Loading...
HomeMy WebLinkAboutDAQ-2024-008116 DAQE-GN121030023-24 {{$d1 }} Dani Baldwin MountainWest Pipeline, LLC P.O. Box 45922 Salt Lake City, UT 84145 Danell.Baldwin@Williams.com Dear Mr. Checketts: RE: Replacement-in-Kind Determination for the Oak Spring Turbine Compressor Station This letter is in response to the notification submitted on January 1, 2024, concerning the exchange of Unit T-3 (7,684 hp rated) at the Salt Lake Station. Utah Division of Air Quality has determined that the exchange of Unit T-3 meets the Replacement-In-Kind rule R307-401-11. MountainWest Pipeline shall notify the Director in writing when the installation of the exchanged Unit T-3 has been completed and is operational. An initial compliance test is required within 180 days of installation. A notification shall be submitted at least 30 days prior to conducting any testing. To ensure proper credit when notifying the Director, send your correspondence to the Director, attn: NSR Section. The replacement of Unit T-3 shall operate under the conditions listed in Approval Order DAQE-AN121030019-20. Please direct any technical questions regarding this letter to Mr. Tad Anderson, who may be reached at (385) 306-6515. Sincerely, {{$s }} Jon L. Black, Manager New Source Review Section JLB:TD:jg {{#d1=date1_es_:signer1:date:format(date, "mmmm d, yyyy")}} {{#s=Sig_es_:signer1:signature}} 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director * ) ' & — 4 @ D v A ? A C ? G w A G ˜ May 15, 2024 Via USPS Mail January 11, 2024 Utah Division of Air Quality Director, Air Quality Division P.O. Box 144820, Salt Lake City, Utah 84114-4820 RE: MountainWest Pipeline, LLC - Oak Spring Turbine Compressor Station Approval Order DAQE-AN0121030019-20 Turbine Core Exchange for T-3 - Request for Substantial Equivalency Determination Dear Division: Upon receipt of a determination of substantial equivalency, MountainWest Pipeline, LLC will exchange the core with a replacement-in-kind for the Solar Taurus 60-7800S (SN OHE20-T9062) turbine, T-3, at the Oak Spring Turbine Compressor Station. The proposed rebuilt core unit is from the Solar Turbines overhaul fleet exchange with identical horsepower, heat rate and emissions. The turbine is equipped with dry low NOx combustion technology and the replacement unit will be identical to the existing core unit with the exception of the combustion unit’s serial number. The turbine core replacement is scheduled for July 2024. The core exchange follows the routine schedule for major maintenance under the fired-hour maintenance agreement with Solar Turbines. T-3 is subject to 40 Code of Federal Regulations Part 60 (NSPS), Subpart GG. Performance testing will be performed in accordance with NSPS Subpart GG and Approval Order DAQE- AN0121030019-20. An initial compliance test will be conducted within 180 days of installation. A notification will be submitted at least 30 days prior to testing. The test results will be submitted within 60 days of testing. As it pertains to R307-401-11(2), MountainWest Pipeline, LLC requests written concurrence from the Division that additional permitting actions or requirements are not required for the turbine core replacement-in-kind for T-3. Questions regarding this submittal should be referred to Dani Baldwin at (801) 201-0595 or dani.baldwin@williams.com. Sincerely, Dani Baldwin Environmental Specialist MountainWest Pipeline, LLC P.O. Box 45922 Salt Lake City, Utah 84145