HomeMy WebLinkAboutDAQ-2025-001965McWANE
DUCTILE
IRON STRONG
U-rnFi D::FAl-l
E l"lV I P.O N f\.1 E f'J Ti----
I
I
TfviFNT OF
AL QL'ALITY-------t
I
I
I
i
I
I
Mcwane Ductile - Utah
PO Box 1219
2550 South Industrial Parkway
Provo, Utah 84601
801.373.6910
www. mcwa neducti le.com
tjtvts;ioN oF AIR Qt,tAt-lTY
TO: Executive Secretary, Utah Air Quality Board
FROM: McWane Ductile - UtahRE: Semi-Annual Monitoring Report for Title V Permit #49OOO17OO4DATE: January 2!t 2025
In accordance with Title V Operating Permit provision I.S.2.a, and Utah Administrative Code (UAC)
R307-415-6a(3)(c)(i), the following monitoring report is submitted.
This report covers the period from 0710t12O24 to t2l3t/2024.
For the indicated reporting period:
There were no deviations from any permit requirements.
Attached is a list of permit requirements for which there were deviations. The list includes
the information required by Operating Permit provision I.S.2.a, and UAC R307-415-
6a(3) (c)( i).
In lieu of attaching the above list, deviation reports submitted in accordance with permit
provision I.S.2.c, and UAC R307-415-6a(3)(c)(ii) are referenced below.
g
tr
tr
E
tr
There were no excursions or exceedances during the
There was at least one excursion or exceedance and
II.8.2.a.3(a)(1) are provided below.
monitoring period (CO CAM Plan).
required information from condition
Date Ivpe Cause Cqrcctive-Action
In accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on information
and belief formed after reasonable inquiry, I certify that the statements and information in this
document are true, accurate, and complete.
tl^r/e5
Vice President, General Manager
McWane Ductile - Utah
Date
B-2-10794