed in this AO. Records of water and/or chemical treatment shall be kept for all periods when the plant is in operation. Records of water and/or chemical treatment shall be made available to the Executive Secretary or Executive Secretary's representative upon request. [R307-401-8] II.B.3 Conditions on the Diesel-Fired Generator II.B.3.a The owner/operator shall use #1 and/or #2 fuel oil or any combination of both as a fuel in the diesel-fired generator. [R307-401-8] II.B.3.a.1 The sulfur content of any fuel oil or diesel burned shall not exceed 15 ppm by weight. [R307-401-8] DAQE-AN0142430002-11 Page 6 II.B.3.a.2 The sulfur content shall be determined by ASTM Method D-4294-89 or approved equivalent. Certification of the fuel oil shall be either by the source's own testing or test reports from the fuel marketer. The sulfur content certification or the test reports shall be available on-site for each load delivered. [R307-401-8] II.B.3.b Visible emissions from the diesel-fired generator shall not exceed 20% opacity. [R307-401-8] II.B.3.b.1 Opacity observations of emissions from stationary sources shall be conducted according to 40 CFR 60, Appendix A, Method 9. [R307-401-8] Section III: APPLICABLE FEDERAL REQUIREMENTS In addition to the requirements of this AO, all applicable provisions of the following federal programs have been found to apply to this installation. This AO in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including UAC R307. NSPS (Part 60), IIII: Stationary Comp/Ignit R.I.C.E. NSPS (Part 60), OOO: Nonmetallic Mineral Processing Plnts MACT (Part 63), A: General Provisions NSPS (Part 60), A: General Provisions MACT (Part 63), ZZZZ: Recipro. Int. Comb Engine (RICE) PERMIT HISTORY This AO is based on the following documents: Incorporates additional information dated April 11, 2011 Incorporates modeling analysis (DAQE-MN0142430002-10) dated December 14, 2010 Incorporates additional information dated May 24, 2010 Incorporates additional information dated April 22, 2010 Incorporates additional information dated March 17, 2010 Is Derived From the NOI dated July 30, 2009 ADMINISTRATIVE CODING The following information is for UDAQ internal classification use only: Salt Lake County CDS B MACT (Part 63), NSPS (Part 60), Nonattainment or Maintenance Area, Title V (Part 70) Area source DAQE-AN0142430002-11 Page 7 ACRONYMS The following lists commonly used acronyms and associated translations as they apply to this document: 40 CFR Title 40 of the Code of Federal Regulations AO Approval Order BACT Best Available Control Technology CAA Clean Air Act CAAA Clean Air Act Amendments CDS Classification Data System (used by EPA to classify sources by size/type) CEM Continuous emissions monitor CEMS Continuous emissions monitoring system CFR Code of Federal Regulations CO Carbon monoxide CO2 Carbon Dioxide CO2e Carbon Dioxide Equivalent - 40 CFR Part 98, Subpart A, Table A-1 COM Continuous opacity monitor DAQ Division of Air Quality (typically interchangeable with UDAQ) DAQE This is a document tracking code for internal UDAQ use EPA Environmental Protection Agency GHG Greenhouse Gas(es) - 40 CFR 52.21 (b)(49)(i) GWP Global Warming Potential - 40 CFR Part 86.1818-12(a) HAP or HAPs Hazardous air pollutant(s) ITA Intent to Approve LB/HR Pounds per hour MACT Maximum Achievable Control Technology MMBTU Million British Thermal Units NAA Nonattainment Area NAAQS National Ambient Air Quality Standards NESHAP National Emission Standards for Hazardous Air Pollutants NOI Notice of Intent NOx Oxides of nitrogen NSPS New Source Performance Standard NSR New Source Review PM10 Particulate matter less than 10 microns in size PM2.5 Particulate matter less than 2.5 microns in size PSD Prevention of Significant Deterioration PTE Potential to Emit R307 Rules Series 307 R307-401 Rules Series 307 - Section 401 SO2 Sulfur dioxide Title IV Title IV of the Clean Air Act Title V Title V of the Clean Air Act TPY Tons per year UAC Utah Administrative Code UDAQ Utah Division of Air Quality (typically interchangeable with DAQ) VOC Volatile organic compounds Lucia Mason <lbmason@utah.gov> Periodic Permit Updates, 14243: TM Crushing, LLC- West Jordan Pit 11 messages Lucia Mason <lbmason@utah.gov>Wed, Jan 8, 2025 at 5:13 PM To: Nicki Coates <ncoates@tmcrushing.com> Hi Nicki, The DAQ is conducting a 10-year review for TM Crushing's West Jordan Pit. Could you provide a good address for the site and confirm the UTM coordinates listed below? 410,280 m Easting, 4,496,040 m Northing, UTM Zone 12 Thanks, Lucia Nicki Coates <ncoates@tmcrushing.com>Mon, Jan 13, 2025 at 3:28 PM To: Lucia Mason <lbmason@utah.gov> Lucia, This should be the correct coordinates. Let me know if there is anything else you need. JW6R+2X4 West Jordan, Utah Thanks Nicki [Quoted text hidden] Lucia Mason <lbmason@utah.gov>Tue, Jan 14, 2025 at 7:27 AM To: Nicki Coates <ncoates@tmcrushing.com> Great! Thank you. Is the address listed below still good for the site? 2/11/25, 10:07 AM State of Utah Mail - Periodic Permit Updates, 14243: TM Crushing, LLC- West Jordan Pit https://mail.google.com/mail/u/0/?ik=509389cc4c&view=pt&search=all&permthid=thread-a:r-1949488890329465207&simpl=msg-a:r-1243878247567697221&simpl=msg-f:1821174447541976294&simpl…1/4 7604 South Highway 111 West Jordan, UT 84044 [Quoted text hidden] Nicki Coates <ncoates@tmcrushing.com>Wed, Jan 15, 2025 at 4:01 PM To: Lucia Mason <lbmason@utah.gov> Yes that is the correct address. [Quoted text hidden] Lucia Mason <lbmason@utah.gov>Thu, Jan 23, 2025 at 2:18 PM To: Nicki Coates <ncoates@tmcrushing.com> Hi Nicki, Thanks for the response. I have a few more follow up questions. When I look up the "7604 South Highway 111 West Jordan" on google earth it doesn't match the coordinates you provided for the site. Do you know why that might be? Is there a better address available? When you provided contact information for the Lake Mountain Pit you listed a billing email. We can only associate one email with each individual in our database and I've listed ncoates@tmcrushing.com under your profile. To include TM Crusing's billing email on your Approval Order I would need a second individual to list it under. Alternatively, billing information will come to your email instead. Let me know how you would like to proceed. Please reach out with any questions. Best, Lucia [Quoted text hidden] Lucia Mason <lbmason@utah.gov>Tue, Feb 4, 2025 at 12:49 PM To: Nicki Coates <ncoates@tmcrushing.com> Hi Nicki, Here's the link to the permit revocation request form: https://utahgov.co1.qualtrics.com/jfe/form/SV_0OFm4bCnka4CQVo Let me know if you choose to revoke either the Lake Mountain or West Jordan Pit approval orders. Thanks! Lucia [Quoted text hidden] 2/11/25, 10:07 AM State of Utah Mail - Periodic Permit Updates, 14243: TM Crushing, LLC- West Jordan Pit https://mail.google.com/mail/u/0/?ik=509389cc4c&view=pt&search=all&permthid=thread-a:r-1949488890329465207&simpl=msg-a:r-1243878247567697221&simpl=msg-f:1821174447541976294&simpl…2/4 Nicki Coates <ncoates@tmcrushing.com>Tue, Feb 4, 2025 at 3:16 PM To: Lucia Mason <lbmason@utah.gov> Lucia, The original address used in this permit is incorrect. Our Pit was located 7800 south Bacchus highway on the northwest corner. There is some house there now. Our Accountant is Jared Reese AP@tmcrushing.com 801-766-7611 We haven’t got the green light from the owner to close these permits yet. So for now we are keeping them open. Thanks Nicki Coates [Quoted text hidden] Lucia Mason <lbmason@utah.gov>Tue, Feb 4, 2025 at 4:52 PM To: Nicki Coates <ncoates@tmcrushing.com> Hi Nicki, Thanks for the updates. I'm going to list the site's address as "Northwest of the intersection of 7800s and Bacchus Highway, West Jordan, UT." Is this the best billing address for the site? 1850 N. 1450 W. Lehi Ut 84043 Thanks, Lucia [Quoted text hidden] Nicki Coates <ncoates@tmcrushing.com>Tue, Feb 4, 2025 at 4:53 PM To: Lucia Mason <lbmason@utah.gov> Yes Thanks Sent from my iPhone [Quoted text hidden] 2/11/25, 10:07 AM State of Utah Mail - Periodic Permit Updates, 14243: TM Crushing, LLC- West Jordan Pit https://mail.google.com/mail/u/0/?ik=509389cc4c&view=pt&search=all&permthid=thread-a:r-1949488890329465207&simpl=msg-a:r-1243878247567697221&simpl=msg-f:1821174447541976294&simpl…3/4 Lucia Mason <lbmason@utah.gov>Tue, Feb 4, 2025 at 4:54 PM To: Nicki Coates <ncoates@tmcrushing.com> Thank you. [Quoted text hidden] Nicki Coates <ncoates@tmcrushing.com>Mon, Feb 10, 2025 at 3:37 PM To: Lucia Mason <lbmason@utah.gov> I just wanted to let you know we are going to close the AO for West Jordan Pit. Can you tell me the site ID? [Quoted text hidden] 2/11/25, 10:07 AM State of Utah Mail - Periodic Permit Updates, 14243: TM Crushing, LLC- West Jordan Pit https://mail.google.com/mail/u/0/?ik=509389cc4c&view=pt&search=all&permthid=thread-a:r-1949488890329465207&simpl=msg-a:r-1243878247567697221&simpl=msg-f:1821174447541976294&simpl…4/4 Response Summary: The form below will collect the information to start the revocation process. Please fill out the information and a NSR Engineer will be contacting you with any follow up requirements. Q2. Company/Owner Information: Owner Name:TM Crushing Address 1850 North 1420 West City Lehi State UT Zip 84096 Q4. Contact Information: Contact Name:Nicki Coates Contact email:ncoates@tmcrushing.com Contact phone 8014252539 Q3. Permit Information: Site Name:West Jordan Aggregate Processing Facility Site ID:14243 Permit ID: Ex DAQE- 111110001-21 AN0142430002-11 Q9. Is the AO revocation subject to the Oil and Gas PBR Registration? PBR Requirements No Q5. Please provide an explanation for the request to revoke your permit Site is currently being developed into a subdivision. Q6. The undersigned acknowledges they are the responsible party to provide DAQ with this information and authorize DAQ to bill the fee for revoking an AO. As authorized by Utah Legislature, the fee is the time spent by the Permitting staff. [Click here] Embedded Data: N/A