Loading...
HomeMy WebLinkAboutDWQ-2025-003182FACT SHEET CORINNE CITY CORPORATION UTAH POLLUTANT DISCHARGE ELIMINATION SYSTEM (UPDES) UPDES PERMIT MODIFICATION: DISCHARGE UPDES PERMIT NUMBER: UT0020931 MINORMUNICIPAL FACILITY CONTACTSPerson Name:JL NicholsPosition:Public Works DirectorPhone Number:435-720-7961Permittee:Corinne City CorporationFacility:Corinne Wastewater Lagoon SystemMailing Address:2420 North 4000 WestPO Box 118Corinne, UT 84307 Actual Address:½ mile south of Corinne City, in Box Elder County Facility Phone Number:(435) 744-5566 DESCRIPTION OF PERMIT MODIFICATION This permit modification is in response to a request from Corinne City Corporation (Corinne), received by the Division of Water Quality (DWQ) on January 8, 2025, requesting a Compliance Schedule forbiochemical oxygen demand (BOD5), total suspended solids (TSS), and pH effluent limitations for Outfall 001D. Corinne is requesting a Compliance Schedule while upgrades are made to the collection system, which will reduce inflow and infiltration (I&I) to the Corinne Wastewater Lagoon System. Increased I&I has resulted in numerous effluent violations from Outfall 001D. DWQ has granted this request based on Corinne’s improvement efforts. The Compliance Schedule will be effective from the Permit modification issuance date until January 1, 2028. The Compliance Schedule will last for the duration of this UPDES permit cycle. For the duration of the Compliance Schedule,DWQ will implement interim limitations for the above parameters. The interim permit limitations are lower than Corinne requested and are based on a review of Corinne’s effluent data for the last five years. The below interim permit limitations and Compliance Schedule are also reflected in Part 1.C.2. and Part 1.C.3. ofUPDES Permit No. UT0020931. These interim effluent limitations shall be applied to Outfall 001D. Any violation of the Compliance Schedule is a violation of the UPDES Permit. Compliance Schedule and Outfall 001D Effluent Limits Compliance Schedule Milestones Date Milestone January 1, 2026 Corinne will submit complete design plans to DWQ. The plans must include updates on construction funding. If plans are submitted and construction begins before January 1, 2026, Corinne shall provide DWQ with construction progress by January 1, 2026. July 1, 2026 Corinne provides DWQ with construction progress. January 1, 2027 Corinne provides DWQ with construction progress. January 1, 2028 Constructions and upgrades are completed. Corinne will meet the final effluent limits. BOD5 Compliance Schedule Date Limit (Weekly Avg.) Limit (Monthly Avg.) Approval – December 31, 2027 65 mg/L 45 mg/L January 1, 2028 35 mg/L 25 mg/L TSS Compliance Schedule Date Limit (Weekly Avg.) Limit (Monthly Avg.) Approval – December 31, 2027 65 mg/L 45 mg/L January 1, 2028 35 mg/L 25 mg/L pH Compliance Schedule Date Limit (Min.) Limit (Max.) Approval – December 31, 2027 6.5 9.5 January 1, 2028 6.5 9.0 The changes listed above are the only proposed changes with this permit modification subject to Public Comment during the Public Notice Comment Period. All other permit effluent limitations remain unopened and unchanged as appropriate. PERMIT DURATIONIt is recommended that this permit modification be effective through the current permit expiration date, May 31, 2026.Drafted byJennifer Berjikian, Environmental ScientistPUBLIC NOTICEBegan: February 28, 2025Ended:March 31, 2025Comments will be received at: 195 North 1950 West PO Box 144870 Salt Lake City, UT 84114-4870During the public comment period provided under R317-8-6.5, any interested person may submit written comments on the draft permit and may request a public hearing, if no hearing has already been scheduled. A request for a public hearing shall be in writing and shall state the nature of the issues proposed to be raised in the hearing. All comments will be considered in making the final decision and shall be answered as provided in R317-8-6.12.ADDENDUM TO FSSOBDuring finalization of the Permit certain dates, spelling edits and minor language corrections were completed. Due to the nature of these changes they were not considered Major and the permit is not required to be re Public Noticed.Responsiveness SummaryNo comments were received during the Public Notice Comment Period. DWQ-2025-001763