No preview available
HomeMy WebLinkAboutDAQ-2025-001965McWANE DUCTILE IRON STRONG U-rnFi D::FAl-l E l"lV I P.O N f\.1 E f'J Ti---- I I TfviFNT OF AL QL'ALITY-------t I I I i I I Mcwane Ductile - Utah PO Box 1219 2550 South Industrial Parkway Provo, Utah 84601 801.373.6910 www. mcwa neducti le.com tjtvts;ioN oF AIR Qt,tAt-lTY TO: Executive Secretary, Utah Air Quality Board FROM: McWane Ductile - UtahRE: Semi-Annual Monitoring Report for Title V Permit #49OOO17OO4DATE: January 2!t 2025 In accordance with Title V Operating Permit provision I.S.2.a, and Utah Administrative Code (UAC) R307-415-6a(3)(c)(i), the following monitoring report is submitted. This report covers the period from 0710t12O24 to t2l3t/2024. For the indicated reporting period: There were no deviations from any permit requirements. Attached is a list of permit requirements for which there were deviations. The list includes the information required by Operating Permit provision I.S.2.a, and UAC R307-415- 6a(3) (c)( i). In lieu of attaching the above list, deviation reports submitted in accordance with permit provision I.S.2.c, and UAC R307-415-6a(3)(c)(ii) are referenced below. g tr tr E tr There were no excursions or exceedances during the There was at least one excursion or exceedance and II.8.2.a.3(a)(1) are provided below. monitoring period (CO CAM Plan). required information from condition Date Ivpe Cause Cqrcctive-Action In accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on information and belief formed after reasonable inquiry, I certify that the statements and information in this document are true, accurate, and complete. tl^r/e5 Vice President, General Manager McWane Ductile - Utah Date B-2-10794