Loading...
HomeMy WebLinkAboutDAQ-2025-000689 DAQE-GN121030024-25 Dani Baldwin MountainWest Pipeline, LLC 650 South Main Street, 3rd Floor Salt Lake City, UT 84101 Danell.Baldwin@Williams.com Dear Dani Baldwin: RE: Replacement-in-Kind Determination for Turbine T-2 at Oak Spring Turbine Compressor Station Project Number: N121030024 The Utah Division of Air Quality (UDAQ) received your notification, dated December 17, 2024, concerning Replacement-in-Kind (RIK) of a Solar Taurus 60-7800S Turbine, Turbine T-2 at the Oak Spring Turbine Compressor Station. The Utah Division of Air Quality has determined that the replacement of the Turbine T-2 satisfies the eligible criteria outlined in R307-401-11. MountainWest Pipeline, LLC shall notify the director in writing when the installation of the exchanged unit has been completed and is operational. An initial compliance test is required within 180 days of installation. A notification shall be submitted at least 30 days prior to conducting any testing. To ensure proper credit when notifying the director, send your correspondence to the Director, attn: NSR section. The replacement of Turbine T-2 shall operate under the conditions listed in Approval Order DAQE-AN121030019-20. The charge for the review done in making this change is a flat fee plus a filing fee as authorized by the Utah Legislature. You will receive an invoice for these charges shortly. If you have any questions, please contact Jacob Hurley, who can be reached at (385) 306-6530 or jhurley@utah.gov. Sincerely, Jon L. Black, Manager New Source Review Section JLB:JH:jg 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director * ) ' & — B v A ? A D @ B w ? E ˜ 02/03/2025 Via Certified Mail December 17, 2024 Utah Division of Air Quality Director, Air Quality Division P.O. Box 144820 Salt Lake City, Utah 84114-4820 RE: MountainWest Pipeline, LLC - Oak Spring Turbine Compressor Station Approval Order DAQE-AN0121030019-20 Turbine Core Exchange for T-2 - Request for Substantial Equivalency Determination Dear Mr. Bird: Upon receipt of a determination of substantial equivalency, MountainWest Pipeline, LLC will exchange the core with a replacement-in-kind for the Solar Taurus 60-7800S turbine, T-2, at the Oak Spring Turbine Compressor Station. The proposed rebuilt core unit is from the Solar Turbines overhaul fleet exchange with identical horsepower, heat rate and emissions. The turbine core replacement is scheduled for April 2025. The core exchange follows the routine schedule for major maintenance under the fired-hour maintenance agreement with Solar Turbines. Turbine T-2 is subject to 40 Code of Federal Regulations Part 60 (NSPS), Subpart KKKK. Performance testing will be performed in accordance with NSPS Subpart KKKK and DAQE- AN0121030019-20. The compliance test will be conducted within 180 days of installation. A notification will be submitted at least 30 days prior to testing. The test results will be submitted within 60 days of testing. As it pertains to R307-401-11(2), MountainWest Pipeline, LLC requests written concurrence from the Division that additional permitting actions or requirements are not required for the turbine core replacement-in-kind for turbine T-2. Questions regarding this submittal should be referred to Dani Baldwin at (801) 201-0595 or dani.baldwin@williams.com. Sincerely, Dani Baldwin Environmental Specialist MountainWest Pipeline, LLC 650 South Main Street, 3rd Floor Salt Lake City, Utah 84101