HomeMy WebLinkAboutDAQ-2025-002019 DAQE-AN102130002-25 {{$d1 }} Gretsel Marshall Chevron Pipe Line Company 651 South Redwood Road North Salt Lake, UT 84054 gretsel@chevron.com Dear Ms. Marshall: Re: Approval Order: Administrative Amendment to Approval Order DAQE-AN0102130001-09 for a 10-Year Review and to Update Equipment Project Number: N102130002 The attached Approval Order (AO) is issued pursuant to the Division of Air Quality conducting a 10-year administrative review of this source and its respective AO. Chevron Pipe Line Company must comply with the requirements of this AO, all applicable state requirements (R307), and Federal Standards. The project engineer for this action is Dungan Adams, who can be contacted at (385) 290-2474 or dunganadams@utah.gov. Future correspondence on this AO should include the engineer's name as well as the DAQE number shown on the upper right-hand corner of this letter. Sincerely, {{$s }} Bryce C. Bird Director BCB:DA:jg cc: TriCounty Health Department 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Tim Davis Interim Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director April 9, 2025 STATE OF UTAH Department of Environmental Quality Division of Air Quality {{#s=Sig_es_:signer1:signature}} {{#d1=date1_es_:signer1:date:format(date, "mmmm d, yyyy")}} {{#d2=date1_es_:signer1:date:format(date, "mmmm d, yyyy"):align(center)}} APPROVAL ORDER DAQE-AN102130002-25 Administrative Amendment to Approval Order DAQE-AN0102130001-09 for a 10-Year Review and to Update Equipment Prepared By Dungan Adams, Engineer (385) 290-2474 dunganadams@utah.gov Issued to Chevron Pipe Line Company - Hanna Pumping Station Issued On {{$d2 }} Issued By {{$s }} Bryce C. Bird Director Division of Air Quality April 9, 2025 TABLE OF CONTENTS TITLE/SIGNATURE PAGE ....................................................................................................... 1 GENERAL INFORMATION ...................................................................................................... 3 CONTACT/LOCATION INFORMATION ............................................................................... 3 SOURCE INFORMATION ........................................................................................................ 3 General Description ................................................................................................................ 3 NSR Classification .................................................................................................................. 3 Source Classification .............................................................................................................. 3 Applicable Federal Standards ................................................................................................. 3 Project Description.................................................................................................................. 4 SUMMARY OF EMISSIONS .................................................................................................... 4 SECTION I: GENERAL PROVISIONS .................................................................................... 4 SECTION II: PERMITTED EQUIPMENT .............................................................................. 5 SECTION II: SPECIAL PROVISIONS ..................................................................................... 6 PERMIT HISTORY ..................................................................................................................... 6 ACRONYMS ................................................................................................................................. 7 DAQE-AN102130002-25 Page 3 GENERAL INFORMATION CONTACT/LOCATION INFORMATION Owner Name Source Name Chevron Pipe Line Company Chevron Pipe Line Company - Hanna Pumping Station Mailing Address Physical Address 651 South Redwood Road 40700 West 7000 North North Salt Lake, UT 84054 Hanna, UT 84031 Source Contact UTM Coordinates Name: Gretsel Marshall 520,536 m Easting Phone: (801) 589-8896 4,472,294 m Northing Email: gretsel@chevron.com Datum NAD83 UTM Zone 12 SIC code 4612 (Crude Petroleum Pipelines) SOURCE INFORMATION General Description Chevron Pipe Line Company (Chevron) owns and operates the Hanna Pumping Station located in Hanna, Duchesne County. The facility receives crude oil, condensable hydrocarbons, and black wax throughput from the company-owned pipeline on its way to Salt Lake City. The facility serves as a buffer to pipeline operations, allowing production to fluctuate while maintaining a consistent flow within the pipeline. The facility includes the petroleum pumping station, storage tanks, and various comfort heaters. NSR Classification 10-Year Review Source Classification Located in Attainment Area Duchesne County Airs Source Size: B Applicable Federal Standards NSPS (Part 60), A: General Provisions NSPS (Part 60), Kb: Standards of Performance for Volatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984 DAQE-AN102130002-25 Page 4 Project Description This is a 10-Year Review for Chevron's Hanna Pumping Station to update contact information, permit formatting, and rule applicability. The source has also requested the following updates to the approved equipment list: 1. Remove Tank 530. 2. Change Tanks 510 and 520 from "external floating roof storage tanks" to "internal floating roof storage tanks." SUMMARY OF EMISSIONS The emissions listed below are an estimate of the total potential emissions from the source. Some rounding of emissions is possible. Criteria Pollutant Change (TPY) Total (TPY) Volatile Organic Compounds -2.60 9.67 Hazardous Air Pollutant Change (lbs/yr) Total (lbs/yr) 2,2,4-Trimethylpentane (CAS #540841) -6 14 Benzene (Including Benzene From Gasoline) (CAS #71432) -4 36 Ethyl Benzene (CAS #100414) 0 20 Hexane (CAS #110543) -92 288 Toluene (CAS #108883) -18 62 Xylenes (Isomers And Mixture) (CAS #1330207) -8 92 Change (TPY) Total (TPY) Total HAPs -0.07 0.26 SECTION I: GENERAL PROVISIONS I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-101] I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401] I.3 Modifications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401-1] I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, shall be made available to the Director or Director's representative upon request, and the records shall include the two-year period prior to the date of the request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401-8] DAQE-AN102130002-25 Page 5 I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this AO, including associated air pollution control equipment, in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Director which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R307-401-4] I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns. [R307-107] I.7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories. [R307-150] SECTION II: PERMITTED EQUIPMENT II.A THE APPROVED EQUIPMENT II.A.1 Hanna Pumping Station II.A.2 Equipment Leaks Various process connection/process control device equipment leaks II.A.3 Tank 510 2,520,000-gallon Internal Floating Roof Storage Tank (1973) II.A.4 Tank 520 2,520,000-gallon Internal Floating Roof Storage Tank (1972) II.A.5 Tank 111 1,680,000-gallon Internal Floating Roof Storage Tank (1949) II.A.6 Comfort Heaters Fuel: Natural Gas Rating: Less than 5 MMBtu/hr each *Listed for informational purposes only DAQE-AN102130002-25 Page 6 SECTION II: SPECIAL PROVISIONS II.B REQUIREMENTS AND LIMITATIONS II.B.1.a The owner/operator shall not exceed the following throughputs: A. 9,166,610 barrels of crude oil throughput per rolling 12-month period. B. 1,896,540 barrels of black wax condensate mix throughput per rolling 12-month period. C. 4,741,350 barrels of condensate throughput per rolling 12-month period. [R307-401] II.B.1.a.1 The owner/operator shall: A. Determine throughput from company and/or customer billing records. B. Record crude oil throughput on a monthly basis. C. Use the throughput data to calculate a new rolling 12-month total by the 20th day of each month using data from the previous 12 months. D. Keep records of crude oil throughput for all periods the facility is in operation. [R307-401-8] II.B.1.b The owner/operator shall not allow visible emissions from any stationary point or fugitive emission source on site to exceed 20% opacity. [R307-201-3, R307-205-4] II.B.1.b.1 Opacity observations of emissions from stationary sources shall be conducted in accordance with 40 CFR 60, Appendix A, Method 9. [R307-201-3] PERMIT HISTORY This Approval Order shall supersede (if a modification) or will be based on the following documents: Supersedes AO DAQE-AN0102130001-09 dated April 9, 2009 Is Derived From NOI dated October 4, 2024 Incorporates Additional Information dated January 22, 2025 Incorporates Additional Information dated March 3, 2025 DAQE-AN102130002-25 Page 7 ACRONYMS The following lists commonly used acronyms and associated translations as they apply to this document: 40 CFR Title 40 of the Code of Federal Regulations AO Approval Order BACT Best Available Control Technology CAA Clean Air Act CAAA Clean Air Act Amendments CDS Classification Data System (used by Environmental Protection Agency to classify sources by size/type) CEM Continuous emissions monitor CEMS Continuous emissions monitoring system CFR Code of Federal Regulations CMS Continuous monitoring system CO Carbon monoxide CO2 Carbon Dioxide CO2e Carbon Dioxide Equivalent - Title 40 of the Code of Federal Regulations Part 98, Subpart A, Table A-1 COM Continuous opacity monitor DAQ/UDAQ Division of Air Quality DAQE This is a document tracking code for internal Division of Air Quality use EPA Environmental Protection Agency FDCP Fugitive dust control plan GHG Greenhouse Gas(es) - Title 40 of the Code of Federal Regulations 52.21 (b)(49)(i) GWP Global Warming Potential - Title 40 of the Code of Federal Regulations Part 86.1818- 12(a) HAP or HAPs Hazardous air pollutant(s) ITA Intent to Approve LB/YR Pounds per year MACT Maximum Achievable Control Technology MMBTU Million British Thermal Units NAA Nonattainment Area NAAQS National Ambient Air Quality Standards NESHAP National Emission Standards for Hazardous Air Pollutants NOI Notice of Intent NOx Oxides of nitrogen NSPS New Source Performance Standard NSR New Source Review PM10 Particulate matter less than 10 microns in size PM2.5 Particulate matter less than 2.5 microns in size PSD Prevention of Significant Deterioration PTE Potential to Emit R307 Rules Series 307 R307-401 Rules Series 307 - Section 401 SO2 Sulfur dioxide Title IV Title IV of the Clean Air Act Title V Title V of the Clean Air Act TPY Tons per year UAC Utah Administrative Code VOC Volatile organic compounds DAQE- RN102130002 March 19, 2025 Gretsel Marshall Chevron Pipe Line Company 651 South Redwood Road North Salt Lake, UT 84054 gretsel@chevron.com Dear Gretsel Marshall, Re: Engineer Review - 10-Year Review and Permit Updates: Administrative Amendment to Approval Order DAQE-AN0102130001-09 for a 10-Year Review and to Update Equipment Project Number: N102130002 The DAQ requests a company representative review and sign the attached Engineer Review (ER). This ER identifies all applicable elements of the New Source Review (NSR) permitting program. Chevron Pipe Line Company should complete this review within 10 business days of receipt. Chevron Pipe Line Company should contact Dungan Adams at (385) 290-2474 if there are questions or concerns with the review of the draft permit conditions. Upon resolution of your concerns, please email Dungan Adams at dunganadams@utah.gov the signed cover letter. Upon receipt of the signed cover letter, the DAQ will prepare an Approval Order (AO) for signature by the DAQ Director. If Chevron Pipe Line Company does not respond to this letter within 10 business days, the project will move forward without source concurrence. If Chevron Pipe Line Company has concerns that cannot be resolved and the project becomes stagnant, the DAQ Director may issue an Order prohibiting construction. Approval Signature _____________________________________________________________ (Signature & Date) 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper Department of Environmental Quality Tim Davis Interim Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Luke Johnson Digitally signed by Luke Johnson Date: 2025.04.02 06:39:27 -06'00' Engineer Review N102130002: Chevron Pipe Line Company- Hanna Pumping Station March 19, 2025 Page 1 UTAH DIVISION OF AIR QUALITY ENGINEER REVIEW SOURCE INFORMATION Project Number N102130002 Owner Name Chevron Pipe Line Company Mailing Address 651 South Redwood Road North Salt Lake, UT, 84054 Source Name Chevron Pipe Line Company- Hanna Pumping Station Source Location 40700 West 7000 North Hanna, UT 84031 UTM Projection 520,536 m Easting, 4,472,294 m Northing UTM Datum NAD83 UTM Zone UTM Zone 12 SIC Code 4612 (Crude Petroleum Pipelines) Source Contact Gretsel Marshall Phone Number (801) 589-8896 Email gretsel@chevron.com Billing Contact Gretsel Marshall Phone Number (801) 589-8896 Email gretsel@chevron.com Project Engineer Dungan Adams, Engineer Phone Number (385) 290-2474 Email dunganadams@utah.gov Notice of Intent (NOI) Submitted October 4, 2024 Date of Accepted Application January 23, 2025 Engineer Review N102130002: Chevron Pipe Line Company- Hanna Pumping Station March 19, 2025 Page 2 SOURCE DESCRIPTION General Description Chevron Pipe Line Company (Chevron) owns and operates the Hanna Pumping Station located in Hanna, Duchesne County. The facility receives crude oil, condensable hydrocarbons, and black wax throughput from the company owned pipeline on its way to Salt Lake City. The facility serves as a buffer to pipeline operations, allowing production to fluctuate while maintaining a consistent flow within the pipeline. The facility includes the petroleum pumping station, storage tanks, and various comfort heaters. NSR Classification: 10 Year Review Source Classification Located in Attainment Area Duchesne County Airs Source Size: B Applicable Federal Standards NSPS (Part 60), A: General Provisions NSPS (Part 60), Kb: Standards of Performance for Volatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984 Project Proposal Administrative Amendment to Approval Order DAQE-AN0102130001-09 for a 10-Year Review and to Update Equipment Project Description This is a 10-Year Review for Chevron's Hanna Pumping Station to update contact information, permit formatting, and rule applicability. The source has also requested the following updates to the approved equipment list: 1. Remove Tank 530 2. Change Tanks 510 and 520 from "external floating roof storage tanks" to "internal floating roof storage tanks" EMISSION IMPACT ANALYSIS This is a 10-Year Review. No equipment is being added, and no changes are being made which will result in an emission increase. Therefore, modeling is not required. [Last updated March 19, 2025] Engineer Review N102130002: Chevron Pipe Line Company- Hanna Pumping Station March 19, 2025 Page 3 SUMMARY OF EMISSIONS The emissions listed below are an estimate of the total potential emissions from the source. Some rounding of emissions is possible. Criteria Pollutant Change (TPY) Total (TPY) Volatile Organic Compounds -2.60 9.67 Hazardous Air Pollutant Change (lbs/yr) Total (lbs/yr) 2,2,4-Trimethylpentane (CAS #540841) -6 14 Benzene (Including Benzene From Gasoline) (CAS #71432) -4 36 Ethyl Benzene (CAS #100414) 0 20 Hexane (CAS #110543) -92 288 Toluene (CAS #108883) -18 62 Xylenes (Isomers And Mixture) (CAS #1330207) -8 92 Change (TPY) Total (TPY) Total HAPs -0.07 0.26 Note: Change in emissions indicates the difference between previous AO and proposed modification. Engineer Review N102130002: Chevron Pipe Line Company- Hanna Pumping Station March 19, 2025 Page 4 Review of BACT for New/Modified Emission Units 1. BACT review regarding Petroleum Pumping Station This is a 10-Year Review. No equipment is being added, and no changes are being made which will result in an emission increase. Therefore, a BACT analysis is not required. [Last updated March 19, 2025] SECTION I: GENERAL PROVISIONS The intent is to issue an air quality AO authorizing the project with the following recommended conditions and that failure to comply with any of the conditions may constitute a violation of the AO. (New or Modified conditions are indicated as “New” in the Outline Label): I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-101] I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401] I.3 Modifications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401-1] I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, shall be made available to the Director or Director's representative upon request, and the records shall include the two-year period prior to the date of the request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401-8] I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this AO, including associated air pollution control equipment, in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Director which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R307- 401-4] I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns. [R307-107] I.7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories. [R307- 150] Engineer Review N102130002: Chevron Pipe Line Company- Hanna Pumping Station March 19, 2025 Page 5 SECTION II: PERMITTED EQUIPMENT The intent is to issue an air quality AO authorizing the project with the following recommended conditions and that failure to comply with any of the conditions may constitute a violation of the AO. (New or Modified conditions are indicated as “New” in the Outline Label): II.A THE APPROVED EQUIPMENT II.A.1 Hanna Petroleum Pumping Station II.A.2 Equipment Leaks Various process connection/process control device equipment leaks II.A.3 Tank 510 2,520,000-gallon Internal Floating Roof Storage Tank (1973) II.A.4 Tank 520 2,520,000-gallon Internal Floating Roof Storage Tank (1972) II.A.5 Tank 111 1,680,000-gallon Internal Floating Roof Storage Tank (1949) II.A.6 Comfort Heaters Fuel: Natural Gas Rating: Less than 5 MMBtu/hr each *Listed for informational purposes only SECTION II: SPECIAL PROVISIONS The intent is to issue an air quality AO authorizing the project with the following recommended conditions and that failure to comply with any of the conditions may constitute a violation of the AO. (New or Modified conditions are indicated as “New” in the Outline Label): II.B REQUIREMENTS AND LIMITATIONS II.B.1.a NEW The owner/operator shall not exceed the following throughputs: A. 9,166,610 barrels of crude oil throughput per rolling 12-month period. B. 1,896,540 barrels of black wax condensate mix throughput per rolling 12-month period. C. 4,741,350 barrels of condensate throughput per rolling 12-month period. [R307-401] Engineer Review N102130002: Chevron Pipe Line Company- Hanna Pumping Station March 19, 2025 Page 6 II.B.1.a.1 NEW The owner/operator shall: A. Determine throughput from company and/or customer billing records. B. Record crude oil throughput on a monthly basis. C. Use the throughput data to calculate a new rolling 12-month total by the 20th day of each month using data from the previous 12 months. D. Keep records of crude oil throughput for all periods the facility is in operation. [R307- 401-8] II.B.1.b NEW The owner/operator shall not allow visible emissions from any stationary point or fugitive emission source on site to exceed 20% opacity. [R307-201-3, R307-205-4] II.B.1.b.1 NEW Opacity observations of emissions from stationary sources shall be conducted in accordance with 40 CFR 60, Appendix A, Method 9. [R307-201-3] Engineer Review N102130002: Chevron Pipe Line Company- Hanna Pumping Station March 19, 2025 Page 7 PERMIT HISTORY When issued, the approval order shall supersede (if a modification) or will be based on the following documents: Supersedes AO DAQE-AN0102130001-09 dated April 9, 2009 Is Derived From NOI dated October 4, 2024 Incorporates Additional Information dated January 22, 2025 Incorporates Additional Information dated March 3, 2025 REVIEWER COMMENTS 1. Comment regarding 10-Year Review: This is a 10-Year Review on Chevron's Hanna Pumping Station AO (DAQE-AN0102130001-09). The mailing address and source contact information have been updated. The permit conditions have been updated to the current format. The source has requested to remove and update equipment so that the Approved Equipment list accurately reflects the equipment on site. The source has requested to remove Tank 530 (listed in AO DAQE-AN0102130001-09) and change Tanks 510 and 520 from "External Floating Roof Storage Tanks" to "Internal Floating Roof Storage Tanks". None of these changes to equipment will result in increases of any air pollutants and no undocumented equipment changes or replacements were ever indicated by DAQ compliance. Therefore, these updates will be included as part of this 10-year review. The source requested that Tank 530 (2,520,000-gallon internal floating roof storage tank) be removed from the updated AO as it was never installed at the facility. The NOI for the 2009 AO lists Tank 530 estimated emissions as 1.38 tons per year (TPY) of VOCs and 0.04 TPY of HAPs. Tank 530 is removed from the Approved Equipment list and its emissions are removed from the Summary of Emissions table. The source indicated that Tanks 520 and 510 are "Internal Floating Roof Tanks" not "External Floating Roof Tanks." Using parameters from the 2009 NOI, emission routine losses were estimated for Tank 510, once assuming an internal floating roof, and once assuming an external floating roof. Emissions were estimated using EPA TANKS 5.1 and parameters listed in the 2009 NOI. The current emissions estimated from Tank 510 assuming an external floating roof were similar to the emissions estimated for Tank 510 in the 2009 NOI. The emissions estimated from Tank 510 assuming an internal floating roof were roughly 40% less than the current external floating roof estimate. Tanks 510 and 520 are both 2,520,00-gallon storage tanks with similar properties. Switching from "External Floating Roof Storage Tanks" to "Internal Floating Roof Storage Tanks" will reduce both VOCs and HAPs. To maintain a conservative site-wide emission estimate, VOC and HAP emissions from Tanks 510 and 520 were reduced by 30%. The 2009 NOI lists Tank 510 estimated emissions as 2.27 TPY of VOCs and 0.06 TPY of HAPs. The change to "Internal Floating Roof Storage Tanks" will conservatively result in a reduction of 0.68 TPY of VOCs and 0.02 TPY of HAPs. The 2009 NOI lists Tank 520 estimated emissions as 1.81 TPY of VOCs and 0.06 TPY of HAPs. The change to "Internal Floating Roof Storage Tanks" will conservatively result in a reduction of 0.54 TPY of VOCs and 0.02 TPY of HAPs. Tanks 510 and 520 are updated to "Internal Floating Roof Storage Tanks" in the Approved Equipment list and the reductions are included in the Summary of Emissions table. Engineer Review N102130002: Chevron Pipe Line Company- Hanna Pumping Station March 19, 2025 Page 8 The requested equipment changes will conservatively result in a net decrease of 2.60 TPY of VOCs and 0.07 TPY of HAPs. The source was previously estimated to produce 0.005 TPY of Naphthalene. After removing the emissions from Tank 530 and updating the emissions from Tanks 510 and 520, the source is estimated to produce 0.004 TPY of Naphthalene. Because this rounds to 0.00 TPY using two decimal places, Naphthalene has been removed from the Summary of Emissions table. [Last updated March 19, 2025] 2. Comment regarding Federal Subpart Applicability: NSPS 40 CFR 60 Subpart Kb (Standards of Performance for Volatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984, and On or Before October 4, 2023) applies to each storage vessel with a capacity greater than or equal to 75 cubic meters that is used to store volatile organic liquids (VOL) for which construction, reconstruction, or modification is commenced after July 23, 1984, and on or before October 4, 2023. The four (4) storage tanks at the facility commenced construction after July 23, 1984, and on or before October 4, 2023, have a capacity greater than 75 cubic meters, and store VOLs. Therefore, NSPS Subpart Kb applies to the source. NSPS Subpart Kb requires the source to maintain storage tank dimensions for the life of the tank, regardless of the tank size or vapor pressure of the contents. MACT 40 CFR 63 Subpart R (National Emission Standards for Gasoline Distribution Facilities (Bulk Gasoline Terminals and Pipeline Breakout Stations) applies to each bulk gasoline terminal and each pipeline breakout station as defined in the subpart that are located at a major source. The facility meets the definition of a pipeline breakout station; however, it is not a major source. Therefore, MACT Subpart R does not apply to the source. [Last updated January 28, 2025] 3. Comment regarding Title V Applicability: Title V of the 1990 Clean Air Act (Title V) applies to the following: 1. Any major source 2. Any source subject to a standard, limitation, or other requirement under Section 111 of the Act, Standards of Performance for New Stationary Sources; 3. Any source subject to a standard or other requirement under Section 112 of the Act, Hazardous Air Pollutants. 4. Any Title IV affected source. This source is not a major source and is not a Title IV source. This source is subject to 40 CFR 60 Subpart Kb; however, the source is only subject to a record keeping requirement that does not support a limitation. Since the source is not subject to a standard, limitation, or other requirement under Section 111 of the Act, Title V does not apply to the Hanna Pumping Station. [Last updated February 18, 2025] Engineer Review N102130002: Chevron Pipe Line Company- Hanna Pumping Station March 19, 2025 Page 9 ACRONYMS The following lists commonly used acronyms and associated translations as they apply to this document: 40 CFR Title 40 of the Code of Federal Regulations AO Approval Order BACT Best Available Control Technology CAA Clean Air Act CAAA Clean Air Act Amendments CDS Classification Data System (used by EPA to classify sources by size/type) CEM Continuous emissions monitor CEMS Continuous emissions monitoring system CFR Code of Federal Regulations CMS Continuous monitoring system CO Carbon monoxide CO2 Carbon Dioxide CO2e Carbon Dioxide Equivalent - 40 CFR Part 98, Subpart A, Table A-1 COM Continuous opacity monitor DAQ/UDAQ Division of Air Quality DAQE This is a document tracking code for internal UDAQ use EPA Environmental Protection Agency FDCP Fugitive dust control plan GHG Greenhouse Gas(es) - 40 CFR 52.21 (b)(49)(i) GWP Global Warming Potential - 40 CFR Part 86.1818-12(a) HAP or HAPs Hazardous air pollutant(s) ITA Intent to Approve LB/HR Pounds per hour LB/YR Pounds per year MACT Maximum Achievable Control Technology MMBTU Million British Thermal Units NAA Nonattainment Area NAAQS National Ambient Air Quality Standards NESHAP National Emission Standards for Hazardous Air Pollutants NOI Notice of Intent NOx Oxides of nitrogen NSPS New Source Performance Standard NSR New Source Review PM10 Particulate matter less than 10 microns in size PM2.5 Particulate matter less than 2.5 microns in size PSD Prevention of Significant Deterioration PTE Potential to Emit R307 Rules Series 307 R307-401 Rules Series 307 - Section 401 SO2 Sulfur dioxide Title IV Title IV of the Clean Air Act Title V Title V of the Clean Air Act TPY Tons per year UAC Utah Administrative Code VOC Volatile organic compounds Tank ID Tank Type Meteorological Location Chemical Name Annual Standing Losses (lb/yr) Tank 510 (Ex)External Floating Roof Tank Salt Lake City, UT Midcontinent Crude Oil RVP 5 2720.528508 Tank 510 (Int)Internal Floating Roof Tank Salt Lake City, UT Midcontinent Crude Oil RVP 5 538.0821495 Annual Rim Seal Losses (lb/yr)Annual Deck Seam Losses (lb/yr)Annual Deck Fitting Losses (lb/yr)Annual Working Losses (lb/yr) 436.383276 0 2284.145232 2613.989142 171.177243 0 366.9049065 2613.989142 Annual Total Losses (lb/yr) 5334.517651 3152.071292 0.59 Tank ID Tank Type Descriptio City, State Company Chemical NAnnual Rim Seal Facto Seal Facto Annual Av Seal-relate Annual Ave Annual Av Tank 510 (External Fl , Midcontin 436.3833 0.6 0.4 8.3 1 0.058591 515.318 Tank 510 (Internal Flo , Midcontin 171.1772 1.6 0.3 0 1.6 0.056308 513.5509 Annual Av Liquid Bulk Tank Paint Tank Paint Annual Ave Annual Pro Annual Wi Number of Effective C Annual Ne Annual Sum Annual Ave Annual Av 2.639318 511.65 0.25 0.25 50 0.4 2613.989 2.6E+08 4896 0.006 7.1 2.547478 511.65 0.25 0.25 50 0.4 2613.989 0 2.6E+08 4896 0.006 7.1 Annual De Annual Tot Annual De Deck Seam Deck Seam Deck Seam Length Factor (ft/sqft) 2284.145 1949.24 0 0 366.9049 325.8 0 0 Tank ID Tank Type Descriptio City, State Company Meteorolo Tank Shap Shell Lengt Shell Side Shell Side Shell Side 2 Shell Heigh Shell Diam Tank 510 (External Fl , Salt Lake C 48 95 Tank 510 (Internal Flo , Salt Lake C 48 95 Maximum Average Li Minimum Is Tank He Typical Ma Typical Ave Typical Mi Number of Roof Type Vacuum Se Pressure S Vapor Spa Is Tank Ins Pontoon Is Tank Ins Tank Cone Tank Dome Is Tank Equ Control De Liquid Bulk Liquid Bulk Tank Botto Cone-Shap Liquid Hee Minimum Self Suppo Number of User Input 511.65 flat none User Input 511.65 flat none Yes Effective C Internal Sh Primary SeSecondary Seal Fit Deck Type Tank ConstDeck Cons Deck SeamPanel/She Panel Leng Shell ColorShell Cond Light Rust Mechanica Rim-mounAverage-fi Welded Welded White Average Light Rust Mechanica Shoe-mou Average-fi Welded Welded White Average Roof ColorRoof Condition White Average White Average Tank ID Tank Type Descriptio City, State Company Access HatAccess Hat Fixed Roof Fixed Roof Unslotted Unslotted Slotted Gu Slotted Gu Tank 510 (External Fl , Bolted cov 1 Ungaskete 1 Tank 510 (Internal Flo , Unbolted c 1 Round pip 1 0 0 Gauge-floa Gauge-floa Gauge-hat Gauge-hat Vacuum BrVacuum Br Deck DrainDeck Drain Deck Leg Deck Leg CDeck Leg o Deck Leg o Rim Vent Unbolted c 1 Weighted 1 Weighted 1 Weighted Unbolted c 1 0 Weighted 1 0 Adjustable 0 Rim Vent CLadder WeLadder We Ladder-slo Ladder-slo Deck Leg ( Deck Leg C Deck Leg ( Deck Leg Count (Double-deck roofs and center area o 1 Adjustable Adjustable 1 0 0 of pontoon roofs) Tank ID Meteorolo Annual Ave Annual Av Annual Ave Annual Av Annual Av January Av January Av January Av January Av February A February A Tank 510 (Salt Lake C 12.62 63.3 42.9 8.3 1442 37.7 23.3 6.7 596 43.1 26.9 Tank 510 (Salt Lake C 12.62 63.3 42.9 8.3 1442 37.7 23.3 6.7 596 43.1 26.9 February A February A March Ave March Ave March Ave March Ave April Avera April Avera April Avera April Avera May Avera May Avera May Avera 7.2 877 53.4 34.4 8.7 1348 60.3 40.2 9.6 1685 71.5 49 8.9 7.2 877 53.4 34.4 8.7 1348 60.3 40.2 9.6 1685 71.5 49 8.9 May Avera June Avera June Avera June Avera June Avera July Averag July Averag July Averag July Averag August Ave August Ave August Ave August Ave 2071 81.8 57.3 9.2 2336 92.4 66.4 8.9 2338 90.1 64.9 9.6 2052 2071 81.8 57.3 9.2 2336 92.4 66.4 8.9 2338 90.1 64.9 9.6 2052 Septembe Septembe Septembe Septembe October Av October Av October Av October Av November November November November December 78.9 54.3 8.7 1689 64 42.2 8.1 1144 48.7 31.1 7.4 700 38 78.9 54.3 8.7 1689 64 42.2 8.1 1144 48.7 31.1 7.4 700 38 December December December Average Daily Total Insolation Factor (Btu/ft2/day) 24.1 7.2 469 24.1 7.2 469 Tank ID Input TypeChemical C Sum of Inc Working Lo Annual Ch Annual Spe Annual Co Annual Th Annual Sum January Ch January Sp January Co Tank 510 (Enter Annu Petroleum User Input Midcontin 4896 Tank 510 (Enter Annu Petroleum User Input Midcontin 4896 January ThJanuary Su February C February S February C February TFebruary S March Che March Spe March Com March Thr March Sum April Chem April Speci April Comp April ThrouApril Sum May Chem May Speci May Comp May ThrouMay Sum o June Chem June Speci June Comp June Throu June Sum o July Chemi July Specia July Comp July Throu July Sum o August Che August Spe August Co August ThrAugust Sum Septembe Septembe Septembe Septembe Septembe October Ch October Sp October Co October ThOctober Su November November November November November December December December December December Sum of Increases/Decreases in Liquid Level (ft/yr) 9/22/21, 11:25 AM OPCE Inspection Memo OPCE Inspection Memo Submitted by: chrisljensen Submitted time: Sep 22, 2021, 11:23:46 AM Date DAQC-1257-2021 Sep 20, 2021, 11:11:00 AM Inspector Name Chris Jensen Site ID 10213 County Duchesne (13) Location Lat: 40.401 Lon: -110.758 Ha nna 9 Bureau of Land Manag... Operator Other Other DAQC-2021-012527 Chevron USA Pipeline https://survey123.arcgis.com/surveys/55cfdeb5cd1c44f8bebc9db8ab170d39/data?objectids=352 1/3 9/22/21, 11:25 AM OPCE Inspection Memo Source Name Hanna pumping Station Source Type Pig Launcher / Receiver API # Is this site controlled? Uncontrolled Is this Location Accessible? Yes Are there visible emissions? No visible emissions detected. Are there Audible or Olfactory Indications? No AVO indications detected. Did an OGI camera survey reveal leaks? No OGI emission found. Is there unapproved equipment? No unapproved equipment found. Did you meet a company representative onsite? Yes Issues or Comments No issues found. https://survey123.arcgis.com/surveys/55cfdeb5cd1c44f8bebc9db8ab170d39/data?objectlds=352 2/3 9/22/21, 11:25 AM OPCE Inspection Memo Compliance Status Compliant Planned or Immediate Response None, In compliance at time of inspection. Future inspections should be..... Decreased / less frequent. Additional comments This source is a pipeline station. They seem to have means of pigging set up here and very large concrete vaults with floating roofs for storage. This source is very well kept and exceptionally clean. There is very little here that could be observed for compliance. The DAQ recommends less frequent inspections . ("44,en Chris Jensen Rik Ombach https://survey123.arcgis.com/surveys/55cfdeb5cd1c44f8bebc9db8ab170c139/data?objectlds=352 3/3 Tank 530 Tank 111 Tank 510 Tank 520 Total Tanks VOCs 1.38 0.94 2.27 1.81 6.40 HAPs 0.040395 0.025021 0.06255 0.062235 0.19 2,2,4-Trimethylpentane 0.00092 0.000625 0.00137 0.001145 0.00 Benzene 0.00275 0.00166 0.0043 0.004475 0.01 Biphenyl 0.00023 0.000185 0.00031 0.000095 0.00 Cresol 0.000355 0.000285 0.00048 0.00015 0.00 Ethybenzene 0.001205 0.00093 0.001665 0.00071 0.00 Hexane 0.024205 0.013175 0.03944 0.048375 0.13 Isopropyl benzene 0.000315 0.00025 0.00043 0.000155 0.00 Naphthalene 0.00055 0.00044 0.00074 0.00023 0.00 Toluene 0.004125 0.00298 0.005915 0.00368 0.02 Xylenes 0.00574 0.004491 0.0079 0.00322 0.02 Tank 111 Tank 510 Tank 520 Total Tanks Fugatives VOCs 0.94 1.589 1.267 3.80 5.87 HAPs 0.024301 0.042931 0.0432845 0.11 0.147805 2,2,4-Trimethylpentane 0.000625 0.000959 0.0008015 0.00 0.00417 Benzene 0.00166 0.00301 0.0031325 0.01 0.009925 Ethybenzene 0.00093 0.0011655 0.000497 0.00 0.00693 Hexane 0.013175 0.027608 0.0338625 0.07 0.06894 Naphthalene 0.00044 0.000518 0.000161 0.00 0.003345 Toluene 0.00298 0.0041405 0.002576 0.01 0.02114 Xylenes 0.004491 0.00553 0.002254 0.01 0.033355 Emissions (tons/year) Emissions (tons/year) Fugatives Site-wide 5.87 12.27 0.15327 0.34 0.00417 0.01 0.009925 0.02 0.00141 0.00 0.002175 0.00 0.00693 0.01 0.06894 0.19 0.00188 0.00 0.003345 0.005 0.02114 0.04 0.033355 0.05 Site-wide 9.666 0.258 0.007 0.018 0.010 0.144 0.004 Previously included in permit, now emission estimate is less than 0.005 tpy 0.031 0.046 Dungan Adams <dunganadams@utah.gov> Review of Chevron's Hanna Pumping Station DAQ Air Permit 7 messages Dungan Adams <dunganadams@utah.gov>Wed, Jan 22, 2025 at 1:29 PM To: gretsel@chevron.com Hi Gretsel, My name is Dungan Adams and I am an environmental engineer for the Utah Division of Air Quality (DAQ). I am reaching out about Chevron's air permit for the Hanna Pumping Station (Attached as DAQE-AN0102130001-09). The DAQ reviews older permits to update contact information and check to see if the facility is still operational. The Hanna Pumping station was operational in 2021 based on a compliance inspection memo, but please let me know if this has changed. Please let me know if the following contact information needs to be updated: Mailing Address: Chevron USA Pipeline Company 2875 S Decker Lake Dr Ste 150 West Valley City, UT 84119 I found your contact information listed on a recently approved Chevron Pipeline air permit, however if there is someone who is better suited to help with my review, could you please forward this message to them? Let me know if you have any questions and thank you for your help. Thanks, Dungan -- Dungan Adams Environmental Engineer | Minor NSR Section M: (385) 290-2474 airquality.utah.gov DAQE-AN0102130001-09.pdf 56K Marshall, Gretsel <gretsel@chevron.com>Wed, Jan 22, 2025 at 2:48 PM To: Dungan Adams <dunganadams@utah.gov> Hi Dungan, 4/2/25, 9:48 AM State of Utah Mail - Review of Chevron's Hanna Pumping Station DAQ Air Permit https://mail.google.com/mail/u/0/?ik=c52f18613a&view=pt&search=all&permthid=thread-a:r1495998040162054846&simpl=msg-a:r-566309110606927…1/4 Yes, the facility is still operational, and I am the correct contact replacing Jim Robbins. My address is: Chevron Pipe Line Company 651 S Redwood Road North Salt Lake, UT 84054 Best, Gretsel Marshall Lead Environmental and Regulatory Specialist | CPP gretsel@chevron.com 651 S Redwood Road North Salt Lake, UT 84054 Mobile +1 801 589 8896 From: Dungan Adams <dunganadams@utah.gov> Sent: Wednesday, January 22, 2025 1:29 PM To: Marshall, Gretsel <gretsel@chevron.com> Subject: [**EXTERNAL**] Review of Chevron's Hanna Pumping Staon DAQ Air Permit Be aware this external email contains an attachment and/or link. Ensure the email and contents are expected. If there are concerns, please submit suspicious messages to the Cyber Intelligence Center using the Report Phishing button. [Quoted text hidden] Dungan Adams <dunganadams@utah.gov>Wed, Jan 22, 2025 at 3:41 PM To: "Marshall, Gretsel" <gretsel@chevron.com> Great. Thanks for getting back to me so quickly! Thanks, Dungan [Quoted text hidden] Dungan Adams <dunganadams@utah.gov>Tue, Feb 18, 2025 at 12:29 PM To: "Marshall, Gretsel" <gretsel@chevron.com> 4/2/25, 9:48 AM State of Utah Mail - Review of Chevron's Hanna Pumping Station DAQ Air Permit https://mail.google.com/mail/u/0/?ik=c52f18613a&view=pt&search=all&permthid=thread-a:r1495998040162054846&simpl=msg-a:r-566309110606927…2/4 Hi Gretsel, Attached is the draft permit for Chevron's Hanna Pumping Station. Please review the draft and let me know if you have any questions. If everything looks good please sign the cover page and return the document to me. Thanks, Dungan [Quoted text hidden] RN102130002.rtf 1469K Marshall, Gretsel <gretsel@chevron.com>Mon, Mar 3, 2025 at 3:02 PM To: Dungan Adams <dunganadams@utah.gov> Hi Dungan, Thank you for sending over the draft permit for Chevron's Hanna Pumping Station. Upon our review, we identified a few clerical errors on page 5: II.A.3 Tank 510 should be Internal Floating Roof II.A.4 Tank 520 should be Internal Floating Roof II.A.6 Tank 530 was never built and should be removed from the equipment inventory Appreciate your time and the review. Please reach out with any questions. Gretsel Marshall Lead Environmental and Regulatory Specialist | CPP gretsel@chevron.com Mobile +1 801 589 8896 [Quoted text hidden] Dungan Adams <dunganadams@utah.gov>Thu, Mar 20, 2025 at 9:30 AM To: "Marshall, Gretsel" <gretsel@chevron.com> Hi Gretsel, 4/2/25, 9:48 AM State of Utah Mail - Review of Chevron's Hanna Pumping Station DAQ Air Permit https://mail.google.com/mail/u/0/?ik=c52f18613a&view=pt&search=all&permthid=thread-a:r1495998040162054846&simpl=msg-a:r-566309110606927…3/4 Attached is the updated draft permit for your review. The changes are highlighted. I have removed Tank 530 and updated Tanks 510 and 520 to internal floating roof storage tanks. If you have any questions about the methodology used to determine the emissions decreases from these equipment changes please let me know and I can provide a more thorough explanation. Let me know if you have any questions. If everything looks good, please sign the cover page and return the document to me. Thanks, Dungan [Quoted text hidden] RN102130002.rtf 1474K Marshall, Gretsel <gretsel@chevron.com>Wed, Apr 2, 2025 at 6:42 AM To: Dungan Adams <dunganadams@utah.gov> Cc: "Johnson, Luke" <lmjo@chevron.com> Dungan, Thank you for your time and your review. The digitally signed copy is attached, please let me know if you will need a wet signed copy as well. Thanks, [Quoted text hidden] RN102130002.pdf 266K 4/2/25, 9:48 AM State of Utah Mail - Review of Chevron's Hanna Pumping Station DAQ Air Permit https://mail.google.com/mail/u/0/?ik=c52f18613a&view=pt&search=all&permthid=thread-a:r1495998040162054846&simpl=msg-a:r-566309110606927…4/4 Dungan Adams <dunganadams@utah.gov> 10-Year Reviews 1 message Alan Humpherys <ahumpherys@utah.gov>Fri, Oct 4, 2024 at 9:29 AM To: Dungan Adams <dunganadams@utah.gov> Dungan, Can you please process the following 10-year reviews? Site #1: 14346 Peer: EQ Old AO: DAQE-AN0143460001-11 dated 5/18/2011 Site #2: 10213 Peer: Tim Old AO: DAQE-AN0102130001-09 dated 4/9/2009 Site #3: 13071 Peer: Dylan Old AO: DAQE-AN0130710004-09 dated 9/9/2009 Site #4: 11640 Peer: Tim Old AO: DAQE-AN0116400002-09 dated 9/10/2009 Site #5: 14227 Peer: Christine Old AO: DAQE-AN0142270001-09 dated 9/17/2009 Site #6: 10645 Peer: Christine Old AOs: DAQE-278-94, DAQE-011-90, AO dated 2/20/86 Thanks, Alan -- Alan Humpherys Manager | Minor NSR Section P: (385) 306-6520 F: (801) 536-4099 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 1/23/25, 2:16 PM State of Utah Mail - 10-Year Reviews https://mail.google.com/mail/u/0/?ik=c52f18613a&view=pt&search=all&permthid=thread-f:1811997790959911347&simpl=msg-f:1811997790959911347 1/1 State of Utah JON M. HUNTSMAN, JR. Governor GARY HERBERT Lie11te11am Go,•emor April 9. 2009 Jim Robbins Department of Environmental Quality William J. Sinclair Acting Exl'rntive Director DIVISION OF AIR QUALITY Cheryl Heying Director Chevron USA Pipeline Company 2875 S Decker Lake Dr Ste 150 West Valley City, UT 84119 Dear Mr. Robbins: Re: Approval Order: Hanna Petroleum Pipeline Pumping Station Duchesne County; CDS B; Attainment Area, NSPS (Part 60) Project Number: N010213-0001 au ------ DAQE-AN0 102130001-09 The attached document is the Approval Order for the above-referenced project. Future correspondence on this Approval Order should include the engineer's name as well as the DAQE number as shown on the upper right-hand corner of this letter. The project engineer for this action is Tim DeJulis, who may be reached at (801) 536-4012. Sincerely, M!He~uti~ y Utah Air Quality Board ve tJtat MCH:TDJ:dn cc: TriCounty Health Department DAQ-2009-010253 150 North 1950 West • Salt Lake City. UT Mailing Address: P.O. Box 144820 • Salt Lake City. UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (80 1) 536-4414 www.deq.111nh. t:m' Primed un 100'~ recyckd paper STATE OF UTAH Department of Environmental Quality Division of Air Quality APPROVAL ORDER: Hanna Petroleum Pipeline Pumping Station Prepared By: Tim DeJulis, Engineer Phone: (801) 536-4012 Email: tdejulis@utah.gov APPROVAL ORDER NUMBER DAQE-AN0102130001-09 Date: April 9, 2009 Hanna Pumping Station Source Contact: Mr. Jim Robbins, Environmental Specialist Phone: (801) 975-2325 ~~ry;j}(J Executive Secretary Utah Air Quality Board Abstract Chevron USA Pipeline Company has requested permission to operate the Hanna petroleum pumping station as a stationary area source. The Hanna station receives crude oil, condensible hydrocarbons, and black wax throughput from the company owned pipeline on its way to Salt Lake City. The Hanna station serves as a buffer to pipeline operations allowing production to ebb and flow while at the same time maintaining a consistent throughput within the pipeline. Plant equipment includes four storage tanks (one with 1,680,000 gallon capacity and three with 2,520,000 gallon capacity), electric pump motors, and various comfort heating equipment items rated less than 5,000,000 Btu/hr each. The emissions, in tons per year, will be as follows: VOC = 12.27, HAPs = 0.33 This air quality AO authorizes the project with the following conditions and failure to comply with any of the conditions may constitute a violation of this order. This AO is issued to, and applies to the following: Name of Permittee: Permitted Location: Chevron USA Pipeline Company 2875 S Decker Lake Dr Ste 150 West Valley City, UT 84119 Chevron USA Pipeline Company: Hanna Pumping Station 40700 West 7000 North Hanna, UT 84031 UTM coordinates: 520,536 m Easting, 4,472,294 m Northing 4612 (Crude Petroleum Pipelines) I.l I.2 I.3 1.4 I.5 SIC code: Section I: GENERAL PROVISIONS All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-101] The limits set forth in this AO shall not be exceeded without prior approval. [R307-401] Modifications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401] All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, shall be made available to the Executive Secretary or Executive Secretary's representative upon request, and the records shall include the two-year period prior to the date of the request. Unless otherw ise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401]. [R307-150] At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this AO including associated air pollution control equipment in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable DAQE-AN0 l02l3000l-09 Page 3 1.6 1.7 II.A 11.A.l II.A.2 11.A.3 II.A.4 II.A.5 11.A.6 11.A.7 11.B II.B. l.a II.B.l.b operating and maintenance procedures are being used will be based on information available to the Executive Secretary which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R307-40 l l The owner/operator shall comply with R307-l50 Series. Inventories, Testing and Monitoring. [R307-150] The owner/operator shall comply with UAC R307-l07. General Requirements: Unavoidable Breakdowns. [R307-l 07] Section II: SPECIAL PROVISIONS The approved installations shall consist of the following equipment: Petroleum Pumping Station Hanna Petroleum Pipeline Pumping Station Equipment Leaks Various Process Connection/Process Control Device Equipment Leaks Comfort Heaters Various comfort heating devices rated less than 5,000,000 Btu/hr -each (listed for informational purposes only) Tank 510 2,520,000 gallon External Floating Roof Storage Tank (1973) Tank 520 2,520,000 gallon External Floating Roof Storage Tank (1972) Tank 111 1,680,000 gallon Internal Floating Roof Storage Tank (1949) Tank 530 2,520,000 gallon Internal Floating Roof Storage Tank (2009) Requirements and Limitations Visible emissions from any stationary point or fugitive emission source associated with the source or with the control facilities shall not exceed 20% opacity. Opacity observations of emissions from stationary sources shall be conducted in accordance with 40 CFR 60 . ' Appendix A, Method 9. [R307-401] The following limits shall not be exceeded: 9,166,610 barrels of crude oil throughput per rolling 12-month period 1,896,540 barrels of black wax condensate mix throughput per rolling 12-month period DAQE-AN0 l 02130001-09 Page 4 II.B.l.c II.B.1.d 4,741,350 barrels of condensate throughput per rolling 12-month period To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous l 2 months. Records of crude oil throughput shall be kept for all periods when the plant is in operation. Crude oil throughput shall be determined by examination of company and/or customer billing records. The records of crude oil throughput shall be kept on a monthly basis. [R307-401] Chevron USA Pipeline Company shall notify the Executive Secretary in writing when the installation of the items appearing in the equipment list is complete and is operational. To insure proper credit when notifying the Executive Secretary, send your correspondence to the Executive Secretary, attn: Compliance Section. If the construction and/or installation is not complete within 18 months from the date of this AO, the Executive Secretary shall be notified · in writing on the status of the construction and/or installation. At that time, the Executive Secretary shall require documentation of the continuous construction and/or installation of the operation and may revoke the AO. [R307-401-18] The owner/operator shall use propane or natural gas as fuel in the various comfort heating devices. [R307-401] Section III: APPLICABLE FEDERAL REQUIREMENTS In addition to the requirements of this AO, all applicable provisions of the following federal programs have been found to apply to this installation. This AO in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including UAC R307. NSPS (Part 60), Kb: VolatLiq/PetroStorageVessel 7/23/84 PERMIT HISTORY This AO is based on the following documents: Is Derived From Original NOi dated November 17, 2008 DAQE-AN0 I 02130001-09 Page 5 ACRONYMS The following lists commonly used acronyms and their associated translations as they apply to this document: 40CFR AO ATT BACT CAA CAAA CDS CEM CEMS CFR co COM DAQ DAQE EPA HAP or HAPs ITA MACT NAA NAAQS NESHAP NOI NO, NSPS NSR PM10 PM2.s PSD R307 R307-401 S02 Title IV Title V UAC UDAQ voe Title 40 of the Code of Federal Regulations Approval Order Attainment Area Best Available Control Technology Clean Air Act Clean Air Act Amendments Classification Data System (used by EPA to classify sources by size/type) Continuous emissions monitor Continuous emissions monitoring system Code of Federal Regulations Carbon monoxide Continuous opacity monitor Division of Air Quality (typically interchangeable with UDAQ) This is a document tracking code for internal UDAQ use Environmental Protection Agency Hazardous air pollutant(s) Intent to Approve Maximum Achievable Control Technology Nonattainment Area National Ambient Air Quality Standards National Emission Standards for Hazardous Air Pollutants Notice of Intent Oxides of nitrogen New Source Performance Standard New Source Review Particulate matter less than 10 microns in size Particulate matter less than 2.5 microns in size Prevention of Significant Deterioration Rules Series 307 Rules Series 307 -Section 401 Sulfur dioxide Title IV of the Clean Air Act Title V of the Clean Air Act Utah Administrative Code Utah Division of Air Quality (typicall y interchangeable with DAQ) Volatile organic compounds State of Utah JON M. HUNTSMAN, JR. Governor GARY HERBERT Lieutenam Governor February 23, 2009 Jim Robbins Department of Environmental Quality William J. Sinclair Acting Executive Director DIVISION OF AIR QUALITY Cheryl Heying Director Chevron USA Pipeline Company 2875 S Decker Lake Dr, Ste 150 West Valley City, UT 84119 Dear Mr. Robbins: f IL£ CO PY DAQE-IN0 102130001-09 Re: Intent to Approve: Hanna Petrolum Pipeline Pumping Station, Duchesne County; CDS B; Attainment Area, NSPS (Part 60) Project Number: N010213-0001 The attached document is the Intent to Approve for the above-referenced project. The Intent to Approve is subject to public review. Any comments received shall be considered before an Approval Order is issued. The Division of Air Quality is authorized to charge a fee for reimbursement of the actual costs incurred in the issuance of an Approval Order. An invoice will follow upon issuance of the final Approv'al Order. Future correspondence on this Intent to Approve should include the engineer's name as well as the DAQE number as shown on the upper right-hand comer of this letter. The project engineer for this action is Tim Dejulis, who may be reached at (801) 536-4012. Sincerely, "i . Ty L. Howard, Manager New Source Review Section TLH:TDJ:kw cc: TriCounty Health Department 150 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled paper STATE OF UTAH Department of Environmental Quality Division of Air Quality INTENT TO APPROVE: Hanna Petrolum Pipeline Pumping Station Prepared By: Tim Dejulis, Engineer Phone: (801) 536-4012 Email: tdejulis@utah.gov INTENT TO APPROVE NUMBER DA QE-IN0102130001-09 Date: February 23, 2009 Hanna Pumping Station Source Contact: Mr. Jim Robbins Environmental Specialist Phone: (801) 975-2325 Ty L. Howard, Manager New Source Review Section Utah Division of Air Quality 1.2 I.3 ABSTRACT Ch~vron USA ~ipeline Company has requested permission to operate the Hanna pe_troleum pumping stat10n as a stationary area source. The Hanna station receives crude oil, condensable hydrocarbons, and black wax throughput from the company owned pipeline on its way to Salt Lake City. The Hanna station serves as a buffer to pipeline operations allowing production to ebb and flow while at the same time maintaining a consistent throughput within the pipeline. Plant equipment includes four storage tanks ( one with 1,680,000 gallon capacity and three with 2,520,000 gallon capacity), electric pump motors, and various comfort heating equipment items rated less than 5,000,000 Btu/hr each. The emissions, in tons per year, will be as follows: VOC = 12.27, HAPs = 0.33 The NOI for the above-referenced project has been evaluated and has been found to be consistent with the requirements of UAC R307. Air pollution producing sources and/or their air control facilities may not be constructed, installed, established, or modified prior to the issuance of an AO by the Executive Secretary of the Utah Air Quality Board. A 30-day public comment period will be held in accordance with UAC R307-401-7. A notification of the intent to approve will be published in the Vernal Express on February 25, 2009. During the public comment period the proposal and the evaluation of its impact on air quality will be available for the public to review and provide comment. If anyone so requests a public hearing, it will be held in accordance with UAC R307-401-7. The hearing will be held as close as practicable to the location of the source. Any comments received during the public comment period and the hearing will be evaluated. The proposed conditions of the AO may be changed as a result of the comments received. Name of Permittee: Chevron USA Pipeline Company 2875 S Decker Lake Dr Ste 150 West Valley City, UT 84119 Permitted Location: Hanna Pumping Station 40700 West 7000 North Hanna, UT 84031 UTM coordinates:520,536 m Easting, 4,472,294 m Northing SIC code:4612 (Crude Petroleum Pipelines) Section I: GENERAL PROVISIONS All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-l O l] The limits set forth in this AO shall not be exceeded without prior: approval. [R307-401] Modifications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401] 1.4 1.5 1.6 1.7 DAQE-IN0 102130001-09 Page 3 II.A II.A. I 11.A.2 11.A.3 II.A.4 11.A.5 11.A.6 11.A.7 All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, s.hall be made available to the Executive Secretary or Executive Secretary's representative upon request, and the records shall include the two-year period prior to the date of the request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401]. [R307-150] At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this AO including associated air pollution control equipment in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Executive Secretary which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R307-401] The owner/operator shall comply with R307-150 Series. Inventories, Testing and Monitoring. [R307-150] The owner/operator shall comply with UAC R307-107. General Requirements: Unavoidable Breakdowns. [R307-107] Section II: SPECIAL PROVISIONS The approved installations shall consist of the following equipment: Petroleum Pumping Station Hanna Petroleum Pipeline Pumping Station Equipment Leaks Various Process Connection/Process Control Device Equipment Leaks Comfort Heaters Various c0mfort heating devices rated less than 5,000,000 Btu/hr -each (listed for informational purposes only) · Tank 510 2,520,000 gallon External Floating Roof Storage Tank (1973) Tank 520 2,520,000 gallon External Floating Roof Storage Tank (1972) Tank 111 1,680,000 gallon Internal Floating Roof Storage Tank (1949) Tank 530 2,520,000 gallon Internal Floating Roof Storage Tank (2009) DAQE-IN0102130001-09 Page4 11.B II.B .1.a II.B.1.b II.B.1.c II.B.1.d Requirements and Limitations Visible emissions from any stationary point or fugitive emission source associated with the source or with the control facilities shall not exceed 20% opacity. Opacity observations of emissions from stationary sources shall be conducted in accordance with 40 CFR 60, Appendix A, Method 9. [R307-40 l] The following limits shall not be exceeded: 9,166,610 barrels of crude oil throughput per rolling 12-month period 1,896,540 barrels of black wax condensate mix throughput per rolling 12-month period 4,741,350 barrels of condensate throughput per rolling 12-month period To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous 12 months. Records of crude oil throughput shall be kept for all periods when the plant is in operation. Crude oil throughput shall be determined by examination of company and/or customer billing records. The records of crude oil throughput shall be kept on a monthly basis. [R307-401] Chevron USA Pipeline Company shall notify the Executive Secretary in writing when the installation of the items appearing in the equipment list is complete and is operational. To insure proper credit when notifying the Executive Secretary, send your correspondence to the Executive Secretary, attn: Compliance Section. if the construction and/or installation is not complete within 18 months from the date of this AO, the Executive Secretary shall be notified in writing on the status of the construction and/or installation. At that time, the Executive Secretary shall require documentation of the continuous construction and/or installation of the operation and may revoke the AO. [R307-401-18] The owner/operator shall use propane or natural gas as fuel in the various comfort heating devices. [R307-401] Section III: APPLICABLE FEDERAL REQUIREMENTS In addition to the requirements of this AO, all applicable provisions of the following federal programs have been found to apply to this installation. This AO in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including UAC R307. NSPS (Part 60), Kb: VolatLiq/PetroStorage Vessel 7 /23/84 PERMIT HISTORY The final AO will be based on the following documents: Is Derived From Original NOI dated November 17, 2008 DAQE-IN0102130001-09 Page 5 ACRONYMS The following lists commonly used acronyms and their associated translations as they apply to this document: 40CFR AO ATT BACT CAA CAAA CDS CEM CEMS CFR co COM DAQ DAQE EPA HAPorHAPs ITA MACT NAA NAAQS NESHAP NOI NO~ NSPS NSR PM10 PM2.s PSD R307 R307-401 S02 Title IV Title V UAC UDAQ voe Title 40 of the Code of Federal Regulations Approval Order Attainment Area Best Available Control Technology Clean Air Act Clean Air Act Amendments Classification Data System (used by EPA to classify sources by size/type) Con_tinuous emissions monitor Continuous emissions monitoring system Code of Federal Regulations Carbon monoxide · Continuous opacity monitor Division of Air Quality (typically interchangeable with UDAQ) This is a document tracking code for internal UDAQ use Environmental Protection Agency Hazardous air pollutant(s) Intent to Approve Maximum Achievable Control Technology Nonattainment Area National Ambient Air Quality Standards National Emission Standards for Hazardous Air Pollutants Notice of Intent Oxides of nitrogen New Source Performance Standard New Source Review Particulate matter less than 10 microns in size Particulate matter less than 2.5 microns in size Prevention of Significant Deterioration Rules Series 307 Rules Series 307 -Section 401 Sulfur dioxide Title IV of the Clean Air Act Title V of the Clean Air Act Utah Administrative Code Utah Division of Air Quality (typically interchangeable with DAQ) Volatile organic compounds State of Utah JON M. HUNTSMAN, JR. Governor GARY HERBERT Lieutenant Governor Department of Environmental Quality William J. Sinclair Acting Executive Director DIVISION OF AIR QUALITY Cheryl Heying Director FILE COPY DAQE-NN0102130001-09 February 23, 2009 Vernal Express Legal Advertising Dept. 60 East 100 North Vernal, UT 84078-2122 RE: Legal Notice of Intent to Approve This letter will confirm the authorization to publish the attached NOTICE in the Vernal Express on February 25, 2009. Please mail the invoice and affidavit of publication to the Utah State Department of Environmental Quality, Division of Air Quality, P.O. Box 144820, Salt Lake City, Utah 84114-4820. Sincerely, ~ rfi¼,y._ Kimberly Wilcox Office Technician Utah Division of Air Quality Enclosure cc: Uintah Basin Association of Governments Duchesne County 150 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 . Telephone (801) 536-4000 • Fax (801 ) 536-4099 • T.D.D. (801 ) 536-4414 HllAllAI Aon 11tnh nf''I\J DAQE-NNO 102130001-09 Page 2 NOTICE A Notice oflntent for the following project submitted in accordance with §R307-401-1, Utah Administrative Code (UAC), has been received for consideration by the Executive Secretary, Utah Air Quality Board: Company Name: Location: Project Description: Chevron USA Pipeline Company Chevron USA Pipeline Company: Hanna Pumping Station -40700 West 7000 North, Hanna, UT, Duchesne County Chevron USA Pipeline Company has requested permission to operate the Hanna petroleum pumping station as a stationary area source. The Hanna station receives crude oil, condensable hydrocarbons, and black wax throughput from the company owned pipeline on its way to Salt Lake City. The Hanna station serves as a buffer to pipeline operations allowing production to ebb and flow while at the same time maintaining a consistent throughput within the pipeline. Plant equipment includes f~ur storage tanks (one with 1,680,000 gallon capacity and three with 2,520,000 gallon capacity), electric pump motors, and various comfort heating equipment items rated less than 5,000,000 Btu/hr each. The emissions, in tons per year, will be as follows : VOC = 12.27, HAPs = 0.33 The completed engineering evaluation and air quality impact analysis showed that the proposed project meets the requirements of federal air quality regulations and the State air quality rules. The Executive Secretary intends to issue an Approval Order pending a 30-day public comment period. The project proposal, estimate of the effect on local air quality and draft Approval Order are available for public inspection and comment at the Utah Division of Air Quality, 150 orth 1950 West, Salt Lake City, UT 84114-4820. Written comments received by the Division at this same address on or befor~ March 27, 2009 will be considered in making the final decision on the approval/disapproval of the proposed project. Email comments will also be accepted at tdejulis@utah.gov. If anyone so requests to the Executive Secretary at the Division in writing within 15 days of publication of this notice, a hearing will be held in accordance with R307-401-7, UAC. . Date of Notice: February 25, 2009 'f NOTICE A Notice of Intent for the following project • submitted in accordance with §R307-401-l, Utah Administrative Code • (UAC), has been received for consider- ation by the Executive Secretary, Utah · Air Quality Board: Company Name: Chevron USA Pipeline Ccimpany Location: Chevron USA Pipeline Company: Hanna Pumping Station -40700 West 7000 North, Hanna, UT, Duchesne County Project Description: Chevron USA Pipeline Company has requested permission to operate the Hanna petroleum pumping station ~ a station- ary area source. ·The Hanna station receives crude oil, condensable hydrocarbons, and black wax throughput from the company owned pipeline on it way to Salt Lake City. The Hanna sta- tion serves as a buffer to pipeline operations allowing produc- tion to ebb and flow while at the same time ·maintaining a consis- tent throughput within the pipeline. Plant equipment includes four storage tanks · (one with 1,680,000 gallon capacity and three with 2,520,000 gallon capacity), elec- tric pump motors, and various comfort heating equi{'ment items rated Jess than 5,000,000 Btu/hr each. The emissions, in tons per y~ar, will L;..... --.f:-11 ...... '";----· "1 70.{""" - PROOF OF PUBLICATION STATE OF UTAH, · County of Uintah }S.S. I, TONYA MUSE, being duly sworn, depose and say that I am the Legals Manager of The Vernal Express, a weekly newspaper of general circulation, published each week at Vernal, Utah, that the notice attached hereto was published in said newspaper for I publication(s), the first publication having been made on February 25, 2009 and the last on February 25 , 2009, that said notice was published in the regular and entire issue of every number of the paper during the period and times of publication, and the same was published in the newspaper proper and not in a supplement. 109 lines. Publication fee, $81.75. This page is not an billing statement or invoice, but a proof of publication. Please make payment from billing invoice. By-l--J-~~~M,~U(f-(~_ ~ LegalsManager Subscribed and sworn to before me February 25, 2009. UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY -·----.. 1 MAR -2 2009 f l ~--.. ----"' -..,.._ __ -.....f DIVISION OF ~IA QUALITY Ut= i:1.~ LUllUW:S. V VV - 12.27, HAPs = 0.33 The completed engineering evalu- ation an'd air qual- ity impact analysis showed that the pro- posed proj.ect meets the requirements of federal air quality reg- ulations and the State air quality rules. The Executive Secretary intends to issue an Approval Order pend- ing a 30-day public comment period. The project proposal, estimate of the effect on local •air qual- ity and draft Approval .Order are available for public inspec- tion and comment at the Utah Division of Air Quality, 150 North 1950 West, Salt Lake City, UT 84114- 4820. Wr-itten com- ments received by the Division at this same address on or before March 27, 2009 will be considered in mak- ing the final decision on the approval/dis- approval of the pro- posed project. Email comments will also be accepted at tdeju- lis@utah.gov. If any- one so requests to the Executive Secretary at the Division in writ- ing within 15 days of publication of this notice, a hearing will be held in accordance 'Yith R307-401-7, UAC. Date of Notice: February 25, 2009. Published in the Vernal Express February 25, 2009. PROOF OF PUBLICATION STATE OF UTAH, County of Uintah I, TONYA MUSE, being duly sworn, dep Legals Manager of The Vernal Express, a general circulation, published each week notice attached hereto was published in si publication(s), the first publication havin~ 25, 2009 and the last on February 25, 200 published in the regular and entire issue o paper during the period and times of publi published in the newspaper proper and no 1 nn. 1• Chevron NOTICE OF INTENT HANNA STATION RECEIVED OCT 2 7 2008 Division of Air Quality CHEVRON PIPE LINE COMPANY October 20, 2008 Prepared by: URS 756 East Winchester Street, Suite 400 Salt Lake City, UT 84107 URS Project: 24584986 Chevron Pipe Line Company Hanna Station The Hanna Station is a pipeline pump station along the pipeline that transports crude oil from the Rangely Oil Field to Salt Lake City for refining. The station is owned and operated by Chevron Pipe Line Company. It is located in Duchesne County at 40700 West 7000 North, Hanna, Utah 84031 (4,472,294 N, 520,536 E, UTM, NAD 83, Zone 12). The facility operates continuously, 24 hours per day, 365 days per year. The facility is not manned; but employees make daily visits to operate and maintain the station. The pipeline transports crude, condensate, and black wax. The Hanna Station consists of four · breakout tanks used to relieve surges or temporarily store crude from the pipeline for reinjection and continued transportation by pipeline to Salt Lake City. In addition, there are two electric pumps used to boost the pressure in the pipeline. The on-site evaporation pond is lined and is used as a retention pond for stormwater runoffs; the drains for the pond are plugged. Stormwater in the retention pond is not contaminated. Sources of emission at the Hanna Station include the breakout tanks and piping components. The anticipated throughput to the breakout tanks is 43 ,300 barrels per day (15,804,500 barrels per year), consisting of 58% crude, 30% condensate, and 12% black wax condensate mixture. Attached are the descriptions of the breakout tanks, report on Form 20. Tank 111 -Internal floating roof tank, 40,000 barrels, installed 1949 Tank 510 -External floating roof tank, 60,000 barrels, installed 1973 Tank 520 -External floating roof tank, 60,000 barrels, installed 1972 Tank #TBD -Internal floating roof tank, 60,000 barrels, proposed installation in 2009. Other equipment on site includes: • Two 30,000 BTU propane space heaters • Two 500-gallon pressurized propane tanks used to run the space heaters. • One 300-gallon solvent tank for parts cleaning. Stoddard solvent does not include HAPs. VOC emissions are approximately 3 pounds. CHEVRON PIPE _NE CO. HANNA STATION 1.0 BACKGROUND BACT Analvsis The Utah Division of Air Quality (DAQ) air permit regulations [UAC R307-401-5(2)(d) and R307-401-8(1)(a)] require any new or modified source seeking an approval order must consider the Best Available Control Technology (BACT). BACT is to be applied to new and modified emission units and is to be .determined on a case-by-case basis, with consideration given to energy impacts, technical feasibility, environmental impacts, and economic impacts. This section presents a BACT analysis for the new and existing emission units that are part of the Chevron Pipe Line Company Hanna Station. For the Hanna Station, volatile organic compounds (VOCs) are the only pollutants emitted into the atmosphere. For purposes of prevention of significant deterioration (PSD) analysis, each project-affected source that emits VOCs must be evaluated to determine BACT. A BACT analysis is being performed for each BACT emission applicable unit that is either existing or will be installed at the facility and will have an increase of VOC emissions. To complete a detailed BACT analysis, the United States Environmental Protection Agency (U.S. EPA) top-down BACT methodology is used to analyze available options and then select an appropriate control technology. To utilize the top-down approach, commercially available control options for each applicable pollutant are identified. Technically infeasible alternatives are then dismissed, and the remaining control options are analyzed and ranked according to control effectiveness. To select a BACT option, the following items are evaluated: energy impacts, environmental impacts, economic impacts, cost effectiveness, and site-specific factors. The control technology selected provides the most stringent level of control without causing adverse economic, energy, or environmental impacts. Generall y, the cost effectiveness parameter is stated as either total or incremental annualized dollar cost per ton of pollutant abated. An extensive review of the U.S. EPA RACT/BACT/LAER Clearinghouse (RBLC) database has been performed for similar sources to identify emission control strategies relevant to the proposed project. An extensive review of the RBLC defined · the range of potentially . applicable emission control applications. For some Hanna Station sources, a strict top-down analysis is not necessary to identify appropriate BACT. In these instances, accepted emission control technology alternatives are identified. Of these, feasible alternatives may then be evaluated in comparison with accepted BACT practices as described in the RBLC or in published BACT guidelines. In no case is the recommended BACT less stringent than the controls required under New Source Performance Standards (NSPS) and National Emission Standards for Hazardous Air 1 CHEVRON PIPE LINE ). HANNA STATION BACT Analysis Pollutants (NESHAP) regulations. The federal requirements are considered a "floor" for BACT considerations. For the Hanna Station, the BACT-applicable sources are listed below in Table 1. Table 1 Hanna Station BACT-Applicable Sources Source ID Source Description Estimated Increase (tpy) PSD Pollutant -VOC T-111 IFR Tank 0.94 T-510 EFR Tank 2.27 T-520 EFR Tank 1.81 T-TBD IFR Tank 1.38 Equipment Fugitives 5.62 Table 2 presents a summary of proposed BACT for the emission sources proposed to be installed as part of the Hanna Station. Details of the BACT analysis are presented in the remainder of this section. Table 2 Summary of Proposed BACT Source Description Pollutant Internal Floating Roof voe Tanks External Floating Roof voe Tanks Process Fugitive voe BACT = Best Available Control Technology LDAR = Leak Detection and Repair VOC = Volatile Organic Compound 2.0 TOP-DOWN BACT APPROACH Most Feasible BACT Selected • Internal Floating Roof • Compliance with regulatory programs • External Floating Roof • Compliance with regulatory programs . • Compliance with LDAR program . • Leak definition more stringent than regulation . BACT is defined in the Clean Air Act as "an emissions limit based on the maximum degree of emissions reduction for each pollutant ... which the permitting authority determines, on a case by case basis, taking in.to account energy, environmental, and economic impacts and 2 CHEVRON PIPE .NE CO. HANNA STATION BACT Analvsis other costs, is achievable for such facility through the application of production processes and available methods, systems, and techniques ... ". Two key aspects of the definition are worthy of notice: • BAeT includes and, in fact, focuses on "production processes" along with add-on controls. • BAeT was intended to be a case-by-case evaluation, implying individual case evaluations and deci sions, not rigid, pre-set guidelines. The top-down BAeT approach starts with the most stringent (or top) technology that has been applied to similar emissions units. A source of control technology information is the RBLe database. The RBLe is an EPA-sponsored database that lists previously EPA- approved BAeT determinations. The top control technology is either accepted as BAeT or rejected based on technical or economic infeasibility. If the top control technology is rejected as BAeT, the next most stringent control technology is either accepted as BAeT or rejected. The top-down approach is continued until a control technology, which is found to be both technically and economically feasible, is accepted as BAeT. 3.0 BACT APPLICABILITY Each of the proposed units to be in stalled as part of the Hanna Station that generate any voe emissions will require BAeT review. Existing emission units require a BAeT analysis as well. 4.0 STORAGE TANKS Four storage tanks (T-111, T-510, T-520 and T-TBD) produce voe emissions; therefore, an analysis will be conducted to establish what constitutes BAeT. Resultant voe emissions from storage tanks occur through two processes defined as working and breathing losses. The existing storage tanks T-111, T-510, and T-520; and the proposed tank T-TBD are/will be equipped with floating roofs as required by 40 eFR 60.112b(a), NSPS Subpart Kb. Working loss emissions are mostly attributed to the loading and unloading of a tank, at which time the hydrocarbon vapor located in the tank headspace is displaced. Working loss emissions generally account for the large majority of emissions from storage tanks. Breathing loss emissions occur from the cyclic diurnal temperature changes. Because the equilibrium pressure of the vapor and liquid phases (vapor pressure) is a function of 3 CHEVRON PIPE LIN HANNA STATION J. ,r BACT AnalVsis temperature, this heating and cooling cycle allows for VOC displacement through the expansion and contraction of the headspace. 4.1 Storage Tank voe BACT Anal ysis The histori cal accepted VOC control practice for storage tanks consists of design meas ures to minimize the hydrocarbon vapor space displacement. 4.1.1 Step 1 -Identify Potenti al Control Technologies The first step in a BACT analysis is to identify all available control tec hnologies. Review of Historical BA CT Determinations The RBLC BACT databases contain numerous BACT determinations for the control of VOC emission s from storage tanks. Review of the RBLC provides an indication of prior BACT determin ation s for storage tanks. A summary of this review appears in Table A-1. Ch evron Pipe Line also reviewed the BACT determinations for storage tanks at the proposed Arizona Clean Fuels, LLC Greenfield refinery and the proposed Hyperion Greenfield refinery in South Dakota as a means to supplement the RBLC search results. Some of these determinations include: • Fixed roof with a closed vent system and vapor capture system • Internal floatin g roof wi th dual seals and inert gas blanketing • External floating roof with dual rim seals • Thermal oxidation Option 1 -Internal fl oating roof tank with appropriate seal design An internal floating roof tank incorporates a roof structure that floats on the liquid surface exerting pressure on the vapor ph ase, thus decreasing the volume of vapor available to emit. The floatin g roof would also uses an appropriate seal design to allow a minimal amount of vapor from exiting as rim losses . In addition to a roof floating on the liquid surface an additional fixed roof is al so constructed atop the storage tank fu rth er limiting the vapor displacement to the atmosphere. 4 CHEVRON PIPE .NE CO. HANNA STATION Option 2 -External floating roof with appropriate seal design BACT Analysis This technology is similar to that listed in Option 1; however, there is no fixed roof atop the floating roof to further minimize vapor displacement to the atmosphere. Option 3 -Work Practices required by regulatory programs Storage tanks are regulated under 40 eFR 60 (NSPS). These regulations require that the facility comply with both vapor pressure and design requirements listed for storage tanks. The requirements are specified in various ranges of vapor pressure and capacities. Option 4 -Thermal Oxidation Thermal oxidation combusts voe streams with a control efficiency of greater than 95%, and can be used for control of any voe-containing stream, including storage tanks. Thermal oxidation is used to process vented voe streams by using an incineration unit or flaring device. While voes are destroyed in this process, other combustion emissions are created and must be accounted for in the emission inventory for the refinery. 4.1.2 Step 2 -Eliminate Technically Infeasible Options The second step in the BAeT analysis is to eliminate any technically infeasi ble control technologies. Each control technology identified in Step 1 is technically feasible. 4.1.3 Step 3-Ranking of Remaining Control Technologies by Control Effectiveness The third step in the BAeT analysis is to rank the remaining technically feasible control technologies in order of control effectiveness. Table 3 shows that ranking. 5 CHEVRON PIPE LINE ). HANNA STATION BACT Analvsis Table 3 Ranking of Remaining Control Options for VOCs from Storage Tanks Rank Control Type Control Efficiency l Thermal Oxidation >95% 2a Internal floating roof Baseline 2b External floating roof Baseline Uncontrolled emissions are not listed because industry standards prevent storing volatile organic liquids in tanks without a roof. 4.1.4 Step 4-Evaluation of the Most Effective Controls The fourth step in the BACT analysis is to evaluate the most effective control technologies not eliminated due to technical infeasibility. Thermal Oxidation The feasibility of adding a thermal oxidation to the storage tanks was considered. Based on standard cost estimation techniques and uncontrolled emissions, the cost of installing and operating thermal oxidation would be approximately $106,000 -$256,000 per ton of VOC to be removed per tank, which exceeds the typi cal cost thresholds used to verify the cost- effectiveness of a control option ($5,000). The cost information and data used to support the cost effectiveness determination is included in Table 4. This high cost is mostly attributed to the low VOC emissions from each tank and the operational cost associated with the thermal oxidizer. In addition to the high cost, thermal oxidizers do emit other criteria pollutants resulting from combustion such as Ox, CO, PM10, etc. Due to the economic, energy, and environmental impacts, the thermal oxidizer is being rejected as BACT. 6 CHEVRON PIPE _NE CO. HANNA STATION BACT Analvsis Table 4 Cost Estimate for Thermal Oxidizer Service T-111 T-510 T-520 T-TBD CAPITAL COSTS: Purchased Equipment (PE) 1 $ 400,000 s 400.000 s 400,000 s 400,000 Aux. Equipment 10% 0,:, of PC : $ .:io,ooo $ 40,000 $ 40.000 s 40,000 lnstrurncntntion 5'1/u 0i, nf PE l $ 20.000 $ 20,000 $ 20,000 $ 20,000 Freight 5'-ro .io of PE ! $ 20,000 $ 20.000 20,000 20,000 Sales Tax 6%, 0o of PE : s 2-l,000 $ 24,000 $ 24.000 $ 24,000 Purclrnsed Eauioment Cost (PEC) $ 504,000 $ 504,000 $ 504,000 $ 504,000 Direct Installation Costs Foundations and support go, ' 0 0o (•f PE : s 40.320 s 40,320 $ 40,320 $ 40,320 Handling and erection 14'½, 0o ('f PE 1 $ 70,560 s 70.560 s 70.560 s 70,560 Electrical 4% 0o of PE : s 20,160 $ 20,160 s 20.160 $ 20,160 Piping 60% 00 t'f PE 1 s 302.400 $ 302,400 $ 302,400 $ 302.400 Ins ulation for ductwork 0.5~1u 011 of PE 1 s 2,520 $ 2.520 $ 2,520 s 2,520 Painting 0.111/;, 0·,, of P[; $ 504 s 504 s 504 s 504 Direct Installation Costs $ 436,464 $ 436.464 $ 436,464 $ 436,464 Direct Costs s 940,-164 $ 9-10.464 s 940,464 s 940,-16-l Indirect Costs (Installation) Engineering 6o'o 00 of PE: s 24.000 $ 24,000 s 24.000 s 24.000 Construction and field expenses IU°lc, 6o l'f P[l s 40.000 $ 40.000 s 40,000 s 40.000 Con tractor fees 2% %of PE: s 8.000 $ 8,000 s 8.000 $ 8,000 Start-up 1° 0 011 f•f PE~ $ 8.000 $ 8,000 s 8,000 $ 8,000 Contimicncics I01>1u "o of PE 1 s 40,000 s 40.000 s 40,000 $ 40,000 Indirect Costs $ 120,000 $ 120.000 s 120,000 $ 120,000 Total Capital Investment (TCI) s 1,060.464 s 1.060,464 s 1,060.464 $ I 060 464 OPERA TING COSTS 3: Operating labor (0.5 hr / 8 hr shift), OP $ 25.00 per h0ur $ 13.688 $ 13,688 $ 13,688 $ 13.688 Supervisory labor. SL I 5°~ %ofOP s 2,053 $ 2.053 $ 2,053 $ 2,053 Maintcnru1ce labor (0.5 hr i 8 hr shift). ML $ 25.00 per hour s 13.688 $ 13,688 $ 13.688 $ 13 ,688 Maintenance Materials, i\,11\1 IOO"o 0oofM s 13,688 s 13,688 s 13,688 $ 13.688 Owrhead 60~. OO (If $ 25.869 s 25,869 $ 25.869 $ 25,869 UP-SL-ML-MM Taxes, Jnsurnnec. and Admin. 411~ 0oofTCJ s 42,419 s -l~,419 s 42,419 s 42.4 19 Annual Onerating Costs $ 111,404 $ 111,404 s 111,404 $ ll I 404 U1pital Recover)' Factor (9.1 %, 20 yr life) Annualized Total Capit al Investment' 0.1103 xTCI s 116.999 $ 116,999 $ 116,999 $ 116,999 Total Annual Costs s 228.403 $ 228,403 $ 228,403 $ 228,4!)3 Uncontrolled :VOC, tpy 0.9-10 2.270 1.810 1.380 95% VOC controlled, tons/yr 0.893 2.157 1.720 1.311 VOC Cost Effecth·cuess, S/1011 reduced s 255,770 $ 105,914 s 132,831 $ 174,220 Notes: I) As obtained from discussions with in-house engineers. 2) Tvpical industry allowances as a pcrcent.1ge of purchased equipment (PE) costs: based on experience. engineering practices, discussions with potential wndors, and as compared to the EPA-approved permit applications. 3) Costs based on experience. engineering practices. and the design for this pro_jcct. 4) Annual ized Total Capital Investment is estimated using the capital recovery factor for 20-yr life and 9.1 percent average interest: i.e., CRF = (i( l+i)An)/((( l +i)An)-1 ). 7 CHEVRON PIPE LINE .J. HANNA STATION Floating Roof BACT Analvsis Installing a floating roof design is within the economic budget for the facility. It is more cost effective to initially construct a floating roof tank than to convert a fixed roof tank to a floating roof tank. The tanks at the Hanna Station tanks will have floating roofs as required by 40 CFR 60.112b(a). 4.1.5 Step 5 -Selection of voe BACT for Storage Tanks Because Chevron Pipe Line is interested in controlling emissions m a manner that is environmentally effective, cost effective and in compliance with 40 CFR 60.112b(a), Chevron proposes that the installation and operation of floating roof tanks subject to NSPS requirements be considered BACT for VOC for the Storage Tanks. Tanks T-520 and T-510 are equipped with external floating roof tanks, and Tanks T-111 and T-TBD is/will be equipped with internal floating roof tanks. 4.1.6 Practically Enforceable BACT for Storage Tanks Development of emission limit to reflect selected control technology VOC emissions from the Storage Tanks were calculated using the EPA TANKS 4.09d software. The estimated VOC emissions associated with storage tanks T-111, T-520, T-510, and T-TBD are 0.41, 1.39, 1.53, and 0.58 tons VOC per year respectively. This emissions estimate is based upon the current/expected design and emissions calculations from EPA TANKS 4.09d. The facility will ensure th at the selected BACT is properly installed, operated, and the selected work practice standards are properly implemented. Compliance Monitoring The facility will comply with applicable NSPS Subpart Kb requirements for the storage tanks. All monitoring, recordkeeping, and reporting will be done in compliance with NSPS requirements. 5.0 PROCESS FUGITIVES The Hanna Station uses man y piping components to distribute the liquid materials (mostly crude oil). between tanks and pipeline. These piping components are potential sources of 8 CHEVRON PIPE _NE CO. HANNA STATION BACT Analvsis VOC effi1ss10ns due to leaking equipment. VOC emissions from those components are mostly related to potential leakage from valves, flanges, and pump seals. It is important to Chevron that these piping components are effectively monitored to decrease emissions as much as possible. The piping components carry products which contain VOCs that will increase emissions if the component leaks. Therefore, a Chevron has employed a Leak Detection and Repair (LDAR) Program to minimize leaks. 5.1 Fugitive VOC BACT Analysis Common strategies for controlling VOC em1ss10ns from equipment leaks are based on LDAR work practices rather than by the traditional emission limits and control devices. The LDAR program currently implemented at the Hanna Station incorporates a vigorous monitoring schedule involving visual inspection (via olfactory inspections) to . monitor and control emissions from piping components. Chevron Pipe Line proposes to comply with the most stringent requirements for LDAR. 5.1.1 Step 1 -Identify Potential Control Technologies The first step in a BACT analysis is to identify all available control technologies. Review of Historical BACT Determinations The RBLC database review provides an indication of historical BACT determinations for fugitive emissions. The RBLC database contains numerous BACT determinations for the control of VOC fugitive emissions. A summary of this review can be found in Table B-1. As demonstrated in a review of the RBLC, the primary control strategy across the board for fugitive VOC emissions is an effective LDAR program. This is true for a facility with fugitive emission limits both on the high and low ends. The requirements for such programs are defined in the Federal regulations. Chevron Pipe Line also reviewed the BACT determinations for equipment leaks at the proposed Arizona Clean Fuels, LLC Greenfield Refinery and the proposed Hyperion . Greenfield Refinery in South Dakota as a means to supplement the RBLC search results. Some of these determinations include: 9 CHEVRON PIPE LINE J. HANNA sTATioN BACTAnalVsis · • Adopt more-stringent leak detection definitions consistent with TRNCC 28 MID emission reduction option. • Limited implementation of seal-less magnetic drive pumps and bellows-seal valves. • Implement a LDAR program consistent with 40 CFR 63 -Subparts II and CC. Option 1 -Implementation of applicable regulatory programs The RBLC analysis demonstrates that the p1imary control strategy for control of fugitive VOC emissions is an effective LDAR program. An effective LDAR program includes a suitable definition of a "leaky" component threshold concentration and a detailed strategy for repairing leaks once they have been identified. For the Hanna Station, NESHAP -Subpart R is applicable. NESHAP -Subpart R does not specify a leak definition since the only monitoring that is required is that performed by visual inspections. The Hanna Station proposes to comply with NESHAP -Subpart R. A summary of applicable regulatory _requirements and proposed BACT can be found in Table 5. 10 CHEVRON PIPE _NE CO. HANNA sTATioN BACT Analvsis Table 5 Summary of Proposed BACT and Applicable Equipment Leak Requirements Component Proposed NESHAP BACT Subpart R Valves-Light Liquid No visual No visual leaks leaks Valves-Heavy Liquid No visual No visual leaks leaks Valves-Gas No visual No visual leaks leaks Pumps-Light Liquid No visual No visual leaks leaks Pumps-Heavy Liq uid No visual No visual leaks leaks Pressure Relief Valve-No visual No visual Gas leaks leaks Pressure Relief Valve-No visual No visual Liquid leaks leaks Light L iquid No visual No visual Connectors leaks leaks VOC Compressors No visual No visual leaks leaks Closed Vent Systems No visual No visual leaks leaks Option 2 -Implementation of enhanced regulatory program As di scussed in Option 1, Hanna Station will comply with the applicable requirements of NESHAP -Subpart R. The enh ancement of applicable regulatory programs will not be necessary since there are no other applicable equipment leak provisions applicable to the Hanna Station. Furthermore, the facility transpo1ts/stores crude oil and petroleum refinery standards to not apply to the facility. 5.1.2 Step 2 -Eliminate Technically Infeasible Options The second step in the BACT analysis is to eliminate any technically infeasible. control technologies. The implementation of applicable regulatory programs as described in Step l is technically feasible. 11 CHEVRON PIPE LINE J. HANNA STATION BACT Analysis 5.1.3 Step 3 -Ranking of Remain ing Control Technologies by Control Effectiveness The third step in the BACT analysis is to rank the remaining technically infeasible control tec hnologies in order of control effectiveness. The most effective of the identified control tec hnologies is a combination of the identified options. Specifically, thi s includes an LDAR program with work practices relative to NESHAP -Subpart R. 5.1.4 Step 4 -Evaluation of the Most Effective Controls The fourth step in the BACT analysis is to evaluate the most effective control technologies not eliminated due to technical infeas ibility. The most effective identified control strategy for fugitive VOC emissions is proposed as BACT. This system will not result in any adverse energy or environmental impacts . Accordingly, no evaluation of alternative control options is warranted. 5.1.5 Step 5 -Selection of voe BACT fo r Fugitive Emissions Chevron proposes that the implementation of an LDAR program m compliance with NESHAP -Subpart R be considered BACT for fugitive emissions of VOC. The LDAR program, as identified in the five step process, will reduce emissions through determination of leaks identified by visual inspections. Compliance with NESHAP -Subpart R will reduce emissions of any regulated pollutant within the transport streams. Practically Enforceable BACT for Fugitive Emissions Development of Emission Limit to Reflect Selected Control Technology VOC emissions from the fu gitive emission sources were calculated using emission factors taken from the Protocol for Equipment Leak Emission Estimates, EPA-453/R-95-017, Table 2-2 and Refinery Average Emission Factors and the Equipment Leaks Fugitives guidance document from the TCEQ (dated November 1995). The following regulations from 40 CFR 60 (NSPS), and 40 CFR 63 (NESHAP) were reviewed in relation to fugiti ve emissions: . • NESHAP Subpart R -ational Emission Standards for Gasoline Distribution Facilities (Bulk Gasoline Terminals & Pipeline Breakout Stations) 12 CHEVRON PIPE _NE CO. HANNA sTATioN BACTAnalvsis • NESHAP Subpart CC (not applicable) -National Emission Standards for Hazardous Air Pollutants from Petroleum Refineries • NSPS Subpart GGG (not applicable) -Standards of Performance for Equipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After January 4, 1983, and on or Before November 7, 2006 • NSPS Subpart GGGa (not applicable) -Standards of Performance for Equipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006 • NSPS Subpart VV (not applicable) -Standards of Performance for Equipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After January 5, 1981 , and on or Before November 7, 2006 • NSPS Subpart VVa (not applicable) -Standards of Performance for Equipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006 . Of the regulations reviewed, it was determined that the Hanna Station is only subject to NESHAP -Subpart R. Therefore, the Hanna Station must comply with the requirements of an LDAl} program structured according to the requirements of NESHAP -Subpart R. LDAR program compliance is enforceable through evaluation of LDAR monitoring and repair documentation. Visual inspections will be used to effectively identify leaks, and LDAR documentation will be maintained through LEAKDAS. LDAR program compliance will be continuous. Compliance Monitoring The Chevron Pipe Line Hanna Station is proposing compliance with the enhanced LDAR program as specified in Table 5 of this permit application. The facility has implemented an LDAR Program to assure compliance with NESHAP requirements for the facility. All monitoring, recordkeeping, and reporting will be done in compliance with the applicable equipment leak requirements. 13 CHEVRON PIPE LINE CO. HANNA STATION Table A-1 Summary of VOC BACT Determinations (per EPA's RBLC) for Storage Tanks FACILITY PERMIT THRU THRU EMIS EMIS FACILITY NAME PROCESS NAME PUT CONTROL DESCRIPTION LIMIT LIMITl STATE DATE PUT UNIT 1 UNIT FUEL OIL KENAI REFINERY AK 3/2 1/2000 NONE INDICATED STORAGE TANKS FUEL OIL KENAI REFINERY AK 3/2 1/2000 NONE INDICATED STORAGE TANKS THE EMISSIONS FROM GROUP A STORAGE TANKS MUST BE COLLECTED BY A VAPOR COMPRESSION SYSTEM AND ARIZONA CLEAN AZ 4/14/2005 GROUP A ROUTED TO THE REFINERY FUELS YUMA STORAGE TANKS FUEL GAS SYSTEM. NO EMISSIONS ARE PERMITTED TO BE RELEASED INTO THE AIR EXCEPT FOR EQUIPMENT LEAKS. THE EMISSIONS FROM GROUP A STORAGE TANKS MUST BE COLLECTED BY A VAPOR COMPRESSION SYSTEM AND ARIZONA CLEAN AZ 4/14/2005 GROUP A ROUTED TO THE REFINERY FUELS YUMA STORAGE TANKS FUEL GAS SYSTEM . NO EMISSIONS ARE PERMITTED TO BE RELEASED INTO THE AIR EXCEPT FOR EQU IPMENT LEAKS. THE TANKS ARE REQUIRED TO ARIZONA CLEAN AZ 4/14/2005 GROUPD BE UNDER PRESSURE SO THAT FUELS YUMA STORAGE TANKS NO EM ISSIONS ARE EM ITTED TO THE ATMOSPHERE. FIXED ROOF TANK WITH ARIZONA CLEAN AZ 4/14/2005 SOUR WATER INTERNAL FLOATING ROOF. FUELS YUMA TANK HEAD SPACE ROUTED TO A CARBON ADSORPTION SYSTEM. BACT Analvsis POLLUTANT COMPLIANCE NOTES KEEP RECORDS READILY AVAILABLE SHOWING THE DlMENSIONS AND CAPACITIES OF THE STORAGE VESSELS. KEEP RECORDS READILY AVAILABLE' '- SHOWING THE DIMENSIONS AND CAPACITIES OF THE STORAGE VESSELl'o' ~ THERE IS NO NUMERICAL EMISSIONS LIMIT FOR GROUP A TANKS SINCE THE EM ISSIONS MUST BE COLLECTED AND NOT EMITTED INTO THE ATMOSPHERE. THERE IS NO NUMERICAL EMISSIONS LIMIT FOR GROUP A TANKS SINCE THE EMISSIONS MUST BE COLLECTED AND NOT EM ITTED INTO THE ATMOSPHERE. I -THE TANKS ARE REQUIRED TO BE UNDER PRESSURE SO THAT NO EMISSIONS ARE EMITTED TO THE ATMOSPHERE. FIXED ROOF TANK WITH INTERNAL FLOATING ROOF. HEAD SPACE ROUTED TO A CARBON ADSORPTION SYSTEM . ~ 14 Utah DivL Jn of Air Quality New Source Review Section Form 1 General Information Application for: 0 Initial Approval Order Date 10/20/2008 □ Approval Order Modification AN APPROVAL ORDER MUST BE ISSUED BEFORE ANY CONSTRUCTION OR INSTALLATION CAN BEGIN. This is not a stand alone document. Please refer to the Permit Application Instructions for specific details required to complete the application. Please print or type all information requested. All information requested must be completed and submitted before an engineering review can be initiated. If you have any questions, contact the Division of Air Quality at (801) 536-4000 and ask to speak with a New Source Review Engineer. Written inquiries may be addressed to: Division of Air Quality, New Source Review Section, P.O. Box 144820, Salt Lake City, Utah 84114-4820. Applicable base fee for engineering review and filing fee must be submitted with the application. General Owner and Facility Information 1. Company name and address: 2. Company contact for environmental matters: Chevron Pipe Line Company Jim Robbins 2875 South Decker Lake Drive, Suite 150 Environmental Specialist West Valley City, UT 84119 Phone No.: (801) 975-2325 Phone No.: (801) 975-2300 Fax No.: (801) 975-2323 Fax No.: (801) 975-2323 3. Facility name and address (if different from above): 4. Owners name and address: Hanna Station N/A 40700 West 7000 North Hanna, UT 84031 Phone no .: None Phone no.: ( ) Fax no.: None Fax no.: ( ) 5. County where the facility is located in: 6. Latitude & longitude, and/or UTM coordinates of plant: ·Duchesne 4,472,294 N, 520,536 E UTM, NAD 83, Zone 12 (meters) 7. Directions to plant or Installation (street address and/or directions to site) (include U.S. Coast and Geodetic Survey map if necessary): 40700 West 7000 North Hanna, UT 84031 8. Identify any current Approval Order(s): N/A AO# Date AO# Date AO# Date AO# Date AO# Date AO# Date 9. If request for modification, permit# to be modified: DAQE# N/A DATED: I I 10. Type of business at this facility: Crude pipeline pump station 11 . Total company employees greater than 100? 12. Standard Industrial Classification Code 4612 Crude petroleum pipelines □ Yes 0 No Page 1 of 4 Approval Order Application Form 1 (Continued) 13. Application for: D New construction 0 Modification 0 Existing equipment operating without permit □ Permanent site for Portable Approval Order □ Change of permit condition □ Change of location 14. For new construction or modification, enter estimated start date: Jan 2008 Estimated completion date: Sep 2009 15. For change of permittee, location or condition, enter 16. For existing equipment in operation without prior permit, date of occurrence: N/A enter initial operation date: 1949 17. Has facility been modified or the capacity increased since November 29, 1969: □ Yes 0 No Process Information 18. Site plan of facility (Attach as Appendix A): See Appendix A. 19. Flow diagram of entire process to include flow rates and other applicable information (Attach as Appendix B): See Appendix B. 20. Detailed writt_en process and equipment description. (Attach as Appendix C): Description must include: Process/Equip specific form(s) identified in the instructions Fuels and their use Equipment used in process Description of product(s) Raw materials used Operation schedules Description of changes to process (if applicable) Production rates (including daily/seasonal variances) See Appendix C. Includes Form 20 -Organic Liquid Storage Tank 21. Does this application contain justifiable confidential data? o Yes 0No Emissions Information 22. Complete and attach Form 1 d, Emissions Information See Appendix D. Include Material Safety Data Sheets for all chemicals or compounds that may be emitted to the atmosphere. 23. Identify on the site plan (see #18 above) all emissions points, building dimensions, stack parameters, etc. See Appendix A. Air Pollution Control Equipment Information 24. List all air pollution control equipment and include equipment specific forms identified in the instructions. J\.U,--L ,....., /\..-.. n No air pollution control equipment. -~ _,, -· 25. List and describe all compliance monitoring devices and/or activities (such as CEM, pressure gages). Attach as /\----rl,~ C No compliance monitoring de.vices. -· 26. Submit modelinq for the project if required. See attached instructions. Modeling not required. 27. Attach as Appendix f: your proposal of what air pollution control devices, if any, or operating practices represents Best Available Control Technology. Discuss and evaluate all air pollution control tech nologies relevant to your situation or process. See Appendix E. 28. I hereby certify that the information and data submitted in and with this application is completely true, accurate and complete, based on reasonable inquiry made by me and to the best of my knowledge and belief. Siqnature: Title: Midcontinent Operational Manager, Northwest 29. Brad Rosewood 30. Telephone Number: 30. Date: October 27, 2008 Name (Type or print) (801) 975-2339 Page 2 of 4 Approval Order Application Form 1 Instructions 1. Identify the name, address, phone number, and fax number of the legal entity that operates the equipment. 2. Identify the person who is to be contacted regarding this application; also include the phone number and fax number of this person. · 3. Identify the address where the equipment will be located. 4. If you are not the owner of the equipment under this application, enter the name, address, phone number, and fax number of the owner. 5. Identify in what county the facility is located. If this is portable equipment, state in what county the first location is. 6. Indicate the technical location of the facility so that it can be located on a map for modeling and inventory purposes. The location can be read from a 7.5· map. 7. Indicate the geographical location or address of facility and directions to site if needed for remote locations. For example, Go five miles south on highway 1, turn left at farmhouse, go 1.5 miles. 8. List any valid Approval Orders (AO) which are for equipment at this site. 9. Indicate previous AO number (if any) and date for AO modification. 10. State the type of business you conduct at this facility. 11 . Indicate if the total number of people employed by your company is over 100 people. 12. Using the provided list of business codes (page 8), enter the code which best describes your business activity at this facility. 13. Check all applicable boxes New Construction: new equipment which has not yet been constructed and requires a permit to construct. Existing Equipment Operating Without Permit: equipment which has been in operation without a prior permit issued by the state. Change of permit condition: permitted equipment which will be operated contrary to permit conditions. Modification: existing equipment which.is physically altered by the removal, addition, or non-identical replacement of parts. Permanent site: equipment will be located continuously at one site for more than 180 days. Change of location: permitted equipment which will be transferred from one property to another. 14. Enter the start date and the completion date of any new installation, construction, or modification. 15. For cases in this category, enter the future date when the change is anticipated. 16. For this category of equipment, enter the date when this equipment was first operated. 17. This is for equipment that was operated before November 29, 1969. Indicate whether the facility has been modified or increased capacity since that date. 18. Attach as Appendix A to the application a site plan in sufficient detail to identify: general location of site, buildings, roads, process equipment, emission points, and site characteristics that may effect plume dispersion. 19. Attach as Appendix B to the application a flow diagram which illustrates the entire process from introduction of raw materials to the emission of exhaust to the atmosphere and includes at least the following: generating equipment, process equipment, control equipment, monitoring devices, duct work, hoods, fans , stacks, flow rates/direction, gauges, etc. 20. Attach as Appendix C to the application a narrative description of the process and equipment to be permitted. Essentially include a narrative of the flow chart above. The description must include equipment or process specific forms as appropriate. The attached general supplemental process form (Form 2) must be filled out by all sources. Please mark which forms below apply to th is project. Forms available upon request are as follows: Form 11 Internal Combustion Engines Form 12 Incinerators Form 13 Spray Booths Form 14 Concrete Batch Plants Form 15 Rock Crushing and Screening Form 16 Soil/groundwater Remediation Form 17 Diesel Powered Standby Generator Form 18 Portable Hot Mix Drum Asphalt Plants Form 19 Fuel Burning Equipment (Boilers, Heaters, Steam Generators) Form 20 Organic Liquid Storage Tank Form 21 Solvent Metal Cleaning (degreasers) Form 22 Combustion Turbines 21 . To claim confidentiality on information submitted with this application, check "yes". Be sure that all submitted information which you wish kept confidential is clearly marked as such. Also state the reason(s) for claiming confidentiality per 40CFR2.208. Examples of acceptable reasons are_ trade secrets and production data. Note that information on emissions and permits cannot be confidential. 3 of 4 New Source Review Application Form 1 Instructions (Continued) 22. Attach a completed Form 1 d, Emissions Information. Provide all MSD Sheets for all chemicals used. 23. List emission points and parameters on the site plan (#14 above). 24. Attach as Appendix D to the application a list of all air pollution control equipment. Must include form(s) as appropriate. Please mark which forms apply to this project. Forms available upon request are as follows: Form 3 Form 4 Form 5 Form 6 Form 7 Form 8 Form 9 Form 10 Afterburners Flares Adsorption Unit Cyclone Condenser Electrical Precipitators Scrubber Fabric Filter 25. Attach as Appendix E to the application a list with description of all compliance monitoring devices and/or activities. Include such things as make, model, type, size, capability, accuracy, calibration frequency, etc. for the devices and monitoring frequency, outline of training program, level of certification required of inspectors, etc. for monitoring activities. 26. Dispersion modeling will be required under two circumstances: 1. if the Executive Secretary determines that modeling is to be performed. 2. if the proposed emissions are in the range of values given in given in Table 1. This requirement holds for new as well as modified sources. For modified sources, the values in Table 1. denote emission increases. If the emission values are greater than values in Table 1, higher level modeling will be required. Call the Planning Section at (801) 536-4000 for additional information. The meteorological data to be used in the modeling must be submitted to the Executive Secretary for review and approval before they are used in the dispersion modeling exercise. Table 1. Criteria For Screen Modeling (tons/year) S02 NOx PM10 fugitive PM,0 non-fugitive CO* HAP** lead 40 40 5 15 100/250 varies 0.6 100 tons if one of the 28 source categories in UAC R307-1-3.6.5.B; 250 tons if not Contact the Division of Air Quality Modeling Section. 27. For a description of a proper BACT proposal, see Form 1 b. 28. Signature of authorized company agent. 29. Name of signing party. 30. Telephone number of signing party. 31 . Date of application. ADDITIONAL INFORMATION MAY BE REQUIRED FOR SOME APPLICATIONS. If so, the reviewing engineer will contact the individual listed in question number 2. U:\aq\ENGINEER\GENERIC\Form01.doc Revised 5/10/06 4 of 4 . ' UtaH . vision of Air Quality New Source Review Section Form 1d Emissions Information Cc. any Chevron Pipe Line Co. Site/Source Hanna Station Date 10/20/2008 Please print neatly or type all information requested. All information must be truthful, accurate and complete before we can process your application. If you have any questions, call (801) 536-4000 and ask to speak with a New Source Review engineer. Written inquiries may be addressed to: Division of Air Quality, NSR Section, P.O. Box 144820, Salt Lake City, Utah 84114-4820. Table 1. Proposed Emissions Pollutant Permitted Emissions Emissions Increases Proposed Emissions (tons/year) (tons/year) (tons/year) PM10 SO2 NOx co ' voe 12 Hazardous 0.3 Air Pollutants (total} Hazardous Air Pollutants (list individually) (attach additional sheet if needed) 2,2,4- Trimethylpentane 0.01 (isooctane) Benzene 0.02 Biphenyl 0.00 Cresol (-m) 0.00 Ethylbenzene 0.01 Hexane (-n) 0.19 lsopropyl benzene 0,00 (cumene) Naphthalene 0.01 Toluene 0.04 Xylenes (mixed 0.05 isomers) other pollutants (list) (attach additional sheet if needed) Page l of 4 Utah Division of Air Quality Approval Order Application Form 1d Emissions Information Table 2. Controlled and Uncontrolled Emissions Pollutant Controlled Emissions (tons/year) Uncontrolled Emissions (tons/year) PM1o S02 NOx co voe 12 Hazardous Air Pollutants (total) 0.3 Hazardous Air Pollutants (list individually) (attach additional sheet if needed) 2,2,4-Trimethylpentane (isooctane) 0.01 Benzene 0.02 Biphenyl 0.00 Cresol (-m) 0.00 Ethyl benzene 0.01 Hexane (-n) 0.19 lsopropyl benzene (cumene) 0.00 Naphthalene 0.01 Toluene 0.04 Xylenes (mixed isomers) 0.05 other pollutants (list) (attach additional sheet if needed) . Page 2 of 4 < L Utah Division of Air Quality Approval Order Application Form 1d Emissions Information Table 3. Hourly HAP Emissions Hazardous Air Pollutants (list individually) Maximum emission rate (lbs/hour) 2,2,4-Trimethylpentane (isooctane) 0.0019 Benzene 0.0053 Biphenyl 0.0005 Cresol (-m) 0.0008 Ethyl benzene 0.0026 Hexane (-n) 0.0443 lsopropyl benzene (cumene) 0.0007 Naphthalene 0.0012 Toluene 0.0086 Xylenes (mixed isomers) 0.0125 Page 3 of 4 Table 1. Table 2. Table 3. Utah Division of Air Quality Approval Order Application Form 1d Emissions Information Instructions Fill out the table. Attach additional sheets if necessary. Provide potential emissions from your entire facility in units of tons per year, expressed to at least two decimal places. Emissions of individual Hazardous Air Pollutants may require more precision; contact a New Source Review Engineer. If you do not now have an Approval Order and you are applying for your first Approval Order, the emissions in "Existing Emissions" column will be zero and the "Emissions Increases" will be equal to the "Proposed "Emissions. If you do have an Approval Order, the emissions in the "Existing Emissions" column will be the emissions listed in your Approval Order. All emissions should be those emissions occuring after any air pollution control devices. Provide emissions that would result if you operated 24 hours per day, 8760 hours per year, unless you are also proposing operating hour limits. If you are proposing operating hour limits, state what these 1-imits are and provide emissions based on these limits. Provide emissions that would result from your potential production or potential raw material consumption, unless you are also proposing production or raw material consumption limits. If you are proposing production or raw material consumption limits, state what these limits are and provide emissions based on these limits. Attach additional sheets with detailed calculations or stack testing information showing how all of the above emission numbers were determined. Fill out the table. Attach additional sheets if necessary. Provide potential emissions from your entire facility in units of tons per year, expressed to at least two decimal places. Emissions of individual Hazardous Air Pollutants may requ ire more precision; contact a New Source Review Engineer. The Hazardous Air Pollutants should be the same Hazardous Air Pollutants listed in Table 1. The emissions in the "Controlled Emissions" column shoud be those emissions occuring after any air pollution control devices. The emissions in the "Uncontrolled Emissions" should be those emissions occuring before any air pollution control devices (in other words, emissions that would result if you did not have any air pollution control devices at all. Provide emissions that would result if you operated 24 hours per day, 8760 hours per year, unless you are also proposing operating hour limits. If you are proposing operating hour limits, state what these limits are and provide emissions based on these limits. Provide emissions that would result from your potential production or potential raw material consumption, unless you are also proposing production or raw material consumption limits. If you are proposing production or raw material consumption limits, state what these limits are and provide emissions based on these limits. Attach additional sheets with detailed calculations or stack testing information showing how all of the above emission numbers were determined. List all Hazardous Air Po llutants emitted by your facil ity. They should be the same Hazardous Air Pollutants listed in tables 1 and 2. For each HAP provide its maximum emission rate in units of pounds per hour. The emission rates should be those rates occuring after any air pollution control devices. Attach additional sheets with detailed calculations or stack testing information showing how all of the above emission numbers were determined. Depending on other conditions unique to each facility, additional emissions information may be required. f:\aq\engineer\generic\ 1 d_emisn.frm Revised 1 /23/03 Page 4 of 4 Utah Division of Air Quality New Source Review Section Site/Source.:...: --=-H=-=a:..:..:n:..:..:n=a.,_, =U-=-T ____ _ Form 20 Date: ___ _,1c,::0!....:/1c,::5"""/2=-=0=0=8 ___ _ Organic Liquid Storage Tank Equipment 1. Tank manufacturer: GATX 2. ldentific9tion number: Tank 520 3. Installation date: 1972 4. Volume: 2,520,000 gallons 5. Inside tank diameter: 95 feet 6. Tank height: 48 feet 7. True vapor pressure of liquid: 0-14 psia 8. Reid vapor pressure of liquid: 5 psi 9. Outside color of tank: White 10. Maximum storage temperature: 200 OF 11 . Average throughput: 79,654,680 gallons per year 12. Turnovers/yearly 31.6 Monthly Weekly 13. Average liquid height (feet): 48 14. Access hatch: l;zJ Yes □ No Number 1 15. Type of Seals: 16. Deck Fittings: Unknown, used TANKS default a. Primary seals: Gauge float well Iii Yes o No Number_1_ Ill Mechanical shoe Gauge hatch/ □ Resilient filled sample well 0Yes □ No Number_1_ □ Liquid filled Roof drains □ Yes o No Number --□ Vapor mounted Rim vents 1;zJYes o No Number 1 □ Liquid mounted Vacuum break @Yes □ No Number 1 □ Flexible wiper Roof leg lil Yes o No Number___1L b. Secondary seal: Ladder well □ Yes □ No Number --Type: Wi~er, rim-mounted Column well □ Yes o No Number -- Other: 1 unslotted guide-~ole well 17. Shell Characteristics: 18. Type of Construction: Condition: Good □ Vertical Fixed Roof Breather Vent Settings: □ Horizontal Fixed Roof Tank Construction: Welded □ Internal Floating Roof Roof Type: Pontoon 0 External Floating Roof Deck Construction: Welded □ Other (please specify) Deck Fitting Category: T~~ical design standard APl-650 19. Additional Controls: N/A □ Gas Blanket □ Venting □ Carbon Adsorption □ Thermal Oxidation □ Other: 20. Single Liquid Information Liquid Name: See TANKS -Liquid Name: CAS Number: printout in -CAS Number: Avg. Temperature: Appendix D. -Avg . Temperature: Vapor Pressure: ,___ Vapor Pressure: Liquid Molecular Weight: Liquid Molecular Weight: Page 1 of 2 Form 21. Chemical Name: - -Organic Liquid Storage Tank (Continued) Chemical Components Information Chemical Name: -See TANKS Percent of Total Liquid Weight:_ printout in -Percent of Total Liquid Weight: Molecular Weight: Appendix D. -Molecular Weight: Avg . Liquid Temperature: -Avg. Liquid Temperature: Vapor Pressure: Vapor Pressure: Emissions Calculations (PTE) 22. Calculated emissions for this device: PM 10 Lbs/hr __ Tons/yr NOx Lbs/hr __ Tons/yr SOx Lbs/hr __ Tons/yr voe 237 Lbs/hr 1.81 Tons/yr HAPs 8.18 Lbs/hr (speciate) 0.06 Tons/yr (speciate) Submit calculations as an appen di x. Provide manufacturer's Material Safety Data Sh eets for products being stored. · See Appendix D for emission calculations. Instructions Note: 1. Submit this form in conjunction with Form 1 and Form 2. 2. Call the Qivision of Air Quality (DAO) at (801) 536-4000 if you have problems or questions in filling out this form . Ask to speak with a New Source Review engineer. We will be glad to help! 1. Indicate the tank manufacturer's name. 2. Supply the equipment identification nu mber that will appear on the tank. 3. Indicate the date of installation. 4. Indicate the capacity of the tank in gallons or barrels. 5. Specify the inside tank diameter in feet. 6. Specify the tank height in feet. 7. Indicate the true vapor pressure of th e liquid (psia). 8. Indicate the Reid vapor pressure of the liquid (psi). 9. Indicate the outside color of the tank. 10. Supply the highest temperature the liq uid will reach during storage (degrees Fahrenheit). 11 . Indicate average annual throughput (gallons). 12. Specify how many times the tank will be emptied and refilled per year, month or week. 13. Specify the average liquid height (feet). 14. Indicate whether or not the tank has access hatches and the number. 15. Indicate what type of seals the tank has. 16. Indicate what type of deck fittings are installed. 17. Specify condition of the tank, also include the following: Breather vent settings in (psig) fo r fixed roof tanks Tank construction , welded or riveted Roof type; pontoon, double deck, or self-supporting roof Deck construction; bolted or welded, sheet or panel construction sizes and seam length Deck fitting category; typical, controlled, or detail 18. Indicate the type of tank construction. 19. Indicate other types of additional controls which will be used. 20. Provide information on liquid being stored, add additional sheets as necessary. 21 . Provide information on chem icals being stored, add additional sheets as necessary. 22. Supply calculations for all criteria pollutants and HAPs. Use AP42 or Manufacturers data to complete your calculations. f:\aq\ENGINEER\GENERIC\Form20.doc revised 9/1 /06 Page 2 of 2 Utah Division of Air Quality New Source Review Section Site/Source.:...: --=-H=a:..:..;n=n=a.,_1 =U-=-T ____ _ Form 20 Date: ___ ..:....:10:!../1.:...:5=/2=0=0=8 ___ _ Organic Liquid Storage Tank Equipment 1. Tank manufacturer: GATX 2. Identification number: Tank 510 3. Installation date: 1973 4. Volume: 2,520,000 gallons 5. Inside tank diameter: 95 feet 6. Tank height: 48 feet 7. True vapor pressure of liquid: 0-14 psia 8. Reid vapor pressure of liquid: 3.5 psi 9. Outside color of tank: White 10. Maximum storage temperature: 200 OF 11 . Average t~roughput: 2571948,405 gallons per year 12. Turnovers/yearly 102.4Monthly Weekly 13. Average liquid height (feet)": 48 14. Access hatch: 0 Yes o No Number 1 15. Type of Seals: 16. Deck Fittings: Unknown, used TANKS default a. Primary seals: Gauge float well 0 Yes o No Number 1 IZl Mechanical shoe Gauge hatch/ □ Resi lient filled sample well @Yes o No Number_1_ □ Liquid filled Roof drains □ Yes o No Number -- □ Vapor mounted Rim vents 0 Yes o No Number _1_ □ Liquid mounted Vacuum break @Yes o No Number_1_ □ Flexible wiper Roof leg @Yes o No Number~ b. Secondary seal : Ladder well □ Yes o No Number --Type: Wi~er, rim-mounted Column well □ Yes o No Number -- Other: 1 unslotted guide-~ole well 17. Shell Characteristics: 18. Type of Construction: Condition: Good □ Vertical Fixed Roof Breather Vent Settings: □ Horizontal Fixed Roof Tank Construction : Welded □ Internal Floating Roof Roof Type: Pontoon 0 External Floating Roof Deck Construction: Welded □ Other (please specify) Deck Fitting Category: Ty~ical design standard APl-650 19. Additional Controls: N/A □ Gas Blanket □ Venting □ Carbon Adsorption □ Thermal Oxidation □ Other: 20. Single Liquid Information Liquid Name: See TANKS -Liquid Name: CAS Number: printout in -CAS Number: Avg. Temperature: Appendix D. -Avg . Temperature: Vapor Pressure: -Vapor Pressure: Liquid Molecular Weight: Liquid Molecular Weight: Page 1 of 2 Form 21. Chemical Name: - -Organic Liquid Storage Tank (Continued) Chemical Components Information Chemical Name: -See TANKS Percent of Total Liquid Weight:_ Percent of Total Liquid Weight: printout in r-- Molecular Weight: Appendix D. c--Molecular Weight: Avg. Liquid Temperature: 1--Avg. Liquid Temperature: Vapor Pressure: Vapor Pressure: Emissions Calculations (PTE) 22. Calculated emissions for this device: PM10 Lbs/hr __ Tons/yr NOx Lbs/hr __ Tons/yr SOx Lbs/hr __ Tons/yr voe 299 Lbs/hr 2.27 Tons/yr HAPs 8.23 Lbs/hr (speciate) 0.06 Tons/yr (speciate) Submit calculations as an appendix. Provide manufacturer's Material Safety Data Sheets for products being stored. See Appendix D for emission calculations. Instructions Note: 1. Submit this form in conjunction with Form 1 and Form 2. 2. Call the Division of Air Quality (DAO) at (801) 536-4000 if you have problems or questions in filling out this form. Ask to speak with a New Source Review engineer. We will be glad to help! 1. . Indicate the tank manufacturer's name. 2. Supply the equipment identification number that will appear on the tank. 3. Indicate the date of installation. 4. Indicate the capacity of the tank in gallons or barrels. 5. Specify the inside tank diameter in feet. 6. Specify the tank height in feet. 7. Indicate the true vapor pressure of the liquid (psia). 8. Indicate the Reid vapor pressure of the liquid (psi). 9. Indicate the outside color of the tank. 10. Supply the highest temperature the liquid will reach during storage (degrees Fahrenheit). 11. Indicate average annual throughput (gallons). 12. Specify how many times the tank will be emptied and refilled per year, month or week. 13. Specify the average liquid height (feet). 14. Indicate whether or not the tank has access hatches and the number. 15. Indicate what type of seals the tank has. 16. Indicate what type of deck fittings are installed. 17. Specify condition of the tank, also include the following: Breather vent settings in (psig) for fixed roof tanks Tank construction, welded or riveted Roof type; pontoon , double deck, or self-supporting roof Deck construction; bolted or welded, sheet or panel construction sizes and seam length Deck fitting category; typical, controlled, or detail 18. Indicate the type of tank construction. 19. Indicate other types of additional controls which will be used. 20. Provide information on liquid being stored, add additional sheets as necessary. 21. Provide information on chemicals being stored, add additional sheets as necessary. 22. Supply calculations for all criteria pollutants and HAPs. Use AP42 or Manufacturers data to complete your calculations. f:\aq\ENGINEER\GENERIC\Form20.doc revised 9/1 /06 Page 2 of 2 Utah Division of Air Quality New Source Review Section Form 20 Organic Liquid Storage Tank Site/Source""": _..a.H=a=n=n"""a'"'"1--=U~T ____ _ Date: -----=-1-=0/:...:1-=5=/2=0-=-0=8 ___ _ Equipment 1. Tank manufacturer: Unknown 2. Identification number: Tank111 3. Installation date: 1949 4. Volume: 1680000 gallons 5. Inside tank diameter: 80 feet 6. Tank height: 48 feet 7. True vapor pressure of liquid: 0-14 psia 8. Reid vapor pressure of liquid: 3.5 psi 9. Outside color of tank: White 10. Maximum storage temperature: 200 OF 11 . Average throughput: 127,049,215 gallons per year 12. Turnovers/yearly 75.6 Monthly __ Weekly _ 13. Average liquid height (feet): 48 14. Access hatch: QI Yes □ No Number 1 15. Type of Seals: 16. Deck Fittings: Unknown, used TANKS default a. Primary seals: Gauge float well @Yes □ No Number 1 Ill Mechanical shoe Gauge hatch/ □ Resilient filled sample well @Yes □ No Number 1 □ Liquid filled Roof drains □ Yes o No Number __ □ Vapor mounted Rim vents □ Yes □ No Number __ □ Liquid mounted Vacuum break @Yes □ No Number_1_ □ Flexible wiper Roof leg ILi Yes o No Number 24 b. Secondary seal: Ladder well 121 Yes o No Number_1_ Type: Wi~er, rim-mounted Column well ILi Yes □ No Number_1_ Other: 17. Shell Characteristics: 18. Type of Construction: Condition: Good □ Vertical Fixed Roof Breather Vent Settings: □ Horizontal Fixed Roof Tank Construction: Welded IZI Internal Floating Roof Roof Type: Cone -Column Su~~orted □ External Floating Roof Deck Construction: Welded □ Other (please specify) Deck Fitting Category: T)l~ical design standard APl-650 19. Additional Controls: N/A □ Gas Blanket □ Venting □ Carbon Adsorption □ Thermal Oxidation □ Other: 20. Single Liquid Information Liquid Name: See TANKS -Liquid Name: CAS Number: printout in -CAS Number: Avg. Temperature: Appendix D. t--Avg. Temperature: Vapor Pressure: t--Vapor Pressure: Liquid Molecular Weight: Liquid Molecular Weight: Page 1 of 2 Chemical Name: - Form . -Organic Liquid Storage Tank (Continued) 21. Chemical Components Information Chemical Name: -See TANKS Percent of Total Liquid Weight:_ Percent of Total Liquid Weight: printout in - Molecular Weight: Appendix D. -Molecular Weight: Avg . Liquid Temperature: -Avg. Liquid Temperature: Vapor Pressure: Vapor Pressure: Emissions Calculations (PTE) 22. Calculated emissions for this device: PM10 Lbs/hr __ Tons/yr NOx Lbs/hr __ Tons/yr SOx Lbs/lir __ Tons/yr voe 123 Lbs/hr 0.94 Tons/yr HAPs 3.29 Lbs/hr (speciate) 0.02 Tons/yr (speciate) Submit calculations as an appendix. Provide manufacturer's Material Safety Data Sheets for products being stored. See Appendix D for emission calculations. Instructions Note: 1. Submit this form in conjunction with Form 1 and Form 2. 2. Call the Division of Air Quality (DAO) at (801} 536-4000 if you have problems or questions in filling out this form. Ask to speak with a New Source Review engineer. We wil l be glad to help! 1. Indicate the tank manufacturer's name. 2. Supply the equipment identification number that will appear on the tank. 3. Indicate the date of installation. 4. Indicate the capacity of the tank in gallons or barrels. 5. Specify the inside tank diameter in feet. 6. Specify the tank height in feet. 7. Indicate the true vapor pressure of the liquid (psia). 8. Indicate the Reid vapor pressure of the liquid (psi). 9. Indicate the outside color of the tank. 10. Supply the highest temperature the liquid will reach during storage (degrees Fahrenheit). 11 . Indicate average annual throughput (gallons). 12. Specify how many times the tank will be emptied and refilled per year, month or week. 13. Specify the average liquid height (feet). 14. Indicate whether or not the tank has access hatches and the number. 15. Indicate what type of seals the tank has. 16. Indicate what type of deck fittings are installed. 17. Specify condition of the tank, also include the following: Breather vent settings in (psig) for fixed roof tanks Tank construction, welded or riveted Roof type; pontoon, double deck, or self-supporting roof Deck construction; bolted or welded, sheet or panel construction sizes and seam length Deck fitting category; typical, controlled, or detail 18. Indicate the type of tank construction. 19. Indicate other types of additional controls which will be used. 20. Provide information on liquid being stored, add additional sheets as necessary. 21 . Provide information on chemicals being stored, add additional sheets as necessary. 22. Supply calculations for all criteria pollutants and HAPs. Use AP42 or Manufacturers data to complete your calculations. f:\aq\ENGINEER\GENERIC\Form20.doc revised 9/1 /06 Page 2 of 2 Utah Division of Air Quality New Source Review Section Site/Source,;_: _..:..H=a=n=n=a._, U"""T-'------- Form 20 Date: ___ ....:1..:0:....:11=5"-=/2=0=0=8 ___ _ Organic Liquid Storage Tank Equipment 1. Tank manufacturer: Matrix Service 2. Identification number: TBD 3. Installation date: ~ro~osed 2008 4. Volume: 2,520,000 gallons 5. Inside tank diameter: 100 feet 6. Tank height: 43'-11" feet 7. True vapor pressure of liquid: 0-14 psia 8. Reid vapor pressure of liquid: 5 psi 9. Outside color of tank: White 10. Maximum storage temperature: 200 OF 11 . Average throughput: 199,136,700 gallons per year 12. Turnovers/yearly 79 Monthly Weekly 13. Average liquid height {feet): 43 14. Access hatch: i;zJ Yes □ No Number 1 15. Type of Seals: 16. Deck Fittings: a. Primary seals: Gauge float well i;zi Yes □ No Number 1 IZI Mechanical shoe Gauge hatch/ □ Resilient filled sample well l:Z!Yes □ No Number_1_ □ Liquid filled Roof drains □ Yes □ No Number __ □ Vapor mounted Rim vents □ Yes □ No Number -- □ Liquid mounted Vacuum break @Yes □ No Number 1 □ Flexible wiper Roof leg @Yes □ No Number~ b. Secondary seal: Ladder well @Yes □ No Number _1_ Type: Wi~er, rim-mounted Column well i;zJ Yes □ No Number_1_ Other: 17. Shell Characteristics: 18. Type of Construction: Condition: New □ Vertical Fixed Roof Breather Vent Settings: □ Horizontal Fixed Roof Tank Construction: Welded 0 Internal Floating Roof Roof Type: Cone-Column Su~~orted □ External Floating Roof Deck Construction: Welded □ Other (please specify) Deck Fitting Category: T)l~ical design standard APl-650 19. Additional Controls: N/A □ Gas Blanket □ Venting □ Carbon Adsorption □ Thermal Oxidation □ Other: 20. Single Liquid Information Liquid Name: See TANKS >---Liquid Name: CAS Number: printout in -CAS Number: Avg. Temperature: Appendix D. >---Avg. Temperature: Vapor Pressure: >---Vapor Pressure: Liquid Molecular Weight: Liquid Molecular Weight: Page 1 of 2 Chemical Name: - Form . ✓ -Organic Liquid Storage Tank (Continued) 21 . Chemical Components Inform ati on f--Chemical Name: See TANKS Percent of Total Liquid Weight:_ printout in ._ Percent of Total Liquid Weight: Molecular Weight: Appendix D. ~ Molecular Weight: Avg . Liquid Temperature: ~ Avg . Liquid Temperature: Vapor Pressure: Vapor Pressure: Emissions Calculations (PTE) 22. Calculated emissions for th is device: PM10 Lbs/hr __ Tons/yr NOx Lbs/hr __ Tons/yr SOx Lbs/hr __ Tons/yr voe 181 Lbs/hr 1.38 Ton s/yr HAPs 5.31 Lbs/hr (speciate) 0.04 Tons/yr (speciate) Submit calculations as an appendix. Provide manufacturer's Material Safety Data Sheets for products being stored. See Appendix D for emission calculations. Instructions Note: 1. Submit this form in conjunction with Form 1 and Form 2. 2. Call the Division of Air Quality (DAO) at (801 ) 536-4000 if you have problems or questions in filling out this form. Ask to speak with a New Source Review engineer. We will be glad to help! 1. Indicate the tank manufacturer's name. 2. Supply the equipment identification number that will appear on the tank. 3. Indicate the· date of installation. 4. Indicate the capacity of the tank in gallons or barrels. 5. Specify the inside tank diameter in feet. 6. Specify the tank height in feet. 7. Indicate the true vapor pressure of the liquid (psia). 8. Indicate the Re id vapor pressure of the liquid (psi). 9. Indicate the outside color of the tank. 10. Supply the highest temperature the liquid will reach during storage (degrees Fahrenheit). 11. Indicate average annual throughput (gallons). 12. Specify how many times the tank will be em ptied and refilled per year, month or week. 13. Specify the average liquid height (feet). 14. Indicate whether or not the tank has access hatches and the number. 15. Indicate what type of seals the tank has. 16. Indicate what type of deck fittings are installed. 17. Specify condition of the tank, also include the following: Breather vent settings in (psig) for fixed roof tanks Tank construction, welded or riveted Roof type ; pontoon, double deck, or self-supporting roof Deck construction; bolted or we lded, sheet or panel construction sizes and seam length Deck fitting category; typical, controlled, or detail 18. Indicate the type of tank construction . 19. Indicate other types of additional controls which will be used. 20. Provide information on liquid being stored, add additional sheets as necessary. 21 . Provide information on chemicals being stored, add additional sheets as necessary. 22. Supply calculations for all criteria poll utants and HAPs. Use AP42 or Manufacturers data to complete your calculations. f:\aq\ENGINEER\GENERIC\Form20.doc revised 9/1 /06 Page 2 of 2 , TANKS 4.0 Report Identification User Identification: City: State: Company: Type of Tank: Description: Tank Dimensions Shell Length (ft): Diameter (ft): Volume (gallons): Turnovers : Net Throughput(gal/yr): Is Tank Heated (y/n): Is Tank Underground (y/n): Paint Characteristics Shell Color/Shade: Shell Condition Breather Vent Settings Vacuum Settings (psig): Pressure Settings (psig) TANKS 4.0.9d Emissions Report -Summary Format Solvent Tank Hanna Utah Tank lndentification and Physical Characteristics Chevron Pipe Line Company Horizontal Tank Solvent N N Aluminum/Specular Good 5.00 6.00 300.00 1.00 300.00 -0.03 0.03 Meterological Data used in Emissions Calculations: Salt Lake City, Utah (Avg Atmospheric Pressure= 12.64 psia) Page 1 of 4 10/14/2008 TANKS 4.0 Report Solvent Tank -Horizontal Tank Hanna, Utah Mixture/Component Month Solvent All Daily Liquid Surf. Temperature (deg F) Avg. Min. Max. 57.19 49.02 65.36 TANKS 4.0.9d Emissions Report -Summary Format Liquid Contents of Storage Tank Liquid Bulk Temp (deg F) 53.30 Vapor Vapor Pressure {psia) Mal. Avg. Min. Max. Weight. 0.1000 0.1000 0.1000 80.0000 Liquid Mass Fract. Vapor Mass Fract. Page 2 of 4 Mol. Weight 120.00 Basis fo Calcula1 l 0/14/2008 -TANKS 4. 0 Report Emissions Report for: Annual Solvent Tank -Horizontal Tank Hanna, Utah jcomponents !solvent 11 II II TANKS 4.0.9d Emissions Report -Summary Format Individual Tank Emission Totals Losses(lbs) I Working Lossjj Breathing Lossll Total Emissions! 0.0611 27311 2781 Page 3 of 4 10/14/2008 TANKS 4. 0 Report Page 4 of 4 · 10/14/2008 CHEVRON PIPE LINE COMPANY HANNA STATION EMISSIONS SUMMARY -2008 POTENTIAL 10/14/2008 Annual Annual Hourly CAS Equipment Maintenance Emissions Emissions Emissions ETV" Pollutant Number Unit Tanks' Fuqitive2 Fuqitive3 lb/vr ton/vr lb/hr lb/hr Hourlv Emission > ETV? voe lb 12,788.25 11 ,244.25 500.00 24,532.50 12.27 HAPs 2,2,4-Trimethylpentane (isooctane) 540-84-1 lb 8.01 7.98 0.36 16.35 0.01 0.0019 NA No, air modeling not required Benzene 71-43-2 lb 26.36 19.00 0.85 46.21 0.02 0.0053 0.027 No, air modeling not required Biphenyl 92-52-4 lb 1.65 2.70 0.12 4.47 0.00 0.0005 0.064 No, air modeling not required Cresci (-m) 108-39-4 lb 2.54 4.16 0.19 6.89 0.00 0.0008 1.13 No, air modeling not required Ethyl benzene 100-41-4 lb g_o1 13.27 0.59 22.87 0.01 0.0026 22.1 No, air modeling not required Hexane (-n) 110-54-3 lb 250.40 132.01 5.87 388.27 0.19 0.0443 9 No, air modeling not required lsopropyl benzene (cumene) 98-82-8 lb 2.30 3.60 0.16 6.06 0.00 0.0007 12.5 No, air modeling not required Naphthalene 91-20-3 lb 3.92 6.41 0.29 10.61 0.01 0.0012 2.7 No, air modeling not required Toluene 108-88-3 lb 33.41 40.48 1.80 75.68 0.04 0.0086 3.8 No, air modeling not required Xvlenes (mixed isomers) 1330-20-7 lb 42.64 63.87 2.84 109.34 0.05 0.0125 22.1 No, air modelinq not required TOTAL HAPs lb 380.24 293.47 13.05 0.34 TOTAL voes ton 6.39 5.62 0.25 12.27 1. RVP 3.5 and RVP 5.0 used for TANKS. 2. Equipment fugitives are totals that include pumps seals, valves, flanges, and drains. 3. Maintenance includes one tank cleaning. 4. Emission threshold value, minimum, vertically restricted/fugitive releases <20 m from property boundary. Utah Division of Air Quality, downloaded 9/24/2008; http://www.airquality.utah.gov/Planning/Modeling/NSR_Permit_Modeling/Modeling%20Guidelines/2007 ACGIH-Tl Vs.xis ETV = emission threshold value HAP = hazardous air pollutant NA = not available CHEVRON PIPE LINE COMPANY HANNA STATION INPUTS for EMISSIONS ESTIMATE -2008 POTENTIAL 10/14/2008 Fugitive Count Source Number Of Units Drains (open-ended lines) 4 Valves 106 Flanges 35 Pump Seals 18 Others 10 Tank Configuration Height Tank Volume Tank# Tank Tvoe Primarv Seals Secondarv Seals Roof Diameter lftl /ftl (bbl) (gal) 111 Internal Floater Mechanical Shoe Wiper, Rim-mounted Cone 80 48 40,000 1,680,000 510 External Floater Mechanical Shoe Wiper, Rim-mounted Pontoon 95 48 60,000 2,520,000 520 External Floater Mechanical Shoe Wiper, Rim-mounted Pontoon 95 48 60,000 2,520,000 New Internal Floater Mechanical Shoe Wiper, Rim-mounted Cone 100 43.92 60,000 2,520,000 Potential Tank Throughput Potential Annual Throughput (bbls) 15,804,500 RVP1 Fraction' TP (bbl) Rangely Crude 2.42 58% 9,166,610 Condensate 4.67 30% 4,741,350 Black Wax Condensate Mix 4.08 12% 1,896,540 Total 100% 15,804,500 -Crude u 11 RVP used in Year Tank# Product TP (bbl) TP (gal) Turnover TANKS) Installed 111 Rangely Crude (33%) 3,024,981 127,049,21 5 75.6 3.5 1949 510 Rangely Crude (67%) 6,141 ,629 257,948,405 102.4 3.5 1973 520 Black Wax Condensate Mix 1,896,540 79,654,680 31.6 5.0 1972 New Condensate 4,741 ,350 199,136,700 79.0 5.0 TBD Total 15,804,500 663,789,000 1Reid vapor pressure (RVP) was determined in laboratory tests. 2Fractional throughput based on design maximum daily throughput of 43,300 bbl/day, 13,000 bbl/day ~f condensate, 25,000 bbl/day of Rangely crude, and 5,300 bbl/day of black wax condensate mix. TP = throughput RVP = Reid vapor pressure Conversions bbls = 42 gals CHEVRON PIPE LINE COMPANY HANNA STATION FUGITIVE EMISSIONS -2008 POTENTIAL 10/14/2008 Fui;iitive VOCs Emisson Emisson Number of Factors1 Factors Emissions2 Emissions Description Units (kci/hr/source) (lb/hr/source) (lb/yr) (ton/yr) Valves 106 2.50E-03 5.50E-03 5,107.08 2.55 Pump Seals 18 1.30E-02 2.86E-02 4,509.65 2.25 Others 10 7.50E-03 1.65E-02 1,445.40 0.72 Connectors 0 2.10E-04 4.62E-04 0.00 0.00 Flanges 35 1.10E-04 2.42E-04 74 .20 0.04 Open ended lines (drains) 4 1.40E-03 3.08E-03 107.92 0.05 Equipment Fugitives 11 ,244.25 5.62 Maintenance Fugitives:$ 500.00 0.25 TOTAL FUGITIVES, voes 11,744.25 5.87 1. Emission fractors from "Protocol for Equipment Leak Emission Estimates", EPA-453/R-95-017, November 1995. Table 2-4 Oil and Gas Production, emission factors for light oil service. 2. Emissions= (# of units)(Emission Factor)(24 hr/day)(365 day/yr) 3. Maintenance includes one tank cleaning. Conversion: 1 kg = 2.2 lb; 1 ton = 2000 lb Fugitive HAPs Equipment Maintenance Weight Fugitive Fugitive Total Pollutant Fraction1 (lb/yr) (lb/yr) (lb/yr) voes 11,244.25 500.00 11 ,744.25 2,2,4-Trimethylpentane (isooctane) 0.00071 7.98 0.36 8.34 Benzene 0.00169 19.00 · 0.85 19.85 Biphenyl 0.00024 .2.70 0.12 2.82 Cresol (-m) 0.00037 4.16 0.19 4.35 Ethylbenzene 0.00118 13.27 0.59 13.86 Hexane (-n) 0.01174 132.01 5.87 137.88 lsopropyl benzene 0.00032 3.60 0.16 3.76 Naphthalene 0.00057 6.41 0.29 6.69 Toluene 0.0036 40.48 1.80 42.28 Xvlenes (mixed isomers) 0.00568 63.87 2.84 66.71 TOTAL FUGITIVE HAPs (lbs.) 293.47 13.05 306.52 1. Weight fraction from API Publication 4723, Nov 2002 (PERF data); Crude Oil. CHEVRON PIPE LINE COMPANY HANNA STATION TANK EMISSIONS -2008 POTENTIAL 10/14/2008 Description CAS Unit Tank #TBD Tank 111 Tank 510 Tank 520 Total Comment Annual Throughput aal 199,136,700 127,049,215 257,948,405 79,654,680 663,789,000 15,804,500 bbl throuqhput 2,2,4-Trimethylpentane (isooctane) 00540-84-1 lb 1.84 1.25 2.74 2.19 8.01 Benzene 00071-43-2 lb 5.50 3.32 8.60 8.95 26.36 Biphenyl 00092-52-4 lb 0.46 0.37 0.62 0.19 1.65 Cresci (-m) 00108-39-4 lb 0.71 0.57 0.96 0.30 2.54 Ethyl benzene 00100-41-4 lb 2.41 1.86 3.33 1.42 9.01 Hexane (-n) 00110-54-3 lb 48.41 26.36 78.88 96.75 250.40 lsopropyl benzene 00098-82-8 lb 0.63 0.50 0.86 0.31 2.30 Naphthalene 00091 -20-3 lb 1.10 0.88 1.48 0.46 3.92 Toluene 00108-88-3 lb 8.25 5.96 11.83 7.36 33.41 Xylenes (mixed isomers) 01330-20-7 lb 11.48 8.92 15.80 6.44 42.64 Total Tank VOCs lb/yr 2,755.29 1,873.79 4,547.70 3,611.47 12,788.25 lb/hr 181.17 123.21 299.03 237.47 840.87 ton/vr 1.38 0.94 2.27 1.81 6.39 Total Annual Tank HAPs (lb) lb/vr 80.80 49.98 125.09 124.37 380.24 lb/hr 5.31 3.29 8.23 8.18 25.00 ton/yr 0.04 0.02 0.06 0.06 0.19 1. Results from TANKS 4.09d, ran 10/14/2008. 2. Speciation of HAPs used in TANKS based on API Publication 4723, Nov 2002 (PERF data). HAP= hazardous air pollutant TRI = toxic release inventory 2007 ACGIH Threshold Limit Values (TLVS), Toxic Screening Levels (TSLs) and Emission Threshold Values (ETVs) The purpose of this document is to serve as aid to NSR Engineers, Consultants, and the General Public in their interpretation of the applicability of UACR307-410-5 when preparing or reviewing a Notice of Intent. UACR307-410-5 requires any source submitting a NOi, which proposes to increase emission of HAP, to use Table 2 in the rule to determine whether or not a dispersion modeling analysis of each pollutant is required as part of a complete NOi. If new emissions of the HAP (expressed in lb/hr) exceeds the emission threshold value, dispersion modeling is required . When selecting the proper Emission Threshold Factor, the folowing release scenario should be determined as follows. "Vertically Restricted Emissions Release" means the release of an air contaminant through a stack or opening whose flow is directed in a downward or horizontal direction due to the alignment of the opening or a physical obstruction placed beyond the opening, or at a height which is less than 1.3 times the height of an adjacent building or structure, as measured from ground level. "Vertically Unrestricted Emissions Release" means the release of an air contaminant through a stack or opening whose flow is directed upward without any physical obstruction placed beyond the opening, and at a height which is at least 1.3 times the height of an adjacent building or structure, as measured from ground level. The lb/yr and TPY values calculated for chronic and carcinogenic HAP below are based on the assumption that the source operates continuously (8760 hr/yr). Acute values are express in lb/hr only, and emission limits or emission levels for acute HAP should not be expressed or calculated in lb/hr or TPY. This is due to the nature of the chemical itself, whereby very short term exposure to high concentrations of the HAP will result in immediate adverse health effects in the exposed individual. Therefore, when evaluating acute HAP for the determination of modeling requirements, ALWAYS evaluate it based on the maximum potential emission rate possible for that process. Do not back-calculate the lb/hr emission rate from the sources proposed pounds or tons per year emission level listed in the NOi. The range of emission threshold values are: Acute Chronic Carcinogenic Minimum ETF -0.038 Minimum ETF - 0.051 Minimum ETF -0.017 For each type of HAP, there is a minimum and maximum emissions threshold factor (ETF). They are: Maximum ETF - 0.310 Maximum ETF - 0.368 Maximum ETF -0.123 Using these values , we are able to calculate the minimum emission rate for each type of HAP such that any source operating with a proposed lb/hr emission level less than this value would not be required to perform a dispersion modeling analysis for this NOi process. Similarly, using these values , we are able to calculate the maximum emission rate for each type of HAP such that any source operating with a proposed lb/hr emission level greater than this values would inevitably be required to perform a dispersion modeling analysis for this NOi process. However, if the source's proposed emission rate is greater than the minimum emission rate , but less than the maximum emission rate listed in the table below, the reviewing engineer will have to review the addition information required to be submitted under R307-410-4 to determine if modeling is required (ie, pollutant release type and distance to property boundary). A listing of TL Vs, TS Ls, and minimum and maximum ETVs are shown in the first half of the table below. The full range of ETVs for all ETFs are listed in the second half of this document. Utah Division of Air Quality, downloaded 9/24/2008; http://www.airquality.utah.gov/Planning/Modeling/NS R _Permit_ Modeling/Modeling%20Guidelines/2007 ACG I H-TL Vs.xis 2007 ACGIH Threshold Limit Values (TLVS), Toxic Screening Levels (TSLs) and Emission Threshold Values (ETVs) Show X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X ACUTE Hazardous Air Pollutants CARCINOGENIC Hazardous Air Pollutants Benzene (including benzene for gasol CHRONIC Hazardous Air Pollutants Biphenyl Cresols/Cresylic acid Cumene Ethyl benzene Hexane Naphthalene Toluene Xylenes (isomers and mixture) ACUTE Hazardous Air Pollutants CARCINOGENIC Hazardous Air Pollutants Benzene (including benzene for gasol CHRONIC Hazardous Air Pollutants -~ Biphenyl Cresols/Cresylic acid Cumene Ethyl benzene Hexane Naphthalene Toluene Xylenes (isomers and mixture) Health Classification Health Classification A1 Care. Health Classification Chronic Chronic Chronic Chronic Chronic Chronic Chronic Chronic Health Classification Health Classification A1 Care. Health Classification Chronic Chronic Chronic Chronic Chronic Chronic Chronic Chronic Utah Division of A ir Quality, downloaded 9/24/2008; Toxic Emission Rate Below Screening Which Modeling Applicable TLV-Ceiling TLV-Ceiling Molecular Levels Would Never Be Triggered Factor 1-Hour 1-Hour Weight (TSLs) Under UAC307-410-5 Safety (uglm3) (ppm) 1-Hour Average 'ETF=0.038 I ug/m3 lb/hr lb/day TPY Toxic Emission Rate Below Screening Which Modeling Applicable TLV-TWA TLV-TWA ~olecular Weigl Levels Would Never Be Triggered Factor 8-Hour 8-Hour (TSLs) Under UAC307-410-5 Safety (ug/m3) (ppm) 24-Hour Average 'ETF=0.017 l"Continious operations uglm3 lb/hr I , lb/yr TPY 30 1,597 0.5 78.11 53 0.027 I 238 0.12 Toxic Emission Rate Below Screening Which Modeling Applicable LV-TWA(ug/m TLV-TWA ~olecular Weigl Levels Would Never Be Triggered Factor 8-Hour 8-Hour (TSLs) Under UAC307-410-5 Safety (ppm) 24-Hour Average 'ETF=0.051 ·continious operations ug/m3 lb/hr lb/yr TPY 30 1,261 0 154.20 42 0.064 564 0.28 30 22,115 5.00 108.14 737 1.13 9,880 4.94 30 245,787 50.00 120.19 8,193 12.5 109,808 54.9 30 434,192 100.00 106.16 14,473 22.1 193,980 97.0 30 176,237 50.00 86.18 5,875 9.0 78,736 39.4 30 52,429 10.00 128.19 1,748 2.7 23,423 11.7 30 75,362 20.00 92.13 2,512 3.8 33,669 16.8 30 434,192 100.00 106.16 14,473 22.1 193,980 97.0 Acute Emission Threshold Values (in lb/hr) Distance to Property Boundary and Emission Threshold Factors Vertically Restricted/Fugitive Releases Vertically Unrestricted Releases <20m 20-50 m 50-100 m >100 m <50 m 50-100 m >100 m 0.038 0.051 . 0.092 0.180 0.154 0.224 0.310 Carcinogenic Emission Threshold Values (in lb/hr) Distance to Property Boundary and Emission Threshold Factors Vertically Restricted/Fugitive Releases Vertically Unrestricted Releases <20 m 20-50 m 50-100 m >100 m <50 m 50-100 m >100 m 0.017 0.022 0.041 0.090 0.066 0.081 0.123 0.0272 0.0351 0.0655 0.1438 0.1054 0.1294 0.1965 Chronic Emission Threshold Values (In lb/hr) Distance lo Property Boundary and Emission Threshold Factors Vertically Restricted/Fugitive Releases Vertically Unrestricted Releases <20 m 20-50 m 50-100 m >100 m <50 m 50-100 m >100 m 0.051 0.066 0.123 0.269 0.198 0.224 0.368 0.06 0.08 0.16 0.34 0.25 0.28 0.46 1.13 1.46 2.72 5.95 4.38 4.95 8.14 12.54 16.22 30.23 66.12 48.67 55.06 90.45 22.14 28.66 53.41 116.80 85.97 97.26 159.78 8.99 11.63 21.68 47.41 34.89 39.48 64.86 2.67 3.46 6.45 14.10 10.38 11.74 19.29 3.84 4.97 9.27 20.27 14.92 16.88 27.73 22.14 28.66 53.41 116.80 85.97 97.26 159.78 http://www.airquality.utah.gov/Planning/Modeling/NS R _Permit_ Modeling/Modeling%20Guidelines/2007 AGGI H-TL Vs.xis Emission Rate Above Which Modeling Would Always Be Triggered Under UAC307-410-5 'ETF=0.310 lb/hr lb/day TPY Emission Rate Above Which Modeling Would Always Be Triggered Under UAC307-410-5 'ETF=0.123 *Continious operations lb/hr lb/yr TPY 0.20 1721 0.86 Emission Rate Above Which Modeling Would Always Be Triggered Under UAC307-410-5 'ETF=0.368 •cantlnious operations lb/hr lb/yr TPY 0.46 4,066 2.0 8.14 71,290 35.6 90.4 792,340 396.2 159.8 1,399,697 700 64.9 568,132 284 19.3 169,016 84.5 27.7 242,943 121 159.8 1,399,697 700 TANKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Identification · User Identification: City: State: Company: Type of Tank: Description: Tank Dimensions Diameter (ft): Volume (gallons): Turnovers: Self Supp. Roof? (y/n): No. of Columns: Eff. Col. Diam. (ft): Paint Characteristics Internal Shell Condition: Shell Color/Shade: Shell Condition Roof Color/Shade: Roof Condition: Rim-Seal System Primary Seal: Secondary Seal Deck Characteristics Deck Fitting Category: Deck Type: Deck Fitting/Status Tank lndentification and Physical Characteristics Hanna Tank #TBD -2008 Potential Hanna Utah Chevron Pipe Line Company Internal Floating Roof Tank Condensate N Light Rust White/White Good White/White Good Mechanical Shoe Rim-mounted Typical Welded 100.00 2,520,000.00 79 02 1.00 1.00 Access Hatch (24-in. Diam.)/Unbolted Cover, Ungasketed Automatic Gauge Float Well/Unbolted Cover, Ungasketed Column Well (24-in. Diam.)/Built-Up Col.-Sliding Cover, Ungask. Ladder Well (36-in. Diam.)/Sliding Cover, Ungasketed Roof Leg or Hanger Well/Adjustable Sample Pipe or Well (24-in. Diam.)/Slit Fabric Seal 10% Open Vacuum Breaker (10-in. Diam.)/Weighted Mech. Actuation, Gask. Meterological Data used in Emissions Calculations: Salt Lake City, Utah (Avg Atmospheric Pressure= 12.64 psia) Quantity 1 1 6 1 32 1 1 Page 1 of 13 10/14/2008 TANKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Liquid Contents of Storage Tank Hanna Tank #TBD -2008 Potential -Internal Floating Roof Tank Hanna, Utah Liquid Daily Liquid Surf. Bulk Vapor Liquid Temperature (deg F) Temp Vapor Pressure (psia) Mal. Mass Mixture/Component Month Avg. Min. Max. (deg F) Avg. Min. Max. Weight. Fract. Crude oil (RVP 5) All 53.92 47.99 59.86 51.98 2.5505 N/A N/A 50.0000 1,2,4• Trimethylbenzene 0.0160 N/A N/A 120.1900 0.0023 2,2.4-Trimethylpentane (isooctane) 0.4987 N/A N/A 114.2300 0.0007 Benzene 0.9843 N/A N/A 78.1100 0.0017 Biphenyl 0.0008 N/A N/A 154.2000 0.0002 Cresol (•m) 0.0010 N/A N/A 108.1000 0.0004 Ethylbenzene 0.0876 N/A N/A 106.1700 0.0012 Hexane (-n) 1.6300 N/A N/A 86.1700 0.0117 lsopropyl benzene 0.0382 N/A N/A 120.2000 0.0003 Naphthalene 0.0019 N/A N/A 128.2000 0.0006 Toluene 0.2725 N/A N/A 92.1300 0.0036 Unidentified Components 2.6610 N/A N/A 49.2054 0.9716 Xylenes (mixed isomers) 0.0728 N/A N/A 106.1700 0.0057 Page 2 of 13 Vapor Mass Mal. Basis for Vapor Pressure Fract. Weight Calculations . 207.00 Option 4: RVP=5 0.0001 120.19 Option 2: A=7.04383, 8_=1573.267, C=208.56 0.0006 114.23 Option 2: A=6.8118, 8=1257.84, C=220.74 0.0027 78.11 Option 2: A=6.905, 8=1211.033, C=220.79 0.0000 154.20 Option 1: VP50 = .0007 VP60 = .00099 0.0000 108.10 Option 2: A=7.508, 8=1856.36, C=199.07 0.0002 106.17 Option 2: A=6.975, 6=1424.255, C=213.21 0.0311 86.17 Option 2: A=6.876, 8=1171.17, C=224.41 0.0000 120.20 Option 2: A=6.93666, 8=1460.793, C=207.78 0.0000 128.20 Option 2: A=7.3729, 8=1968.36, C=222.61 0.0016 92.13 Option 2: A=6.954, 8=1344.8, C=219.48 0.9631 214.40 0.0007 106.17 Option 2: A=7.009, 8=1462.266, C=215.11 10/14/2008 TANKS 4.0 Report Emissions Report for: Annual TANKS 4.0.9d Emissions Report -Summary Format Individual Tank Emission Totals Hanna Tank #TBD -2008 Potential -Internal Floating Roof Tank Hanna, Utah II Losses(lbs) !components Rim Seal Lossll Withdraw! Lossll Deck Fitting Lossll !crude oil (RVP 5) 67.5111 1,923.7311 764 0411 I 1,2,4-Trimethylbenzene 0.0011 4.4811 o.osll Biphenyl 0.0011 0.4611 0.0011 Cresci (-m) I 0 0011 0.7111 0.0011 lsopropyl benzene II 0.0011 0.6211 0.0211 Ethylbenzene 0.0111 2.2711 0.1311 Hexane (-n) 2.1011 22 sail 23.7311 Naphthalene o.ooll 11011 0.0011 Toluene 0.1111 69311 1 2211 Xylenes (mixed isomers) o.osll 10 9311 o.s1 II 2,2,4-Trimethylpentane (isooctane) 0 0411 1.3711 04411 Benzene 01811 3.2511 2.0611 Unidentified Components 65.0311 1,869.0411 735.8911 Page 3 of 13 Deck Seam Loss ll Total Emissions! 0.0011 2,755.291 0.0011 4.531 0.0011 0.461 0.00 11 0.711 0.00 11 0631 0.00 11 2.41 I 0 0011 48.41 1 o.ooll 1.1 ol 0.0011 8.251 0 0011 11.481 0 0011 1.841 0.0011 s.sol 00011 2,669.961 10/14/2008 TANKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Identification User Identification: City: State: Company: Type of Tank: Description: Tank Dimensions Diameter (ft): Volume (gallons): Turnovers: Self Supp. Roof? (yin): No. of Columns: Eff. Col. Diam. (ft): Paint Characteristics Internal Shell Condition: Shell Color/Shade: Shell Condition Roof Color/Shade: Roof Condition: Rim-Seal System Primary Seal: Secondary Seal Deck Characteristics Deck Fitting Category: Deck Type: Deck Fitting/Status Tank lndentification and Physical Characteristics Hanna Tank 111 -2008 Potential Hanna Utah Chevron Pipe Line Company Internal Floating Roof Tank Crude Oil N Light Rust White/White Good White/White Good Mechanical Shoe Rim-mounted Typical Welded 80.00 1,680,000.00 75.62 1.00 1.00 Access Hatch (24-in. Diam.)/Unbolted Cover, Ungasketed Automatic Gauge Float Well/Unbolted Cover, Ungasketed Column Well (24-in. Diam.)/Built-Up Col.-Sliding Cover, Ungask. Ladder Well (36-in. Diam.)/Sliding Cover, Ungasketed Roof Leg or Hanger Well/Adjustable . Sample Pipe or Well (24-in. Diam.)/Slit Fabric Seal 10% Open Vacuum Breaker (10-in . Diam.)/Weighted Mech. Actuation, Gask . Meterological Data used in Emissions Calculations: Salt Lake City, Utah (Avg Atmospheric Pressure= 12.64 psia) Quantity 1 1 1 1 24 1 1 Page 4 of 13 10/14/2008 TANKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Liquid Contents of Storage Tank Hanna Tank 111 -2008 Potential -Internal Floating Roof Tank Hanna, Utah Liquid Daily Liquid Surf. Bulk Vapor Liquid Temperature (deg F) Temp Vapor Pressure (psia) Mol. Mass Mixture/Component Month Avg. Min. Max. (deg F) Avg. Min. Max. Weight. Fract. Crude Oil (RVP 3.5) All 53.92 47.99 59.86 51.98 1.5477 NIA NIA 60.0000 1,2,4-Trimethylbenzene 0.0160 NIA NIA 120.1900 0.0023 2,2,4-Trimethylpentane (isooctane) 0.4987 NIA NIA 114.2300 0.0007 Benzene 0.9843 NIA NIA 78.1100 0.0017 8iphenyl 0.0008 NIA NIA 154.2000 0.0002 Cresol (-m) 0.0010 NIA NIA 108.1000 0.0004 Ethylbenzene 0.0876 NIA NIA 106.1700 0.0012 Hexane (-n) 1.6300 NIA NIA 86.1700 0.0117 lsopropyl benzene 0.0382 NIA NIA 120.2000 0.0003 Naphthalene 0.0019 NIA NIA 128.2000 0.0006 Toluene 0.2725 NIA NIA 92.1300 0.0036 Unidentified Components 1.5727 NIA NIA 59.4493 0.9716 Xylenes (mixed isomers) 0.0728 NIA NIA 106.1700 0.0057 Page 5 of 13 Vapor Mass Mol. Basis for Vapor Pressure Fract. Weight Calculations 120.00 Option 4: RVP=3.5 0.0000 120.19 Option 2: A=7.04383, 8=1573.267, C=208.56 0.0005 114.23 Option 2: A=6.8118, 8=1257.84, C=220.74 0.0021 78.11 Option 2: A=6.905, 8=1211.033, C=220.79 0.0000 154.20 Option 1: VP50 = .0007 VP60 = .00099 0.0000 108.10 Option 2: A=7.508, 8=1856.36, C=199.07 0.0001 106.17 Option 2: A=6.975, 8=1424.255, C=213.21 0.0247 86.17 Option 2: A=6.876, 8=1171.17, C=224.41 0.0000 120.20 Option 2: A=6.93666, 8=1460.793, C=207.78 0.0000 128.20 Option 2: A=7.3729, 8=1968.36, C=222.61 0.0013 92.13 Option 2: A=6.954, 8=1344.8, C=219.48 0.9707 120.93 0.0005 106.17 Option 2: A=7.009, 8=1462.266, C=215.11 10/14/2008 TANKS 4.0 Report Emissions Report for: Annual TANKS 4.0.9d Emissions Report -Summary Format Individual Tank Emission Totals Hanna Tank 111 -2008 Potential -Internal Floating Roof Tank Hanna, Utah II Losses(lbs) I c omponents Rim Seal Lossll Withdraw! Lossll Deck Fitting Los_sll Crude Oil (RVP 3.5) 37.5911 1,537.9711 298.2311 1,2,4-Trimethylbenzene 0.0011 3.5811 0.0111 Biphenyl o.oojl 03711 0.0011 Cresol (-m) 0.0011 0 5711 0.0011 lsopropyl benzene 0.0011 0.4911 0.0011 Ethyl benzene 0.0111 1.8111 0.0411 Hexane (-n) 0.9311 18.0611 7.3711 Naphthalene o ooll 0.8811 0.0011 Toluene o.osll 55411 0.3811 Xylenes (mixed isomers) 0.0211 8.7411 01611 2,2,4-Trimethylpentane (isooctane) 0 0211 1.0911 0 1411 Benzene o.08II 2.6011 06411 Unidentified Components 36.4911 1,494.2511 289.48 11 Page 6 of 13 Deck Seam Lossll Total Emissions! 0.0011 1,873.791 0.0011 3.6oj 0.0011 0.371 0 0011 0.571 0.0011 o.soj 0.0011 1.861 0 0011 26.361 o.ooll 0.881 0.0011 5.961 0.0011 8.921 00011 1.251 00011 3.321 0 0011 1,820.211 10/1 4/2008 TANKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Tank lndentification and Physical Characteristics Identification User Identification: City: Hanna Tank 510 -2008 Potential Hanna State: Utah Company: Type of Tank: Description: Chevron Pipe Line Company External Floating Roof Tank Crude Oil Tank Dimensions Diameter (ft): Volume (gallons): Turnovers: Paint Characteristics Internal Shell Condition: Shell Color/Shade: Shell Condition Roof Characteristics Type: Fitting Category Light Rust White/White Good Pontoon Typical Tank Construction and Rim-Seal System Construction: Welded Primary Seal: Mechanical Shoe Secondary Seal Rim-mounted Deck Fitting/Status Access Hatch (24-in. Diam.)/Bolted Cover, Gasketed Automatic Gauge Float Well/Unbolted Cover, Ungasketed 95.00 2,520,000.00 102.36 Vacuum Breaker (10-in. Diam.)/Weighted Mech. Actuation, Gask. Unslotted Guide-Pole Well/Ungasketed Sliding Cover Gauge-Hatch/Sample Well (8-in. Diam.)/Weighted Mech. Actuation, Gask. Roof Leg (3-in. Diameter)/Adjustable, Pontoon Area, Ungasketed Roof Leg (3-in. Diameter)/Adjustable, Center Area, Ungasketed Rim Vent (6-in. Diameter)/Weighted Mech. Actuation, Gask. Meterological Data used in Emissions Calculations: Salt Lake City, Utah (Avg Atmospheric Pressure= 12.64 psia) Quantity 1 1 1 1 1 17 16 1 Page 7 of 13 10/14/2008 TANKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Liquid Contents of Storage Tank Hanna Tank 510 -2008 Potential -External Floating Roof Tank Hanna, Utah Liquid Daily Liquid Surf. Bulk Vapor Liquid Temperature (deg F) Temp Vapor Pressure (psia) Mel. Mass Mixture/Component Month Avg. Min. Max. (deg F) Avg. Min. Max. Weight. Fract. Crude Oil (RVP 3.5) All 53.92 47.99 59.86 51.98 1.5477 N/A N/A 60.0000 1,2,4-Trimethylbenzene 0.0160 N/A N/A 120.1900 0.0023 2,2,4-Trimethylpentane (isooctane) 0.4987 N/A N/A 114.2300 0.0007 Benzene 0.9843 N/A N/A 78.1100 0.0017 Biphenyl 0.0008 N/A N/A 154.2000 0.0002 Cresci (-m) 0.0010 N/A N/A 108.1000 0.0004 Ethylbenzene 0.0876 N/A N/A 106.1700 0.0012 Hexane (-n) 1.6300 N/A N/A 86.1700 0.0117 lsopropyl benzene 0.0382 NIA N/A 120.2000 0.0003 Naphthalene 0.0019 N/A N/A 128.2000 0.0006 Toluene 0.2725 N/A N/A 92.1300 0.0036 Unidentified Components 1.5727 N/A N/A 59.4493 0.9716 Xy1enes (mixe~ isomers) 0.0728 N/A N/A 106.1700 0.0057 Page 8 of 13 Vapor Mass Mol. Basis for Vapor Pressure Fract. Weight Calculations 120.00 Option 4: RVP=3.5 0.0000 120.19 Option 2: A=7.04383, 6=1573.267, C=208.56 0.0005 114.23 .option 2: A=6.8118, 6=1257.84, C=220.74 0.0021 78.11 Option 2: A=6.905, 6=1211 .033, C=220.79 0.0000 154.20 Option 1: VP50 = .0007 VP60 = .00099 0.0000 108.10 Option 2: A=7.508, 6=1856.36, C=199.07 0.0001 106.17 Option 2: A=6.975, 6=1424.255, C=213.21 0.0247 86.17 Option 2: A=6.876, 6=1171 .17, C=224.41 0.0000 120.20 Option 2: A=6.93666, 6=1460.793, C=207.78 0.0000 128.20 Option 2: A=7.3729, 6=1968.36, C=222.61 0.0013 92.13 Option 2: A=6.954, 8=1344.8, C=219.48 0.9707 120.93 0.0005 106.17 Option 2: A=7.009, 6=1462.266, C=215.11 10/14/2008 TANKS 4.0 Report Emissions Report for: Annual TANKS 4.0.9d Emissions Report -Summary Format Individual Tank Emission Totals Hanna Tank 510 -2008 Potential -External Floating Roof Tank Hanna, Utah II Losses(lbs) !components Rim Seal Lossll Withdraw! Lossll Deck Fitting Lossll Crude Oil (RVP 3.5) 306.7711 2,597.0611 1,650 .0111 1,2,4-Trimethylbenzene 0.0111 60511 o.osll Biphenyl 0.0011 0.62II 0.0011 Cresol (-m) 0.0011 0 9611 0.0011 lsopropyl benzene 0.0011 0.8311 0.0311 Ethylbenzene 0.0411 3.0611 0.2211 Hexane (-n) 7.5911 30.4911 408011 Naphthalene 0.0011 1.4811 0.0011 Toluene 0.3911 9.3511 2.0911 Xylenes (mixed isomers) 0.16II 14.7511 08811 2,2,4-Trimethylpentane (isooctane) 0.1411 1 8411 0 7611 Benzene 0.6611 43911 3 5511 Unidentified Components 297 .7711 2,523.2211 1,601 .6111 Page 9 of 13 ' Deck Seam Lossll Total Emissions! 0.0011 4,553.841 0.0011 6.151 o ooll 0.621 0.0011 0.961 0.0011 0.861 0.0011 3.331 0.0011 78.881 0.0011 1.481 0 0011 11.831 0.0011 15 sol 0.0011 2 741 o.ooll 8.601 0.0011 4,422.601 10/14/2008 TANKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Tank lndentification and Physical Characteristics Identification User Identification: City: Hanna Tank 520 -2008 Potential Hanna State: Utah Company: Type of Tank: Description: Chevron Pipe Line Company External Floating Roof Tank Black Wax Condensate Mix Tank Dimensions Diameter (ft): Volume (gallons): Turnovers: Paint Characteristics Internal Shell Condition: Shell Color/Shade: Shell Condition Roof Characteristics Type: Fitting Category Light Rust White/White Good Pontoon Typical Tank Construction and Rim-Seal System Construction: Welded Primary Seal: Mechanical Shoe Secondary Seal Rim-mounted Deck Fitting/Status Access Hatch (24-in. Diam.)/Bolted Cover, Gasketed Automatic Gauge Float Well/Unbolted Cover, Ungasketed 95.00 2,520,000.00 31 .61 Vacuum Breaker (10-in. Diam.)/Weighted Mech. Actuation, Gask. Unslotted Guide-Pole Well/Ungasketed Sliding Cover Gauge-Hatch/Sample Well (8-in . Diam.)/Weighted Mech. Actuation, Gask. Roof Leg (3-in. Diameter)/Adjustable, Pontoon Area, Ungasketed Roof Leg (3-in. Diameter)/Adjustable, Center Area, Ungasketed Rim Vent (6-in. Diameter)/Weighted Mech. Actuation, Gask. Meterological Data used in !:;missions Calculations: Salt Lake City, Utah (Avg Atmospheric Pressure= 12.64 psia) Quantity 1 1 1 1 1 17 16 1 Page 10 of 13 10/14/2008 TANKS 4. 0 Report TANKS 4.0.9d Emissions Report -Summary Format Liquid Contents of Storage Tank Hanna Tank 520 -2008 Potential -External Floating Roof Tank Hanna, Utah Liquid Daily Liquid Surf. Bulk Vapor Liquid Temperature (deg F) Temp Vapor Pressure (psia) Mel. Mass Mixture/Component Month Avg. Min. Max. (deg F) Avg. Min. Max. Weight. Fract. Crude oil (RVP 5) All 53.92 47.99 59.86 51.98 2.5505 N/A N/A 50.0000 1,2,4-Trimethylbenzene 0.0160 N/A N/A 120.1900 0.0023 2,2,4-Trimethylpentane (isooctane) 0.4987 N/A N/A 114.2300 0.0007 Benzene 0.9843 N/A N/A 78.1100 0.0017 Biphenyl 0.0008 N/A N/A 154.2000 0.0002 Cresci (-m) 0.0010 N/A N/A 108.1000 0.0004 Ethylbenzene 0.0876 N/A N/A 106.1700 0.0012 Hexane (•n) 1.6300 N/A N/A 86.1700 0.0117 lsopropyl benzene 0.0382 N/A N/A 120.2000 0.0003 Naphthalene 0.0019 N/A N/A 128.2000 0.0006 Toluene 0.2725 N/A N/A 92.1300 0.0036 Unidentified Components 2.6610 N/A N/A 49.2054 0.9716 Xylenes (mixed isomers) 0.0728 N/A N/A 106.1700 0.0057 Page 11 of 13 Vapor Mass Mel. Basis for Vapor Pressure Fract. Weight Calculations 207 .00 Option 4: RVP=5 0.0001 120.19 Option 2: A=7.04383, 6=1573.267, C=208.56 0.0006 114.23 Option 2: A=6.8118, 6=1257.84, C=220.74 0.0027 78.11 Option 2: A=6.905, 6=1211.033, C=220.79 0.0000 154.20 Option 1: VP50 = .0007 VP60 = .00099 0.0000 108.10 Option 2: A=7.508, 6=1856.36, C=199.07 0.0002 106.17 Option 2: A=6.975, 6=1424.255, C=213.21 0.031 1 86.17 Option 2: A=6.876, 6=1171.17, C=224.41 0.0000 120.20 Option 2: A=6.93666, 6=1460.793, C=207.78 0.0000 128.20 Option 2: A=7.3729, 6=1968.36, C=222.61 0.0016 92.13 Option 2: A=6.954, 6=1344.8, C=219.48 0.9631 214.40 0.0007 106.17 Option 2: A=7.009, 6=1462.266, C=215.11 10/14/2008 TANKS 4.0 Report Emissions Report for: Annual TANKS 4.0.9d Emissions Report -Summary Format Individual Tank Emission Totals Hanna Tank 520 -2008 Potential -External Floating Roof Tank Hanna, Utah II Losses(lbs) !components Rim Seal Lossll Withdrawl Lossll Deck Fitting Loss ll Crude oil (RVP 5) 440.7811 801.9711 2,370.7611 1,2,4-Trimethylbenzene 0 0311 1 8711 0.1411 Biphenyl 0.0011 0.1911 0.0011 Cresol (-m) 0.0011 0 3011 0.0011 lsopropyl benzene 0 0111 0.2611 o 0511 Ethylbenzene 0.0711 0.9511 0.4011 Hexane (-n) 13.6911 9.4211 73.6411 Naphthalene 0.0011 0.4611 00011 Toluene 0.7011 2.8911 37711 Xylenes (mixed isomers) 0.3011 4.5611 1 5911 I 2,2,4-Trimethylpentane (isooctane) 0.2511 0.5711 1.3611 I Benzene II 1. 1911 1 3611 6.4011 I Unidentified Components II 424.5411 779.1711 2,283.4011 Page 12 of 13 Deck Seam Lossll Total Emissions! o ooll 3,613.51 I o ooll 2.041 0.0011 0.191 0.0011 0.301 0 0011 0.311 o.ooll 1.421 00011 96.751 00011 0.461 0.0011 7.361 0 0011 6.441 0 0011 2.191 0.0011 8.951 0.0011 3,487.111 10/14/2008 TANKS 4.0 Report Page 13 of 13 TANKS 4.0.9d Emissions Report -Summary Format Total Emissions Summaries -All Tanks in Report Emissions Report for: Annual Tank Identification Losses (lbs) Hanna Tank #TBD -2008 Potential Chevron Pipe Line Company Internal Floating Roof Tank Hanna, Utah 2,755.29 Hanna Tank 111 -2008 Potential Chevron Pipe Line Company Internal Floating Roof Tank Hanna, Utah 1,873.79 Hanna Tank 510 -2008 Potential Chevron Pipe Line Company External Floating Roof Tank Hanna, Utah 4,553.84 Hanna Tank 520 -2008 Potential Chevron Pipe Line Company External Floating Roof Tank Hanna, Utah 3,613.51 Total Emissions for all Tanks: 12,796.43 10/14/2008 CHEVRON PIPE LINE CO. HANNA STATION Table A-1 (Continued) Summary of VOC BACT Determinations (per EPA's RBLC) for Storage Tanks FACILITY PERMIT THRU THRU EMIS EMIS FACILITY NAME STATE DATE PROCESS NAME PUT PUT CONTROL DESCRIPTION LIMIT LIMIT 1 UNIT 1 UNIT REFINERY MACT REQUIRES PONCA CITY OK 7/1/2002 TANKS VARIES CERTAIN CONTROL DEVICES REFINERY WHICH ARE INSTALLED ON THE STORAGE TANKS. REFINERY MACT REQUIRES PONCA CITY OK 7/1/2002 TANKS VARIES CERTAIN CONTROL DEVICES REFINERY WHICH ARE INSTALLED ON THE STORAGE TANKS. ATOFINA PORT TK-800 EFR ARTHUR TX 5/18/2001 TANK NONE INDICATED 4.05 LB/H COMPLEX ATOFINA PORT TK-801 EFR ARTHUR TX 5/18/2001 NONE INDICATED 4.16 LB/H COMPLEX TANK ATOFINA PORT TK-802 EFR ARTHUR TX 5/18/2001 NONE INDICATED 4.16 LB/H COMPLEX TANK ATOFINA PORT TK-805 EFR ARTHUR TX 5/18/2001 NONE INDICATED 2.78 LB/H COMPLEX TANK ATOFTNA PORT TK-8077 IFR ARTHUR TX 5/18/2001 NONE INDICATED 1.26 LB/H COMPLEX TANK BAYTOWN TX 4/5/2001 TANK ZTK-08 FLOATING ROOF OR 22 LB/H OLEFINS PLANT EQUIVALENT BACT Analysis POLLUTANT COMPLIANCE NOTES II ' -· -- 15 CHEVRON PIPE LINE CO. HANNA STATION Table A-1 (Continued) Summary of VOC BACT Determinations (per EPA's RBLC) for Storage Tanks FACILITY PERMIT THRU THRU EMIS EMIS FACILITY NAME STATE DATE PROCESS NAME PUT PUT CONTROL DESCRIPTION LIMIT LIMIT J UNIT I UNIT BAYTOWN TX 4/5/200 1 (2) TANKS ZTK-FLOATING ROOF OR 0.4 LB/H OLEFINS PLANT 09A&B EQUIVALENT BAYTOWN FLOATING ROOF OR TX 4/5/2001 TANK ZTK-10 0.51 LB/H OLEFINS PLANT EQUIVALENT BAYTOWN TX 4/5/2001 TANKZTK-I1 FLOATING ROOF OR 0.28 LB/H OLEFINS PLANT EQUIVALENT SAINT-GO BAIN FUEL FUGITIVES VETROTEX TX 11/13/2000 & DIESEL NONE INDICATED 3.06 LB/H AMERICA STORAGE TANK VALERO REFINING INTERNAL FLOATING ROOF, COMPANY-TX 6/11/2002 TANKS 60000 GAUH 4013 LB/H CORPUS CHRISTI MONTHLY EMISSIONS RECORD REFINERY VALERO REFINING INTERNAL FLOATING ROOF, COMPANY-TX 6/11 /2002 TANKS 60000 GAUH 4013 LB/H CORPUS CHRISTI MONTHLY EMISSIONS RECORD REFINERY MARATHON FIXED ROOF INTERNAL FLOATING ROOF; PETROLEUM CO LA 12/27/2006 COMPLY WITH 40 CFR 63 LLC STORAGE TANKS SUBPART CC MARATHON INTERNAL INTERNAL FLOATING ROOFS ; PETROLEUM CO LA 12/27/2006 FLOATING ROOF COMPLY WITH 40 CFR 63 LLC STORAGE TANKS SUBPART CC BACT Analvsis POLLUTANT COMPLIANCE NOTES -' ,I FUGITIVE EM ISSIONS ARE AN ESTIMATE ONLY. " ,. 16 CHEVRON PIPE LINE CO. HANNA STATION Table A-1 (Continued) Summary of VOC BACT Determinations (per EPA's RBLC) for Storage Tanks FACILITY PERMIT THRU THRU EMIS EMIS FACILITY NAME STATE DATE PROCESS NAME PUT PUT CONTROL DESCRIPTION LIMIT LIMIT 1 UNIT 1 UNIT MARATHON EXTERNAL EXTERNAL FLOATING ROOF; PETROLEUM CO LA 12/27/2006 FLOATING ROOF COMPLY W 1TH 40 CFR 63 LLC STORAGE TANKS SUBPART CC . BACT Analvsis POLLUTANT COMPLIANCE NOTES - -,r 17 RBLCID IL-0073 MT-0013 OK-0059 OK-0089 OK-0092 TX-0235 TX-0237 TX-0269 TX-0269 TX-0315 TX-0315 TX-0315 CHEVRON PIPE LINE CO. HANNA STATION Table B-1 Summary of VOC BACT Determinations (per EPA's RBLC) for Fugitives THRU FACILITY NAME FACILITY PERMIT PROCESS NAME THRU PUT CONTROL DESCRIPTION STATE DATE PUT UNIT EXXONMOBIL OIL IL 8/19/2003 FUGITIVES NONE INDICATED CORPORATION MONTANA REFINING MT 1/23/1998 LIQUID GASOLINE NONE INDICATED COMPANY FUGITIVE FUGITIVE REFINERY MACT REQUIRES INSPECTION AND MAINTENANCE OF PONCA CITY REFINERY OK 7/1/2002 COMPONENTS/EQUIPM ENT PUMP SEALS, VALVES, FLANGES, AND LEAKS PIPES. TPI PETROLEUM INC., CRUDE UNIT FUGITIVE LEAK DETECTION AND REPAIR (OVA VALERO ARDMORE OK 6/9/2003 REFlNERY EMISSIONS &METHOD 21) VALERO ARDMORE OK 1/13/2003 CRUDE UNIT FUGITIVE LEAK DETECTION AND REPAIR REFINERY EMISSIONS PROGRAM EMISSIONS ARE ESTIMATES, NOT VALERO REFfN ING MAXIMUM ALLOWABLE RATES. COMPANY-CORPUS TX 6/1 1/2002 FUGITIVES SPECIAL CONDITIONS APPLY FOR MAINTENANCE AND COMPLIANCE OF CHRISTI REFINERY EQUIPMENT RELATED TO FUGITIVE EMISSIONS OF voe, SEE PERM IT. PORT ARTHUR TX 9/8/1998 FUGITIVES 28 LAER MONITORING AND REFINERY MAINTENANCE PROGRAM SWEENY TANK FARM TX 5/8/1996 PUMP PIT AREA FUGITIVES CONTROLLED WITH THE 28VHP LEAK DETECTION AND REPA IR PROGRAM. PROCESS FUG ITIVE EM ISSIONS ARE SWEENY TANK FARM TX 5/8/1996 TANK AREA FUGITIVES CONTROLLED WITH THE 28VHP LEAK DETECTION AND REPAIR PROGRAM. EXXON MOBIL BRUP OFF-SITE FUGITIVES BAYTOWN REFTNERY TX 7/12/1999 (COOLING TOWER, PUMP, NONE INDICATED VAL) EXXON MOBIL FLEXICOKING FUGITIVES LOAR PROGRAM (SEE SPECIAL BAYTOWN REFINERY TX 7/12/1999 (FXK, FRACTIONATOR, LT CONDITION #13 IN PERMIT) ENDS) EXXON MOBIL TX 7/12/1999 PIPE STILL 7 FUGITIVES LOAR PROGRAM (SEE SPECIAL BAYTOWN REFINERY CONDITION #13 IN PERMIT) BACT Analvsis EMIS EMIS EMISLIMITl LIMIT LIMIT AVG TIME 1 1 CONDITION UNIT 3.76 TPY IO MG/L .... REFINERY .,,, MACT 10000 PPM leak detection, see notes see note 1655 LB/H 2.44 LB/H 1.83 LB/H 0.91 LB/H I - 3.2 LB/H 20.4 LB/H 0.91 LB/H 18 '• RBLCID TX-0315 TX-0315 TX-03 15 TX-0320 TX-0320 TX-0320 TX-0320 TX-0320 TX-0322 TX-0322 TX-0335 TX-0340 TX-0340 CHEVRON PIPE LINE CO. HANNA STATION Table B-1 (Continued) Summary of VOC BACT Determinations (per EPA's RBLC) for Fugitives THRU FACILITY PERMIT THRU FACILITY NAME STATE DATE PROCESS NAME PUT PUT CONTROL DESCRIPTION UNIT EXXON MOBIL TX 7/12/1999 RESIDFTNfNG & PIPE STILL LOAR PROGRAM (SEE SPECIAL BAYTOWN REFINERY 8 FUG ITIVES CONDITION #13) EXXON MOBIL TX 7/12/1999 SCU 2 FUGITIVES LOAR PROGRAM (SEE SPECIAL BAYTOWN REFINERY CONDITION #13 OF PERMIT) EXXON MOBIL TX 7/12/1999 SOUR WATER STRIPPING LOAR PROGRAM (SEE SPECIAL BAYTOWN REFINERY FUGITIVES CONDITION #13 OF PERMIT) ALON USA BIG SPRING TX 9/2/1999 CRUDE COMPLEX 28VHP LOAR REFINERY FUGITIVES, 02CRUDEFUG ALON USA BIG SPRING TX 9/2/1999 FUEL GAS TREATER 28VHP LOAR REFINERY FUGITIVES, I0FGTFUG ALON USA BIG SPRING TX 9/2/1999 LDH FUGITIVES, 28VHP LOAR REFINERY 09LDHFUG ALON USA BIG SPRING TX 9/2/1999 PDA FUGITIVES, 28VHP LOAR REFINERY 09PDAFUG ALON USA BIG SPRING REFORMATE SPLITTER/CS REFINERY TX 9/2/1999 COLUMN FUGITIVES, 28VHP LOAR 26MTEFUG CITGO CORPUS CHRISTI PROCESS FUGITIVES, 517-REFINERY-WEST TX 10/15/1999 NONE INDICATED PLANT SI4 CITGO CORPUS CHRISTI SRU PROCESS FUGITIVES, REFINERY-WEST TX I 0/15/1999 553-FUG -NONE INDICATED PLANT TRIGEANT CORPUS TX sn12000 FUGITIVES, FUGITIVES NONE INDICATED CHR ISTI EXXON MOBIL TX 4/13/2001 PROCESS FUGITIVES, LSM, 28VHP LOAR PROGRAM BAYTOWN REFINERY LSMFUG EXXON MOBIL TX 4/13/2001 STORAGE TANK 0806, INTERNAL FLOATING ROOF BAYTOWN REFINERY TK0806 BACT Analvsis EMIS EMIS EMIS LIMIT I l LIMIT LIMIT I AVG TIME I UNIT CONDITION 3.42 LB/H 4.2 LB/H 0.5 LB/H 8.03 LB/H 0.98 LB/H 0.5 1 LB/H 3 LB/H 055 LB/H """I _,J 18.59 LB/H 1.05 LB/H 2.19 LB/H 12 LB/H 0.16 LB/H 19 RBLCID . TX-0348 TX-0348 TX-0348 TX-0348 TX-0348 TX-0376 TX-0376 TX-0376 TX-0376 TX-0379 TX-0379 TX-0416 LA-0211 CHEVRON PIPE LINE CO. HANNA STATION Table B-1 (Continued) Summary of VOC BACT Determinations (per EPA's RBLC) for Fugitives THRU FACILITY NAME FACILITY PERMIT PROCESS NAME THRU PUT CONTROL DESCRIPTION STATE DATE PUT UNIT DIAMOND SHAMROCK TX 10/19/200 I FUGITIVES-NONE INDICATED MCKEE PLANT ISOMERIZATION, F-9 I DIAMOND SHAMROCK TX 10/19/200 1 FUGITIVES -NO. 3 NONE INDICATED MCKEE PLANT REFORMER DIAMOND SHAMROCK TX I 0/19/2001 FUGITIVES -NO. 3 SRU , F-NONE INDICATED MCKEE PLANT 90 DIAMOND SHAMROCK TX 10/19/2001 FUGITIVES -NO. 4 NONE INDICATED MCKEE PLANT HYDROTREATER, F-88 DIAMOND SHAMROCK TX 10/19/2001 FUGITIVES-SPLITTER, F-89 NONE INDICATED MCKEE PLANT DOW TEXAS TX 11/26/2002 PIPING FUGITIVES, NONE INDICATED OPERATIONS FREEPORT PROJECT A, A50FUO I DOW TEXAS TX 11/26/2002 PIPING FUGITIVES, NONE INDICATED OPERATIONS FREEPORT PROJECT B, B73FUOI DOW TEXAS TURBINE LUBRICATION OPERATIONS FREEPORT TX 11/26/2002 FUGITIVES, PROJECT A, NONE IN DICATED A50VI DOW TEXAS TURBINE LUBRICATION OPERATIONS FREEPORT TX 11/26/2002 FUGITIVES, PROJECT B, NONE INDICATED B73V4 EXXONMOBIL FOLLOW PROCEDURES FOR LEAK TX 6/10/2002 FCCU FUGITIVES PREVENTION, DETECTION, AND BEAUMONT REFINERY REPA IR. FOLLOW PROCEDURES FOR LEAK EXXONMOBIL TX 6/10/2002 FCCU FUGITIVES PREVENTION, DETECTION, AND BEAUMONT REFINERY (PRESCRUBBER), 06FG-001 REPA IR. SHELL OIL DEER PARK TX 11/24/1999 FUG ITIVE, PIPING LEAK DETECTION AND REPAIR PROGRAM MARATHON LA 12/27/2006 FUGITIVE EM ISSIONS LA REFINERY MACT PETROLEUM CO LLC BACT Analvsis EMIS EMIS EMISLIMITl LIMIT LIMIT AVG TIME . 1 1 CONDITION UNIT 1.46 LB/H 1.04 LB/H ..... , 0.21 LB/H 1.2 LB/H 0.23 LB/H 0.136 LB/H 0.136 LB/H 0.006 LB/H 0.006 LB/H 9.84 LB/H - I _, 9.85 LB/H 0.09 LB/H 20 '• r L A B C D E F G H 7+00 · m.sr . . ma 1-mr . r-r ffi·-·-;-·-·-·-·-·-·~z~~---·-·-·-·-·-·. -~·-, ·0-~. ·-·-·-·-·-· ·---~~..___._r---+-1 ====-~-~ .. ~-~ Ji: .~ !'-"'.>M?. $+00 4+00 .. ·1- □=" ,..'I, ,..,.,, 0 0+00 1 I · ~ 0 I i~ -~ '"'""""""" .;._ . c5 """ ~ a.-.,.;o·· r ~- wrn~ n:#rl -1j L -~ I i1ll1 b I,, "'""'fA'J'L.· 'i: j ''-l__J· \..nMS -~"' """'"" 0 2+00 1+00 . '~~~~.cw r----~----! ~" ---__,-~·--~ • . .. ! .! -----~L-~~ i:::~ ~□ l'WON.NCTN«S . TN,fltllJ . CJ ~~IU [D :1U[ltAll.DN:: ·Pt LU ~~: ~ n ~ ~ -=--=-::.~, ,, ,, ,, D ,, ,, \~\_; '+;:,., \<., \\'t" B '\,,\ \ .. • \(""'I \ \ I \ \ . ll~,'f~~ i i !! I 0+00 . L • ..,._, -· -· _ _._, -· -•-··-··-·-· -· -· -· -· -· ,.,.,,·-•·-·-· : --· -· -· _,.;l-J_. __ I 8 i i 8 i 8 ~ w · !I I .1. I (_ H6' I -1 I I I I I -·-··-•·-•·. ·-·-·-. -·. ·-•-•·-•·-• 8 ; 8 : .~ ,._,_j i DRAWING ISSUED • " l T SCALC:1••40' ,l!!!!!!:. ___ fOR APPROVAL ___ FOR CONSTRUCTION I ,OR REV1EW ---F'OR BID I ifNGlobal ___ mR REF£Rt•ct ___ ""' AS-eu1Lr ~ 11.JJOJ,....., -,... »t1 ___ FOR PERMIT REQUEST ~~-, IICF'CRC:NCC IMM,1/INGS 1----------+-----+------+------l◊ 0 ~RC~=l~~ ~!_~i~ ma.... Plpoln PLOT PLAN HANNA PUMP STATION HANNA.!. DUCHESNE COUNTY I--------+----+-----+----,◊ ◊ SCH.[~ DR . .....lltLCH. _!Sll:i_DR, ,,,,,,., --[NGR. -- CPR' G OCPT. ___ (HG. D[PT. COST CODC UTF0 16-A-00001 A 7 2 3 4 6 J I Process Flow Diagram I Pipeline from Rangely Oil Field Potent Throu. =43,3 =15,80 11 ay ls/yr • Tank · i. . T-520 . .. 60,000 ' bbl CHEVRON PIPE LINE COMPANY HANNA STATION .~ Fugitive Emissions -Valves, Fittings, Pump Seals Tank -Maintenance Emi ssions I I ,i, • • • : Tanks ', Tanks Tank < •~ T-510 T-111 ~ #TBD i. 60,000 . 40,000 60,000 • bbl bbl bbl ~ .. , Pipeline to the Salt Lake Refineries UTAH DIVISION OF AIR QUALITY SOURCE PLAN REVIEW Jim Robbins Chevron USA Pipeline Company 2875 S Decker Lake Dr Ste 150 West Valley City, UT 84119 RE: Review Engineer: Date: Notice of Intent Submitted: Plant Contact: Phone Number: Fax Number: Source Location: Project Number: NSR0102130001 Hanna Petrol um Pipeline Pumping Station Duchesne County; CDS B; Attainment Area, NSPS (Part 60) Tim Dejulis Not locked November 17, 2008 Jim Robbins (801) 975-2325 801-975-2323 40700 West 7000 North, Hanna, UT Duchesne County 4,472,294 m Northing, 520,536 m Easting, UTM Zone 12 UTM Datum: NAD83 DAQ requests that a company/corporation official read the attached draft/proposed Plan Review with Recommended Approval Order Conditions. If this person does not understand or does not agree with the conditions, the review engineer should be contacted within five days after receipt of the Plan Review. If this person agrees with the Plan Review and Recommended Approval Order Conditions, this person should sign below and return (FAX# 801-536-4099) within 10 days after receipt of the conditions. If the review engineer is not contacted within IO days, the review engineer shall assume that the company/corporation official agrees with this Plan Review and will process the Plan Review towards final approval. A public comment period wi ll be required before the Approval Order can be issued. Applicant Contact ____________________________ _ (Signature & Date) Engineering Review: Chevron USA Pi peline Company: Hanna Pumping Station -Hanna Petrolum Pipeline Pumping Station Not locked Page I ABSTRACT Chevron Pipeline Company has requested permi ssion to operate the Hanna petroleum pumping station as a stationary area source. The Hanna station receives crude oil, condensible hydrocarbons, and bl ack wax throughput from the company owned pipeline on it way to Salt Lake City. The Hanna station serves as a buffer to pipeline operations allowing production to ebb and flow while at the same time maintaining a consistent throughput within the pipeline. Plant equipment includes four storage tank s (one with 1,680,000 gallon capacity and three with 2,520,000 gallon capacity), electric pump motors, and various comfort heating equipment items rated less than 5,000,000 Btu/hr each. The emissions, in tons per year, will be as follows: VOC = 12.27, HAPs = 0.33 SOURCE SPECIFIC DESIGNATIONS Nonattainment or Maintenance Areas Impacted: %%:udaq_ao_impacts%% Applicable Programs: Attainment Area, Subpart (No subparts) applies to Petroleum Pumping Station NSPS (Part 60), Subpart Kb: VolatLiq/PetroStorageVessel 7/23/84 applies to Petroleum Pumping Station Description of Proposal: Changes: Chevron Pipeline Company intends to establish a petroleum pumping station as a new stationary area source. Crude oil , condensible hydrocarbons, and black wax are transported by the pipeline to customers in Salt Lake City. The pump ing stati on employs large storage tanks and electrical pumps. Permit History: When issued, the ap proval order shall supersede or will be based on the fo llowing doc uments: Is Deri ved From Original NOi dated November 17, 2008 Emissions Summary: Estimated Criteri a Pollutant Potential Emissions Volatile Organi c Compound s Estimated Hazard ous Air Po llutant Potenti al Emiss ions 12.27 tons/yr 2,2,4-Trimethylpentane (CAS #54084 1) .01 tons/yr Engineering Review: Chevron USA Pipeline Company: Han na Pumping Station -Hanna Petro lum Pipeline Pumping Station ot locked Page 2 Benzene (Including Benzene From Gasoline) (CAS #71432) Ethyl Benzene (CAS #100414) Hexane (CAS #110543) Naphthalene (CAS #91203) Toluene (CAS # 108883) Xylenes (Isomers And Mixture) (CAS #1330207) Total hazardous air pollutants Best Available Control Technology Analysis: .02 tons/yr .01 tons/yr .19 tons/yr .01 tons/yr .04 tons/yr .05 tons/yr .33 tons/yr l. BACT review regarding Pl ant-wide -BACT Analysis Chevron Pipeline Company has evaluated control options for all new, or modified equipment items in terms of practical feasibility, control efficiency, and weighed the amount of pollution controlled agai nst the cost of implementing a given technology, or strategy. The va rious comfort heating devices do not require a BACT analysis due to the exclusion given to these devices rated less than 5,000,000 Btu/hr -each in UAC R307-401-10. The New Source Review Engineering Section recommends the following as BACT: Storage Tanks Use of submerged fill technology Use of fl oating roof technology Regul arl y visuall y in spect storage tanks (above ground), connecting suppl y or discharge pipes, flanges, or gaskets, for gaps, tears or other .defects · Regul arl y maintaining storage tanks, and all connected equipment. [Last updated Febru ary 19. 2009) Modeling Results: This source does not require modeling because the source is located in a Non-attainment area or erniss ions increases are below thresholds establi shed in R307-410. [Last updated February 19, 2009] Engi neering Review: Chevron USA Pipeline Company: Hanna Pumping Station -Hanna Petrolum Pipeline Pumping Station Not locked Page 3 I.l I.2 L3 I.4 I.5 I.6 I.7 RECOMMENDED APPROVAL ORDER CONDITIONS The intent is to issue an air quality Approval Order (AO) authorizing the project with the following recommended conditions and that fai lure to comply with any of the conditions may constitute a violation of the order. The AO will be issued to and will apply to the following: Name of Permittee: Chevron USA Pipeline Company 2875 S Decker Lake Dr Ste 150 West Valley City, UT 84119 Permitted Location: Chevron USA Pipel ine Company: Hanna Pumping Station 40700 West 7000 North Hanna, UT 84031 UTM coordinates: SIC code: 520,536 m Easting, 4,472,294 m Northing 4612 (Crude Petroleum Pipelines) Section I: GENERAL PROVISIONS All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-10 l] The limits set forth in thjs AO shall not be exceeded without prior approval. [R307-401] Modifications to the equipment or processes approved by this AO that could affect the emissions covered by thi s AO must be reviewed and approved. [R307-401] All records referenced in this AO or in other applicabl e rules. which are required to be kept by the owner/operator, shall be made avai lable to the Executive Secretary or Executive Secretary's representative upon request, and the records shall include the two-year period prior to the date of the request. Unl ess otherwise specifi ed in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-150] At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate an y equipment approved under thi s AO including associated air pollution control equipment in a manner consistent with good air pollution control practice for minimizin g emi ssions. Determination of whether acceptable operating and maintenance procedures are being used wi ll be based on information available to the Executive Secretary which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and in spection of the source. All maintenance . performed on equipment authori zed by this AO shall be recorded. [R307-401] The owner/operator shall comply with R307-150 Series. In ven tories. Testing and Monitoring. [R307-150] The owner/operator shall compl y with UAC R307-107. General Requirements: Unavoidable Breakdowns. [R307-107] Engineering Review: Chevron USA Pipeline Company: Hanna Pumping Station -Hanna Petrolum Pipeline Pumping Station Not locked Page 4 II.A II.A.I II.A.2 11.A.3 II.A.4 II.A.5 . II.A.6 II.A.7 II.B .l.a ll.B.l.b II.B. l.c II.B.l.d Section II: SPECIAL PROVISIONS The approved installations shall consist of the following equipment: Petroleum Pumping Station Hanna Petroleum Pipeline Pumping Station Equipment Leaks Various Process Connection/Process Control Device Equipment Leaks Comfort Heaters Various comfort heating devices rated less than 5,000,000 Btu/hr -each (listed for informational purposes only) Tank 510 2,520,000 gallon External Floating Roof Storage Tank (1973) Tank 520 2,520,000 gallon External Floating Roof Storage Tank (1972) Tank 111 1,680,000 gallon Internal Floating Roof Storage Tank (1949) Tank 530 ·2,520,000 gallon Internal Floating Roof Storage Tank (2009) Requirements and Limitations Visible e missions from any stationary poi nt or fugitiv e e mi ssion source associated with the source or with the control facilities shall not exceed 20% opacity. Opacity observations of emissions from stationary sources shall be conducted in accordance with 40 CFR 60, Appendix A, Method 9. [R307-40 l] The following limits shall not be exceeded: 9,166,610 barrels of crude oil throughput per rolling 12-month period 1,896,540 barrels of black wax condensate mix throughput per rolling 12-month period 4,741,350 barrels of condensate throughput per rolling 12-month period To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous 12 months. Records of crude oil throughput shall be kept for all periods when the plant is in operation. Crude oil throughput shall be determined by examination of company and/or customer billing records. The records of crude oil throughput shall be kept on a monthly basis. [R307-401] C hevron Pipeline Company shall noti fy th e Executi ve Secretary in writing when the installati on of the items appearing in the equipment li st is complete and is operational. To insure proper credit when notifying the Executive Secretary, send your c01Tespondence to the Executi ve Secretary, attn: Compliance Section. If the construction and/or in stallation is not complete within 18 months from the date of this AO, the Executive Secretary shall be notified in writing on the status of the construction and/or installation. At that time, the Executive Secretary shall require documentation of the continuous construction and/or in stallation of the operation and may revoke the AO. lR307-40J-18] The owner/operator shall use propane or natural gas as fuel in the various comfort heating devic es. [R 307-4011 Engineering Review: Chevron USA Pipeline Company: Hanna Pumping Station -Hanna Petrol um Pipeline Pumping Station ot locked Page 5 Section III: APPLICABLE FEDERAL REQUIREMENTS In addition to the requirements of this AO, all applicable provisions of the following federal programs have been found to apply to this installation. This AO in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including UAC R307. NSPS (Part 60), Kb: VolatLiq/PetroStorage Vessel 7 /23/84 Engineering Rev iew: Chevron USA Pipeline Company: Hanna Pumping Station -Hanna Petrolum Pipeline Pumping Stati on Not locked Page 6 REVIEWER COMMENTS The AO will be based on the following documents: Is Derived From Original NOI dated November 17, 2008 l. Comment on an item originating in TMD regarding Petroleum Pumping Station Additional information: Submitted February 12, 2009. [Last updated February 19, 2009] 2. Comment on an item ori gin ating in TMD regarding Petroleum Pumping Station Additional information: Submitted January 20, 2009. [Last updated February 19, 2009] 3. Comment on an item originating in TMD regarding Petroleum Pumping Station Additional information: Submitted January 28, 2009. [Last updated February 19, 2009) 4. Comment on an item originating in TMD regarding Petroleum Pumping Station Additional information : Submitted February 11, 2009. [Last updated February 19, 2009] 5. Comment on an item origi nat ing in TMD regarding Petroleum Pumping Station Comments from Chevron USA Pipeli ne: Source raised concerns regarding language contained in conditions II.B.l.a, 11.B.l.b, and 11.B.l.d on several occasions (January 20, 2009, January 28, 2009, February 11 , 2009, and February 12, 2009) which delayed the start of the public comment period. The comments were about the applicability of R307-l 50, the relevance of opacity observations, the listing of fuel combustion devices mentioned in R307-401-10, and the timing of updating rolling 12-month throughput totals. These negotiations resulted in the following changes to the pl an review submitted to the source: l. Opacity raised to 20% as per R307-205. 2. The frequency of monitoring of pipeline throughput will change from daily to monthly. 3. R307-401-10 fuel buring equipment will include a "for informational purposes on ly" reference. 4. Fuel burning equipment will include natural gas as well as propane. [Last updated February 19, 2009] Engineering Review: Chevron USA Pipeline Company: Hanna Pumping Station -Hanna Petrolum Pipeline Pumping Station ot locked Page 7 ACRONYMS The following lists commonl y used acronyms and their associated translations as they appl y to this document: 40CFR AO ATT BACT CAA CAAA CDS CEM CEMS CFR co COM DAQ DAQE EPA HAPorHAPs ITA MACT NAA NAAQS NESHAP NOI NOx NSPS NSR PMIO PM2.s PSD R307 R307-401 S02 Title IV Title V UAC UDAQ voe Title 40 of the Code of Federal Regulations Approval Order Attainment Area Best Available Control Technology Clean Air Act Clean Air Act Amendments Classification Data System (used by EPA to classify sources by size/type) Continuous emissions monitor Continuous emissions monitoring system Code of Federal Regulations Carbon monoxide Continuous opacity monitor Division of Air Quality (typically interchangeable with UDAQ) This is a document tracking code for internal UDAQ use Environmental Protection Agency Hazardous air pollutant(s) Intent to Approve Maximum Achievable Control Technology Nonattainment Area National Ambient Air Quality Standards National Emission Standards for Hazardous Air Poll utants Notice of Intent Oxides of nitrogen New Source Performance Standard New Source Review Particulate matter less than 10 microns in size Particulate matter less than 2.5 microns in size Prevention of Si gn ificant Deterioration Rules Series 307 Rules Series 307 -Section 401 Sulfur dioxide Title IV of the Clean Air Act Title V of the Clean Air Act Utah Administrative Code Utah Di vision of Air Quality (typicall y interchangeable with DAQ) Volatile organi c compounds Engineering Review: Chevron US A Pipeline Company: Hanna Pumping Station -Hanna Petrolum Pipeline Pumping Station Not locked Page 8 UTAH DIVISION OF AIR QUALITY SOURCE PLAN REVIEW Jim Robbins Chevron USA Pipeline Company 2875 S Decker Lake Dr Ste 150 West Valley City, UT 84119 RE: Review Engineer: Date: otice oflntent Submitted: Plant Contact: Phone Number: Fax Number: Source Location: Project Number: NSR0102130001 Hanna Petrolum Pipeline Pumping Station Duchesne County; CDS B; Attainment Area, NSPS (Part 60) Tim Dejulis Not locked November 17, 2008 Jim Robbins (80 I) 975-2325 801-975-2323 40700 West 7000 North, Hanna, UT Duchesne County RECEIVED JAN 2 0 2009 Division of Air Quality 4,472,294 m Northing, 520,536 m Easting, UTM Zone 12 UTM Datum: t-/AD83 __ -~ Comment [AH1]: These coordinates ~, in NAD27 is outside the boundary of the DAQ requests that a company/corporation official read the attached draft/proposed Plan Review with Recommended Approval Order Conditions. If this person does not understand or does not agree with the conditions, the review engineer should be contacted within five days after receipt of the Plan Review. If this person agrees with the Plan Review and Recommended Approval Order Conditions, this person should sign below and return (FAX # 801-536-4099) within IO days after receipt of the conditions. If the review engineer is not contacted within IO days, the review engineer shall assume that the company/corporation official agrees with this Plan Review and will process the Plan Review towards final approval. A public comment period will be required before the Approval Order can be issued. Applicant Contact __________________________ _ (Signature & Date) Engineering Review: Chevron USA Pipeline Company: Hanna Pumping Station -Hanna Perrolum Pipeline Pumping Station Not locked Page 1 '' facility. , ' Deleted: NAD27 ABSTRACT Chevron Pipeline Company has requested permission to operate the Hanna petroleum pumping station as a stationary area source. The Hanna station receives crude oil, condensible hydrocarbons, and black wax throughput from the company owned pipeline on it way to Salt Lake City. The Hanna station serves as a buffer to pipeline operations allowing production to ebb and flow while at the same time maintaining a consistent throughput within the pipeline. Plant equipment includes four storage tanks (one with 1,680,000 gallon capacity and three with 2,520,000 gallon capacity), electric pump motors, and various comfort heating equipment items rated less than 5,000,000 Btu/hr each. The emissions, in tons per year, will be as follows: voe =~2.27,_~~~s_ ~~-34 _________________________________________________ -< _ - SOURCE SPECIFIC DESIGNATIONS ,, ,, ' ' ' Comment [AH2]: Increased significant digits. Deleted: 12.00 Deleted: 0.33 Nonattainment or Maintenance Areas Impacted: f /o %: udaq_ ao _ impacts% o/c _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -Comment [AH3]: Facility is in Applicable Programs: Attainment Area, Subpart (No subparts) applies to Petroleum Pumping Station NSPS (Part 60), Subpart Kb: VolatLiq/PetroStorageVessel 7/23/84 applies to Petroleum Pumping Station Description of Proposal: Changes: Chevron Pipeline Company intends to establish a petroleum pumping station as a new stationary area source. Crude oil, condensible hydrocarbons, and black wax are transported by the pipeline to customers in Salt Lake City. The pumping station employs large storage tanks and electrical pumps. Permit History: When issued, the approval order shall supersede or wi ll be based on the fo llowing documents: Is Derived From Original NOi dated ovember 17, 2008 Emissions Summary: , Estimated Criteria Pollutant Potential Emissions Volatile Organic Compounds --------------------------- !Estimated Hazardous Air Pollutant Potential Emission ._ __________________________________ - 2,2,4-Trimethylpentane (CAS #540841 ) .01 tons/yr Benzene (Including Benzene From Gasoline) .02 tons/yr Engineering Review: Chevron USA Pipeline Company: Hanna Pumping Station -Hanna Petrol um Pipeline Pumping Station Not locked Page 2 attainment area. Comment [AH4 ]: Increase significant digits. Deleted: 12 Comment [AHS]: Please add: Biphenyl = 0.002 ton/yr Cresol (m) = 0.002 ton/yr Cumene = 0.003 ton/yr (CAS #71432) Ethyl Benzene (CAS #100414) Hexane (CAS #110543) Naphthalene (CAS #91203) Toluene (CAS #108883) Xylenes (Isomers And Mixture) (CAS #1330207) Total hazardous air pollutants Best Available Control Technology Analysis: I. BACT review regarding Plant-wide .01 tons/yr .19 tons/yr .01 tons/yr .04 tons/yr .05 tons/yr ~)jlqn~0'! __________________________ --1~De_leted __ :_.33 ______ ~ BACT Analysis: Chevron Pipeline Company has evaluated control options for all new, or modified equipment items in terms of practical feasibility, control efficiency, and weighed the amount of pollution controlled against the cost of implementing a given technology, or strategy.The various comfort heating devices do not require a BACT analysis due to the exclusion given to these devices rated less than 5,000,000 Btu/hr-each in UAC R307-401- IO.The New Source Review Engineering Section recommends the following as BACT: Storage Tanks Use of submerged fill technology Use of floating roof technology Regularly visually inspect storage tanks (above ground), connecting supply or discharge pipes, flanges, or gaskets, for gaps, tears or other defects Regularly maintaining storage tanks, and all connected equipment [Last updated December 29, 2008] Modeling Results: This source does not require modeling because the source is located in a Non-attainment area or emissions increases are below thresholds established in R307-4 l 0. [Last updated December 29, 2008] Engineering Review: Chevron USA Pipeline Company: Hanna Pumping Station -Hanna Petrolum Pipeline Pumping Station Not locked Page 3 I.I 1.2 1.3 1.4 1.5 RECOMMENDED APPROVAL ORDER CONDITIONS The intent is to issue an air quality Approval Order (AO) authorizing the project with the following recommended conditions and that failure to comply with any of the conditions may constitute a violation of the order. The AO will be issued to and will apply to the following: Name of Permittee: Chevron USA Pipeline Company 2875 S Decker Lake Dr Ste 150 West Valley City, UT 84119 Permitted Location: Chevron USA Pipeline Company: Hanna Pumping Station 40700 West 7000 orth Hanna, UT 84031 UTM coordinates: SIC code: 520,536 m Easting, 4,472,294 m Northing 4612 (Crude Petroleum Pipelines) Section I: GENERAL PROVISIO S All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-l O 1] The limits set forth in this AO shall not be exceeded without prior approval. [R307-401] Modifications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401] All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, shall be made available to the Executive Secretary or Executive Secretary's representative upon request, and the records shall include the two-year period prior to the date of the request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401]. [R307-150] At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this Approval Order including associated air pollution control equipment in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Executive Secretary which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R3 07-401] I~_ - - - - - ->: - - - - - - - - - - -~ - - - - - - - - - ---- - - - - ---- --- - -- - - - - - --- - - --- - - - - ---,---~-~~:i!~:~:,,,.1~:Can7::nn!i°m ', warrant an inventory on a routine basis. 1.7 The owner/operator shall comply with UAC R307-107. General Requirements: Unavoidable Breakdowns. [R307-107] Engineering Review: Chevron USA Pipeline Company: Hanna Pwnping Station -Hanna Petrolwn Pipeline Pwnping Station Not locked Page 4 , However, the facility will submit an , inventory as needed upon written request , by DAQ. Deleted: The owner/operator shall comply with R307-150 Series. Inventories, Testing and Monitoring. [R307-150]'l! II.A II.A.I II.A.2 II.A.3 II.A.4 II.A.5 ILA.6 II.A.7 11.B rt.B.1.a II.B.1.b II.B.l.c rt.B.1.d Section 11: SPECIAL PROVISIONS The approved installations shall consist of the following equipment: Petroleum Pumping Station Hanna Petroleum Pipeline Pumping Station Equipment Leaks Various Process Connection/Process Control Device Equipment Leaks Tank 111 1,680,000 gallon Internal Floating Roof Storage Tank (1949) Tank 510 2,520,000 gallon External Floating Roof Storage Tank (1973) Tank 520 2,520,000 gallon External Floating Roof Storage Tank (1972) Tank530 2,520,000 gallon Internal Floating Roof Storage Tank (2009) Comfort Heaters Various comfort heating devices rated less than 5,000,000 Btu/hr -each Requirements and Limitations L ____________________________________________________________ _ I\ I ' The following limits shall not be exceeded: I ' I ' 9,166,610 barrels of crude oil throughput per rolling 12-month period 1,896,540 barrels of black wax condensate mjx throughput per rolling 12-month period 4,741,350 barrels of condensate throughput per rolling 12-month period ' ,b rolling 12-month total throughput will be calculated on a monthly basis and records shall be made available to the Executive Secretary or Executive Secretary's representative upon request, Recorqs of crude oi 1 throughput shall be kept for two years for all periods when the plant is in ' operation. Crude oil throughput shall be determined by examination of company and/or customer billing records. J:~~0_7:~01 l __________________________________ _ ' Chevron Pipeline Company shall notify the Executive Secretary in writing when the installation\ of the items appearing in the equipment list is complete and is operational. To insure proper credit when notifying the Executive Secretary, send your correspondence to the Executive Secret~ry, attn: Compliance Section. If the construction and/or installation is not complete within 18 months from the date of this AO, the Exec;utive Secretary shall be notified in writing on the status of the construction and/or installation. At that time, the Executive Secretary shall requin(documentation of the continuous construction and/or installation of the operation and may reyoke the AO. [R307-401-18] I I I Comment [AH7]: This facility is not a source for PM. The only time opacity may be a concern would be short-term during construction. Deleted: Visible emissions from any stationary point or fugitive emission source associated with the source or with the control facilities shall not exceed 100/o opacity. Opacity observations of emissions from stationary sources shall be conducted at an acceptable frequency, in accordance with 40 CFR 60, Appendix I A, Method 9. [R307-401] I Deleted:,i Deleted: To detennine compliance with a rolling 12-month total, the owner/operator shall calculate a new 12- month total by the twentieth day of each month using data from the previous 12 months. ' Deleted: The records of crude oil throughput shall be kept on a daily basis .. The owner/operator shall use propane or natural gas as fuel in the various~ heatin_g ____ --{ Deleted: compfon devices. ~----------~ J R307401l _____________________________________________________ -,~De_leted_:_. _____ ~ Section Ill: APPLICABLE FEDERAL REQUIREMENTS Engineering Review: Chevron USA Pipeline Company: Hanna Pumping Station -Hanna Petrol um Pipeline Pumping Station Not locked Page 5 In addition to the requirements of this AO, all applicable provisions of the following federal programs have been found to apply to this installation. This AO in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including UAC R307. NSPS (Part 60), Kb: VolatLiq/PetroStorage Vessel 7 /23/84 Engineering Review: Chevron USA Pipeline Company: Hanna Pumping Station -Hanna Petrol um Pipeline Pumping Station ot locked Page 6 REVIEWER COMMENTS The AO will be based on the following documents: Is Derived From %% %%NEXT%,% :uda %%NEXT%% q_p ermi t C mt_ nsr %% Original NOI dated ovember 17, 2008 Engineering Review: Chevron USA Pipeline Company: Hanna Pumping Station -Hanna Petrolum Pipeline Pumping Station Not locked Page 7 ACRONYMS The following lists commonly used acronyms and their associated translations as they apply to this document: 40CFR AO ATI BACT CAA CAAA CDS CEM CEMS CFR co COM DAQ DAQE EPA HAP orHAPs ITA MACT NAA NAAQS NESHAP NOi NOx NSPS NSR PM10 PM2.5 PSD R307 R307-401 S02 Title IV TitleV UAC UDAQ voe Title 40 of the Code of Federal Regulations Approval Order Attainment Area Best Available Control Technology Clean Air Act Clean Air Act Amendments Classification Data System (used by EPA to classify sources by size/type) Continuous emissions monitor Continuous emissions monitoring system Code of Federal Regulations Carbon monoxide Continuous opacity monitor Division of Air Quality (typicall y interchangeable with UDAQ) This is a document tracking code for internal UDAQ use Environmental Protection Agency Hazardous air pollutant(s) Intent to Approve Maximum Achievable Control Technology Nonattainment Area National Ambient Air Quality Standards National Emission Standards for Hazardous Air Pollutants Notice oflntent Oxides of nitrogen New Source Performance Standard New Source Review Particulate matter less than IO microns in size Particulate matter less than 2.5 microns in size Prevention of Significant Deterioration Rules Series 307 Rules Series 307 -Section 401 Sulfur dioxide Title IV of the Clean Air Act Title V of the Clean Air Act Utah Administrative Code Utah Division of Air Quality (typically interchangeable with DAQ) Volatile organic compounds Engineering Review: Chevron USA Pipeline Company: Hanna Pwnping Station -Hanna Petrolwn Pipeline Pwnping Station Not locked Page 8 Chevron November 13, 2008 Utah Division of Air Quality Attn: Mr. Tim DeJulis 150 North 1950 West Salt Lake City, Utah 84114-4820 () -n ra3\7~:) 1000-· Global Gas Chevron Pipe Line Company 2875 S Decker Lake Dr Ste 150 Salt Lake City, UT 84119 Tel 801 975 2320 Fax 801 975 2333 UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY ---·-. · 7 NOV 173)()8 ; ~--... --. .J DIVISION OF ~IR QUALITY Chevron Pipe Line Company -Hanna Facility Notice of Intent ~~'~ No \ o '2-.l °?:> ~cx..x:> 1 Dear Mr. DeJulis: Please find attached a copy of the signed Chevron Pipe Line Company, Notice of Intent Permit for the Hanna Facility. This signed copy is a duplicate of the information that Autumn Hu of URS provided to you on October 20, 2008. Also attached is a check for the amount of $1,900.00 for the NOi processing fee. Based on this information, the potential to emit for the Hanna Facility is 12.27 tons of VOC per year (tpy), while the Hazardous Air Pollutants (HAP's) is _:S I ton per year. Due to the critical nature of the weather, we would appreciate all efforts to expedite this permit as soon as possible. If additional clarification and/or information are required, please contact Jim Robbins at (80 I) 975-2325. Sincerely, ;{)/J;:; 1m Robbins Environmental Specialist Attachments Chevron NOTICE OF INTENT HANNA STATION CHEVRON PIPE LINE COMPANY November3,2008 Prepared by: URS UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY -----. -7 1 ! I NOV 1 7 2008 ! DIVISION OF ~IA QUALITY 7 56 East Winchester Street, Suite 400 Salt Lake City, UT 84107 URS Project: 24584986 ' NOTICE OF INTENT HANNA STATION CHEVRON PIPE LINE COMPANY November3,2008 TABLE OF CONTENTS Fonn I Form Id Appendix A Appendix B Appendix C Appendix D Appendix E General lnfo nnation Emi ssions Information Site Plan Flow Diagram Site Description Emission Estimate BACT Analysis - Utah Division of Air Quality New Source Review Section Form 1 General Information Application for: 0 Initial Approval Order Date 11/3/2008 D Approval Order Modification AN APPROVAL ORDER MUST BE ISSUED BEFORE ANY CONSTRUCTION OR INSTALLATION CAN BEGIN. This is not a stand alone document. Please refer to the Permit Application Instructions for specific details required to complete the application. Please print or type all information requested. All information requested must be completed and submitted before an engineering review can be initiated. If you have any questions, contact the Division of Air Quality at (801) 536-4000 and ask to speak with a New Source Review Engineer. Written inquiries may be addressed to: Division of Air Quality, New Source Review Section, P.O. Box 144820, Salt Lake City, Utah 84114-4820. Applicable base fee for engineering review and filing fee must be submitted with the application. General Owner and Facility Information 1. Company name and address: 2. Company contact for environmental matters: Chevron Pipe line Company Jim Robbins 2875 South Decker Lake Drive, Suite 150 Environmental Specialist West Valley City, UT 84119 Phone No.: (801) 975-2325 Phone No.: (801) 975-2300 Fax No.: (801) 975-2323 Fax No.: (801) 975-2323 3. Facility name and address (if different from above): 4. Owners name and address: Hanna Station N/A 40700 West 7000 North Hanna, UT 84031 Phone no.: None Phone no.: ( ) Fax no.: None Fax no.: ( ) 5. County where the facility is located in: 6. Latitude & longitude, and/or UTM coordinates of plant: Duchesne 4,472,294 N, 520,536 E UTM, NAD 83, Zone 12 (meters) 7. Directions to plant or Installation (street address and/or directions to site) (include U.S. Coast and Geodetic Survey map if necessary): 40700 West 7000 North Hanna, UT 84031 8. Identify any current Approval Order(s): N/A AO# Date AO# Date AO# Date AO# Date AO# Date AO# Date 9. If request for modification, permit# to be modified: DAQE # N/A DATED: I I 1 O. Type of business at this facility: Crude pipeline pump station 11. Total company employees greater than 100? 12. Standard Industrial Classification Code 4612 Crude petroleum pipelines D Yes 0 No Page 1 of 4 Approval Order Application Form 1 (Continued) 13. Application for: □ New construction 0 Modification 0 Existing equipment operating without permit □ Permanent site for Portable Approval Order □ Change of permit condition □ Change of location 14 . For new construction or modification, enter estimated start date: Jan 2008 Estimated completion date: Sep 2009 15. For change of permittee. location or condition, enter 16. For existing equipment in operation without prior permit, date of occurrence: N/A enter initial operation date: 1949 17. Has facility been modified or the capacity increased since November 29, 1969: D Yes 0 No Process Information 18. Site plan of facility (Attach as Aooendix A) See APPendix A. 19. Flow diagram of entire process to include flow rates and other applicable information (Attach as Appendix B): See Appendix B. 20. Detailed written process and equipment description. (Attach as Appendix C): Description must include: Process/Equip specific form(s) identified in the instructions Fuels and their use Equipment used in process Description of product(s) Raw materials used Operation schedules Description of changes to process (if applicable) Production rates (including daily/seasonal variances) See Appendix C. Includes Form 20 -Organic LiQuid Storage Tank 21 . Does this application contain justifiable confidential data? Yes 0 No I Emissions Information I 22. Complete and attach Form 1 d. Emissions Information See Appendix D. Include Material Safety Data Sheets for all chemicals or compounds that may be emitted to the atmosphere. 23. Identify on the site plan (see #18 above) all emissions points, building dimensions, stack parameters, etc. See Appendix A. Air Pollution Control Equipment Information 24 . List all air pollution control equipment and include equipment specific forms identified in the instructions. AU --A . r. No air pollution control eQuipment. ,~ -~- 25. List and describe all compliance monitoring devices and/or activities (such as CEM, pressure gages). i\ttach as A-,: .. r No compliance monitoring devices. -~~ ~- 26. Submit modeling for the project if reauired. See attached instructions. Modeling not reQuired. 27. Attach as Appendix ~ your proposal of what air pollution control devices, if any, or operating practices represents Best Available Control Technology. Discuss and evaluate all air pollution control technologies relevant to your situation or process. See Appendix E. 28. I hereby certify that the information and data submitted in and with this application is completely true, accurate and complete, based on reasonable inquiry made by me and to the best of my knowledge and belief. / --~attlfe:'v'/ -Title Midcontinent Operational Manager, Northwest '--_/{ -,v ) 29 . .L.. -30. Telephone Number 30 . Date: 11/3/2008 '--Brad ~asefwbt¼J / (801) 975-2339 / - Page 2 of 4 Approval Order Application Form 1 Instructions 1. Identify the name, address, phone number, and fax number of the legal entity that operates the equipment. 2. Identify the person who Is to be contacted regarding this application; also include the phone number and fax number of this person. 3. Identify the address where the equipment will be located. 4. If you are not the owner of the equipment under this application, enter the name, address, phone number, and fax number of the owner. 5. Identify in what county the facility is located. If this is portable equipment, state in what county the first location is. 6. Indicate the technical location of the.facility so that it can be located on a map for modeling and inventory purposes. The location can be read from a 7 .5 map. 7. Indicate the geographical location or address of facility and directions to site if needed for remote locations. For example, Go five miles south on highway 1, turn left at farmhouse, go 1.5 miles. 8. List any valid Approval Orders (AO) which are for equipment at this site. 9. Indicate previous AO number (if any) and date for AO modification. 10. State the type of business you conduct at this facility. 11 . Indicate if the total number of people employed by your company is over 100 people. 12. Using the provided list of business codes (page 8), enter the code which best describes your business activity at this facility. 13. Check all applicable boxes New Construction: new equipment which has not yet been constructed and requires a permit to construct. Existing Equipment Operating Without Permit: equipment which has been in operation without a prior permit issued by the state. Change of permit condition: permitted equipment which will be operated contrary to permit conditions. Modification: existing equipment which is physically altered by the removal, addition, or non-identical replacement of parts. Permanent site: equipment will be located continuously at one site for more than 180 days. Change of location : permitted equipment which will be transferred from one property to another. 14. Enter the start date and the completion date of any new installation, construction, or modification. 15. For cases in this category, enter the future date when the change is anticipated. 16. For this category of equipment, enter the date when this equipment was first operated. 17. This is for equipment that was operated before November 29, 1969. Indicate whether the facility has been modified or increased capacity since that date. 18. Attach as Appendix A to the application a site plan in sufficient detail to identify: general location of site, buildings, roads, process equipment, emission points, and site characteristics that may effect plume dispersion. 19. Attach as Appendix B to the application a flow diagram which illustrates the entire process from introduction of raw materials to the emission of exhaust to the atmosphere and includes at least the following: generating equipment, process equipment, control equipment, monitoring devices, duct work, hoods, fans, stacks, flow rates/direction, gauges, etc. 20. Attach as Appendix C to the application a narrative description of the process and equipment to be permitted. Essentially include a narrative of the flow chart above. The description must include equipment or process specific forms as appropriate. The attached general supplemental process form (Form 2) must be filled out by all sources. Please mark which forms below apply to this project. Forms available upon request are as follows: Form 11 Internal Combustion Engines Form 12 Incinerators Form 13 Spray Booths Form 14 Concrete Batch Plants Form 15 Rock Crushing and Screening Form 16 Soil/groundwater Remediation Form 17 Diesel Powered Standby Generator Form 18 Portable Hot Mix Drum Asphalt Plants Form 19 Fuel Burning Equipment (Boilers, Heaters, Steam Generators) Form 20 Organic Liquid Storage Tank Form 21 Solvent Metal Cleaning (degreasers) Form 22 Combustion Turbines 21 . To claim confidentiality on information submitted with this application, check "yes". Be sure that all submitted information which you wish kept confidential is clearly marked as such. Also state the reason(s) for claiming confidentiality per 40CFR2.208. Examples of acceptable reasons are trade secrets and production data. Note that information on emissions and permits cannot be confidential. 3 of 4 New Source Review Application Form 1 Instructions (Continued) 22. Attach a completed Form 1d, Emissions Information. Provide all MSD Sheets for all chemicals used. 23. List emission points and parameters on the site plan (#14 above). 24. Attach as Appendix D to the application a list of all air pollution control equipment. Must include form(s) as appropriate. Please mark which forms apply to this project. Forms available upon request are as follows: Form 3 Afterburners Form 4 Flares Form 5 Adsorption Unit Form 6 Cyclone Form 7 Condenser Form 8 Electrical Precipitators Form 9 Scrubber Form 10 Fabric Filter 25. Attach as Appendix E to the application a list with description of all compliance monitoring devices and/or activities. Include such things as make, model, type, size, capability, accuracy, calibration frequency, etc. for the devices and monitoring frequency, outline of training program, level of certification required of inspectors, etc. for monitoring activities. 26. Dispersion modeling will be required under two circumstances: 1. if the Executive Secretary determines that modeling is to be performed. 2. if the proposed emissions are in the range of values given in given in Table 1. This requirement holds for new as well as modified sources. For modified sources, the values in Table 1. denote emission increases. If the emission values are greater than values in Table 1, higher level modeling will be required. Call the Planning Section at (801) 536-4000 for additional information. The meteorological data to be used in the modeling must be submitted to the Executive Secretary for review and approval before they are used in the dispersion modeling exercise. Table 1. Criteria For Screen Modeling (tons/year) S02 NOx PM10 fugitive PM10 non-fugitive CO* HAP** lead 40 40 5 15 100/250 varies 0.6 100 tons if one of the 28 source categories in UAC R307-1-3.6.5.B; 250 tons if not Contact the Division of Air Quality Modeling Section. 27. For a description of a proper BACT proposal, see Form 1b. 28. Signature of authorized company agent. 29. Name of signing party. 30. Telephone number of signing party. 31 . Date of application. ADDITIONAL INFORMATION MAY BE REQUIRED FOR SOME APPLICATIONS. If so. the reviewing engineer will contact the individual listed in question number 2. U:\aq\ENGINEER\GENERIC\Form01 .doc Revised 5/10/06 4 of 4 Utah Division of Air Quality New Source Review Section Form 1d Emissions Information Company ___ C_he_v~r_o_n_P_i~p~e~L~in~e""-'-C~o. Site/Source Hanna Station Date 11/3/2008 Please print neatly or type all information requested. All information must be truthful, accurate and complete before we can process your application. If you have any questions, call (801) 536-4000 and ask to speak with a New Source Review engineer. Written inquiries may be addressed to: Division of Air Quality, NSR Section, P.O. Box 144820, Salt Lake City, Utah 84114-4820. a e T bl 1 P ropose d E .. m1ss1ons Pollutant Permitted Emissions Emissions Increases Proposed Emissions (tons/year) (tons/year) (tons/vear) PM10 SO2 NOx co voe 12 Hazardous 0.3 Air Pollutants (total) Hazardous Air Pollutants (list individually) (attach additional sheet if needed) 2,2,4- Trimethylpentane 0.01 (isooctane) Benzene 0.02 Biphenyl 0.00 Cresol (-m) 0.00 Ethylbenzene 0.01 Hexane (-n) 0.19 lsopropyl benzene 0.00 (cumene) Naphthalene 0.01 Toluene 0.04 Xylenes (mixed 0.05 isomers) other pollutants (list) (attach additional sheet if needed) Page I of 4 Utah Division of Air Quality Approval Order Application Form 1d Emissions Information Table 2. Controlled and Uncontrolled Emissions Pollutant Controlled Emissions (tons/year) Uncontrolled Emissions (tons/year) PM10 S02 NO, co voe 12 Hazardous Air Pollutants (total) 0.3 Hazardous Air Pollutants (list individually) (attach additional sheet if needed) 2,2,4-Trimethylpentane (isooctane) 0.01 Benzene 0.02 Biphenyl 0.00 Cresol (-m) 0.00 Ethylbenzene 0.01 Hexane (-n) 0.19 lsopropyl benzene ( cumene) 0.00 Naphthalene 0.01 Toluene 0.04 Xylenes (mixed isomers) 0.05 other pollutants (list) (attach additional sheet if needed) Page 2 of --1 Utah Division of Air Quality Approval Order Application Form 1d Emissions Information a e ouny mIssIons T bl 3 H I HAP E . . Hazardous Air Pollutants (list individually) Maximum emission rate (lbs/hour) 2,2,4-Trimethylpentane (isooctane) 0.0019 Benzene 0.0053 Biphenyl 0.0005 Cresci (-m) 0.0008 Ethylbenzene 0.0026 Hexane (-nJ 0.0443 lsopropyl benzene (cumene) 0.0007 Naphthalene 0.0012 Toluene 0.0086 Xylenes (mixed isomers) 0.0125 Page 3 of 4 Table 1. Table 2. Table 3. Utah Division of Air Quality Approval Order Application Form 1d Emissions Information Instructions Fill out the table. Attach additional sheets if necessary. Provide potential emissions from your entire facility in units of tons per year, expressed to at least two decimal places. Emissions of individual Hazardous Air Pollutants may require more precision; contact a New Source Review Engineer. If you do not now have an Approval Order and you are applying for your first Approval Order, the emissions in "Existing Emissions" column will be zero and the "Emissions Increases" will be equal to the "Proposed "Emissions. If you do have an Approval Order, the emissions in the "Existing Emissions" column will be the emissions listed in your Approval Order. All emissions should be those emissions occuring after any air pollution control devices. Provide emissions that would result if you operated 24 hours per day, 8760 hours per year, unless you are also proposing operating hour limits. If you are proposing operating hour limits, state what these limits are and provide emissions based on these limits. Provide emissions that would result from your potential production or potential raw material consumption, unless you are also proposing production or raw material consumption limits. If you are proposing production or raw material consumption limits, state what these limits are and provide emissions based on these limits. Attach additional sheets with detailed calculations or stack testing information showing how all of the above emission numbers were determined. Fill out the table. Attach additional sheets if necessary. Provide potential emissions from your entire facility in units of tons per year, expressed to at least two decimal places. Emissions of individual Hazardous Air Pollutants may require more precision; contact a New Source Review Engineer. The Hazardous Air Pollutants should be the same Hazardous Air Pollutants listed in Table 1. The emissions in the "Controlled Emissions" column shoud be those emissions occuring after any air pollution control devices. The emissions in the "Uncontrolled Emissions" should be those emissions occuring before any air pollution control devices (in other words, emissions that would result if you did not have any air pollution control devices at all. Provide emissions that would result if you operated 24 hours per day, 8760 hours per year, unless you are also proposing operating hour limits. If you are proposing operating hour limits, state what these limits are and provide emissions based on these limits. Provide emissions that would result from your potential production or potential raw material consumption, unless you are also proposing production or raw material consumption limits. If you are proposing production or raw material consumption limits, state what these limits are and provide emissions based on these limits. Attach additional sheets with detailed calculations or stack testing information showing how all of the above emission numbers were determined. List all Hazardous Air Pollutants emitted by your facility. They should be the same Hazardous Air Pollutants listed in tables 1 and 2. For each HAP provide its maximum emission rate in units of pounds per hour. The emission rates should be those rates occuring after any air pollution control devices. Attach additional sheets with detailed calculations or stack testing information showing how all of the above emission numbers were determined. Depending on other conditions unique to each facility, additional emissions information may be required. f :laqlengineerlgenericl 1 d _ emisn. frm Revised 1/23/03 Pagt' 4 of 4 Appendix A Site Plan -_ l I \+oo ot+oo ,_ l B H ]+r1 t ^6 AL , ' ++oo6O + l4 .+ l- t- l- I l+ l- t- a+ 5V ) >aRF E RG r- r , : H - ) '" - A.- - - _ / L_ l &t 4 L:ho,( i l ort *i " Es fiI.: . .r - c f * - ,7 ' ) * / ,/ ,n . ^ { - , / 7 oi - ! '/ ' *l s g '* * t r- - T - t ls ll It t tt i lH t I I __ J s l I 8l I ;+88 ._ . * ,, /, ' i* ti rs i- * I ,i H I qi ii r I s l- ' f f r ti r I E lu * f ri r' I i lT I* * H , t I lE Er E i I 16 -i t i o+oa r- I BIil -\t .q Ox BeFr} 1 - - =E p t-r - r . . L o$ u \s ilE " rio rh 0+ 0 0 I +0 0 2+ 0 0 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 8+ 0 0 9+ 0 0 "l rllIrC.) t ahl (4cttn -e F 3 ru : iJ . I T ;T i P -.' 4 ; . Y B t 1l 1l tl ir /r ,' P- s t 3 P-5 t a /7/ t/ t/ *Y u r / Ht IN Il. ," r ? , 6 " " ' '4 f '. / . / I /z o * i ,t ' E o ti , t 'E - ' lP . z fi ER - ' " i$ Hi Ei Lg -: F B R <r! ( 4 t u 8t " I i F :i S H ot -\ Q ! ]u o3:.\ ri, e \to l ++Luolq sF 6q 2A{I(,rr,o sF fi(,/t {e =8DO 1tE E @v t;r'. t!{p ; s8 t Do - 'E i e; . , HH 50 ' - O ' t t t N , +#IA N K LtU t l S roo -t{B 8$\!r\I tB t t+ J (H i i ) Ho $B E $\ .\ l $$$, ^H: .. 8 'n ' n I t t oo o o ;! ; ! n n 1E Tl.ll il Ii il . zY ' - o ' utN . I 0+ 0 0 t- Appendix B Flow Diagram Process Flow Diagram Pipeline from Range ly Oil Field Potent Throu. = 43,3 =15,80 ii ay ls/yr + Tank T-520 . 60,000 hhl .. CHEVRON PIPE LINE COMPANY HANNA STATION •• Fugiti ve Emi ss ions -Valves, Fittings, Pump Seals Tank -Maintenance Emi ssions • • ! ' l I + + • '! · Tanks Tanks Tank ~ T-510 \< T-111 · ¥#TBD ., 60.000 ,, 40.000 60,000 . hhl hhl bbl -7 Pipeline to the Salt Lake Refineries Appendix C Site Description Chevron Pipe Line Company Hanna Station The Hanna Station is a pipeline pump station along the pipeline that transports crude oil from the Rangely Oil Field to Salt Lake City for refining. The station is owned and operated by Chevron Pipe Line Company. It is located in Duchesne County at 40700 West 7000 North, Hanna, Utah 84031 (4,472,294 N, 520,536 E, UTM, NAO 83, Zone 12). The facility operates continuously, 24 hours per day, 365 days per year. The facility is not manned; but employees make daily visits to operate and maintain the station. The pipeline transports crude, condensate, and black wax. The Hanna Station consists of four breakout tanks used to relieve surges or temporarily store crude from the pipeline for reinjection and continued transportation by pipeline to Salt Lake City. ln addition, there are two electric pumps used to boost the pressure in the pipeline. The on-site evaporation pond is lined and is used as a retention pond for stormwater runoffs: the drains for the pond are plugged. Sto1mwater in the retention pond is not contaminated. Sources of emission at the Hanna Station include the breakout tanks and piping components. The anticipated throughput to the breakout tanks is 43 ,300 barrels per day ( 15.804.500 barrels per year), consisting of 58% crude. 30% condensate, and 12% black wax condensate mixture. Attached are the descriptions of the breakout tanks, report on Forni 20. Tank I I 1 -Internal noating roof tank. 40,000 barrels, installed 1949 Tank 510 -External noating roof tank. 60.000 ba1Tel s. installed 1973 Tank 520 -External floating roof tank. 60,000 barrels. installed 1972 Tank #TBD -Internal floating roof tank, 60.000 barrels. proposed installation in 2009. Other equipment on site includes: • Two 30,000 BTU propane space heaters • Two 500-gallon pressurized propane tanks used to run the space heaters. • One 300-gallon solvent tank for parts cleaning. Stoddard solvent does not include HAPs. VOC emissions are approximately 3 pounds. Utah Division of Air Quality New Source Review Section Site/Source-=-: _....:H..:.;a=.;n:..:.;n:..:.;a::.i....;U:.T-=-------- Form 20 Date: ___ _,_1=0/_,_1=5/=2=00=8=------ Organic Liquid Storage Tank Equipment 1. Tank manufacturer: Matrix Service 2. Identification number: TBD 3. Installation date: QrOQOSed 2008 4. Volume: 2,520,000 gallons 5. Inside tank diameter: 100 feel 6. Tank height: 43'-11" feet 7. True vapor pressure of liquid: 0-14 psia 8. Reid vapor pressure of liquid: 5 psi 9. Outside color of tank: White 10. Maximum storage temperature: 200 OF 11 . Average throughput: 199,136,700 gallons per year 12. Turnovers/yearly 79 Monthly Weekly 13. Average liquid height (feet) 43 14. Access hatch: EZl Yes o No Number 1 15. Type of Seals: 16. Deck Fittings: a. Primary seals: Gauge float well 0Yes o No Number __ 1_ 0 Mechanical shoe Gauge hatch/ □ Resilient filled sample well @Yes o No Number __ 1_ □ Liquid filled Roof drains □ Yes o No Number __ □ Vapor mounted Rim vents □ Yes o No Number □ Liquid mounted Vacuum break Ill Yes □ No Number __ 1_ □ Flexible wiper Roof leg 0Yes □ No Number--1Q_ b. Secondary seal: Ladder well 0Yes D No Number __ 1_ Type: WiQer, rim-mounted Column well 0Yes D No Number __ 1_ Other: 17. Shell Characteristics: 18. Type of Construction: Condition: New o Vertical Fixed Roof Breather Vent Settings: □ Horizontal Fixed Roof Tank Construction: Welded 0 Internal Floating Roof Roof Type: Cone-Column SUQQOrted 0 External Floating Roof Deck Construction: Welded 0 Other (please specify) Deck Fitting Category: T~Qical design standard APl-650 19. Additional Controls: N/A □ Gas Blanket o Venting □ Carbon Adsorption □ Thermal Oxidation □ Other: I 20. Single Liquid Information I Liquid Name: See TANKS -Liquid Name: CAS Number: printout in -CAS Number: Avg. Temperature: Appendix D. ,____ Avg. Temperature: Vapor Pressure: ,____ Vapor Pressure: Liquid Molecular Weight Liquid Molecular Weight: Page 1 of 2 Chemical Name: - Form 20 -Organic Liquid Storage Tank (Continued) 21 . Chemical Components Information Chemical Name: ~ See TANKS Percent of Total Liquid Weight: _ printout in -Percent of Total Liquid Weight: Molecular Weight: Appendix D. >--Molecular Weight: Avg. Liquid Temperature: >--Avg. Liquid Temperature: Vapor Pressure: Vapor Pressure: Emissions Calculations (PTE) 22. Calculated emissions for this device: PM ,o Lbs/hr __ Tans/yr NOx Lbs/hr __ Tons/yr SOx Lbs/hr __ Tons/yr voe 181 Lbs/hr 1.38 Tons/yr HAPs 5.31 Lbs/hr {speciate) 0.04 Tons/yr (speciate) Submit calculations as an appendix. Provide manufacturer's Material Safety Data Sheets for products being stored. See Appendix D for emission calculations. Instructions Note 1. Submit this form in conjunction with Form 1 and Form 2. 2. Call the Division of Air Quality (DAO) at (801) 536-4000 if you have problems or questions in filling out this form. Ask to speak with a New Source Review engineer. We will be glad to help! 1. Indicate the tank manufacturer's name. 2. Supply the equipment identification number that will appear on the tank. 3. Indicate the date of installation. 4. Indicate the capacity of the tank in gallons or barrels. 5. Specify the inside tank diameter in feet. 6. Specify the tank height in feet. 7. Indicate the true vapor pressure of the liquid {psia). 8. Indicate the Reid vapor pressure of the liquid (psi). 9. Indicate the outside color of the tank. 10. Supply the highest temperature the liquid will reach during storage (degrees Fahrenheit). 11 . Indicate average annual throughput (gallons). 12. Specify how many times the tank will be emptied and refilled per year, month or week. 13. Specify the average liquid height (feet). 14. Indicate whether or not the tank has access hatches and the number. 15. Indicate what type of seals the tank has. 16. Indicate what type of deck fittings are installed. 17. Specify condition of the tank, also include the following: Breather vent settings in (psig) for fixed roof tanks Tank construction, welded or riveted Roof type; pontoon, double deck, or self-supporting roof Deck construction; bolted or welded, sheet or panel construction sizes and seam length Deck fitting category; typical. controlled, or detail 18. Indicate the type of tank construction. 19. Indicate other types of additional controls which will be used. 20. Provide information on liquid being stored, add additional sheets as necessary. 21 . Provide information on chemicals being stored, add additional sheets as necessary. 22. Supply calculations for all criteria pollutants and HAPs. Use AP42 or Manufacturers data to complete your calculations. f:\aq\ENGINEER\GENERIC\Forrn20.doc revised 9/1 /06 Page 2 of 2 Utah Division of Air Quality New Source Review Section Site/Source,_: _...:.H.,,,a~n-"'n-'-"a::L..::U'--'T'------ Form 20 Date: ___ _,_10,,,_,/_,_1!e!5/ce:2-"-00"'"'8,c__ ___ _ Organic Liquid Storage Tank Equipment 1. Tank manufacturer: Unknown 2. Identification number: Tank 111 3. Installation date: 1949 4. Volume: 1680000 gallons 5. Inside tank diameter: 80 feet 6. Tank height: 48 feet 7. True vapor pressure of liquid: 0-14 psia 8. Reid vapor pressure of liquid: 3.5 psi 9. Outside color of tank: White 10. Maximum storage temperature: 200 OF 11 . Average throughput: 127,049,215 gallons per year 12. Turnovers/yearly 75.6 Monthly Weekly 13. Average liquid height (feet): 48 14. Access hatch: EZI Yes D No Number 1 15. Type of Seals: 16. Deck Fittings: Unknown, used TANKS default a. Primary seals: Gauge float well 0Yes D No Number_1_ 0 Mechanical shoe Gauge hatch/ D Resilient filled sample well IZl Yes D No Number_1_ D Liquid filled Roof drains □ Yes D No Number -- D Vapor mounted Rim vents □ Yes D No Number __ D Liquid mounted Vacuum break IZl Yes D No Number _1_ D Flexible wiper Roof leg IZ!Yes D No Number_l!_ b. Secondary seal: Ladder well IZl Yes D No Number _1_ Type: WiQer, rim-mounted Column well 0Yes D No Number _1_ Other: 17. Shell Characteristics: 18. Type of Construction: Condition: Good □ Vertical Fixed Roof Breather Vent Settings: □ Horizontal Fixed Roof Tank Construction: Welded lil Internal Floating Roof Roof Type: Cone -Column SuQQOrted □ External Floating Roof Deck Construction: Welded □ Other (please specify) Deck Fitting Category: Tl£Qical design standard APl-650 19. Additional Controls: N/A □ Gas Blanket □ Venting □ Carbon Adsorption □ Thermal Oxidation D Other: 20. Single Liquid Information Liquid Name: See TANKS -Liquid Name: CAS Number: printout in -CAS Number: Avg. Temperature: Appendix D. -Avg. Temperature: Vapor Pressure: -Vapor Pressure: Liquid Molecular Weight: Liquid Molecular Weight: Page 1 of 2 Chemical Name: - Form 20 -Organic liquid Storage Tank (Continued) 21 . Chemical Components Information ,--Chemical Name: See TANKS Percent of Total Liquid Weight:_ printout in >--Percent of Total Liquid Weight: Molecular Weight: Appendix D. -Molecular Weight: Avg. Liquid Temperature: ,__ Avg. Liquid Temperature: Vapor Pressure: Vapor Pressure: Emissions Calculations (PTE) 22. Calculated emissions for this device: PM10 Lbs/hr __ Tons/yr NO, Lbs/hr __ Tons/yr so, Lbs/hr __ Tons/yr voe 123 Lbs/hr 0.94 Tons/yr HAPs 3.29 Lbs/hr (speciate) 0.02 Tons/yr (speciate) Submit calculations as an appendix. Provide manufacturer's Material Safety Data Sheets for products being stored. See Appendix D for emission calculations. Instructions Note: 1. Submit this form in conjunction with Form 1 and Form 2. 2. Call the Division of Air Quality (DAQ) at (801) 536-4000 if you have problems or questions in filling out this form. Ask to speak with a New Source Review engineer. We will be glad to help' 1. Indicate the tank manufacturer's name. 2. Supply the equipment identification number that will appear on the tank. 3. Indicate the date of installation. 4. Indicate the capacity of the tank in gallons or barrels. 5. Specify the inside tank diameter in feet. 6. Specify the tank height in feet. 7. Indicate the true vapor pressure of the liquid (psia). 8. Indicate the Reid vapor pressure of the liquid (psi) 9. Indicate the outside color of the tank. 10. Supply the highest temperature the liquid will reach during storage (degrees Fahrenheit). 11 . Indicate average annual throughput (gallons). 12. Specify how many times the tank will be emptied and refilled per year, month or week. 13. Specify the average liquid height (feet). 14. Indicate whether or not the tank has access hatches and the number. 15. Indicate what type of seals the tank has. 16. Indicate what type of deck fittings are installed. 17. Specify condition of the tank, also include the following: Breather vent settings in (psig) for fixed roof tanks Tank construction, welded or riveted Roof type; pontoon, double deck, or self-supporting roof Deck construction; bolted or welded, sheet or panel construction sizes and seam length Deck fitting category; typical, controlled, or detail 18. Indicate the type of tank construction. 19. Indicate other types of additional controls which will be used. 20. Provide information on liquid being stored, add additional sheets as necessary. 21 . Provide information on chemicals being stored, add additional sheets as necessary. 22. Supply calculations for all criteria pollutants and HAPs. Use AP42 or Manufacturers data to complete your calculations. f \aq\ENGINEER\GENERIC\Form20.doc revised 9/1 /06 Page 2 of 2 Utah Division of Air Quality New Source Review Section Site/Source_: __ H~a_n_n~a~U_T ____ _ Form 20 Date: 10/15/2008 Organic Liquid Storage Tank Equipment 1. Tank manufacturer: GATX 2. Identification number: Tank 510 3. Installation date: 1973 4. Volume: 2 520 000 gallons 5. Inside tank diameter: 95 feet 6. Tank height: 48 feet 7. True vapor pressure of liquid: 0-14 psia 8. Reid vapor pressure of liquid: 3.5 psi 9. Outside color of tank: White 10. Maximum storage temperature: 200 OF 11. Average throughput: 257,948,405 gallons per year 12. Turnovers/yearly 102.4Monthly __ Weekly_ 13. Average liquid height (feet): 48 14. Access hatch: 0 Yes D No Number 1 15. Type of Seals: 16. Deck Fittings: Unknown, used TANKS default a. Primary seals: Gauge float well IZl Yes D No Number_1_ 0 Mechanical shoe Gauge hatch/ D Resilient filled sample well IZl Yes D No Number_1_ D Liquid filled Roof drains o Yes o No Number __ D Vapor mounted Rim vents IZI Yes o No Number_1_ D Liquid mounted Vacuum break IZl Yes D No Number_1_ D Flexible wiper Roof leg IZl Yes o No Number~ b. Secondary seal: Ladder well o Yes o No Number __ Type: Wi(!er, rim-mounted Column well o Yes D No Number __ Other: 1 unslotted guide-(!ole well 17. Shell Characteristics: 18. Type of Construction: Condition: Good o Vertical Fixed Roof Breather Vent Settings: o Horizontal Fixed Roof Tank Construction: Welded o Internal Floating Roof Roof Type: Pontoon 0 External Floating Roof Deck Construction: Welded o Other (please specify) Deck Fitting Category: Tt(!ical design standard APl-650 19. Additional Controls: N/A o Gas Blanket o Venting o Carbon Adsorption o Thermal Oxidation D Other 20. Single Liquid Information Liquid Name: See TANKS f---Liquid Name: CAS Number printout in -CAS Number: Avg. Temperature: Appendix D. f---Avg. Temperature: Vapor Pressure: f---Vapor Pressure: Liquid Molecular Weight: Liquid Molecular Weight: Page 1 of 2 Chemical Name: - Form 20 -Organic Liquid Storage Tank (Continued) 21 . Chemical Components Information ,__ Chemical Name: See TANKS Percent of Total Liquid Weight:_ printout in '--Percent of Total Liquid Weight: Molecular Weight: Appendix D. ~ Molecular Weight: Avg. Liquid Temperature: ...._ Avg. Liquid Temperature: Vapor Pressure: Vapor Pressure: Emissions Calculations (PTE) 22. Calculated emissions for this device: PM,o Lbs/hr __ Tons/yr NOx Lbs/hr __ Tons/yr SOx Lbs/hr __ Tons/yr voe 299 Lbs/hr 2.27 Tons/yr HAPs 8.23 Lbs/hr (speciate) 0.06 Tons/yr (speciate) Submit calculations as an appendix. Provide manufacturer's Material Safety Data Sheets for products being stored. See Appendix D for emission calculations. Instructions Note: 1. Submit this form in conjunction with Form 1 and Form 2. 2. Call the Division of Air Quality (DAO) at (801) 536-4000 if you have problems or questions in filling out this form. Ask to speak with a New Source Review engineer. We will be glad to help! 1. Indicate the tank manufacturer's name. 2. Supply the equipment identification number that will appear on the tank. 3. Indicate the date of installation. 4. Indicate the capacity of the tank in gallons or barrels. 5. Specify the inside tank diameter in feet. 6. Specify the tank height in feet. 7. Indicate the true vapor pressure of the liquid (psia). 8. Indicate the Reid vapor pressure of the liquid (psi). 9. Indicate the outside color of the tank. 10. Supply the highest temperature the liquid will reach during storage (degrees Fahrenheit). 11 . Indicate average annual throughput (gallons). 12. Specify how many times the tank will be emptied and refilled per year. month or week. 13. Specify the average liquid height (feet). 14. Indicate whether or not the tank has access hatches and the number. 15. Indicate what type of seals the tank has. 16. Indicate what type of deck fittings are installed. 17. Specify condition of the tank, also include the following: Breather vent settings in (psig) for fixed roof tanks Tank construction, welded or riveted Roof type; pontoon, double deck, or self-supporting roof Deck construction; bolted or welded. sheet or panel construction sizes and seam length Deck fitting category; typical, controlled. or detail 18. Indicate the type of tank construction. 19. Indicate other types of additional controls which will be used. 20. Provide information on liquid being stored, add additional sheets as necessary. 21 . Provide information on chemicals being stored, add additional sheets as necessary. 22. Supply calculations for all criteria pollutants and HAPs. Use AP42 or Manufacturers data to complete your calculations. f \aq\ENGINEER\GENERIC\Form20.doc revised 9/1 /06 Page 2 of 2 Utah Division of Air Quality New Source Review Section Site/Source.:..: _ _,H..:.:a:e,n..:.:n..:.:a:e.i...,U:e...T'--------- Form 20 Date: ___ ....:1-"'0'-'/1:..::5::..:/2:..:0:..::0:..::8 ____ _ Organic Liquid Storage Tank Equipment 1. Tank manufacturer: GATX 2. Identification number: Tank 520 3. Installation date: 1972 4. Volume: 2,520 000 gallons 5. Inside tank diameter: 95 feet 6. Tank height: 48 feet 7. True vapor pressure of liquid: 0-14 psia 8. Reid vapor pressure of liquid: 5 psi 9. Outside color of tank: White 10. Maximum storage temperature: 200 OF 11 . Average throughput: 79,654,680 gallons per year 12. Turnovers/yearly 31.6 Monthly __ Weekly_ 13. Average liquid height (feet): 48 14. Access hatch: EZI Yes D No Number 1 15. Type of Seals 16. Deck Fittings: Unknown, used TANKS default a. Primary seals: Gauge float well 0Yes D No Number_1_ [Z) Mechanical shoe Gauge hatch/ □ Resilient filled sample well IZI Yes o No Number_1_ 0 Liquid filled Roof drains o Yes o No Number __ D Vapor mounted Rim vents Ill Yes o No Number_1_ 0 Liquid mounted Vacuum break IZl Yes D No Number_1_ 0 Flexible wiper Roof leg IZI Yes D No Number~ b. Secondary seal: Ladder well o Yes o No Number __ Type: Wiper, rim-mounted Column well o Yes D No Number -- Other: 1 unslotted guide-pole well 17. Shell Characteristics: 18. Type of Construction: Condition: Good o Vertical Fixed Roof Breather Vent Settings: o Horizontal Fixed Roof Tank Construction: Welded o Internal Floating Roof Roof Type: Pontoon 0 External Floating Roof Deck Construction: Welded o Other (please specify) Deck Fitting Category: T:-ipical design standard APl-650 19. Additional Controls: N/A o Gas Blanket :::i Venting o Carbon Adsorption o Thermal Oxidation o Other: 20. Single Liquid Information Liquid Name: See TANKS -Liquid Name: CAS Number: printout in CAS Number: -Avg. Temperature: Appendix D. -Avg. Temperature: Vapor Pressure: -Vapor Pressure: Liquid Molecular Weight: Liquid Molecular Weight: Page 1 of 2 Chemical Name: - Form 20 -Organic Liquid Storage Tank (Continued) 21 . Chemical Components Information Chemical Name: -See TANKS Percent of Total Liquid Weight:_ printout in -Percent of Total Liquid Weight: Molecular Weight: Appendix D. -Molecular Weight: Avg. Liquid Temperature: -Avg. Liquid Temperature: Vapor Pressure: Vapor Pressure: Emissions Calculations (PTE) 22. Calculated emissions for this device: PM10 Lbs/hr __ Tons/yr NO. Lbs/hr __ Tons/yr so. Lbs/hr __ Tons/yr voe 237 Lbs/hr 1.81 Tons/yr HAPs 8.18 Lbs/hr (speciate) 0.06 Tons/yr (speciate) Submit calculations as an appendix. Provide manufacturer's Material Safety Data Sheets for products being stored. See Appendix D for emission calculations. Instructions Note: 1. Submit this form in conjunction with Form 1 and Form 2. 2. Call the Division of Air Quality (DAQ) at (801) 536-4000 if you have problems or questions in filling out this form. Ask to speak with a New Source Review engineer. We will be glad to help' 1. Indicate the tank manufacturer's name. 2. Supply the equipment identification number that will appear on the tank. 3. Indicate the date of installation. 4. Indicate the capacity of the tank in gallons or barrels. 5. Specify the inside tank diameter in feet 6. Specify the tank height in feet. 7. Indicate the true vapor pressure of the liquid (psia). 8. Indicate the Reid vapor pressure of the liquid (psi). 9. Indicate the outside color of the tank. 10. Supply the highest temperature the liquid will reach during storage (degrees Fahrenheit). 11 . Indicate average annual throughput (gallons). 12. Specify how many times the tank will be emptied and refilled per year, month or week. 13. Specify the average liquid height (feet). 14. Indicate whether or not the tank has access hatches and the number. 15. Indicate what type of seals the tank has. 16. Indicate what type of deck fittings are installed. 17. Specify condition of the tank, also include the following: Breather vent settings in (psig) for fixed roof tanks Tank construction, welded or riveted Roof type; pontoon, double deck, or self-supporting roof Deck construction; bolted or welded. sheet or panel construction sizes and seam length Deck fitting category; typical, controlled, or detail 18. Indicate the type of tank construction. 19. Indicate other types of additional controls which will be used. 20. Provide information on liquid being stored, add additional sheets as necessary. 21 . Provide information on chemicals being stored, add additional sheets as necessary. 22. Supply calculations for all criteria pollutants and HAPs. Use AP42 or Manufacturers data to complete your calculations. flaq\ENGINEER\GENERIC\Form20.doc revised 9/1 /06 Page 2 of 2 Appendix D Emission Estimate CHEVRON PIPE LINE COMPANY HANNA STATION EMISSIONS SUMMARY· 2008 POTENTIAL 1011412008 Annual Annual Hourly CAS Equipment Maintenance Emissions Emissions Emissions Erv• Pollutant Number Unit Tanks' Fugitive2 Fugitive 1 lb/yr ton/yr lb/hr lb/hr Hourly Em ission > ETV? voe lb 12,788.25 11,244.25 500.00 24,532.50 12.27 HAPs 2.2.4-Trimethylpentane (isooctane) 540-84-1 lb 8.01 7.98 0.36 16.35 0.01 0,0019 NA No, air modeling not required Benzene 71-43-2 lb 26.36 19 00 0,85 46.21 0.02 0.0053 0.027 No, air modeling not required Biphenyl 92-52-4 lb 1.65 2.70 0.12 4.47 0 00 0.0005 0.064 No, air modeling not required Cresol (-m) 108-39-4 lb 2.54 4.16 0.19 6.89 0.00 0.0008 1.13 No, air modeling not required Ethylbenzene 100-41-4 lb 9.01 13.27 0.59 22.87 0.01 0,0026 22.1 No, air modeling not required Hexane (-n) 110-54-3 lb 250.40 132.01 5.87 388.27 0.19 0.0443 9 No. air modeling not required lsopropyl benzene (cumene) 98-82-8 lb 2.30 3.60 0.16 6.06 0.00 0.0007 12.5 No. air modeling not required Naphthalene 91-20-3 lb 3.92 6.41 0.29 10.61 0.01 0,0012 2,7 No, air modeling not required Toluene 108-88-3 lb 33.41 40.48 1.80 75,68 0,04 0.0086 3.8 No, air modeling not required Xvlenes (mixed isomers) 1330-20-7 lb 42.64 63 .87 2.84 109.34 0.05 0.0125 22.1 No, air modeling not required TOTAL HAPs lb 380.24 293.47 13,05 0.34 TOTAL voes ton 6.39 5.62 0.25 12.27 1. RVP 3.5 and RVP 5.0 used for TANKS. 2. Equipment fugitives are totals that include pumps seals. valves. flanges. and drains. 3. Maintenance includes one tank cleaning. 4. Emission threshold value, minimum. vertically restricted/fugitive releases <20 m from property boundary. Utah Division of Air Quality. downloaded 9/24/2008. http://www.airquality.utah.gov/Planning/Modeting/NSR_Permit_Modeling/Modeling¾20Guidelinesl2007 ACGIH-TLVs.xls ETV = emission threshold value HAP = hazardous air pollutant NA= not available CHEVRON PIPE LINE COMPANY HANNA STATION INPUTS for EMISSIONS ESTIMATE -2008 POTENTIAL 10/14/2008 Fugitive Count Source Number Of Units Drains (open-ended lines) 4 Valves 106 Flanges 35 Pump Seals 18 Others 10 Tank Configuration Height Tank Volume Tank# Tank Type Primary Seals Secondary Seals Roof Diameter (ft) (ft) (bbl) (gal) 111 Internal Floater Mechanical Shoe Wiper. Rim-mounted Cone 80 48 40.000 1,680,000 510 External Floater Mechanical Shoe Wiper. Rim-mounted Pontoon 95 48 60,000 2,520,000 520 External Floater Mechanical Shoe Wiper. Rim-mounted Pontoon 95 48 60,000 2,520.000 New Internal Floater Mechanical Shoe Wiper. Rim-mounted Cone 100 43.92 60.000 2,520,000 Potential Tank Throughput Potential Annual Throughput (bbls) 15,804,500 RVP' Fraction' TP (bbl) Rangely Crude 2.42 58% 9.166.610 Condensate 4.67 30% 4.741.350 Black Wax Condensate Mix 4.08 12% 1.896,540 Total 100% 15,804,500 1.,ruae u11 RVP used in Year Tank# Product TP (bbl) TP (gal) Turnover TANKS) Installed 111 Rangely Crude (33%) 3.024.981 127.049.215 75.6 3.5 1949 )"'3 -84{'~·1,1.,"ZD ...._ 510 Rangely Crude (67%) 6,141 .629 257,948.405 102.4 3.5 1973 ' I < 520 Black Wax Condensate Mix 1.896.540 79.654.680 31.6 5.0 1972 -,0., <.,,;-\ I \.,i!,O < New Condensate 4.741.350 199.136.700 79.0 5.0 TBD I qq \ ~ ·1oc> D Total 15,804,500 663,789,000 I f _,. 'Reid vapor pressure (RVP) was determined in laboratory tests. 2Fractional throughput based on design maximum daily throughput of 43.300 bbl/day. 13.000 bbl/day of condensate. 25.000 bbl/day of Rangely crude, and 5.300 bbl/day of black wax condensate mix. TP = throughput RVP = Reid vapor pressure Conversions bbls = 42 gals CHEVRON PIPE LINE COMPANY HANNA ST A TION FUGITIVE EMISSIONS -2008 POTENTIAL 10/14/2008 FuQitive VOCs Emisson Emisson Number of Factors1 Factors Emissions2 Emissions Description Units (kq/hr/source l (lb/hr/source l (lb/vrl (ton/vrl Valves 106 2.50E-03 5.50E-03 5,107.08 2.55 Pump Seals 18 1.30E-02 2.86E-02 4,509.65 2.25 Others 10 7.50E-03 1.65E-02 1,445.40 0.72 Connectors 0 2.1 0E-04 4.62E-04 0.00 0.00 Flanges 35 1.10E-04 2.42E-04 74.20 0.04 Open ended lines (drains) 4 1.40E-03 3.08E-03 107.92 0.05 Equipment Fugitives 11 ,244.25 5.62 Maintenance Fugitives3 500.00 0.25 TOTAL FUGITIVES, voes 11,744.25 5.87 1. Emission tractors from "Protocol for Equipment Leak Emission Estimates", EPA-453/R-95-017, November 1995. Table 2-4 Oil and Gas Production. emission factors for light oil service. 2. Emissions=(# of units)(Emission Factor)(24 hr/day)(365 day/yr) 3. Maintenance includes one tank cleaning. Conversion: 1 kg = 2.2 lb; 1 ton = 2000 lb FuQitive HAPs Equipment Maintenance Weight Fugitive Fugitive Total Pollutant Fraction1 (lb/yr) (lb/yr) (lb/yr) voes 11 ,244.25 500.00 11,744.25 2,2,4-Trimethylpentane (isooctane) 0.00071 7.98 0.36 8.34 Benzene 0.00169 19.00 0.85 19.85 Biphenyl 0.00024 2.70 0.12 2.82 Cresol (-m) 0.00037 4.16 0.19 4.35 Ethyl benzene 0.00118 13.27 0.59 13.86 Hexane (-n) 0.01174 132 01 5.87 137.88 lsopropyl benzene 0.00032 3.60 0.16 3.76 Naphthalene 0.00057 6.41 0.29 6.69 Toluene 0.0036 40.48 1.80 42.28 Xylenes (mixed isomers) 0.00568 63.87 2.84 66.71 TOTAL FUGITIVE HAPs (lbs.) 293.47 13.05 306.52 1. Weight fraction from API Publication 4723, Nov 2002 (PERF data}; Crude Oil. CHEVRON PIPE LINE COMPANY HANNA STATION TANK EMISSIONS -2008 POTENTIAL 10/14/2008 Description GAS Unit Tank #TBD Tank 111 Tank 510 Tank 520 Total Comment Annual Throughput qal 199.136,700 127,049,215 257,948.405 79,654,680 663.789,000 15,804,500 bbl throughput 2.2.4-Trimethylpentane (isooctane) 00540-84-1 lb 1.84 1.25 2.74 2.19 8.01 Benzene 00071-43-2 lb 5.50 3.32 8.60 8.95 26.36 Biphenyl 00092-52-4 lb 0.46 0.37 0.62 0.19 1.65 Cresci (-m) 00108-39-4 lb 0.71 0.57 0.96 0.30 2.54 Ethylbenzene 00100-41-4 lb 2.41 1.86 3.33 1.42 9.01 Hexane (-n) 00110-54-3 lb 48.41 26.36 78.88 96.75 250.40 lsopropyl benzene 00098-82-8 lb 0.63 0.50 0.86 0.31 2.30 Naphthalene 00091-20-3 lb 1.10 0.88 1.48 0.46 3.92 Toluene 00108-88-3 lb 8.25 5.96 11.83 7.36 33.41 Xylenes (mixed isomers) 01330-20-7 lb 11.48 8.92 15.80 6.44 42.64 Total Tank voes lb/yr 2,755.29 1,873.79 4,547 70 3,611.47 12,78825 lb/hr 181.17 123.21 299.03 237.47 840.87 ton/yr 138 0.94 2.27 1.81 6.39 Total Annual Tank HAPs (lb) lb/yr 80.80 49.98 125.09 124.37 380.24 lb/hr 5.31 3.29 8.23 8.18 25.00 ton/yr 0.04 0.02 0.06 0.06 0.19 1. Results from TANKS 4.09d. ran 10/14/2008. 2. Speciation of HAPs used in TANKS based on API Publication 4723, Nov 2002 (PERF data). HAP = hazardous air pollutant TRI = toxic release inventory 2007 ACGIH Threshold Limit Values (TLVS). Toxic Screening Levels (TSLs) and Emission Threshold Values (ETVs) The purpose of this document is to serve as aid to NSR Engineers. Consultants. and the General Public in their interpretation of the applicability of UACR307-410-5 when preparing or reviewing a Notice of Intent. UACR307-410-5 requires any source submitting a NOi. which proposes to increa se emission of HAP. to use Table 2 in the rule to determine whether or not a dispersion modeling analysis of each pollutant is required as part of a complete NOi. If new emissions of the HAP (expressed in lb/hr) exceeds the emission threshold value. dispersion modeling is required. When selecting the proper Emission Threshold Factor. the folowing release scenario should be determined as follows. "Vertically Restricted Emissions Release" means the release of an air contaminant through a stack or opening whose flow is directed in a downward or horizontal direction due to the alignment of the opening or a physical obstruction placed beyond the opening . or at a height which is less than 1.3 times the height of an adjacent building or structure. as measured from ground level. "Vertically Unrestricted Emissions Release" means the release of an air contaminant through a stack or opening whose flow is directed upward without any physical obstruction placed beyond the opening , and at a height which is at least 1.3 times the height of an adjacent building or structure, as measured from ground level. The lb/yr and TPY values calculated for chronic and carcinogenic HAP below are based on the assumption that the source operates continuously (8760 hr/yr). Acute values are express in lb/hr only. and emission limits or emission levels for acute HAP should not be expressed or calculated in lb/hr or TPY. This is due to the nature of the chemical itself, whereby very short term exposure to high concentrations of the HAP will result in immediate adverse health effects in the exposed individual. Therefore. when evaluating acute HAP for the determination of modeling requirements, ALWAYS evaluate it based on the maximum potential emission rate possible for that process. Do not back-calculate the lb/hr emission rate from the sources proposed pounds or tons per year emission level listed in the NOi. The range of emission threshold values are: Acute Chronic Carcinogenic Minimum ETF - 0.038 Minimum ETF - 0.051 Minimum ETF -0.017 For each type of HAP, there is a minimum and maximum emissions threshold factor (ETF). They are : Maximum ETF -0.310 Maximum ETF -0.368 Maximum ETF -0.123 Using these values . we are able to calculate the minimum emission rate for each type of HAP such that any source operating with a proposed lb/hr emission level less than this value would not be required to perform a dispersion modeling analysis for this NOi process. Similarly. using these values . we are able to calculate the maximum emission rate for each type of HAP such that any source operating with a proposed lb/hr emission level greater than this values would inevitably be required to perform a dispersion modeling analysis for this NOi process. However. if the source's proposed emission rate is greater than the minimum emission rate . but less than the maximum emission rate listed in the table below. the reviewing engineer will have to review the addition information required to be submitted under R307-410-4 to determine if modeling is required (ie, pollutant release type and distance to property boundary). A listing of Tl Vs, TSLs. and minimum and maximum ETVs are shown in the first half of the table below. The full range of ETVs for all ETFs are listed in the second half of this document. Utah Division of Air Quality , downloaded 9/24/2008. http 1/www .airq uality. utah.gov/Plann1ng/Modeling/N SR_ Perm1t_Modeling/Modeling¾20G uidelines/200 7 ACG I H-TL Vs. xis 2007 ACGIH Threshold Limit Values (TLVS). Toxic Screening Levels (TSLs) and Emission Threshold Values (ETVs) Show X X X X X X X X X X X X X X X X X X ACUTE Hazardous Air Pollutants CARCINOGENIC Hazardous Air Pollulanls Benzene (induding benzene for gasol CHRONIC Hazardous Air Pollutants Biphenyl Cresols/Cresylic acid Cumene Ethyl benzene Hexane Naphthalene Toluene Xylenes (isomers and mixture) ACUTE Hazardous Air Pollutants CARCINOGENIC Hazardous Air Pollutants Benzene (including benzene for gasol CHRONIC Hazardous Air Pollutants Bi phenyl Cresols/Cresyhc acid Cumene Ethyl benzene Hexane Naphlhalene Toluene Xylenes (isomers and mixlure) Health Classification Health Class1ficat1on Al Care. Health Classification Chronic Chrohic Chronic Chronic Chronic Chronic Chronic Chronic Heallh Classification Heallh Classif1cat1on A1 Care. Health Classification Chronic Chronic Chronic Chrome Chronic Chronic Chronic Chronic Utah Division of Air Quality. downloaded 9/24/2008; Toxic Em1ss1on Rate Below Screenmg Vvt11ch Modeling Applicable TLV-Ce1l1ng TLV-Ce1hng Molecular Levels Would Never Be Triggered Factor 1-Hour 1-Hour Weighl (TSLs) Under UAC307-410-5 Safety (ug/m3) (ppm) 1-Hour Average "ETF=0.038 I ug/m3 lb/hr lb/day I TPY Toxic Emission Rate Below Screening \Nh1ch Modeling Applicable TLV-TWA TLV-TWA ~olecular We1gt Levels Would Never Be Triggered Factor 8-Hour 8-Hour (TSLs) Under UAC307-410-5 Safety (ugim3) (ppm) 24-Hour Average •ETF=0.017 l•Continious operations ug/m3 lb/hr I lb/yr I TPY 30 1,597 0.5 78. 11 53 0.027 I 238 I 0.12 Toxic Emission Rate Below Screening IM\ich Modeling Applicable LV-TWA(ug/m TLV-TWA ~olecular Weigt Levels Would Never Be Triggered Factor 8-Hour 8-Hour (TSLs) Under UAC307-410-5 Safety (ppm) 24-Hour AVerage •ETF=0.051 ·continious operations ug/m3 lb/hr lb/yr TPY 30 1,261 0 154.20 42 0.064 564 0.28 30 22.115 5.00 108.14 737 1.13 9.880 4.94 30 245,787 50.00 120.19 8,193 12.5 109,808 54,9 30 434,192 100,00 106.16 14.473 22.1 193,980 97.0 30 176.237 50.00 86.18 5,875 9.0 78,736 39.4 30 52.429 10.00 128.19 1.748 2.7 23,423 11,7 30 75,362 20.00 92. 13 2.512 3.8 33.669 16.8 30 434,192 100,00 106.16 14,473 22.1 193,980 97.0 Acute Emission Threshold Values (in lb/hr) Distance to Property Boundary and Emission Threshold Factors Vertically Restncted/Fug1live Releases Vertically Unrestricted Releases <20 m 20-50 m 50-100 m >100 m <SO m 50-100 m >100 m 0.038 0.051 0.092 0.180 0.154 0.224 0.310 Carcinogenic Emission Threshold Values (in lb/hr) Distance to Property Boundary and Emission Threshold Factors Vertically Restricled/Fug1tive Releases Vertically Unrestricted Releases <20 m 20-50 m 50-100 m >100 m <50 m 50-100 m >100 m 0.017 0.022 0.041 0.090 0.066 0.081 0.123 0.0272 0.0351 0,0655 0.1438 0.1054 0.1294 0.1965 Chronic Emission Threshold Values (In lb/hr) Distance to Property Boundary and Emission Threshold Factors Vertically Restricted/Fugitive Releases Vertically unrestricted Releases <20 m 20-50 m 50-100 m >100 m <50m so-100 m >100 m 0,051 0.066 0.123 0.269 0.198 0.224 0,368 0.06 0.08 0.16 0.34 0.25 0.28 0.46 1 13 1.46 2.72 5,95 4.38 4.95 8.14 t2.54 16.22 30.23 66.12 48.67 55.06 90.45 22.14 28.66 53.41 116.80 85.97 97.26 159.78 8.99 1 t.63 21 .68 47.4 t 34.80 39,48 64.86 2.67 3.46 6.45 t4.10 10.38 11 .74 19.29 3.84 4.97 9.27 20.27 14.92 16.88 27.73 2214 28.66 53.41 116.80 85.97 97.26 159.78 http· //www.airq uality. utah. gov/Planning/Modeling/NS R _Perm it_Modeling/Modeling ¾20G uidelines/2007 ACG I H-TL Vs. xis Emission Rate Above \J\tlich Modeling Would Always Be Triggered Under UAC307-410-5 "ETF•0.310 lb/hr lb/day I TPY Emission Rate Above VVhich Modeling Would Always Be Tnggered Under UAC307-410-5 'ETF=0.123 •continious operations lb/hr lb/yr I TPY 0.20 1721 I 0.86 Emission Rat• Above IM\lch Modeling Would Always Be Triggered Under UAC307-410-5 •ETF=0.368 •continious operations lb/hr lb/yr TPY 0.46 4,066 2.0 8.14 71,290 35.6 90.4 792,340 396.2 159.8 1,399,697 700 64.9 568.132 284 19.3 169,016 84.5 27.7 242,943 121 159.8 1,399,697 700 TANKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Identification User Identification: City: State: Company: Type of Tank Description: Tank Dimensions Diameter (ft): Volume (gallons) Turnovers: Self Supp. Roof? (yin): No. of Columns: Eff. Col. Diam. (ft): Paint Characteristics Internal Shell Condition: Shell Color/Shade Shell Condition Roof Color/Shade Roof Condition Rim-Seal System Primary Seal: Secondary Seal Deck Characteristics Deck Fitting Category: Deck Type: Deck Fitting/Status Tank lndentification and Physical Characteristics Hanna Tank #TBD -2008 Potential Hanna Utah Chevron Pipe Line Company Internal Floating Roof Tank Condensate N Light Rust White/White Good White/White Good Mechanical Shoe Rim-mounted Typical Welded 100.00 2,520,000.00 79.02 1.00 1.00 -----------------·-"''""'"'"---------------------~·--·····-··~·-,"·· Access Hatch (24-in. Diam.)/Unbolted Cover. Ungasketed Automatic Gauge Float Welt/Unbolted Cover. Ungasketed Column Well (24-in. Diam.)/Built-Up Col.-Sliding Cover. Ungask. Ladder Well (36-in. Diam.)/Sliding Cover. Ungasketed Roof Leg or Hanger Well/Adjustable Sample Pipe or Well (24-in. Diam )/Slit Fabric Seal 10% Open Vacuum Breaker (10-in. Diam.)/Weighted Mech. Actuation. Gask. Meterological Data used in Emissions Calculations: Salt Lake City. Utah (Avg Atmospheric Pressure = 12.64 psia) Quantity 1 1 6 1 32 1 1 Page I of 13 10/14/2008 TANKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Liquid Contents of Storage Tank Hanna Tank #TBD -2008 Potential -Internal Floating Roof Tank Hanna, Utah Liquid Daily Liquid Surf Bulk Vapor L1qu1d Temperature (deg F) Temp Vapor Pressure (ps,a) Mal Mass Mixture/Component Monlh Avg. Min Max (deg F) Avg M,n Max Weight. Fract. Crude oil (RVP 5) All 53 92 47 99 59 86 51 98 2 5505 NIA NIA so 0000 1 2 4-Tnmethy1henzene 0 0160 NIA NIA 120 1900 0.0023 2 2 4. Tnmethylpentane (1sooctane) 0 4987 NIA NIA 114.2300 0 0007 Benzene 0 9843 NIA NIA 78.1100 0.0017 81nhenyl 0.0008 NIA NIA 154.2000 0.0002 Cresol (-m) 0.0010 NIA NIA 108 1000 0.0004 E thylbenzene 0.0876 NIA NIA 106.1700 0.0012 Hexane (-n) 1.6300 NIA NIA 86. 1700 0.0117 lsopropyl benzene 0.0382 NIA NIA 120.2000 0.0003 Naphthalene 0.0019 NIA NIA 128.2000 0.0006 Toluene 0.2725 NIA NIA 92.1300 0.0036 Uniden11f1ed Components 2.6610 NIA NIA 49.2054 0.9716 Xylenes (mixed ,somers) 0.0728 NIA NIA 106.1700 0.0057 ] Page 2 of 13 Vapor Mass Mol. Basis for Vapor Pressure Fracl. Weight Calculations _, __ ,_,_ 207.00 Op11on 4 RVP=5 0 0001 120.19 Option 2 A=7.04383. B= 1573.267. C=208.56 0.0006 114 23 Option 2 A=6.8118, 8=1257,84, C=220.74 0.0027 78.11 Option 2 A=6.905, 6=1211.033. C=220.79 0.0000 154.20 Option 1. VPS0 = .0007 VP60 = .00099 0.0000 108.10 Option 2 A=7.508. 6=1856.36. C=199.07 0.0002 106.17 Op11on 2 A=6.975, 6=1424.255. C=213.21 0.0311 86.17 Option 2. A=6.876, 8=1171.17. C=224.41 0.0000 120.20 Option 2 A=6.93666. 8=1460.793, C=207.78 0.0000 128.20 Option 2. A=7.3729, 6=1968.36, C=222.61 0.0016 92.13 Op11on 2· A=6.954. 8=1344.8, C=219.48 0.9631 214.40 0.0007 106.17 Option 2 A=7.009. 8=1462.266. C=215,11 I 0/14/2008 TANKS 4.0 Report Emissions Report for: Annual TANKS 4.0.9d Emissions Report ~ Summary Format Individual Tank Emission Totals Hanna Tank #TBD • 2008 Potential -Internal Floating Roof Tank Hanna , Utah II Losses(lbs) !components II Rim Seal Lossll Withdraw! Lossll Deck Fitting Lossll !crude oil (RVP 5) II 67.5111 1.923.7311 764 0411 I 1.2.4-Trimethylbenzene II 0.0011 4.4811 o.05I1 I Biphenyl II o ooll 0.4611 0.0011 I Cresol (-m) II o.ooll 0.7111 0.0011 I lsopropyl benzene II o.ooll 0.62II 0.0211 I Ethylbenzene II 0.0111 2.2111 0.1311 Hexane (-n) II 2.1011 22.5811 23.7311 Naphthalene II o.ooll 11011 0.0011 Toluene II 0 1111 6.93 11 1.2211 Xylenes (mixed isomers) II o 05JI 10.9311 0.5111 2.2.4-Trimethylpentane (isooctane) II 0 0411 1.3711 0.4411 Benzene II 0,1811 3.2511 2.0611 Unidentified Components II 65 0311 1,869 0411 735.8911 Page 3 of 13 Deck Seam Lossll Total Emissions! o.ooll 2,755.291 0.0011 4.531 o.ool l 0.461 o.ool l 0,711 o.ooll 0.631 0.0011 2.41 I 0.0011 48.411 o ooJI 1.101 0.0011 8 251 0.0011 11.481 o.ooll 1.841 o.ooll 5,501 0.0011 2,669.961 10/14/2008 TANKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Identification User Identification. City State: Company: Type of Tank: Description: Tank Dimensions Diameter (ft): Volume (gallons): Turnovers: Self Supp. Roof? (yin): No. of Columns: Eff. Col. Diam. (ft): Paint Characteristics Internal Shell Condition: Shell Color/Shade : Shell Condition Roof Color/Shade: Roof Condition: Rim-Seal System Primary Seal: Secondary Seal Deck Characteristics Deck Fitting Category: Deck Type: Deck Fitting/Status Tank lndentification and Physical Characteristics Hanna Tank 111 -2008 Potential Hanna Utah Chevron Pipe Line Company Internal Floating Roof Tank Crude Oil N Light Rust White/White Good White/White Good Mechanical Shoe Rim-mounted Typical Welded 80.00 1,680,000.00 75.62 1.00 1.00 Access Hatch (24-in. Diam .)/Unboited Cover. Ungasketed Automatic Gauge Float Well/Unbolted Cover. Ungasketed Column Well (24-in. Diam.)/Buiit-Up Coi.-Sliding Cover. Ungask. Ladder Well (36-in. Diam.)/Sliding Cover. Ungasketed Roof Leg or Hanger Well/Adjustable Sample Pipe or Well (24-in. Diam.)/Slit Fabric Seal 10% Open Vacuum Breaker (10-in. Diam.)/Weighted Mech. Actuation. Gask. Meterologicai Data used in Emissions Calculations: Salt Lake City. Utah (Avg Atmospheric Pressure = 12.64 psia) Quantity 1 1 1 1 24 1 1 Page 4 of 13 10/14/2008 T i\N KS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Liquid Contents of Storage Tank Hanna Tank 111 -2008 Potential -Internal Floating Roof Tank Hanna, Utah L1qu1d Daily L1qu1d Surf Bulk Vapor Liquid Temperature (deg F) Temp Vapor Pressure {ps1a) Mal. Mass Mixture/Component Month Avg Min Max (deg F) Avg. Mm Max. Weight. Fract -·•·------· -··-··--··-. ----·- Crude 0 11 (RVP 3.51 All 53.92 47 99 59 86 51 98 1.5477 NIA NIA 60.0000 1.2 4-Tr1methylbenzene 00160 NIA NIA 120.1900 0 0023 2 2 d-Trimethylpen!ane (1!;ooctane) 0.4987 NIA NIA 114.2300 0.0007 Benzene 0.9843 NIA NIA 78, 1100 0.0017 81phenyl 0.0008 NIA NIA 154.2000 0.0002 Cresol (-m) 0.0010 NIA NIA 108,1000 0.0004 Ethylbenzene 0.0876 NIA NIA 106.1700 0.0012 Hexane (-n) 1.6300 NIA NIA 86. 1700 0.0117 lsopropyl benzene 0.0382 NIA NIA 120.2000 0.0003 Naphthalene 0.0019 NIA NIA 128.2000 0.0006 Toluene 0.2725 NIA NIA 92. 1300 0.0036 Unidentified Components 1.5727 NIA NIA 59.4493 0.9716 Xylenes (mixed ,somers) 0.0728 NIA NIA 106.1700 0.0057 Page 5 of 13 Vapor Mass Mol. Basis for Vapor Pressure Fract. Weight Calculations ·---.. ---- 120.00 Option 4 RVP=3.5 0.0000 120.19 Option 2 A=7.04383. 6=1573.267. C=208.56 0.0005 114.23 Option 2 A=6.8118. 6=1257.84. C=220.74 0.0021 78.1 I Option 2 A=G.905. B= 1211.033. C=220.79 0.0000 154.20 Option 1. VP50 = .0007 VP60 = .00099 0.0000 108.10 Option 2· A=7.508. 6=1856.36. C=199.07 0.0001 106.17 Option 2 A=6.975. 8=1424.255. C=213.21 0.0247 86.17 Option 2· A=6.876. 8=1171.17, C=224.41 0.0000 120.20 Option 2· A=6.93666. 8=1460.793. C=207.78 0.0000 128.20 Option 2 A=7.3729, 8=1968.36, C=222.61 0.0013 92.13 Option 2. A=6.954. 8=1344.8, C=219.48 0.9707 120.93 0.0005 106.17 Option 2 A=7.009, 8=1462.266, C=215.11 I 0/14/2008 TANKS 4.0 Report Emissions Report for: Annual TANKS 4.0.9d Emissions Report -Summary Format Individual Tank Emission Totals Hanna Tank 111 -2008 Potential -Internal Floating Roof Tank Hanna, Utah II Losses(lbs) I components II Rim Seal Lossll Withdraw! Lossll Deck Fitting Lossll Crude Oil (RVP 3.5) II 37.5911 1.537.9711 298.2311 1,2.4-Trimethylbenzene 0.0011 3 sail 0.0111 Biphenyl 0.0011 0 3711 o.ooll Cresci (-m) 0.0011 0.5711 0.0011 lsopropyl benzene 0.0011 0.4911 o.ooll Ethylbenzene 0.0111 1.a1 II 0.0411 I Hexane (-n) 0.9311 18.0611 7.3711 I Naphthalene o.ooll 0.8811 o.ooll I Toluene o 0511 5 5411 0.3811 I Xylenes (mixed isomers) 0 0211 8 7411 0.16II I 2. 2 .4-T rimethylpentane (isooctane) 11 0 0211 1 0911 0 1411 I Benzene II o.oall 2 6011 0.6411 I Unidentified Components II 36.4911 1.494 2511 289.4811 Page 6 of 13 Deck Seam Lossll Total Emissions! 0.0011 1,873.791 0.0011 3.601 0.0011 0.371 0.0011 0.571 0.0011 o.5ol 0.0011 1.861 0.0011 26.361 o ooll 0.881 o.ooll 5.961 0.0011 8.921 o.ooll 1.251 0.0011 3.321 o.ooll 1,820.211 10/14/2008 TAN KS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Identification User Identification: City State: Company: Type of Tank: Description: Tank Dimensions Diameter (ft): Volume (gallons): Turnovers: Paint Characteristics Internal Shell Condition: Shell Color/Shade: Shell Condition Roof Characteristics Type: Fitting Category Tank lndentification and Physical Characteristics Hanna Tank 510 -2008 Potential Hanna Utah Chevron Pipe Line Company External Floating Roof Tank Crude Oil Light Rust White/White Good Pontoon Typical 95.00 2.520,000.00 102.36 Tank Construction and Rim-Seal System Construction: Welded Primary Seal: Mechanical Shoe Secondary Seal Rim-mounted Deck Fitting/Status Quantity -----···-·· ............. ·-.... ----.... ---- Access Hatch (24-in. Diam.)/Bolted Cover, Gasketed ........ _ ... ---·-· ....... ____ ......... _.... . .. . . .. . 1 Automatic Gauge Float Well/Unbolted Cover, Ungasketed Vacuum Breaker (10-in. Diam.)/Weighted Mech. Actuation. Gask. Unslotted Guide-Pole Well/Ungasketed Sliding Cover Gauge-Hatch/Sample Well (8-in. Diam.)/Weighted Mech. Actuation. Gask. Roof Leg (3-in. Diameter)/Adjustable. Pontoon Area. Ungasketed Roof Leg (3-in. Diameter)/Adjustable. Center Area. Ungasketed Rim Vent (6-in. Diameter)/Weighted Mech. Actuation. Gask. Meterological Data used in Emissions Calculations: Salt Lake City. Utah (Avg Atmospheric Pressure = 12.64 psia) 1 1 1 1 17 16 1 Page 7 of 13 10/1 4/2008 TANKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Liquid Contents of Storage Tank Hanna Tank 510 -2008 Potential -External Floating Roof Tank Hanna, Utah L1qu1d Daily Uqu1d Surf. Bulk Vapor Liquid Temperature (deg F) Ternp Vapor Pressure (ps1a) Mol. Mass M1xture/Componen1 Month Avg Min. Max (deg F) Avg. Min Max Weight Fract. --------O•••-• ---·-----·--------· ---··--- Crude 0 1 (RVP 3 5) All 5] 92 47 99 59.86 51 98 1 5477 NIA NIA 60 0000 1.2 4-Tnmethylbenzene 0.0160 NIA NIA 120 1900 0.0023 2.2 4-Trimethytpentane (1sooctane) 0 4987 NIA NIA 114.2300 0.0007 Benzene 0 9843 NIA NIA 781100 0.0017 81phenyl 0.0008 NIA NIA 154 2000 0.0002 Cresol (-m) 0.0010 NIA NIA 108.1000 0.0004 Elhylbenzene 0 0876 NIA NIA 106 1700 0.0012 Hexane (-r,) 1.6300 NIA NIA 86 1700 0.0117 I sopropyl benzene 0 0382 NIA NIA 120 2000 0.0003 Naphthalene 0.0019 NIA NIA 128 2000 0.0006 T ol11ene 0 2725 NIA NIA 92 1300 0.0036 Unidentified Components 1.5727 NIA NIA 59.4493 0.9716 Xylenes (rn1xed isomers) 0.0728 NIA NIA 106.1700 0.0057 Page 8 of 13 Vapor Mass Mol. Basis for Vapor Pressure Fract. Weight Calculations ·----- 120.00 Option 4 RVP=3.5 0.0000 120.19 Option 2 A=7.04383 8=1573.267. C=208.56 0 0005 114.23 Option 2· A=6.8118. 8=1257.84. C=220.74 0.0021 78.11 Option 2 A=G.905. 8=12 t 1033. C=220.79 0.0000 154.20 Option 1. VP50 = .0007 VP60 = .00099 0.0000 108.10 Option 2 A=7.508. 6=1856.36. C=199.07 0.0001 106.17 Option 2 A=6.975. 8=1424.255. C=213.21 0.0247 86. 17 Option 2 A=6.876. 8=1171.17. C=224.41 0 0000 120.20 Option 2 A=6.93666. 8=1460.793. C=207.78 0.0000 128.20 Option 2 A=7 3729. 8=1968.36. C=222.61 0.0013 92.13 Option 2 A=6.954 8=1 344.8. C=219.48 0.9707 120.93 0.0005 106.17 Option 2 A=7.009 B= 1462.266. C=215.11 10/14/2008 TANKS 4.0 Report Emissions Report for: Annual TANKS 4.0.9d Emissions Report -Summary Format Individual Tank Emission Totals Hanna Tank 510 -2008 Potential -External Floating Roof Tank Hanna, Utah I II Losses(lbs) I components Rim Seal Lossll Withdraw! Lossll Deck Fitting Lossll !crude Oil (RVP 3.5) 306.7711 2 597 0611 1,650.0111 I 1.2.4-Trimethylbenzene 0.01 11 6 0511 o.08II I Biphenyl 0.0011 0.62II o.ooll I Cresci (-m) o.ooll 0 9611 0.0011 I lsopropyl benzene I 0.0011 0.8311 0.0311 I Ethylbenzene II 0,0411 3 0611 0.2211 Hexane (-n) II 7.5911 30.4911 40.8011 Naphthalene II 0.0011 1.4811 o.ooll Toluene II 0 3911 9.3511 2.0911 Xylenes (mixed isomers) II 0.16II 14.7511 0.8811 2.2.4-Trimethylpentane (isooctane) II 0.1411 1,8411 0,7611 Benzene II 0.6611 4.3911 3.5511 Unidentified Components II 297.nll 2,523,2211 1.601 .6111 Deck Seam Lossll 0.0011 0.0011 o.ooll 0.0011 o.ooll 0.0011 0.0011 o.ooll 0.0011 0.0011 o.ooll 0.0011 0.0011 J Page 9 of 13 Total Emissions! 4,553.841 6.151 0.621 0.961 0.861 3.331 78.881 1.481 11.831 15.801 2.741 8.601 4,422.601 10/14/2008 TANKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Tank lndentification and Physical Characteristics Identification User ldentificalion: City: Hanna Tank 520 -2008 Potential Hanna Utah State Company: Type of Tank: Description: Chevron Pipe Line Company External Floating Roof Tank Black Wax Condensate Mix Tank Dimensions Diameter (ft): Volume (gallons): Turnovers: Paint Characteristics Internal Shell Condition: Shell Color/Shade: Shell Condition Roof Characteristics Type Fitting Category Light Rust White/White Good Pontoon Typical Tank Construction and Rim-Seal System Construction: Welded Primary Seal: Mechanical Shoe Secondary Seal Rim-mounted Deck Fitting/Status Access Hatch (24-in. Diam.)/Bolted Cover, Gasketed Automatic Gauge Float Well/Unbolted Cover, Ungasketed 95.00 2.520.000.00 31.61 Vacuum Breaker (10-in. Diam.)/Weighted Mech. Actuation, Gask. Unslotted Guide-Pole Well/Ungasketed Sliding Cover Gauge-Hatch/Sample Well (8-in. Diam.)/Weighted Mech. Actuation, Gask. Roof Leg (3-in. Diameter)/Adjustable. Pontoon Area. Ungasketed Roof Leg (3-in. Diameter)/Adjustable. Center Area . Ungasketed Rim Vent (6-in. Diameter)/Weighted Mech. Actuation. Gask. Meterological Data used in Emissions Calculations: Salt Lake City. Utah (Avg Atmospheric Pressure = 12 .64 psia) • Quantity 1 1 1 1 1 17 16 1 Page 10 of 13 I 0/14/2008 T J\NKS 4.0 Report TANKS 4.0.9d Emissions Report -Summary Format Liquid Contents of Storage Tank Hanna Tank 520 -2008 Potential -External Floating Roof Tank Hanna, Utah L1qu1d Daily L1qu1d Surf. Bulk Vapor Liquid Temperature (deg F) Temp Vapor Pressure (ps1a) Mel. Mass M1xture/Component Month Avg. Min. Max. (deg F) Avg. Min. Max. Weight. Fract. ~-·------·• ·-----··-•-··· ··-·--· ---•·------· -· -------~--- Crude 01I (RVP 5) All 53.92 47.99 59.86 51.98 2.5505 NIA NIA 50.0000 1.2 4. Trimethylbenzene 0.0160 NIA NIA 120.1900 0.0023 2.2.4-Tmnethylpentane (1sooctane) 0.4987 NIA NIA 114,2300 0.0007 Benzene 0.9843 NIA NIA 78.1100 0.0017 81phenyl 0.0008 NIA NIA 154.2000 0.0002 Cresci (-m) 0.0010 NIA NIA 108.1000 0.0004 E thylbenzene 0.0876 NIA NIA 106,1700 0.0012 Hexane (-n) 1.6300 NIA NIA 86, 1700 0.0117 1sopropyl benzene 0.0382 NIA NIA 120.2000 0.0003 Naphthalene 0.0019 NIA NIA 128.2000 0.0006 Toluene 0.2725 NIA NIA 92. 1300 0.0036 Un1dentlf1ed Components 2.6610 NIA NIA 49,2054 0.9716 Xylenes (mixed isomers) 0.0728 NIA NIA 106.1700 0,0057 Page 11 of 13 Vapor Mass Mel. Basis for Vapor Pressure Fract. Weight Calculations 207.00 Option 4 · RVP=5 0.0001 120.19 Option 2. A=7.04383. 8=1573.267, C=208.56 0,0006 114.23 Option 2· A=6.8118, 8=1257.84, C•220.74 0.0027 78.11 Option 2: A=6.905, 8=1211.033, C•220.79 0,0000 154.20 Option 1 VP50 = .0007 VP60 = .00099 0.0000 108.10 Option 2: A=7.508. 8=1856.36. C=199.07 0.0002 106.17 Option 2. A=6.975, 8=1424.255. C•213.21 0.0311 86.17 Option 2: A=6.876. 8=1171.17. C=224.41 0.0000 120.20 Option 2: A=6.93666, 8=1460.793. C=207.78 0.0000 128.20 Option 2: A=7.3729. 8=1968.36, C=222.61 0.0016 92.13 Option 2: A=6,954, 8=1344.8, C=219.48 0.9631 214.40 0.0007 106,17 Option 2: A=7,009, B= 1462.266, C=215.11 I 0/14/2008 TANKS 4.0 Report Emissions Report for: Annual TANKS 4.0.9d Emissions Report -Summary Format Individual Tank Emission Totals Hanna Tank 520 -2008 Potential -External Floating Roof Tank Hanna, Utah II Losses(lbs) I components II Rim Seal Lossll Withdraw! Lossll Deck Fitting Lossll !crude oil (RVP 5) II 440.7811 801.9711 2,370.7611 I 1.2.4-Trimethylbenzene II 0.0311 1,8711 0 1411 I Biphenyl II 0.0011 0.19 11 o ooll I Cresci (•m) II 0.0011 0.30 11 0.0011 I lsopropyl benzene II 0.0111 02611 o.05II I Ethyl benzene I 0.0711 o.95II 0.4011 I Hexane (-n) 13 6911 9.4211 73.6411 I Naphthalene o ooll 0.4611 o ooll I Toluene 0 7011 2 8911 3.7711 I Xylenes (mixed isomers) 0.30 11 4.5611 1.5911 I 2.2.4-Trimethylpentane (isooctane) 0.25 11 0.5711 1.3611 I Benzene 1,1911 1.3611 6.4011 I Unidentified Components 424.5411 779.1711 2,283.4011 Page 12 of 13 Deck Seam Lossll Total Emissions! 0.0011 3.613.51 I 0.0011 2.041 o ooll 0.191 0.0011 0.301 0.0011 o.31 I 0.0011 1.421 0.0011 96.751 o ooll 0.461 o.ooll 7.361 o.ooll 6.441 o.ooll 2.191 0.0011 8,951 0.0011 3,487.111 10/14/2008 J TANKS 4.0 Report Page 13 of 13 TANKS 4.0.9d Emissions Report -Summary Format Total Emissions Summaries -All Tanks in Report Emissions Report for: Annual Tank Identification Losses (lbs) Hanna Tank #TBD -2008 Potential Chevron Pipe Line Company Internal Floating Roof Tank Hanna. Utah 2,755.29 Hanna Tank 111 -2008 Potential Chevron Pipe Line Company Internal Floating Roof Tank Hanna. Utah 1,873.79 Hanna Tank 51 O -2008 Potential Chevron Pipe Line Company External Floating Roof Tank Hanna. Utah 4,553.84 Hanna Tank 520 -2008 Potential Chevron Pipe Line Company External Floating Roof Tank Hanna. Utah 3,613.51 Total Emissions for all Tanks: 12,79643 10/14/2008 TANKS 4.0 Report Identification User Identification: City: Stale: Company: Type of Tank: Description: Tank Dimensions Shell Length (ft): Diameter (ft): Volume (gallons): Turnovers: Net Throughput(gal/yr): Is Tank Heated (y/n): Is Tank Underground (y/n): Paint Characteristics Shell Color/Shade: Shell Condition Breather Vent Settings Vacuum Settings (psig): Pressure Settings (psig) TANKS 4.0.9d Emissions Report -Summary Format Tank lndentification and Physical Characteristics Solvent Tank Hanna Utah Chevron Pipe Line Company Horizontal Tank Solvent N N Aluminum/Specular Good 5.00 6.00 300.00 1.00 300.00 -0.03 0.03 Meterological Data used in Emissions Calculations: Salt Lake City, Utah (Avg Atmospheric Pressure= 12.64 psia) Page 1 of 4 10/14/2008 TANKS 4.0 Report Solvent Tank -Horizontal Tank Hanna, Utah Mixture/Component Month Solvent All Daily Liquid Surf. Temperature (deg F) Avg. Mm. Max. 57.19 49.02 65.36 TANKS 4.0.9d Emissions Report -Summary Format Liquid Contents of Storage Tank Liquid Bulk Vapor Liquid Temp Vapor Pressure (psia) Mol. Mass (deg F) Avg. Min. Max. Weig,!. Fract. 53.30 0.1000 0.1000 0.1000 80.0000 Page 2 of 4 Vapor Mass Mol. Basis fa Fract. Weight Calculal 120.00 10/14/2008 TANKS 4.0 Report Emissions Report for: Annual Solvent Tank -Horizontal Tank Hanna, Utah I components !solvent II II II TANKS 4.0.9d Emissions Report -Summary Format Individual Tank Emission Totals Losses(lbs) I Working Lossll Breathing Lossll Total Emissions! 0.0611 2.7311 2781 Page 3 of 4 10/1 4/2008 TANKS 4.0 Report Page 4 of 4 10/14/2008 Appendix E BACT Analysis CHEVRON PIPE LINE CO. HANNA STATION 1.0 BACKGROUND BACT Analvsis The Utah Division of Air Quality (DAQ) air permit regulations [UAC R307-401-5(2)(d) and R307-401-8(l)(a)] require any new or modified source seeking an approval order must consider the Best Available Control Technology (BACT). BACT is to be applied to new and modified emission units and is to be determined on a case-by-case basis, with consideration given to energy impacts, technical feasibility, environmental impacts, and economic impacts. This section presents a BACT analysis for the new and existing emission units that are part of the Chevron Pipe Line Company Hanna Station. For the Hanna Station. volatile organic compounds (VOCs) are the only pollutants emitted into the atmosphere. For purposes of prevention of significant deterioration (PSD) analysis, each project-affected source that emits VOCs must be evaluated to determine BACT. A BACT analysis is being perfonned for each BACT emission applicable unit that is either existing or will be installed at the facility and will have an increase of VOC emissions. To complete a detailed BACT analysis. the United States Environmental Protection Agency (U.S. EPA) top-down BACT methodology is used to analyze available options and then select an appropriate control technology. To utilize the top-down approach, commercially available control options for each applicable pollutant are identified. Technically infeasible alternatives are then dismissed, and the remaining control options are analyzed and ranked according to control effecti\'eness. To select a BACT option, the following items are evaluated: energy impacts. environmental impacts, economic impacts, cost effectiveness, and site-specific factors. The control technology selected provides the most stringent level of control without causing adverse economic, energy, or environn1ental impacts. Generally, the cost effectiveness parameter is stated as either total or incremental annualized dollar cost per ton of pollutant abated. An extensive review of the U.S. EPA RACT/BACT/LAER Clearinghouse (RBLC) database has been performed for similar sources to identify emission control strategies relevant to the proposed project. An extensive review of the RBLC defined the range of potentially applicable emission control applications. For some Hanna Station sources. a strict top-down analysis is not necessary to identify appropriate BACT. In these instances, accepted emission control technology alternatives are identified. Of these, feasible alternatives may then be evaluated in comparison with accepted BACT practices as described in the RBLC or in published BACT guidelines. Jn no case is the recommended BACT less stringent than the controls required under New Source Pe1fonnance Standards (NSPS) and National Emission Standards for Hazardous Air CHEVRON PIPE LINE CO. HANNA STATION BACT Analysis Pollutants (NESHAP) regulations. The federal requirements are considered a "floor" for BACT considerations. For the Hanna Station, the BACT-applicable sources are listed below in Table 1. Table l Hanna Station BACT-Applicable Sources Source ID Source Description Estimated Increase (tpy) PSD Pollutant -VOC T-111 IFR Tank 0.94 T-510 EFR Tank 2.27 T-520 EFR Tank 1.81 T-TBD 1FR Tank 1.38 Equipment Fugitives 5.62 Table 2 presents a summary of proposed BACT for the emission sources proposed to be installed as part of the Hanna Station. Details of the BACT analysis are presented in the remainder of this section. Table 2 Summary of Proposed BACT Source Description Pollutant Internal Floating Roo f voe Tanks External Floating Roof voe Tanks ' Process Fugitive voe BACT = Best .1\\"ailable Control Technology LDAR = Leak Detection and Repair VOC = Volatile Organic Compound 2.0 TOP-DOWN BACT APPROACH Most Feasible BACT Selected • Internal Floating Roof • Compliance with regulatory programs • Ex ternal Floating Roof • Compliance with regulatory programs . • Compliance with LOAR program . • Leak definition more stringent than regulation . BACT is defined in the Clean Air Act as "a11 emissions limit based on the maximum degree of emissio11s reduction for each pol/1110111 ... 11·/,ic/1 the permitting authority determines. 011 a case by case basis. 1aki11g into acco11111 energv. e11rironme11tal. and economic impacts and 2 CHEVRON PIPE LINE CO. HANNA STATION BACT Ana1Vsis other costs, is achievable for such .facility through th e application of production processes and available methods, systems, and techniques ... ". Two key aspects of the definition are worthy of notice: • BACT includes and, in fact, focuses on "production processes" along with add-on controls. • BACT was intended to be a case-by-case evaluation, implying individual case evaluations and decisions, not rigid, pre-set guidelines. The top-down BACT approach starts with the most stringent (or top) technology that has been applied to similar emissions units. A source of control technology information is the RBLC database. The RBLC is an EPA-sponsored database that li sts previously EPA- approved BACT determinations. The top control technology is either accepted as BACT or rejected based on technical or economic infeasibility. If the top control technology is rejected as BACT, the next most stringent control technology is either accepted as BACT or rejected. The top-down approach is continued until a control technology, which is found to be both technically and economically feasible, is accepted as BACT. 3.0 BACT APPLICABILITY Each of the proposed units to be installed as part of the Hanna Station that generate any VOC emi ssions \\·ill require BACT review. Existing emission units require a BACT analysis as \\'ell. 4.0 STORAGE TANKS Four storage tanks (T-111 , T-510, T-520 and T-TBD) produce VOC emissions; therefore, an analysis will be conducted to establish what constitutes BACT. Resultant VOC emissions from storage tank s occur through two processes defined as working and breathing losses. The existing. storage tanks T-111 , T-510, and T-520; and the proposed tank T-TBD are/will be equipped with fl oating roofs as required by 40 CFR 60.l 12b(a), NSPS Subpa11 Kb. Working loss emissions are mostly attributed to the loading and unloading of a tank, at which time the hydrocarbon vapor located in the tank headspace is displaced. Working loss emissions generally account for the large majority of emissions from storage tanks. Breathing loss emissions occur from the cycli c diurnal temperature changes. Because the equilibrium pressure of the vapor and liquid phases (vapor pressure) is a function of 3 CHEVRON PIPE LINE CO. HANNA STATION BACT Analvsis temperature, this heating and cooling cycle allows for VOC displacement through the expansion and contraction of the headspace. 4.1 Storage Tank voe BACT Analysis The historical accepted VOC control practice for storage tanks consists of design measures to minimize the hydrocarbon vapor space displacement. 4.1.1 Step 1 -Identify Potential Control Technologies The first step in a BACT analysis is to identify all available control technologies. Review of Historical BACT Determinations The RBLC BACT databases contain numerous BACT determinations for the control of VOC emissions from storage tanks. Review of the RBLC provides an indication of prior BACT determinations for storage tanks. A summary of this review appears in Table A-1. Chevron Pipe Line also reviewed the BACT detenninations for storage tanks at the proposed Arizona Clean Fuels, LLC Greenfield refinery and the proposed Hyperion Greenfield refinery in South Dakota as a means to supplement the RBLC search results. Some of these determinations include: • Fixed roof with a closed vent system and vapor capture system • Internal floating roof with dual seals and inert gas blanketing • External floating roof with dual rim seals • Thermal oxidation Option 1 -Internal floating roof tank with appropriate sea) design An internal floating roof tank incorporates a roof structure that floats on the liquid surface exerting pressure on the vapor phase, thus decreasing the volume of vapor available to emit. The floating roof would also uses an appropriate seal design to allow a minimal amount of vapor from exiting as rim losses. In addition to a roof floating on the liquid surface an additional fixed roof is also constructed atop the storage tank further limiting the vapor displacement to the atmosphere. 4 CHEVRON PIPE LINE CO. HANNA STATION Option 2 -External floating roof with appropriate seal design BACT Analvsis This technology is similar to that listed in Option 1 ; however, there is no fixed roof atop the floating roof to further minimize vapor displacement to the atmosphere. Option 3 -Work Practices required by regulatory programs Storage tanks are regulated under 40 eFR 60 (NSPS). These regulations require that the facility comply with both vapor pressure and design requirements listed for storage tanks. The requirements are specified in various ranges of vapor pressure and capacities. Option 4 -Thermal Oxidation Thermal oxidation combusts voe streams with a control efficiency of greater than 95%, and can be used for control of any voe-containing stream, including storage tanks. Thermal oxidation is used to process vented voe streams by using an incineration unit or flaring device. While voes are destroyed in this process, other combustion emissions are created and must be accounted for in the emission inventory for the refinery. 4.1.2 Step 2 -Eliminate Technically Infeasible Options The second step in the BAeT analysis is to eliminate any technically infeasible control technologies. Each control technology identified in Step I is technically feasible. 4.1.3 Step 3 -Ranking of Remaining Control Technologies by Control Effectiveness The third step in the BAeT analysis is to rank the remaining technically feasible control technologies in order of control effectiveness. Table 3 shows that ranking. 5 CHEVRON PIPE LINE CO. HANNA STATION Table 3 BACT Analvsis Ranking of Remaining Control Options for VOCs from Storage Tanks Rank Control Type Control Efficiency I Thermal Oxidation >95% 2a Internal fl oating roof Baseline 2b External floating roof Baseline Uncontrolled em1ss10ns are not listed because industry standards prevent storing vo latile organic liquids in ta nks w ithout a roof. 4.1.4 Step 4 -Evaluation of the Most Effective Controls The fourth step in th e BACT analysis is lo evaluate the most effective control technologies not eliminated due to technical infeasibility. Thermal Oxidati on The feasibility of adding a th ermal ox idation to the storage tanks was considered. Based on standard cost estimation techniques and uncontro ll ed emissions, the cost of installing and operating thennal oxidation would be approx imately $106,000 -$256,000 per ton of VOC to be removed per tank, which exceeds the ty pical cost thresholds used to verify the cost- effecti veness of a control option {$5 ,000). The cost information and data used to support the cost effectiveness detern1ination is included in Table 4. This hi gh cost is mostl y attributed to the low VOC emissions from each tank and the operational cost associated with th e thermal ox idizer. In addi tion to the hi gh cost, thenn al oxidizers do emit other criteria pollutants resulting from combustion such as NOx, CO. PM 10, etc. Due to the economic . energy, and environmental impacts. the thermal oxidizer is being rejected as BACT. 6 l q-(U 11-!)l)!U 11 .j}li JM.) · ~ 1 'h ,1.1,"llUI .,::1:,.1:·,t: w.1.11.'d ( ,, pm: ·"'.Pi ; \-11Z JO_! J,,1,1:1 \1,"l ,o~."II p;mh: .... ,"'ttl ,fo,,11 p.,u·u11,-., ... ,1 !U-"'WhJ\U( (CliCk _) jC11, J. p,Vl(&:nnuv , t- l-'-'!uJd --~til .WJ u i11 ... ,p •"41 {'UC S..' "ll "'C Id .~UI i,"'.)H13U."I .,.,llJIJ,..__h,} lh' r.)i;i;t:'{ i:1~V ) l { 'l-lU.l;;t:~}q~.lde i:;.u, ... d }'·' \1,11Jlh.>v'r:fJ .... ,p 0 1 p:,!~fulOi\ '-C puc ·,;_;1,,pu-1 \ !C!lll,)h)(I ljll.~\ St1(11._.:s11:,:--1p "9.:'lll.'.'l~id .1111 l,"l,')Ul.:u:, ·,,,ll."'I P(h.:~ m) [',"l<;t:q 'l'-0.'I { ~Jd i l\1,,u1(frnl,., r,,q·q;,,Uh,l _;,, ~.:i'Hl,).;lr,,d r, ,c ')."l."IUt; \\V!IC ,n,;npm p.::--1d \ [ ti': si,.,u1~·u., ,,'),w4-ut tJll" 5U01$~H.)5:p lUl)lJ pJll!C14,:, '\· 11 ·,.,,o, O(~'tLl 11,: I IXi" I ror·s.:, (,(,(,·•111 t()t'll l r,w:r {,•1,.r;~ 'ix,,·:.·1 ,~•)·ii ~~(•·~ )i~•f!.1 t-·9t··111J(f I (K~fili:I <KMJOt- 11fkfS i.K)ffS !KKl'llt (M~ft-: t <,W(lt(, f"'l)t'.i)tt' i-o, If(~·: ,;or·~11f tt'-H·o~ {Jll~'OL. <1;::t·ot tij)(fto~ <Kxri-c 0(1(1°1)~ (XHffJc (~)((l)t •~Xf(XJt O9.L·.1 ~ 1 •£wm o:n ~ I ton 11 ~ I <,!t-'Zt \ unr,;: 5 ~x•J'i l , ~i<'I \'I s f~tfi ~ ~~'ff I ' t 9t-.090' l ~ OO(YOZI s i,O(i'l)t s OiMi'S \; (~llfX ' t,~;'()t- ' 1)1')(ft: 5: t '.it '()t6 ~ ~)t'(Jft ~ i-o, ~ oz~·z ' oot·:or s o--)ro;:: ' {)l)r;:'oL s otrot s 0()(J'to, ~ O<Krtc s OO(fOZ s 000-0Z s <KJffOt- s U(J(f()(Jt- 0lS·.1 s1sA1eu11318 SI tlf,SOI s s L~ I Z cl~~: s I lilt°III , I 1,lh:P ~ I <,•,s\:~ ~ i\~1Jf ! \ :,.;~•ii"! ) t >i♦-C \ 1iX'l"~! ) I ~~t-·tl\1ff l ~ I ,~>i1'1,;:1 , ono·or \ oo~•s I, (HlifS ', (k,".flit ~ OOit't-~ \ I r--Wlltl, ,; I t<•t ·•1tt- ,; tfh \ u;:~-~ S (je}f-'~01£ 'i (l'-)!'lii ~ fr;~·o!. S ()[f'llt s (l(l{fto, $ t)O(fti: s ooo'oi: s ()(lO'IIZ $ ()()(fl)t s fKHIWJt tllS·.l. , I OcL·;~, ~M(i1 1Jt(1 II s I r,w~.:, ~ I r.6(;911 s I tllt"III <.. I 1dr-~t \ (,•J..;' .,: ' ~:<•ft'! , -...;X•J ! I \ !:.~O ~ ',(\•f:._. l , I r9t-·oc,o I , I nno·o~i \: O(lt1'1lj· ' (Jl\}ti'_-i , o(R.1·s , ooo·ot OO<ft~ \ I r9h•tl, ~ I r•1r·-,,t '\ Hb ' o: ~·;: , 1iot·~nf ') 09i"U~ ) ll'l;·o.:. " oz:r·ot , I •K~.rto, ~ 000 t~~ \ l~llfllc $ tl<}lf(J: , mO'nt \ O()(fO<>t- 111-1. s ~ s ~ :-: ' ' ~ ' ' ., ' ' s s s s s IH '· 1 ll ;.• · i\l\ II\ 1, ,!l • i \: l" ~. i=~."• !.>,.l ,/,l l•)' :t::•~ :-.J !,j l,J•,. 1<1 (·• d 1,1:<>, hi l·· ', 1.1:-•·,. .1.1 1,,-, .. !ti ;,, -~ , Id ;.•', 1,t i•••, i,I !••· 1.-1 I•'•,, u,, ... , 1<1•·•. 1,11"'• I.I i:-•~ rn1rn ' . '«lt') '',1ll1f tlti .,: ' ".,!).! HO'!-; ·· •. 01 ·• -., .. ·..,1,1 ',J1; ·•.111 ·• •. ~ tl ".,11q "' ".t-1 !, ... ~ ·',,") .. , •> 0 t>lll "IU,lUll\.,l\UI 1l!J!dt!J tt!&Oj_ p,H'!I\HIUUV PJ!I J\ 0~ ·0 ..,1•,.i JOI.WJ ,-... l.\O.).lll IV.l!lh:J ,1,0 _) ;;ll!Jr.J,\(fO 1unuuv tmup-.,.· put: ':lJUCJll'Uf ·s."'Xl'.L P">lJ'·"O J.\I\ ·._;:wu~H~h ,,ucu;>IU~Ct·\ "II\ tJjltj:-Jtt"' Jlj,; {ltJOqt:1 _.,_'ll!l:U,)ltlli:!1\ T:-, · mqCJ \ 10S.t \t,,dn, dU {lJUl~ Jl{ '.! J4,; 011oqc1 i1U~lCJ~do ',SJ.SO.) ~>'.\:UVl!J,I {I_)_l) lU-Hu1,~,,u1 fV.l!th:.) 11?Ju,1_ SlSO_) lJJllpuf 5-J.1.)UJciUllHO) tiil•lH!lS S.."'l.:1j JOl)CJIUO,_) S,'lsu.xix.., PPIJ puc u011.)tt11St10) -1m1JJt1rau1 ilh)ilCUCl'-\ifJ 51SV) 1.1:'IJ~puf S!SOJ PWQ s:,~o) uo;1c11c1su1 p.);:o ,1li!HIICJ 'fJO.\\}Jl1~l J~f tlOtlCtl1'0f i1u~d~d jCJUIXl['J lk>U;)..)JJ put -'m1puc1-1 uoJdn~ puc SUOOCJ)llllO.:J ~ISO.) m)~ICflCIS.Uf l..);)_HQ tJ]dl !SO.) 111.,tud111b3 pasc4JJllJ XC_l SOfCS ntfl1.:u;1 U~lt'lU.JlllOJl'SU[ 111ou1d111b3 ·,nv , /3,1) rno,udrnb3 p,sc,p.mJ 'S.lSOJ '1V.LIJ V .>..l!-'-'·JS .l;}Z!P!XO 1ew.1aq,.L .IOJ ;J.)EW!JS3. .)SO:) 17 a1qe,.L NOI..LV..LS VNNVH ·03 3NI'l 3dld NONA3H::> CHEVRON PIPE LINE CO. HANNA STATION Floating Roof BACT Analysis Installing a floating roof design is within the economic budget for the facility. It is more cost effective to initially construct a floating roof tank than to convert a fixed roof tank to a floating roof tank. The tanks at the Hanna Station tanks will have floating roofs as required by 40 CFR 60.1 I 2b(a). 4.1.5 Step 5 -Selection of voe BACT for Storage Tanks Because Chevron Pipe Line is interested in controlling em1ss10ns m a manner that is environmentally effective, cost effective and in compliance with 40 CFR 60. l l 2b(a), Chevron proposes that the installation and operation of floating roof tanks subject to NSPS requirements be considered BACT for voe for the Storage Tanks. Tanks T-520 and T-510 are equipped with external floating roof tanks, and Tanks T-111 and T-TBD is/will be equipped with internal floating roof tanks. 4.1.6 Practically Enforceable BACT for Storage Tanks Development of emission limit to reflect selected control technology VOC emissions from the Storage Tanks were calculated using the EPA TANKS 4.09d software. The estimated voe emissions associated with storage tanks T-111 , T-520. T-510, and T-TBD are 0.41 , 1.39, 1.53, and 0.58 tons VOC per year respectively. This emissions estimate is based upon the current/expected design and emissions calculations from EPA TANKS 4.09d. The facility will ensure that the selected BAeT is properly installed, operated. and the selected work practice standards are properly implemented. Compliance Monitoring The facility will comply with applicable NSPS Subpart Kb requirements for the storage tanks. All monitoring. recordkeeping, and reporting will be done in compliance with NSPS requirements. 5.0 PROCESS FUGITIVES The Hanna Station uses many piping components to distribute the liquid materials (mostly crude oil) between tanks and pipeline. These piping components are potential sources of 8 CHEVRON PIPE LINE CO. HANNA STATION BACT AnalVsis VOC em1ss1ons due to leaking equipment. VOC em1ss1ons from those components are mostly related to potential leakage from valves, flanges, and pump seals. It is important to Chevron that these piping components are effectively monitored to decrease emissions as much as possible. The piping components carry products which contain VOCs that will increase emissions if the component leaks. Therefore, a Chevron has employed a Leak Detection and Repair (LDAR) Program to minimize leaks. 5.1 Fugitive voe BACT Analysis Common strategies for controlling VOC em1ss1ons from equipment leaks are based on LDAR work practices rather than by the traditional emission limits and control devices. The LDAR program currently implemented at the Hanna Station incorporates a vigorous monitoring schedule involving visual inspection (via olfactory inspections) to monitor and control emissions from piping components. Chevron Pipe Line proposes to comply with the most stringent requirements for LDAR. 5.1.1 Step 1 -Identify Potential Control Technologies The first step in a BACT analysis is to identify all available control technologies. Review of Historical BACT Determinations The RBLC database review provides an indication of historical BACT determinations for fugitive emissions. The RBLC database contains numerous BACT determinations for the control of VOC fugitive emissions. A summary of this review can be found in Table B-1. As demonstrated in a review of the RBLC, the primary control strategy across the board for fugitive VOC emissions is an effective LDAR program. This is true for a facility with fugitive emission limits both on the high and low ends. The requirements for such programs are defined in the Federal regulations. Chevron Pipe Line also reviewed the BACT determinations for equipment leaks at the proposed Arizona Clean Fuels, LLC Greenfield Refinery and the proposed Hyperion Greenfield Refinery in South Dakota as a means to supplement the RBLC search results. Some of these determinations include: 9 CHEVRON PIPE LINE CO. HANNA STATION BACY Analvsis • Adopt more-stringent leak detection definitions consistent with TRNCC 28 MlD emission reduction option. • Limited implementation of seal-less magnetic drive pumps and bellows-seal valves. • Implement a LDAR program consistent with 40 CFR 63 -Subparts Il and CC. Option I -Implementation of applicable regulatory programs The RBLC analysis demonstrates that the primary control strategy for control of fugitive VOC emissions is an effective LDAR program. An effective LDAR program includes a suitable definition of a '·leaky"" component threshold concentration and a detailed strategy for repairing leaks once they have been identified. For the Hanna Station, NESHAP -Subpai1 R is applicable. NESHAP -Subpart R does not specify a leak definition since the only monitoring that is required is that performed by visual inspections. The Hanna Station proposes to comply with NESHAP -Subpart R. A summary of applicable regulatory requirements and proposed BACT can be found in Table 5. 10 CHEVRON PIPE LINE CO. HANNA STATION BACT Analysis Table 5 Summary of Proposed BACT and Applicable Equipment Leak Requirements Component Proposed NESHAP BACT Subpart R Valves-Light Liquid No visual No visual leaks leaks Valves-Heavy Liquid No visual No visual leaks leaks Valves-Gas No visual No visual leaks leaks Pumps-Light Liquid No visual No visual leaks leaks Pumps-Heavy Liquid No visual No \·isual leaks leaks Pressure Relief Val\'e-No \'isual No \·isual Gas leaks leaks Pressure Relief Valve-No \'isual No \'isual Liquid leaks leaks Light Liquid No \'isual No \'isual Connectors leaks leaks VOC Compressors No\ isual No \·isual leaks leaks Closed Vent Systems No \·isual No \'isual leaks leaks Option 2 -Implementation of enhanced regulatory program As discussed in Option 1, Hanna Station will comply with the applicable requirements of NESHAP -Subpart R. The enhancement of applicable regulatory programs will not be necessary since there are no other applicable equipment leak provisions applicable to the Hanna Station. Furthermore. the facility transpo11slstores crude oil and petroleum refinery standards to not apply to the facility. 5.1.2 Step 2 -Eliminate Technically Infeasible Options The second step in the BACT analysis is 10 eliminate any technically infeasible control technologies. The implementation of applicable regulatory programs as described in Step 1 is technically feasible. I I CHEVRON PIPE LINE CO. HANNA STATION BACT Analysis 5.1.3 Step 3 -Ranking of Remaining Control Technologies by Control Effectiveness The third step in the BACT analysis is to rank the remaining technically infeasible control technologies in order of control effectiveness. The most effective of the identified control technologies is a combination of the identified options. Specifically, this includes an LDAR program with work practices relative to NESHAP -Subpart R. 5.1.4 Step 4 -Evaluation of the Most Effective Controls The fourth step in the BACT analysis is to evaluate the most effective control technologies not eliminated due to technical infeasibility. The most effective identified control strategy for fugitive VOC emissions is proposed as BACT. This system will not result in any adverse energy or environmental impacts. Accordingly. no evaluation of alternative control options is warranted. 5.1.5 Step 5 -Selection of voe BACT for Fugitive Emissions Chevron proposes that the implementation of an LDAR program in compliance with NESHAP -Subpart R be considered BACT for fugiti ve emissions of VOC. The LDAR program, as identified in the five step process. wi ll reduce emissions through determination of leaks identified by visual inspections. Compliance with ESHAP -Subpart R will reduce emissions of any regulated pollutant within the transport streams. Practically Enforceable BACT.fiJr F11giti1·e Emissions Development of Emission Limit to Reflect Selected Control Technology VOC emissions from the fugitive emission sources were calculated using emission factors taken from the Protocol for Equipment Leak Emission Estimates, EPA-453/R-95-017, Table 2-2 and Refinery Average Emission Factors and the Equipment Leaks Fugitives guidance document from the TCEQ (dated ovember 1995). The following regulations from 40 CFR 60 (NSPS), and 40 CFR 63 (NESHAP) were reviewed in relation to fugitive emissions: • NESHAP Subpart R -National Emission Standards for Gasoline Distribution Facilities (Bulk Gasoline Terminals & Pipeline Breakout Stations) 12 CHEVRON PIPE LINE CO. HANNA STATION BACY AnalVsis • NESHAP Subpart CC (not applicable) -National Emission Standards for Hazardous Air Pollutants from Petroleum Refineries • NSPS Subpart GGG (not applicable) -Standards of Performance for Equipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After January 4, 1983, and on or Before November 7, 2006 • NSPS Subpart GGGa (not applicable) -Standards of Performance for Equipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006 • NSPS Subpart VY (not applicable) -Standards of Perfonnance for Equipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction. Rec onstruction, or Modification Commenced After January 5, 198 I , and on or Before November 7. 2006 • NSPS Subpart VVa (not applicable) -Standards of Performance for Equipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction. Reconstructi on, or Modification Commenced After November 7, 2006 Of the regulations reviewed. it was determined that the Hanna Station is only subject to NESHAP -Subpart R. Therefore. the Harurn Station must comply with the requirements of an LOAR program structured according to the requirements of NESHAP -Subpart R. LOAR program compliance is enforceable through evaluation of LOAR monitoring and repair documentati on. Visual inspections will be used to effectively identify leaks, and LOAR documentation will be maintained through LEAKOAS. LDAR program compliance will be continuous. Compliance Monitoring The Chevron Pipe Line Hanna Station is proposing compliance with the enhanced LOAR program as specified in Table 5 of this permit application. The facility has implemented an LDAR Program to assure compliance with NESHAP requirements for the facility. All monitoring, recordkeeping.. and reporting will be done in compliance with the applicable equipment leak requirements. 13 CHEVRON PIPE LINE CO. HANNA STATION Tahle A-I Summary of VOC BA CT Determinations (p er EPA 's RBLC) for Storage Tanks FACILITY PERMIT TI-IRU TJ-IRU EMIS EM.IS FACILITY NAME STATE DATE PROCESS NAME PUT l'llT CONTROL DESCRJPTION LIMIT LIMIT! UNIT 1 UNIT Flll·.1. OIi. Kl:NAI Rl:FINl:RY AK ,12112nnn S I0I{/\(d'. ·1 ;\NKS NONI: INl)JC'.<\Tl:D Fl 11:1. (lll. KEN,\! Rl:FIN l'RY AK 312112()()() STOR/\Cil' TANKS NONI: INDICA JED Tl IE F.MISSIONS FROM (iROI JI' A STORACil: TANKS MUST Bl: C'OL.I .ECTFll BY A VAPOR COMl'RESS!ON SYSTl:M AND AR II.ONA Cl.l:AN Al. 4/14/2/lOS CiROl ll'A ROI ITFI) TO Tl II' lff.l·INl:RY I'I 11:1.S YI JM.<\ STORM ii: TANKS Fl 11:1. CiAS SYSTEM NO l:MISSJnNs ARE l'l:RMITTED TO BE RFl.l'ASFD INTO Tl IE AIR l'XCFPT FOR F()I Jll'MENT 1.I:AKS Tl IE EM ISSIONS FROM (iROLJI' A STORA( ii'. TANKS Ml 1ST 11E COI.I..ECTEIJ HY A VAPOR COMPRESSION SYSTEM AND ARl/,ONA CLEAN Al. 4/14/2005 CiROIJP A ROI JTED TO TIIE RFFINERY Fl JFI.S Yl JMA STORA<iE TANKS FUEi . (i/\S SYSTEM. NO EMISSIONS ARE l'ERMITTED TO [lE REI.EASED INTO Tl IE AIR E:XCEPT f'OR EOIJll'MENT LEAKS. THE TANKS ARE REQI IIRED TO /\RWlN/\ CI.E/\N /\7. 4/1-1/2005 CiROIII' ll flE l IN llER PRESSURE SO Tl !AT Fl 11:1.S YI JM/\ STOR/\CiE TANKS NO EMISSIONS /\RI' EMITTED TO Tl IE ATMOS I'! JERE FIXED ROOF TANK WITI I AR I/ONA Cl FAN Srn lR WATER INTERN/\! FJ.O;\TINCi ROOF Fl 11:1 S Yl IM.-\ /\I, 4/14/2()(), TAN K I !FAil Sl'/\CI: ROI IJ'J'IJ TO/\ C;\RllON /\JJSORl'TION SYSTEM. BACT Analysis POLLUTANT COMPLIANCE NOTES KEL:P RECORDS READILY AVAILABLE SI IOWINCi Tl IE DIMENSIONS AND CAl'ACITIES OF Tl IE STORAGE VESSU5 KEEP RECORDS READILY A VAILABI.E SI IOWIN<i Tl II.: DIMENSIONS AND CAl'ACITIF.S OF TIIF. STORAGE VESSELS Tl !ERE IS NO NUMERICAL EM ISSIONS LIMIT FOR GROUP A TANKS SINCE Tl IE EM ISSIONS MIJST BE COLLECTED AND NOT EMITTED INTO THE ATMOSPHERE. TIIERE IS NO NUMERICAL EMISSIONS LIMIT FOR GROlJI' A TANKS SINCE Tl-IE EMISSIONS MUST BE COLLECTED AND NOT EMITTED INTO THE A TMOSPI-IERE. THE TANKS ARE REQUIRED TO BE UNDER PRESSURE SO THAT NO EMISSIONS ARE EMITTED TO THE ATMOS Pl JERE. FIXED ROOF TANK WITH INTERNAL f'LO/\TINCi ROOF. IIEAD SPACE ROUTED TO A CARBON ADSORPTION SYSTEM. 14 CHEVRON PIPE LINE CO. HANNA STATION Table A-1 (Continued) Summary of VOC BACT Determinations (per EPA 's RBLC) for Storage Tanks FACILITY PERMIT THRU TURU EMlS EMlS F'ACILITY NAME STATE DATE PROCESS NAME PlJT PUT CONTROL DESCRIPTION LIMIT : LIM.IT I UNIT I UNIT RIT INFRY MACT REQIJJRES PONCA CITY OK 7/l /2002 TANKS VARIES CERTAIN CONTROL DEVICES RITINl:RY WI IICI I ARF. INSTALLED ON Tl IE STORi\C,E TANKS. REFINERY MACT REQUIRES PONCA CITY OK 7/1/2002 TANKS VARIES CERTAIN CONTROi. DEVICES REFI Nl·.RY WI IICI I ARE INSTALLED ON THE STORACiE TANKS 1\TOFINA l'ORT TK-800 ITR 1\RTIII IR TX 'i/I R/2/irl I NONE INDICATEll 4 05 LB/H C ·oMPI .LX TANK ATOFIN1\ PORT TK-80I FFR Alff lll lR TX 5/18/200 I NONE INDICATFll 4 Ir, l,B/H COMPLl:X TANK ATOFINA PORT TK-802 FFR ARTIII IR TX 5/1 8/200 I NONE INDI CATW 4 16 Ln/H COMl'IXX TANK ATOFIN!\ PORT TK-xn, IT R ARTIII IR TX ,1I xmInI NONI: INDICATED 2n Ul/I1 COMl'I.FX TANK .'\TOFINA l'Oln TK-X077 IFR 1\J{ll II IR TX 5/1 8/211/l l NONI·: INDICAl'Ul I 2(, I.Bill COMl'l.l:X TANK llt\ VTO\\'N TX .1/5/20/l I T1\NK /.TK-llX Fl .O!\TIN<i ROOF OR 22 LB/H ()I l'.FINS l'I .ANT H)I IIVAI.FNT BACY Analysis ,. POLLUTANT COMPLIANCE NOTES 15 CHEVRON PIPE LINE CO. HANNA STATION Table A-1 (Continued) Summary of VOC BACT Determinations (per EPA's RBLC) for Storage Tanks FACILITY PERMIT THRIJ THRU EMIS EMIS FACILITY NAME PROCESS NAME PUT CONTROL DESCRIPTION LIMIT LIMIT I STATE DATE PUT UNIT 1 UNIT Ill\ YTO\l'N TX -1/5/2()01 (cl Ti\NKS 7.TK-Fl.0/\TING ROOF OR 0 -1 LH/11 01 I .FINS l'l.i\NT n<li\&I\ H,ll I1\1/\1.ENT lli\ YTO\\'N TX -1/'-/2(1(11 Ti\NK /.TK-I0 Fl .0/\TIN( i ROOF OR 0 51 IJ\/11 01 !'.FINS 1'1/\NT l'CJI IJ\1/\IY.NT Ill\ YTOWN ·Ix -1/'-/2001 Ti\NK /.TK-II Fl.01\TIN(i ROOF OR 0 28 LB/1-1 01.1:FINS l'Li\NT U)IJ1\1 /\LENT Si\lNT-<oOB/\IN Fl 11'1. Fl J(iJTIVES VETROTF.X TX I I /1 .l/cnnn & llIESFI. NONE INlllCi\TFll J or, LB/I-I i\Ml'RIC/\ STORMiE Ti\NK \/!\ I.FRO Rl'FININCi INTERNAL FL01\TI NG ROOF. COMl'ANY-TX (,/1 I /2002 TANKS 60000 C,1\ I.ii I 40 13 LIVI! CORl'I IS CIIRISTI MONTI 11.Y !:MISSIONS Rl-:COR[) RITINLRY VAl.1'IW RITININ<i INTERN1\L FI.OATJN(i ROOF. COMPANY-I X (,/1 I /2002 J'i\NKS (,OOilO Cit\ 1./11 -1013 Lil/II CORl'I IS Cl IRIS 11 MONTI II Y EMISSIONS RECORll Rl'l·INLRY MARA l'IION FIXFll ROOF IN l'ERNAL FL01\TIN<, ROOF. Pl' l'HOl.I:1I1\1 CO I.A 12/27/20()(, STORMiF TANKS COMPLY WITI I 40 l'FR (,J LI.C SI JflP/\RT CC MARA 11 ION INTl:RNAL INTERNAL FI.OATINCi ROOFS, Pl'THOl.1:1 IM CO Li\ 12/27/200(, Fl .OA TIN(i ROOF COMPLY WITI I 40 cm !,_1 I IC STOHM,F TANKS SI I111'/\RT CC BACT Analvsis POLLUTANT COMPLIANCE NOTES FUGITIVE EMISSIONS ARF. AN ESTIMATE ONLY 16 CHEVRON PIPE LINE CO. HANNA STATION Table A-1 (Continued) Summary of VOC BACT Determinations (per EPA's RBLC) for Storage Tanks BACT Analvsis . THRO EMIS . EMIS ' \ "'. " } . FACILITY NAME FA~ll~l:Y PER:".'fr PROCESS NAME l HRU PUT CONTROL DESCRIPTION LIMIT LIMIT I. .POLLlffANTCOMPLIANCE NOTES SfArE DAIE PUT UNIT · · t . UNIT · · . '< > ·' " ... ,. .. y. •. .,. MARATIION FXTlcRN/\1. EXTFRN/\L FUl/\TIN(i ROOr: PFTIHll .Fl l~I co I .J\ I 2/~7/2(1()1, Fl .0 1\TIN(i Rnor COM l'I .Y inn I .j() CTR ()J 1.1.C STORA<iF.T1\NKS Sl/fll'/\RT CC S 17 RBLCII) I 1,.nm .1 MT-11011 OK-1111~1) OK-rnlX'> OK-ll11')2 TX-ll2.15 TX-112:17 TX-02(,9 ·1 X-ll2(,<> r:\-0.l 1 ~ rX-ll.11.' TX-ll.l 15 CHEVRON PIPE LINE CO. HANNA STATION Table B-1 Summary of VOC BACT Determinations (per EPA 's RBLC) for Fugitives THRU FACILITY NAME 1-"ACILITY PERMIT PROCESS NAME THRU PUT CONTROL DESCRIPTION STATE DATE PUT UNIT FXXONMOllll 0 11. II, X/1')/200.1 Fl l(;JTIVFS NONI' INIJIC/\TEIJ c·oRl'(ll{t\TION MONT1\NJ\ Rl-.l'ININ<i MT l/2J/l <)9R l.l(_)l llll (;ASOI.INI' NONI' INDICJ\TJ;D COMPANY FIJ<ilTIVF. Fl l<ilTIVF. RIT INl:RY MACT RE<)I IIR ES l't \NC/\ CITY RIT INl'RY OK 7/11211(12 COMl'ON l'.NTS/1'.f.l l lll'MF.NT INSl'l'.CTION AND MAINTl·:N/\NCI: OF l'lJMP Sl·:AI.S. VAi.YES. FLAN(;Es. /\ND Ll:i\KS PIPES. ·11'11'1·.IIWl.l'I IM INC. CRI lllF I INIT Fl J(;ITIVF. LEAK lll:TF.CTION /\ND REPAIR (OVA VA l.l'RO AIWMOR I: OK (,/<)/200.1 Rl'.l·INl:RY EMISSIONS & Ml'TI IOD 211 VAi.FRO M{llMORI' OK I /I .1/2110.l CRI JllE I /NIT Fl IG!TIVE LEAK Dl'TECTION /\ND REPAIR RIT INLRY 1:~IISSIONS l'ROC;RAM EM ISSIONS /\RE ESTIMATES. NOT V /\I.FRO RFFININ<; M/\XIMllM ALLOWABLE RATES COMl'/\NY-CORI'! IS TX 6/11/2(1()2 FIJ(;ITIYES SPECIAL CONDITIONS APPLY FOR MAINTEN/\Nl'E AND COMPLIANCE or CIIRISTI RIT INl:RY EQUIPMENT RELATED TO FUGITIVE EM ISSIONS OF voe. SEE PERMIT PORT A RTIII IR TX <)/R/1 <J<JR Fl l(;iT!YES 28 LAFR MONITORIN(i AND RIT !NlcRY Mi\lNTENANCF l'ROGR/\M SWFI-.NY TANK FARM TX i /8/19% l'l JMI' PIT ARE/\ FlJ<,ITIVES CONTROLLED WIT! I THE 28YI-II' LEAK Dl:Tl:CTION AND REl'AIR PROGRAM PROCESS FIJGITIYE EMISSIONS ARE SWl'ENY IANK l'/\RM TX .'IX/I ')% TANK A REA FIJ(i!TIVl:S CONTROi.LED WITI I Tl IE 28VI II' LEAK llETFCT!ON /\Nil REl'i\lR PROGRAM. l:XXON MOBIi IIRI II' OFF-SITE Fl l(,ITIYI-.S Ill\ YTOWN RIT INl'R Y TX 7/12/l')()I) (COOi.iNC; TOWl'R. l'lJMI'. NONE INlllCATEll VALi EXX<lN MOBIi FLl:XICOKIN(, Fl l(il rl Yl:S I.DAR l'IW(;R/\M (SEF. SPECIAL Ill\ YTOWN lfrF INl'.R Y ·1 X 7/12/1'1')') ( FXK. l'RACTIONATOR. I.T CONlllTION #1:1 IN PERMIT) LNDSl EXXON MOil i i. TX 7/12/1<)()() l'll'E STILL 7 FIJC;ITIYl:S l.lli\R PROGRAM (SEE SPECIAL 11/\YTOWN RIT INl:RY CONDITION# I :I IN PERMIT) BACY Analvsis EMIS EMIS EMIS LIMITl LIMIT LIMIT AVG TIME I I CONDITION UNIT 3.76 TPY 10 MCi/L REFINERY Mi\CT 10000 PPM lea~ detection. s~c not~s sec note 1655 LB/H 2.44 LB/H 1.83 LB/I-I 0.91 LB/II 3 2 LB/I-I 20.4 LB/I-I 0.9 1 LB/H 18 RBLCID TX-ll1J, TX-Ill!, rx.n.1I, T\-ll.121l TX-OJ20 TX-ll.120 TX-lll20 TX-0.120 TX-ll.122 TX-ll322 TX-033:i TX-0340 TX-ll.1-lll CHEVRON PIPE LI NE CO. HANNA STATION Table B-1 (Continued) Summary of VOC BACT Determinations (per EPA 's RBLC) for Fugitives THRU FACILITY NAME FACILITY PERMlT PROCF:ss NAME THRll PllT CONTROL DESCRIPTION STATE DATE PUT UNIT l·.XXON MOIIII. ·1 X 7/J 2/1 C)()<) Rl :SIIJFINJN(i & 1'11'1: STILi, l,lli\R l'RO<iRi\M (SIT Sl'ECI/\L Ill\ YTOWN RITINl·.RY X Fl l<illl \/I·.S CONIJITION 11I.li I XXflN ~'iOIIII. TX 7/1 2/ I <Jtl<J SCI I 2 Fll(ilTIVF.S l.ll1\R J>R()(iRi\M (Sl'.F. Sl'ECI/\L lli\YTOWN RITINFRY CONDITION# 13 OF PERMIT) l'.XXON ~101lll TX 7/1 2/1 ')()() SOI IR Wi\Tl'R STRll'l'IN< i l.l)i\R PRO(,Ri\M (SFF SPECI/\L Ill\ YTOWN Rl'.l·INl·.R Y f'I l(ilTIVES CONDITION# 13 OF PERMIT) /\I.ON I IS/\ lllfi Sl'RINfi TX <J/2/I C)()') CRI 11)1' COMl'l.l:X 28\/1 II' Ll)i\R IUTINERY FIJ<,ITl\/I·:S. 02C RI ll>ITI I<, /\I.ON I/Si\ lll(i Sl'RJN(i TX <J/2/f l)l)l) Fl JFI. GAS TRF/\TFR 2RVIII' I.DAR RFFINU{Y FI /CiJTIVIS IOHiTFllfi /\I.ON I IS/\ Bl(i Sl'RIN(i TX 'l/2/I ()<)() I I )I I Fl /( ilTIVF.S. 28\/111' I.Di\R RITINl:RY O'lLDI JFI l(i /\I.ON I IS/\ lll<i Sl'RINC. TX ')/2/1 ')')') PD/\ Fl IGJTI YES. 28\/1 IP LD/\R RFFINl'RY O'll'IMFl /(i /\I.ON I IS1\ Jll(i Sl'RIN(i RFFORM/\TJ: SPI .ITTJ:R/CR TX ()/2/1 <)')') COLI IMN Fl ICilTIVES. 2XV I II' Llli\R Rl:FINl'.RY 2f,MTFFlKi CIHiO CORl'I JS Cl IRISTI PIWCTSS Fl JC,ITIVFS.5I7-RITINl:RY-WIS I TX 10/ I 5/1 'J'J'l NONE INDIC/\TEO l'Li\NT S I-I CIT<iO CORI'! IS Cl IRISTI SRlJ PROCESS FIJ(ilTJVES. REFINERY-WEST TX I 0/15/1909 553-FlJG NONE INDIC/\TED l'l.i\NT TRJ(iEi\NT COR Pl JS TX 8/7/2000 flJGITIVES. FUGITIVES NONE JNJ)JC/\TED CIIRISTI 1-:xxoN MORII. TX 4/1 J/200 I PROCESS r-tJGITIVES. I.SM, 28\/1·11' LDAR PROGRAM Bi\ YTOWN REFINl:RY l,SMFU<, l'XXON ~Willi . TX -l/1 J/2110 I STOR/\C,E Ti\NK ll806. INTERN/\ I. FI.OATJN<, ROOF Ill\ YTOWN RIT INFRY TJ.;ORll(, J BACT Analvsis EMIS EMIS EMTS LIMITt LIMIT LIMIT AVG TIME I I CONDITION UNIT .142 LB/JI 42 LB/H 0.5 LB/II 8 03 LB/H 0 98 J,B/H 0 5 I LB/H 3 LB/H 0 55 LB/H 18.59 LB/H I 05 LB/I-I 2. 19 LB/I-I 12 LB/H 0.16 LB/I-I 19 RBLCID TX-ll.1-lR TX-0.1-lR TX-034~ TX-0348 TX-<l.1-JX ·1 X-OJ7r, TX-ll.17r, IX-037(, TX-037/, TX-0379 T\:-11.179 rX-04 I<, I .. ·\-fl" I I CHEVRON PIPE LINE CO. HANNA STATION Table 8-1 (Continued) Summary of VOC BACT Determinations (per EPA 's RBLC) for Fugitives THRU FACILITY NAME FACILITY PERMIT PROCESS NAME THRU PUT CONTROL DESCRIPTION STATE DATE PUT liNIT DIAMONll SIIAM IWCK TX Ill/I <)/2<Hll FI JC ilTIVES -NONF INlllCATF.ll MCKl:I·: l'LIINT ISOMFRIZATION. F-91 DIAMONll SIIA MROC:K TX 10/19/20()( Fl l(ilTIVES -NO .1 NONI-: INDICATEll MCKIT l'I /\NT RITORMFR lllAMONll SI IAMROCK TX I 0/19/200 1 Fl/CilTIVl'S -NO. 3 SRl l. F-NONE INrnCATED MCKff PLANT 90 lllAMONll SI IAMIWCK TX 10/19/2001 FlJCilTIVES -NO 4 NONE INll!CATED MCKIT. Pl.i\NT I IYDROTRF.A TER. F-RR lllAMONll SI IAMROCK TX f ()/f'l/20()( FllCilTIVF.S-Sl'I.ITTER. F-R'l NONE INDICATED MCKI-T. l'I ,\NT llOW Tl'XAS TX 11/26/2002 PIPIN(i Fl l(ilTIVFS. NONE INDICATED Ol'l'RATIONS FR El:l'<lRT PRC )JECT A. AiOFI 10 I llOWTl'XAS TX I I /26/2(1112 l'll'IN<. FlJ(ifTIVF.S. NONE INDI CATUJ OPERA llO NS FR IT l'ORT l'RO.IFCT fl. B7.Wl JOI l)OWTI.X.'\S Tl lfUllNE I.I IBRICATION Ol'l'RATIONS FRITl'ORT TX I I /2(,/2002 FlJ<rlTIVIS l'IW.11:CT A. NONE INDICATED A50VI llOW TEXAS Tl IRBINE Ll IRRICA TION Ol'F.RATIONS FREEPORT TX 11/26/2()()2 FlJ<rlTIVES. l'IW.IECT B. NONE INl)(CATED B73V4 l:XXONMOllll. FOLi.OW l'ROCEll lJRl'S FOR LEAK lll:Al IMONT RIT INl:RY TX (,/10/2002 FCC! J Fl IGITIVl:S PREVENTION. DETECTION. AND REPAIR 1:XXC>NMOllll. FCC! I FlJCilTIVl·.S FOi.i.OW l'ROCFlll lRES FOR LEAK 111·:AI IMONT Rl:FINl:R Y TX r,/J0/2<l02 (PRESCR l lllllER ). or,FG-00 1 l'Rl'.VENTION. llFTFCTION. AND REPAIR SI 11:1.1. 011. IJl :ER 1'1\RK T\: I I /24/1 <><)<J Fl ICilTIVE. Pll'IN<, I.EAK DETl:CTION AN() REPAIR l'Rll<,RAM ~1ARATI ION I.A I 2/ 2 7 /201l(, Fl l(;JTIVI: 1:MISSIONS I.A lffFINl·.RY MACT l'l'.TROl.l.-1 IM en I I.C BACT Analvsis E1'-US EM.IS EMISLIMIT I LIMlT Lll\,UT AVG TIME 1 I CONDITION UNIT 1.46 LB/H 1.04 LB/H 0.21 LB/H 1.2 LB/H 0.23 LB/H 0.136 LB/H 0.136 LB/H 0.006 LB/I-I 0.006 LB/H 9 84 LB/H 9.85 LB/I-I 0 09 I.BIi i 20 (1/.29/2009) Tim Dejulis -Re: CPL Hanna Station Plan Review comments .. From: To: CC: Date: Subject: Hi Tim, <Autumn_Hu@URSCorp.com> "Tim Dejulis" <tdejulis@utah.gov> <Jim Robbins@chevron.com> 1/28/2009 6:57 PM Re: CPL Hanna Station Plan Review comments We would like the permit to go to public comment as soon as possible, but would like to review a draft first. Below are response to your questions and some issues that we need clarifications on. TD,UDAQ: AH7: Monitoring of opacity is a condition that appears in every permit that DAO issues. 10% is based on the fuels being consumed or processed in the plant. This condition must remain. AH, URS: We continue to be concerned about the inclusion of this clause. The Hanna Station is located in an attainment area. Normal operation of this station is not expected to impact opacity because there are no particulate matter (PM) sources in this facility: equipment being permitted does not consume fossil fuel or emit PM; comfort heaters consuming propane are exempt from this permit; pumps using electricity are not emission sources. The facility emits only VOCs which originate from storage tanks and pipeline components, not from combustion sources. Please reconsider this condition for this facility which does not have a source that would impact opacity. If you determine that opacity observation is still required, please propose language that clarify when and who will conduct the observation. For this case, our preference would be for UDAQ to conduct opacity observation as needed. If this is unacceptable, we would like to conduct the observation only when requested by UDAQ. TD,UDAQ: Thank you for your suggested condition language. Throughput is usually monitored on a daily basis and tallied (record keeping) by the 20th of each month. Reporting is on demand. Is there a truly compelling reason for the suggested monitoring, record keeping, and reporting schedule? AH, URS: We have suggested the record keeping and reporting schedule because throughput records may not be readily available by the 20th of each month. The facility is an unmanned breakout station, although employees make routine visits. In addition, crude handled at the facility is not sold. At the Hanna Station, there are meters on the incoming and outgoing lines that provide the data to determine throughput. Suggested new text: To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous 12 months. Records shall be made available to the Executive Secretary or Executive Secretary's representative upon request. Record keeping for two years was added for clarification. The two-year record keeping schedule reiterates the requirement already set forth under Section I, General Provisions. The original text of this condition can be confused to mean throughput records shall be kept for the life of the facility. TD, UDAQ: Natural gas fuel combustion has different emissions than propane although these two emissions profiles are similar. It is unusual to be able to use propane and natural gas flexibly in comfort heating devices without a mechanical conversion. Also, natural gas is generally a cheaper commodity than propane so a source will use propane as a back-up if natural gas is unavailable. Do you mind offering a explanation/clarification in this matter? AH, URS: Equipment using either propane or natural gas with rated capacity less than 5 million BTU per hour is category exempt under R307-401-1 o. Page 1 (1/~9/2009) Tim Dejulis -Re: CPL Hanna Station Plan Review comments Since these comfort heaters are exempt, can condition I1.B.1.d be removed from the permit? The comfort heaters currently run on propane, but we would like flexibility to use natural gas for heating if that becomes available in the future. Regards, Autumn Autumn Hu Environmental Engineer URS Corporation 756 E Winchester St, Suite 400, Salt Lake City, UT 84107 TEL: 801-904-4057 FAX: 801-904-4100 Email: Autumn_Hu@URSCorp.com This e-mail and any attachments are confidential. If you receive this message in error or are not the intended recipient, you should not retain, distribute, disclose or use any of this information and you should destroy the e-mail and any attachments or copies. "Tim Dejulis" <tdejulis@utah.gov> 01/22/2009 04:51 PM To <Autumn_Hu@URSCorp.com> cc Hi Autumn, Subject Re: CPL Hanna Station Plan Review comments Responses to the points you raise are as follows: AH1: NAO 1983 appears in the database. Why it does not appear in the document created by the database is not known to me but it will be correct before the public comment starts. AH2: I see that your calculations list 12.27 tons. The forms you offered _ list 12(.00) so it was a routine matter for me to use the lower number. 12.27 tons will appear in the intent to approve document. AH3: These are some of those wildcard characters I warned you about. Please pay no attention to them. AH4: 12.21 tpy voe. AH5: As far as biphenyl, cresol, and cumene are concerned these emission rates are less than 10 pounds per year each and so not listed. Total HAPs are 0.33 tpy. AH6: We discussed this. The condition references compliance with R307-150. Page 2 (1/29/2009) Tim Dejulis -Re: CPL Hanna Station Plan Review comments If this rule doesn't apply then there's no exposure. All things being equal the DAO will leave this condition in the permit. AH7: Monitoring of opacity is a condition that appears in every permit that DAO issues. 10% is based on the fuels being consumed or processed in the plant. This condition must remain . Thank you for your suggested condition language. Throughput is usually monitored on a daily basis and tallied (record keeping) by the 20th of each month. Reporting is on demand. Is there a truly compelling reason for the suggested monitoring, record keeping, and reporting schedule? Natural gas fuel combustion has different emissions than propane although these two emissions profiles are similar. It is unusual to be able to use propane and natural gas flexibly in comfort heating devices without a mechanical conversion. Also, natural gas is generally a cheaper commodity than propane so a source will use propane as a back-up if natural gas is unavailable. Do you mind offering a explanation/clarification in this matter? Considering that several important structural changes will be made prior to start of the public comment period would there be any objection to starting the public comment period in the next ten days? Regards, Timothy DeJulis >» <Autumn_Hu @URSCorp.com> 1/15/2009 9:57 AM >>> Hi Tim, Attached are my comments for the Chevron Pipe Line Hanna Station Plan Review. I have used "track changes" in MS Word. Also, I have attached is PDF version in case the Word version does not work for you. Please let me know if you have any questions. Regards, Autumn. (See attached file: Chevron Pipeline 10213 -2008 (CPL).rtf) (See attached file: Chevron Pipeline 10213 -2008 (CPL).pdf) Autumn Hu Environmental Engineer URS Corporation 756 E Winchester St, Suite 400, Salt Lake City, UT 84107 TEL: 801-904-4057 FAX: 801-904-4100 Email: Autumn_Hu@URSCorp.com This e-mail and any attachments are confidential. If you receive this message in error or are not the intended recipient, you should not retain, distribute, disclose or use any of this information and you should destroy the e-mail and any attachments or copies. Page 3 (?/11/2009) Tim Dejulis -~e: CPL Hanna Station Plan Review comments From: To: Date: Subject: Hi Tim, <Autumn_Hu@URSCorp.com> "Tim Dejulis" <tdejulis@utah.gov> 2/11/2009 3:37 PM Re: CPL Hanna Station Plan Review comments Based on our conversion on Monday (2/9/2009), please considered the text revisions below. Inventory: Provision 1.6 · The owner/operator shall comply with R307-150 Series. Inventories, Testing and Monitoring. [R307-150] --->Chevron understands that this provision will be retained. Opacity: Provision 11.B.1.a Visible emissions from any stationary point or fugitive emission source associated with the source or with the control facilities shall not exceed 10% 20% opacity. Opacity observations of emissions from stationary sources shall be conducted at an acceptable frequency, in accordance with 40 CFR 60, Appendix A, Method 9. [R307-401] ---> Based on your previous email response, Chevron understands that a 20% opacity limit will be used. · Rolling 12-month totals: Provision 11.B.1 .b To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous 12 months. Records of crude oil throughput shall be kept for all periods when the plant is in operation. Crude oil throughput shall be determined by examination of company and/or customer billing records. The records of crude oil throughput shall be kept on a daily basis .. [R307-401] --->Chevron is prepared to calculate a rolling 12-month throughput total by the 20th of each month. However, we feel that daily record of throughput is unnecessary. At the Hanna Station, there are meters on the incoming and outgoing lines that provide the data to determine monthly throughput. The facility is an unmanned breakout station. A minimum monthly visit would provide the required data; a daily record of throughput wou ld result in unnecessary visits .to this facility. Fuel for heaters: Provision I1.B.1.d The owner/operator shall use propane as fuel in th e various compfort comfort heating devices. [R307-401] --->Chevron understands that this provision will be retained. Regards, Autumn Autumn Hu Environmental Engineer URS Corporation 756 E Winchester St, Suite 400, Salt Lake City, UT 84107 TEL: 801-904-4057 FAX: 801-904-4100 Email: Autumn_Hu@URSCorp.com This e-mail and any attachments are confidential. If you receive this message in error or are not the intended recipient, you should not retain, distribute, disclose or use any of this information and you should destroy the e-mail and any attachments or copies. Page 1 (2/?-1/2009) Tim Dejulis -Re: CPL Hanna Station Plan Review comments "Tim Dejulis" <tdejulis@utah.gov> 02/04/2009 02:49 PM To <Autumn_Hu@URSCorp.com> cc Hi Autumn, Subject Re: CPL Hanna Station Plan Review comments With respect to opacity: compliance with opacity is a continuous obligation on the part of the source. Rule 307-205 applies to sources in attainment areas regardless of whether or not a reference to this rule appears in a permit. This rule specifies a 20% opacity limit. It is Chevron's obligation to demonstrate compliance with this rule. I would refer you to compliance personnel with regards to their policy in these matters. However, 10% opacity is routinely specified for combustion units using natural gas or propane and it is unlikely that the Hanna Pipeline will ever violate 10% opacity, so this is a reasonable limit. In the interest of moving forward it will be possible to identify 20% vs 10%. On exempted equipment items: many times DAO is placed in the position of evaluating emissions from equipment identified for exemption from Notice of Intent and permit requirements under R307-401-10. As you read this rule citation you'll notice that the type of fuel employed effects the exempt status capacity limits of the unit. It will be possible to identify these units as, "For informational purposes only," but experience in these matters dictates some reference to their existence in the permit. As to fuel requirements: we require fuels to be specified in a permit regardless of the applicability of R307-401-10. The emission profiles for various fuels are different -there are differences between natural gas and propane owing to each fuel's energy value. Propane's fuel value is specified in terms of Btu per gallon compared to natural gas in terms of Btu per cubic foot. The NOi specifies two propane space heaters. No emissions estimates.were produced using either propane or natural gas as the primary fuel. You can take the fact that I have not asked you for them to mean that DAO understands that the potential NOx and CO from these space heaters is likely to be less than eight ounces per day. Technically your NOi is incomplete, however. On rolling 12-month totals: Chevron has from the 21st of one month until the 20th of the following month to update the rolling 12-month total for the Hanna station. Chevron is certainly in the business of tracking every gallon of material that flows-through their pipelines on an ongoing basis. Chevron can keep the records as long as they like, but we use the permit language that you refer to be consistent for all sources in this regard, unless a truly compelling reason for an alternate can be offered in writing. Different people can interpret a condition in different ways, but to be candid this is the first time anyone suggested an interpretation requiring that records be maintained for all time. It might interest you to know that DAO policy is to avoid specifying the same thing more than once in a permit. For example, if I were to do as you suggest and list the Page 2 (2J;i 1/2009) Tim Dejulis -Re: CPL Hanna Station Plan Review comments times frame in two places, does Chevron get two violations for not preserving records? This is a really simple operation and a simple permit. Compliance at this plant should be a walk in the park compared to other operations. Why don't we move forward now? Regards, Timothy DeJulis >>> <Autumn_Hu @URSCorp.com> 1/28/2009 6:57 PM >>> Hi Tim, We would like the permit to go to public comment as soon as possible, but would like to review a draft first. Below are response to your questions and some issues that we need clarifications on. TD,UDAQ: AH?: Monitoring of opacity is a condition that appears in every permit that DAO issues. 10% is based on the fuels being consumed or processed in the plant. This condition must remain. AH , URS: We continue to be concerned about the inclusion of this clause. The Hanna Station is located in an attainment area. Normal operation of this station is not expected to impact opacity because there are no particulate matter (PM) sources in this facility: equipment being permitted does not consume fossil fuel or emit PM; comfort heaters consuming propane are exempt from this permit; pumps using electricity are not emission sources. The facility emits only VOCs which originate from storage tanks and pipeline components , not from combustion sources. Please reconsider this condition for this facility which does not have a source that would impact opacity. If you determine that opacity observation is still required, please propose language that clarify when and who will conduct the observation. For this case, our preference would be for UDAQ to conduct opacity observation as needed. If this is unacceptable, we would like to conduct the observation only when requested by UDAQ. TD,UDAQ: Thank you for your suggested condition language. Throughput is usually monitored on a daily basis and tallied (record keeping) by the 20th of each month. Reporting is on demand. Is there a truly compelling reason for the suggested monitoring, record keeping, and reporting schedule? AH, URS: We have suggested the record keeping and reporting schedule because throughput records may not be readily available by the 20th of each month. The facility is an unmanned breakout station, although employees make routine visits. In addition, crude handled at the facility is not sold. At the Hanna Station, there are meters on the incoming and outgoing lines that provide the data to determine throughput. Suggested new text: To determine compliance with a rolling 12-month total, th e owner/operator shall calculate a new 12-month total by the twentieth day of each month using data from the previous 12 months. Records shall be made available to the Executive Secretary or Executive Secretary's representative upon request. Record keeping for two years was added for clarification. The two-year record keeping schedule reiterates the requirement already set forth under Section I, General Provisions. The original text of this condition can be confused to mean throughput records shall be kept for the life of the facility. TD, UDAQ: Natural gas fuel combustion has different emissions than propane although these two emissions profiles are similar. It is unusual to be able to use propane and natural gas flexibly in comfort heating devices without Page 3 (2/t1/2009) Tim Dejulis -Re: CPL Hanna Station Plan Review comments · a mechanical conversion. Also, natural gas is generally a cheaper commodity than propane so a source will use propane as a back-up if natural gas is unavailable. Do you mind offering a explanation/clarification in this matter? AH , URS: Equipment using either propane or natural gas with rated capacity less than 5 million BTU per hour is category exempt under R307-401-10. Since these comfort heaters are exempt, can condition I1.B.1.d be removed from the permit? The comfort heaters currently run on propane, but we would like flexibility to use natural gas for heating if that becomes available in the future. · Regards, Autumn Autumn Hu Environmental Engineer URS Corporation 756 E Winchester St, Suite 400, Salt Lake City, UT 84107 TEL: 801-904-4057 FAX: 801-904-4100 Email: Autumn_Hu @URSCorp.com This e-mail and any attachments are confidential. If you receive this message in error or are not the intended recipient, you should not retain, distribute, disclose or use any of this information and you should destroy the e-mail and any attachments or copies. "Tim Dejulis" <tdejulis @utah.gov> 01/22/2009 04:51 PM To <Autumn_Hu @URSCorp.com> cc Hi Autumn, Subject Re: CPL Hanna Station Plan Review comments Responses to the points you raise are as follows: AH1 : NAO 1983 appears in the database. Why it does not appear in the document created by the database is not known to me but it will be correct before the public comment starts. AH2: I see that your calculations list 12.27 tons. The forms you offered list 12(.00) so it was a routine matter for me to use the lower number. 12.27 tons will appear in the intent to approve document. AH3: These are some of those wildcard characters I warned you about. Please pay no attention to them. Page 4 (?/11/2009) Tim Dejulis -Re: CPL Hanna Station Plan Review comments AH4: 12.27 tpy voe. AH5: As far as biphenyl, cresol. and cumene are concerned these emission rates are less than 10 pounds per year each and so not listed. Total HAPs are 0.33 tpy. AH6: We discussed this. The condition references compliance with R307-150. If this rule doesn't apply then there's no exposure. All things being equal the DAO will leave this condition in the permit. AH7: Monitoring of opacity is a condition that appears in every permit that DAO issues. 10% is based on the fuels being consumed or processed in the plant. This condition must remain. Thank you for your suggested condition language. Throughput is usually monitored on a daily basis and tallied (record keeping) by the 20th of each month. Reporting is on demand. Is there a truly compelling reason for the suggested monitoring, record keeping, and reporting schedule? Natural gas fuel combustion has different emissions than propane although these two emissions profiles are similar. It is unusual to be able to use propane and natural gas flexibly in comfort heating devices without a mechanical conversion. Also, natural gas is generally a cheaper commodity than propane so a source will use propane as a back-up if natural gas is unavailable. Do you mind offering a explanation/clarification in this matter? Considering that several important structural changes will be made prior to start of the public comment period would there be any objection to starting the public comment period in the next ten days? Regards, Timothy DeJulis >>> <Autumn_Hu@URSCorp.com> 1/15/2009 9:57 AM »> Hi Tim, Attached are my comments for the Chevron Pipe Line Hanna Station Plan Review. I have used "track changes" in MS Word. Also, I have attached is PDF version in case the Word version does not work for you. Please let me know if you have any questions. Regards, Autumn. (See attached file: Chevron Pipeline 10213 -2008 (CPL).rtf) (See attached file: Chevron Pipeline 10213 -2008 (C PL}.pdf} Autumn Hu Environmental Engineer URS Corporation 756 E Winchester St, Suite 400, Salt Lake City, UT 84107 TEL: 801-904-4057 FAX: 801-904-4100 Email: Autumn_Hu @URSCorp.com This e-mail and any attachments are confidential. If you receive this message in error or are not the intended recipient, you should not retain, distribute, disclose or use any of this information and you should destroy the e-mail and any attachments or copies. Page 5 (2/~ 1/2009) Tim Dejulis -Re: CPL Hanna Station Plan Review comments Page 6