Loading...
HomeMy WebLinkAboutDAQ-2025-001964^i\Ery. March 12,2025 Bryce Bird, Director Utah Division of Air Quality 195 North 1950 West P.O. Box 144820 Salt Lake City, Utah 84114-4820 40 CFR 63 Subpart A and CC Periodic Reports Tesoro Refining & Marketing Company. Salt Lake City Refinery Dear Mr. Bird: Please find enclosed the periodic report for Tesoro Refining & Marketing Company (TRMC), Salt Lake City Refinery (herein referred to as Tesoro) covering the time period between July 15, 2024 and January 14,2025. This report includes the periodic report in accordance with 40 CFR 63.654,40 CFR 63.'10 and Table 6 - General Provisions Applicability to Subpart CC in the Appendix to Subpart CC - Tables. The Salt Lake Refinery does not operate any delayed cokers. Tesoro no longer operates atmospheric pressure relief devices subject to the requirements of 40 CFR 63.648(,). lf you have any questions concerning the contents of this report, please contact Chris Kaiser at (801) s21-4959. Dean P. Anderson Vice President Tesoro Refining & Marketing Company LLC Attachment: PERIODIC EXCESS EMISSION REPORT cc: USEPA Region Vlll '1595 Wynkoop Street Mail Code ENF-AT Denver, CO 80202-1129 Tesoro Refining & Marketing Company LLC A eubcidiary of Marathon Petroloum Corpor.tion Haruo Dtuvenro ENUEONUENTAL GIJAJTY MAR 1 3 2025 DMSpr{ OF An Ot,At'il Via Couruen B-2-10335 PERIODIC REPORT REFINERY MACT (40 CFR 63 Subpaft CC) Reporting Period: July 15,2024 - January 14, ZOZ5 Tesoro Refining and Marketing Company Salt Lake City Refinery 474 West 900 North salt Lake city, Utah 94103 ,lF 1 ,t ,,n25 1 ,.,',,N* OF AIR OUALITY Periodic Excess Emission Report Morch 2025 Contents Table 1 Table 2 Table 3 Table 4 Table 5 Table 6 Table 7 Table 8 Table 9 Table 10 Table 1 1 Table 12 Table 13 Table 14 Table 15 Table 16 Lisi of Tobles Gasoline Loading Rack Periodic Report pertaining to Tank Trucks or Cargo Tanks s63.6ss(b), 63.a28(g)(1),63.428(h)(2) & (3)........... .........13 Gasoline Loading Rack Periodic Report pertaining to Monitoring 563.655(b), 63.428(hX1) Group 1 lnternal Floating Roof Annual (visual hatch) lnspections Conducted During the Reporting Period $63.655(gX2Xi) ................ .....................15 Group 1 lnternal Floating Roof lnternal lnspections Conducted During the Reporting Group 1 lnternal Floating Roof lnternal lnspections Conducted During the Reporting Group 1 External Floating Roof Secondary Seal lnspections Conducted During the Reporting Period 963.655(gX3Xi) .................. .....................18 Group 1 External Floating Roof Primary Seal lnspections Conducted During the Reporting Group 1 External Floating Roof Seal Visual lnspections Conducted During the Reporting Group 1 Floating Roof lnspections Conducted During the Reporting Period Excess Emission Data for Group 1 MPVs During the Reporting Period 553.655(gX6)..........22 Pressure Relief Devices in OHAP gas or vapor service subject to 563.6480)('l) and Pressure Relief Devices in OHAP gas or vapor service subject to 563.648()(2).......................24 Notification of Compliance Status Update - Storage Vessels......... .......................25 Notification of Compliance Status Update - Miscellaneous Process Vents..............................27 Maintenance Vent Work Practices subject to 563.648(c)...................... ...................29 Flare combustion efficiency subject to $63.670 (b), (d), (e) and (f)...............................................30 List of Attochments Attachment A - Secondary Seal Gap Calculations Attachment B - Primary Seal Gap Calculations 1.0 563.655 Subport CC Periodic Reporling pursuant to 563.555(e), the following information contains the required information specified in paragraphs (a) through (g) in 553.655. Each specified requirement is identified in bold text and Tesoro's response is provided information is in non-bold text. This compliance report covers the period beginning on the compliance date for this affected source, July 15,2024 and January 14,2025. l.l S63.6ss(o) Each owner or operator subject to the wastewater provisions in 563.647 shal! comply with the recordkeeping and reporting provisions in 5561.356 and 61.357 of 40 CFR part 61, subpart FF unless they are complying with the wastewater provisions specified in paragraph (oX2Xii) of 063.540. There are no additional reporting and recordkeeping requirements for wastewater under this subpart unless a wastewater stream is included in an emissions average. Recordkeeping and reporting for emissions averages are specified in 963.653 and in paragraphs (fl(5) and (gXB) of this section. ln accordance with 40 CFR 53.655(a), Tesoro complies with the annual reporting provisions in 561.357 of 40 CFR part 51. There are no additional reporting requirements for wastewater under 40 CFR 63 Subpart CC. Under 40 CFR 51.357(c), if the total annual benzene quantity from facility waste is less than 10 Mg/yr but is equal to or greater than 1 Mg/yr, then the owner or operator shall submit to the Administrator one of the following, as appropriate: 1 . A report that updates the information listed in paragraphs 56'l .357(a) (1) throug h (aX3) of this section. The report is to be submitted annually and whenever there is a change in the process generating the waste stream that could cause the total annual benzene quantity from facility waste to increase to '10 Mg/yr or more, or 2. tf the information in the annual report required by 561 .3 57(aX1) through (a)(3) is not changed in the following year, the owner or operator may submit a statement to that effect. A separate update to the TAB was submitted in accordance with 561.357(c) on or before April 7, 2024. 1.2 S63.6s5(b) Each owner or operator subject to the gasoline loading rack provisions in 553.650 shall comply with the recordkeeping and reporting provisions in 563.428 (b) and (c), (9)(1), (hXl) through (h)(3), and (k) of subpart R. These requirements are summarized in table 4 of this subpart. There are no additiona! reporting and recordkeeping requirements for gasoline loading racks under this subpart unless a loading rack is included in an emissions average. Recordkeeping and reporting for emissions averages are specified in 563.653 and in paragraphs (0(5) and (g)(8) of this section. The following information is found in Table 1. o Each loading of a gasoline cargo tank for which vapor tightness documentation had not been previously obtained by the facility; t563.428(gX1)l o Each instance of a nonvapor-tight gasoline cargo tank loading at the facility in which the owner or operator failed to take steps to assure that such cargo tank would not be reloaded at the facility before vapor tightness documentation for that cargo tank was obtained, t563.428(hX2)l o Each reloading of a nonvapor-tight gasoline cargo tank at the facility before vapor tightness documentation for that cargo tank is obtained by the facility in accordance with 963.422(c)(2). t563.428hx3)l Table 2 notes each exceedance or failure to maintain, as appropriate, the monitored operating parameter value determined under 563.425(b). The report includes the monitoring data for the days on which exceedances or failures occurred, and a description and timing of the steps taken to repair or perform maintenance on the vapor collection and processing systems or the CMS (if the CMS indicated that the operating parameter value was exceeded or not maintained). t$63.428(h)(1)l 1.3 S63.6ss(c) Each owner or operator subject to the marine tank vessel loading operation standards in 563.651 shall comply with the recordkeeping and reporting provisions in 5563.567(a) and 63.557(c) through (k) of subpart Y. These requirements are summarized in table 5 of this subpart. There are no additional reporting and recordkeeping requirements for marine tank vessel loading operations under this subpart unless marine tank vesse! loading operations are included in an emissions average. Recordkeeping and reporting for emissions averages are specified in 563.553 and in paragraphs (0(5) and (g)(8) of this section. Tesoro does not have marine loading regulated under 40 CFR 63 Subpart Y and Subpart CC. 1.4 S63.6s5(d) Each owner or operator subject to the equipment leaks standards in 563.448 shall comply with the recordkeeping and reporting provisions in paragraphs (dXl) through (dX6) of this section. Tesoro has chosen to comply with the equipment leaks standards in 563.648 by complying with the provisions of 40 CFR 60 Subpart Wa. Therefore, its periodic reporting obligation is delineated in 40 CFR 60.487a. Tesoro currently submits a quarterly report to the Utah Division of Air Quality with the information required in 40 CFR 60.487 and Utah's R307-326-7. These reports satisfy the requirements of 40 CFR 63.655(d). l.s S63.6ss(e) Each owner or operator of a source subject to this subpart shall submit the reports listed in paragraphs (e)(1) through (eX3) of this section except as provided in paragraph (hxs) of this section, and shall keep records as described in paragraph (i) of this section. Tesoro submits this report pursuant to 563.655(eX2). 563.655(eX1) and (3) reporting requirements are not applicable for this periodic report. r.6 s63.6s5(f) Each owner or operator of a source subject to this subpart shall submit a Notification of Compliance Status report within 150 days after the compliance dates specified in 563.6a0(h) with the exception of Notification of Compliance Status reports submitted to comply with 563.640(lX3) and for storage vessels subject to the compliance schedule specified in 563.640(h)(2). Tesoro submitted an updated NOCS on June 27,2019 addressing new provisions related to delayed cokers and atmospheric PRDs. Tesoro operates no delayed cokers and previously had four atmospheric PRDs subject to the new provisions. These PRDs were redirected to a flare gas recovery system in2022 and are no longer subject to this requirement. Tesoro has submitted several Notices of Compliance Status regarding storage tanks in Group 1 service over the previous decades. The current list of storage tanks the refinery manages as eligible for Group 1 service are tanks 243, 252,307, 308, 321,324, 325, 326,328, 330, 402, 405, 412, 413, 41 4, 421, 422, 423, and 432. 1.7 S63.65s(g) The owner or operator of a source subject to this subpart shall submit Periodic Reports no later than 50 days after the end of each 6-month period when any of the information specified in paragraphs (g)(1) through (7) of this section or paragraphs (gX9) through (14) of this section is collected. The first 6-month period shall begin on the date the Notification of Compliance Status report is required to be submitted. A Periodic Report is not required if none of the events identified in paragraphs (gXl) through (7) of this section or paragraphs (gXg) through (14) of this section occurred during the 6-month period unless emissions averaging is utilized. Quarterly reports must be submitted for emission points included in emission averages, as provided in paragraph (gX8) of this section. An owner or operator may submit reports required by other regulations in place of or as part of the Periodic Report required by this paragraph (g) if the reports contain the information required by paragraphs (g)(1) through (14) of this section. ln accordance with 40 CFR 63.655(9), the periodic report is submitted no later than 50 days after the end of each 6-month period when any of the compliance exceptions specified in paragraphs (gX1) through (gX5) of this section occur. The first 6-month period started on January 15, 1999, the date the Notification of Compliance Status report was required to be submitted. 963.555(gX1) For storage vessels, Periodic Reports shal! include the information specified for Periodic Reports in paragraphs (g)(2) through (5) of this section. lnformation related to gaskets, slotted membranes, and sleeve seals is not required for storage vessels that are part of an existing source complying with 563.646. Tesoro summarizes inspection results, as required, in the following sections. When complying with 563.646, Tesoro does not report inspection failures related to gaskets, slotted membranes, and sleeve seals. 563.655(gX2) lnternal floating roofs. S63.655(gX2Xi) An owner or operator who elects to comply with 563.645 by using a fixed roof and an internal floating roof or by using an external floating roof converted to an internal floating roof shall submit the results of each inspection conducted in accordance with 563.120(a) of subpart G in which a failure is detected in the control equipment. Tesoro summarizes inspection results, as required, in the following sections. 563.655(g)(2XiXA) For vessels for which annual inspections are required under 563.120(aX2)(i) or (aX3)(ii) of subpart G, the specifications and requirements listed in paragraphs (gX2XiXAXl) through (3) of this section apply. 963.655(gX2XiXAXl) A failure is defined as any time in which the internal floating roof is not resting on the surface of the liquid inside the storage vessel and is not resting on the leg supports; or there is liquid on the floating roof; or the sea! is detached from the internal floating roof; or there are holes, tears, or other openings in the seal or seal fabric; or there are visible gaps between the seal and the wall of the storage vessel. Annual inspections for which a failure was detected in the control equipment are summarized in Table 3. 563.655(gX2Xi)(AXz) Except as provided in paragraph (gX2XiXAX3) of this section, each Periodic Report shall include the date of the inspection, identification of each storage vessel in which a failure was detected, and a description of the failure. The Periodic Report shall also describe the nature of and date the repair was made or the date the storage vessel was emptied. Annual inspections for which a failure was detected, the date of the inspection, identification of each storage vessel in which a failure was detected, and a description of the failure are summarized in Table 3. 563.655(g)(2)(iXAX3) lf an extension is utilized in accordance with 563.120(aX4) of subpart G, the owner or operator shall, in the next Periodic Report, identify the vessel; include the documentation specified in 563.120(aX4) of subpart G; and describe the date the storage vesse! was emptied and the nature of and date the repair was made. Tesoro utilized two 30-day extensions on Tank 321 during this reporting period as detailed in Table 3. After an internal visual inspection was conducted, inspectors entered the tank and performed a detailed inspection from the floating roof. Two areas were identified where the primary seal had detached. lt was necessary to remove the tank from service and degas it to conduct repairs. Because alternative storage capacity was not available, it was first necessary to change service of another tank and construct piping to convey product to the other tank. Additionally, delays were encountered while arranging degassing contractors during the holiday season. The tank was removed from service for repairs on 1/6/2025. The tank remains out of service at the time of writing and will not be returned to service until it is fully compliant with all control requirements. 563.655(gX2XiXB) For vessels for which inspections are required under 563.120(a)(2Xii), (a)(3)(i), or (a)(3)(iii) of subpart G (i.e., internal inspections), the specifications and requirements listed in paragraphs (gX2XiXAXl) and (2) of this section apply. 563.655(g)(2XiXBXl) A failure is defined as any time in which the internal floating roof has defects; or the primary seal has holes, tears, or other openings in the seal or the seal fabric; or the secondary seal (if one has been installed) has holes, tears, or other openings in the seal or the seal fabric; or, for a storage vessel that is part of a new source, the gaskets no longer close off the liquid surface from the atmosphere; or, for a storage vessel that is part of a new source, the slotted membrane has more than a 10 percent open. lnternal inspections for which a failure was detected in the control equipment are summarized in Table 4. 063.655(gX2XiXBX2) Each Periodic Report shall include the date of the inspection, identification of each storage vessel in which a failure was detected, and a description of the failure. The Periodic Report sha!! also describe the nature of and date the repair was made. lnternal inspections for which a failure was detected, the date of the inspection, identification of each storage vessel in which a failure was detected, and a description of the failure are summarized in Table 4. S63.655(gX2)(ii) An owner or operator who elects to comply with 563.550 by using a fixed roof and an internal floating roof shall submit the results of each inspection conducted in accordance with 563.1063(c)(1), (d)(1), and (d)(2) of subpart WW in which a failure is detected in the control equipment. For vessels for which inspections are required under 563.1063(c) and (d), the specifications and requirements listed in paragraphs (g)(2Xii)(A) through (C) of this section apply. Tesoro's Group 1 storage vessels became subject to complying with $63.660 beginning on April 29,2016 during a previous reporting period. (A) A failure is defined in 963.1053(d)(1) of subpart WW. lnspections for which a failure was detected in the control equipment are summarized in Table 5 (B) Each Periodic Report shall include a copy of the inspection record required by 563.1065(b) of subpart WW when a failure occurs. lnspections for which a failure was detected in the control equipment are summarized in Table 5. (C) An owner or operator who elects to use an extension in accordance with 563.1063(eX2) of subpart WW shall, in the next Periodic Report, submit the documentation required by 963.1063(e)(2). Tesoro did not utilize an extension during this reporting period. 563.655(gX3) External floating roofs. 563.655(gX3Xi) An owner or operator who elects to comply with 563.545 by using an external floating roof shall meet the periodic reporting requirements specified in paragraphs (gX3XiXA) through (C) of this section. Tesoro summarizes inspection results, as required, in the following sections. (A) The owner or operator shall submit, as part of the Periodic Report, documentation of the results of each seal gap measurement made in accordance with $63.120(b) of subpart G in which the seal and seal gap requirements of 563.120(b)(3), (4), (5), or (5) of subpart G are not met. This documentation shall include the information specified in paragraphs (gX3)(iXAX1) through (4) of this section. The secondary and primary seal exception report is included in Table 6 and Table 7, respectively. The secondary and primary seal gap calculations are included as an attachment to this report if applicable. (B) tf an extension is utilized in accordance with 563.120(bX7)(ii) or (bX8) of subpart G, the owner or operator shall, in the next Periodic Report, identify the vesseh include the documentation specified in 563.12O(bXTXii) or (b)(8) of subpart G, as applicable; and describe the date the vessel was emptied and the nature of and date the repair was made. Tesoro did not utilize an extension during this reporting period. (C) The owner or operator shall submit, as part of the Periodic Report, documentation of any failures that are identified during visua! inspections required by 563.120(bX10) of subpart G. This documentation shall meet the specifications and requirements in paragraphs (gX3XiXCXl) and (2) of this section. (CXl) A failure is defined as any time in which the external floating roof has defects; or the primary seal has holes or other openings in the seal or the seal fabric; or the secondary seal has holes, tears, or other openings in the seal or the seal fabric; or, for a storage vessel that is part of a new source, the gaskets no longer close off the liquid surface from the atmosphere; or, for a storage vessel that is part of a new source, the slotted membrane has more than 10 percent open area. lnspections for which a failure was detected are summarized are Table 8. (CX2) Each Periodic Report shall include the date of the inspection, identification of each storage vessel in which a failure was detected, and a description of the failure. The Periodic Report shall also describe the nature of and date the repair was made. lnspections for which a failure was detected, the date of the inspection, identification of each storage vessel in which a failure was detected, and a description of the failure are summarized are Table 8. 963.655(gX3)(ii) An owner or operator who elects to comply with 563.660 by using an external floating roof shatl meet the periodic reporting requirements specified in paragraphs (gX3Xii)(A) and (B) of this section. (A) For vessels for which inspections are required under 563.1063(c)(2), (d)(1), and (d)(3) of subpart ll\M, the owner or operator shall submit, as part of the Periodic Report, a copy of the inspection record required by 563.1055(b) of subpart WW when a failure occurs. A failure is defined in 563.1063(dX1). lnspections for which a failure was detected are summarized are Table 9. (B) An owner or operator who elects to use an extension in accordance with 563.1063(e)(2) or (c)(2)(iv)(B) of subpart W\Al shall, in the next Periodic Report, submit the documentation required by those paragraphs. Tesoro did not utilize an extension during this reporting period 563.655(g) (4) [Reservedl 963.655(gX5) An owner or operator who elects to comply with 563.646 or 563.660 by installing a ctosed vent system and control device shall submit, as part of the next Periodic Report, the information specified in paragraphs (gxsxi) through (v) of this section, as applicable. Tesoro does not have any Group 1 tanks that comply with 563.646 or 563.650 by the use of a closed vent system and control device. 563.555(gX6) For miscellaneous process vents for which continuous parameter monitors are required by this subpart, periods of excess emissions shall be identified in the Periodic Reports and shall be used to determine compliance with the emission standards. All of Tesoro's Group 1 miscellaneous process vents (MPV) for which continuous parameter monitors are required are controlled by a flare system equipped with Flare Gas Recovery. 563.655(gX6)(i) Period of excess emission means any of the following conditions: Periods of excess emissions during the reporting period are summarized in Table 10. (A) An operating day when the daily average value of a monitored parameter, except presence of a flare pilot flame, is outside the range specified in the Notification of Compliance Status report. Monitoring data recorded during periods of monitoring system breakdown, repairs, calibration checks and zero (low-level) and high-level adjustments shall not be used in computing daily average values of monitored parameters. (A) Not applicable. Tesoro's Group 1 MPVs are controlled by a flare. (B) An operating day when all pilot flames of a flare are absent. (C) An operating day when monitoring data required to be recorded in paragraphs (iX3) (i) and (ii) of this section are available for less than 75 percent of the operating hours. (D) For data compression systems under paragraph (hxsxiii) of this section, an operating day when the monitor operated for less than 75 percent of the operating hours or a day when less than 18 monitoring values were recorded. (D) Not applicable. Tesoro does not use data compression systems. S53.655(gX6)(ii) For misceltaneous process vents, excess emissions shall be reported for the operating parameters specified in table 10 of this subpart unless other site-specific parameter(s) have been approved by the operating permit authority. Not applicable. Tesoro complies with 563.643(a), therefore, the requirements of Subpart CC table 10 do not apply. 553.655(g)(6)(iii) For periods in closed vent systems when a Group 1 miscellaneous process vent stream was detected in the bypass line or diverted from the control device and either directly to the atmosphere or to a control device that does not comply with the requirements in 563.643(a), report the date, time, duration, estimate of the volume of gas, the concentration of organic HAP in the gas and the resulting mass emissions of organic HAP that bypassed the control device. For periods when the flow indicator is not operating, report the date, time, and duration. This reporting requirement became applicable effective February 1,2016. The refinery currently operates one MPV to which this provision applies: UFU hydrogen bypass to south flare via FCV-032346 to allow preferential venting of hydrogen during fuel gas or hydrogen long conditions Periods in closed vent systems when a Group 1 miscellaneous process vent stream was detected in the bypass line or diverted from the control device and either directly to the atmosphere or to a control device that does not comply with the requirements in 563.643(a) are included in Table 10. 563.655(g)(7) If a performance test for determination of compliance for a new emission point subject to this subpart or for an emission point that has changed from Group 2 to Group 1 is conducted during the period covered by a Periodic Report, the results of the performance test shall be included in the Periodic Report. No performance tests were conducted during the reporting period that demonstrated a change of a from Group 2 status to Group 1 or for demonstrating compliance of a new emission point subject to Subpart CC. $63.655(g)(8) The owner or operator of a source shall submit quarterly reports for all emission points included in an emissions average. Not applicable. Tesoro does not seek to comply with Subpart CC by using the emission averaging provisions presented in 563.652, therefore no quarterly report is required in accordance with 563.5ss(gXB). 963.655(gX9) For heat exchange systems, Periodic Reports must include the information in 563.6ss(gX9). Not applicable. Tesoro reports heat exchange systems subject to Subpart CC in a separate report specific to Heat Exchange Systems. 963.655(gX10) For pressure relief devices subject to the requirements 563.648(), Periodic Reports must include the information specified in paragraphs (g)(10)(i) through (iii) of this section. Provisions in 563.555(9X10) became applicable January 30, 2019. Exceptions to these requirements are summarized below in Table 15. 563.655(gX10)(i) For pressure relief devices in organic HAP gas or vapor service, pursuant to 563.6480)(1), report any instrument reading of 500 ppm or greater. Pressure relief devices (PRD) in organic HAP gas or vapor service, pursuant to 553.548()(1) where an instrument reading of 500 ppm or greater occurred is summarized in Table 11. 563.655(g)(10)(ii) For pressure relief devices in organic HAP gas or vapor service subject to 563.648(iX2), report confirmation that any monitoring required to be done during the reporting period to show compliance was conducted. For PRDs in organic HAP gas or vapor service subject to 563.6a8()(2), monitoring required during the reporting period to demonstrate compliance is summarized in Table 12. 563.655(gX1Oxiii) For pressure relief devices in organic HAP service subject to 563.648()(3), report each pressure release to the atmosphere, including duration of the pressure release and estimate of the mass quantity of each organic HAP released, and the results of any root cause analysis and corrective action analysis completed during the reporting period, including the corrective actions implemented during the reporting period and, if applicable, the implementation schedule for planned corrective actions to be implemented subsequent to the reporting period. The provisions for PRDs under 563.648(J)(3) became applicable January 30, 2019. lnitially the refinery operated four atmospheric PRDs subject to these requirements. No release events occurred at the facility during the time these provisions were applicable. These devices were rerouted to the flare gas recovery system during the first half of 2022.The refinery no longer operates atmospheric PRDs subject to these provisions. 563.655(g)(11) For flares subject to 563.670, Periodic Reports must include the information specified in paragraphs (g)(11)(i) through (iv) of this section. The provisions for flares under 563.670 became applicable January 30, 2019. lnformation required by 553.655(gX1 1) is reported in Table 16. 563.655(gX12) For delayed coking units, the Periodic Report must include the information specified in paragraphs (gX1zxi) through (iv) of this section. Not applicable. Tesoro does not operate a delayed coking unit. 553.655(g)(13) For maintenance vents subject to the requirements in 563.643(c), Periodic Reports must include the information specified in paragraphs (g)(13)(i) through (iv) of this section for any release exceeding the applicable limits in 553.643(c)(1). For the purposes of this reporting requirement, owners or operators complying with 563.643(cXlXiv) must report each venting event for which the lower explosive limit is 20 percent or greater. This requirement became applicable December 26,2018. Monitoring required during the reporting period to demonstrate compliance is summarized in Table 15. 563.655(gX14) Any changes in the information provided in a previous Notification of Compliance Status report. Table 13 and Table 14 contain current information summarizing previous NOCS reports and periodic updates. l2 (r) g€€3€ EsB 0, $'= 5A. oi EEszaEE PEE.=trsotr bP.tJ oEpo5€E*o,!L,BO**FE oa<50EEL, aJPEEige ot -* 6s EEoPsttSSAa l,BOgo Fa ,EsEu8q -!{OLJ =o=$Egqr!€E sOS OJ\id.Ehrq, ESEgso a-tuO)Sr.OB o94UJo.(,z Fd,orutdut-F(,z4fooUIddfI(Jo UI oE autEdUahtrlaYl\, d(, =o o d 1J dul-FF aaFzulo U =oz Oti ->60-Y = o-$ c'9 g= s.P trl-sz oe _98 Ii E; 3.a 9P E! oS € E E.E € P'P Lt -e5 .e U.-.9 OE E> L! =E ob do- bE Icc=s iE pE tfi 5! i.: P: EF S.9 .=: ;E EA BP EE E= = o€ >tgU-atP^; ;3 E8E g,; c,;c .= x +\oPr.l:Pq=- F q E:: ;: iO9 EiU EgE- EEI oc\l.: $t P-q.Y (o O e:X+ v oJ oo3 !U' .E-cLL(f,:PA:AO'=! EE giE 9; EEo <^= .9pgr ;'Q i 6n l5 6U- OJ 0-(Eo oc (o -C(E(o=>.=E E;qE:.2 o or=-c:=ru(,) - (oo (! )/." I:$E+ B=EEsHi.:6hE -H-oER'EfE€E fL.--C;-C1(E-C(!HU H g5 H5rrJEuJ (\' OllJ O N Eoc{a.ilio A o,oc{a(!,.o ll roro.odrOtao-vtro oo) oU o (l.vuf Jtro o o, .s .EoEooEocLoE UEo LoGo-v;u '?6 OFe,C U tlo.o-9;Oc.s .9 O^ i!8e EOoa €.g cTlC'= o o€lloroEhF s qo9'r! l-PP (! ^ I L-ouoR'Pt.4tr9m.=!i.ciPP6!ELL?o(E=PcE =oo u!(E:{ .!+ L)Y ue ci'=rrcE Ei'- otrE(/)g;= fr3 f e; 3 = 5:i =* 9EE Eq E=3 Ifirq!2Ur{.oEo.1,0C.j. S E€ ur.o E 6: IYii-=Ftovui 9c tA (I9 .=rge Z3 EE #, E.aroA;.DI b':3 0 .-vpLo UJ€ Eqil 46 .E= E D = EsX_ Ue ; bE oo, E s E 3'E sE6 I ! 6-9 q, 0Ooll=uro h-x u Pe r!+ g O(o-cyu,te ..3 A Ou'=c-cY E E$FE 3_oE!u!qg,EAoccZ T g:EE ae,:;=lO.S o'6 P Jtr!-rotLC,E ii Bs€ S6 E.E.oq I e f;€EE HE vEb6 =AAEL6F3 reEE ksYEotaon:fFjEE:S APPgE -6c{N.=EEUo 'nltr: E zE ig*E og e EH 3. z 6.r 0J c o .!.==-Q ESfi:EEe <= C I v -F96-Uc=o,36e o d.=-'>E F il o'- OJ >0'6.-c>?a ! gE;;s; +.!J+.E S E E.bUEEEsgor P c.ri -..}*fgfrSEE ,u-.E 9 f E $!* 3; # ! : !; s qE . s s E E E € E E ; i E: ;; I E E; i $I E H s E E e i E =t I EE:. T;iEEH :E FrEc E! es cEt sEP o t o,EgE:€rE EFEEE€ -'-LEE&EHEgUPT }G lE;€ e r(l) o -. O-O tE g# EE E- vNoN N O c!rn Jc(oF () .9qv0Jov<CPOcntcJ:Ugtso_o.cEct.=Fc trEno.E-o E,!e90god'U+@OL9'ob3 EO'=9J6.qE -fEoEco9P.E.y9ooEP'= O)!cc'=!o+to)o.CEcl'6o P:cEc:qr.lj€enBo9c .!2.o> SE9- o'5E9(l,F*E.Eg 6_@CO.98 9o;-o.E; -oOF ;e>6E9 oE ot60(l)o-+ cr!ooe9-E o)0)= ts.gao=E -o,Yf-iaFO-6 q6ECb.- O-tO)aGCj:C'E.95:;.. 6 09lE couoz.E E -C .:-p=iti€Efi E'i e9 E-'=.:(rJdr!86, V3s g 3f €.Ei Eo-:'-oE $sE g b EEP.:CL oEE o2 f,*E ge, 8€." I+ o,g 3 eP Eg[ :'5 U.cs 36 =6 tr -9e 8su Egr6<uliu ;tr6 I3oL-oFiE9orn=Co-PO otH (! Lo .s50) €P Lur(I,_jctr 6 9-o 6o E .='6 'ET EE; Ea .PEi €=-.^oJ-YoJ5 5!: EE p=3..Ea = cr'Y P ==:=o5 e.ci c .vtao] 6 = 9es € a3 :d6 E frE €.,:E a Et efs & eE E+l to ="E E6A 4i Eh,Loo-f,.,S ;€F;E 2E^ e63 ;E E i$ ;EE Ei E3; E;E g; g63 aEe rt 3Ep€ == io-u.io EE XE 9 E !- =c:r=tu9'tdL,-s s PP ^eE =E EHE IH 2 .o -e PoP=go:3E g:; dii I o.rA U v=c*.!o 6:(ogo- -91 CEE'= osB_ ;e.o EEE bb_6 g .8b P#6-oJ LLO(!(tJoJ s, UE eEE EEE g+!o+ ^ ?o:oEOOLL:Aor-S E CtttC UiE '- 'Eocto -(DC'(I,F(tl l-I ACEbE .s =-o,.=o!L- u1 UESu=c =- ': .rouY6Pr H ci =ij n o_!l. tsc,€E 8- HoJqq]i; d. e -iuZ8: ! E'= o 9! otE ii E.9 IEi dE ftgt P I c:: =t eYp^Ezo6:-d11.1tl1tr!# UJ eEb 3# BEs $g 4alqqrl.J-E s! O =c bp o.Y .- !v =.n:tvlrl=-FEE' )d ZIag EI _HEIf ee 2i=b='-€€E r*t 2 r= (\a E" roro.o <'i.o aO, !o oo-g) tr!oo.oe os o,c Dot,o Uft,coU,co UooUIE otr o E ooe, E,lc o -9 Ec o E ofo o toEo .=CL!f oo-od .9!o'troo- PxoCo-c .= =-(trE,6 ==tr(!o- -of,6 o N o cnroo criroqF\ .= =o(,,c(!! o(J(,(t, .E C.9coxOJ fi. (!0) oj aediJo Or#cr; U;o>,E-o ^-o7a>.=2= y9(E-orxg.- U(EL!Yo)otL A>U60:!<e Pa ,^0J=Cr4ft1 Og) r.o 'J=Xo o- OJ;s xe b5 g :=L(\rvIi(!5 EE r=lj)\(llOl4t L' L L,{t (!'5 o? e*H €5 :EB Pi $EE EE'EEE TB [E o -eP T*E E9 r^ Eo g = 6PH SI s;E i E ;s$ fE EE{ €ot9(Iltrt(Jqi-L5 I Ab €c -.Y',o- c916.-d €€ - *.4 3 e 6 5 L : r (lO s mit -:E(IJ='aI E.ps ;: EEs € AY .9r q tr 4E;E€ 8- T = EH; * z;-oP!.1.9E ,rE€ E=; EE(uP-.=Eit: IA EE H E U i€ eE g;E Pe A E €s: 3E E= ;E"i d. urF i:o tr= E3 EgE HE g6 =;s #E S3P E = 3 25Et EE "ft XEt^E,o 3;# ;E 2E e€ii Po41*1i!!so 'o o c q 8- I o ? BfE E &P.$:; E€ - Fl = UevE6 EEE=: ZT -S- o,l-oc^si-cc HHE ;3 =;$ EErE E P .3. ei .e 7-cd.l>:s-;qEoE Y! qJ^*Es Sq.l!tro <-rorllC(I, v I C(\t5hB .9-",] p E3Sa E 9?I,(ULXLo o o uJ'->9-rt ts d S' BiEEi{ E *+9Y ic9t o ,^--oY^-cv!- gp e GlPE; E-E*P>\Cr6-(O(!c>=Eeo(o€ 6P- co;:: r€ g =^9CO(l,)gor.= (! X-C'tEEf i:E oLar Xie =(E='::c!S:0 Bs'i t E AE F : E 'Y e tr€ 3 € b!Pts(!6>.or!Ur:oE-ctE*cuo.=El6.oxqrlderfi5:p=eYCE(O(E>P E*ESEBE E B e i E e'E s;t?E: H LfrL_L9O-o:-_o'E dr (o,q66efd="Ef=.!!fE ,g [f g g H s>!a l, O c..c.,E b >; ,9 F UrEEEsdcig.EEocEEX!o-c(olo,i6bUf=EPN (J o.=6 (JE c=oV.E (rlt :*g63srOCc'i .grO=.D, =rr=OU'Ee O-PE":.5;ECooocOoe,bO-c-c= ol.9trcE(Eogtoo€gb6: o .:lU6tAEtrL.9€CUOoo!vl) =.sOpooutc}Eoot,!trPoXUXoait, dE.eo!E(JEor'E.P.tr 0-6E P ?o Et .LAL ooI ii'Ef-Lnl.E ::# .of,*o)cL u.Ffo-O sE6 bpEy -La:(JE(JooE'-ro '5U o Y=E O-Uoqo_l-<L6 o' .L(oo-o&, oo f (oz q)E .s EoPo .9 Eo .N Pfc.o coxlrJ b coo-c (, tr(!o-ofvts.o t@ )! )uloi= l^rI: r!:oN .rir.Otal E.= =o.uc(o! oL'U(o ._cEo.N J .9c.oIAc(U x(lJcCE(,f -LJ iArrn l^;_o:oINiF .ri(o 6 oo-oo o Eoq Lori !(! Eorh oto ! qJi E ._c . IA(,l ..sc OJo-o L 0.,.C\P-Ov lb 'uii(Eror! r9roiriocoo o o ol-c P(o ! !c(! ot(,,(!Ef, p =g Eo o!t q)e o o-o(ouiL.o9.(lJEi'!r o:LJi (o o_o L., or 9r:lG'I(r( l-(oJ ':>j e(Ee tr( -! CCL(ol g?oIfr.! trL-c OJc EC(Erp f,g E..oo- ,or o: .Ei E:c!oix{ +(!l -C+o-(o(Ort-cutC.sl(o: outrTo=-cL ot E: (lJuooc-co!-o.EaPJf,0)(!3s-oL9'-orrc EFsg (I) P63b=oE9(lJo E .UIo io CJEd.uLLiiOEtrrf >.= E.= =Ei(+!E =o):x9oJi; nt!is:r,l=r:c)0) :L,@t-c:o ro. !(o' cn -oo,NiIrrr1 {'(o Ilar 6ls.iaiEJp(cl(Utu( F(@l.'i!!lEIv!ot5eL+ Ec U'EO-o(E-o)E>\. L.(EE oicoOT O.=O-.rn C(!(E(t) oo-ool/) =.:o(oioOEf;o-9g6 E€gJ4 dGl-oJd(/)ibU(o>E !;DF --P-(!--cI,PIra4bDore =o)j'=-uiE c-(! o -cp =o ! Ec(! oo E.g! E IAo o oo, E (tJ o- o c, E @L' (uLof(tvl N N o c(l., Eo fgo o-c Eo '(o T(u -c l4o t^o oOl('Lo oo (,)c (,o EcoiPIXl(l)1 OtJI9i9soJJ6_!o: P(Llo+*r-o((un-cLHJts9(ot sr .s(u( 6= o,Eg(E' (Jv(!OLJEcLc(EL(9b EoOo?b (o:trE o-d $L, ti .oPo-A vL)a568!rE1O=ro O-riEroOaa Lltq.9iEobGc,E,)ceo bEOoocE3o9 I+LOECoEr,oo€ E!oJlUCDOE'F otubu..ts .9oo5TEahEEciE:O3 H fr EtreE3=E(ljFrtd:uO€ Eo tP Efl EE P + Fo E: u, = dE =I ;tE =FLntJA q.o oE 3# eF trsr =cL u.= =B g; T6 bx ;9T'5: 6L.,E(JFooo.!-ur: BJ H:!'-ulIlqxP r* 2 oN ePL!oolg eG P 5 de s;; xO ebg ,=u9 EEg El.,6sLut 6r- ) o-{ E'= 9 Ert'E6--o{i oc 3 L,.a o-P q oq 39: f€ e s* b3 5;i I9 b P8 P.!tl.koE 6i9.= E8. E[E €O6LPsG(EO;l,c :*--H itGrn(lJ(, ED tA (, dr oJE T*E !6.E:s :E b.3 2 €llro,,i:cg 5g€ EE "Ed EI HrH € trqJoo-oOL)-c6!-: -^ u _fiJ g.C E E* EP'5 ;tr v.=-c 9 -=LE P8-e E ^.a E3e € 6 E ;6E e H3 EH= & eotn;ZR X g-! d t E.\.UllfOJe.a-,=EOEOIg:;;; Ef EEu=EcLorJ-,,zE Etsu o Ef ei 3-b1.-qo,or66=9 '=5Rg idE 4f; EE€8. €; eE ;3s= 3# Etu€58 tr g, *+ HEE; i'i'= =s flI!E EE H-PH9.1=FE3T; Eg Eo'sE=-E ;E UE gegf BE =E EEdE r** z c.l P* ,^o=C '4rnOgJ (o 'E =o o-*F o);s ;l*(t.lvo(J e'-=E E3F el/IEEZ.E Iq'= olU:9EPH; g EF ;E: E = >\g or Lo) E0,,P ES EEg Eq is s 3(it o 'S .9 V.l arr>\(tt=r, .= E€ i E EE€ ;9) b:.d, b E iE; € .g e E,[ €ot'; .= .=ED.Eorltutr -L)L:O'=P6Offu(!-?]O s orii -t -E.s g '; *:E6 I E =E=s € r6 9tg E *E € ;** i =E *ti Es EE tEE Es ee :'= = ^ 3 =P E,aE P; AE e[; Bj Bf E=il 9.; Ee f tE u= =a P€e 3; go ErB iE 3=: E = 3 25Et EE EXETr,E-or.iior9'=E(J9 e€ ii, PE =31-1ioEsE gSH r* 2 NN OJlol-lclo l6 IEI o.rlq loJIUlxl3lol-l!toILtoJIo-t-lolcl.ILl(ololo)IUlcloJlot(olo,IEl(EG ! OJ:o o.o(\, o, 0,, o (l.) o,-cFi(E! O)E g OJo_o OJ c(u (! o oc E.o)(! .UE .E (I) E OJE. co o c(l., -o(! (E3(l) E(o ocF co r.o ol LArJ')qrntorOt Eo,F o-oL.txoo(.,ceo- Eo(J of o o,coc EoG€X6s-ro=ro1rO(t)riK.oF.aEt:o .ilTE Acrrg4cbut=!rb€clo.-zOor-e!=TE HgE a'=cgJ64ooFI € 9Et==g_t;& E).9tr!8 E: a0J .= lllE iE Eo -E= oE 6E H Ou1 I>.n ..'l e ti6O,E 95 6ur f g'r -r7-a u.= 9g :! E Ei(tJYtalCYtaCLUIrfL,EE il F>oJA-o 9E =ItIr'Ear Toble I I Pressure Relief Devices in OHAP gos or vopor service subject to 963.6a8fi)(l) ond S63.655(gXl0)(i): IllA pressure release also requires that root cause analysis and a corrective action analysis be conducted for the event. These analyses are attached to the report as applicable. I2l This is the total amount of OHAP released; an estimate of the amount of each OHAP released is shown in the following table Pressure Relief Devices Reporting Period: 7 /15/2022 - 1 /14/2024 Parameters:Work Practice Standards: Organic HAP Except during a pressure release, operate each pressure relief device in organic HAP gas or vapor service with an instrument reading of less than 500 ppm t563.648(ix1)l Post-Release Monitoring lnstall a replacement disk (if applicable) within 5 days of pressure release and conduct instrument monitoring, as applicable, no later than 5 calendar days after the PRD returns to organic HAP gas or vapor service t563.548fiX2)l Report Any lnstrument Reading Above 500 ppm 1563.655(g)(10)(i)l: None during reporting period*Duplicate rows as needed for additional events. Event# I PRDID Date of Opening Time of Opening Reading N/A Pressure Release Events t563.655(g)(10xii) and (iv)l;ttl Tesoro operated no PRDs subject to this requirement during the reporting period. Pressure Releases Exceeding T2lblday for Pilot-Operated PRDs in OHAP Service t563.655(g)(10Xiii)l: None during reporting period Event #PRD ID Duration of Release Estimate of Organic HAP Releasedt2l Any additional comments/information N/A lbs 23 vN El Eo-o ! o EoU =!coUt,(E =oUc .ga EoU 3NYx?go GOPiEri'traa t- IeP'fri'=o.llbeb=&=]LFtioJ4oEO.g pG frC.=^OZI ;ts. r.l; :q ES -EH 9\UE oiJ C,O-opf2 9u o3 E;- 2S +s dl.toJ>'EvLLrr.tr 9; 46 EH 5.9 E 6- t^E E; 6 bPl/tFoo:go. =-CerutO-o.L,e c< xo.9-ul5 E.c :{ G g2 =e'l =.Ln ii o__ .u tJ -6OJIJ-s E: r.ct .!!.9 A roN 6 (o CJ z.t(EIrlcoUc) ! (! b(! E.C -.c =lslotolLIolCI 6lol _t6lsl6JlPIxlul q oo z(,! o(,, OJ !c(! a(I, E o .E3 oo o) ,El!o 6c (uxU .t4(!o b(o!co(J OJ ! (! e"o E o- -c'=t *lotol s'lLI!l6lol -lclLI(tJliilul I(o(u Z.(! !coU(l,, 'ocG-(! E o-E.=3 oo otl.cl(!lol*l(!ICILIoJl !ttr, I E OJ b(E E o-l-t:lolol d|lcl Plolol*l (olCILIsl'l ooo e.(E:ocoUq) E (o b(! E o- E!ll*lotoiLIorl.ElPl6lol*-l_t PILloJlilLUI lqooa u(!! o OJ Ec(! a(I, E.C o. .ts =oo C,lc (!o Ec 0.,xU l6 l6loJ laoE'cot,(U !c(! Z"(! E o--l.=l}I*tolol orlcl clol _ll!lCILIoJl xl '!l 14l!(l) b(!roco q) E Gbt! E o- E.:3slotol -lcl 6lol*-l_tclclLIdjl xlrJJ I 6(!(I) b(,lJco(J(t) ! (! b(E E o_l =l.=l3l*tolOI -lcl (olol ];lclLlslnl (E(lJ b(! E o- -c.t3l+lotol Orl.El ololEl_t6lsloJlEI-l b(o EI o_l =l.=l3l ol9l Orlcl clol*l (ElCILldJl6l (!q) b(! E'g-o !lil EIol o,lcl 6lol _t6lclLldllEI-l t OJ e.(! E o- E=3 ololLI orlcluldlol .lclLlslcl -l E OJ bltl E oi-l BI*tololLI-lclPl6lol*l (BlclblEI-l 6(! o)0b(!EcoU(U 'o (o a.(D E o- '= *lotol -lcl Pl6lol*l EIoJlxluJl b(! Ei o_l =l.:l3l EIol;lcl (EIOI -lslol El !(! o) b(!EcoUo !c(! b(E E.C o- -c..=3l otol orlcl (gIol _t6lEIoJlPlxlul I(! c, b(! !Co(J OJ E obo E o- -c.= =oo o,]clPl6tol _tclclLld]l xltr, I lco (! (l, E Uo't !c(E ct)cl ol.=lclolEI o, I =l6l(Jl ol-tolo-lcl>I c .9 (o C(u E =(JoEE (! Olc o olEI o, ILIll6l6lol ol-lolo-lcl>l .9 (o Co E =Uo-(, !c(Eo 'tro.!Co E qJ f o o- oo-(! c.o (o Co E =IoE ! (o cr)c ol.=lclolEIoil;l orl OI-tolol(!l>l Co.E oco, E:lUoE1' (o O) 'tro.=CoEI EIflql EI 3lolo-llol>l ofo (9 a.fo(, o-fo(, o.:,o (9 ofo (9 o.lo (9 alo(, oao (9 o. o (9 ofo (9 a.fo (9 oIo(, a-fo(, o.Jo I o)o (9 o:,o (9 Fo)o (9 o.5o (9 o.lo(, Nofo (9 N o.fo(, Nolo(, N o.fo(, N o.fo (9 msNJC(UF NrnN!C(oF Nocn !c(! F @Ocn -Yc(oF Nrn -vc(,F !tNrn J (! F rJ1NfnJC(!F r.oNrn !coF @Ncn .Yc(!F ocf)an -vC(! F No$Jc(EF 6lNOl-$lsfJl -:zcl c(ol fllFIF anF$ !coF s\t -!zc(oF Nsizc€F NlmNl c\lsls -sz I -:zcl c(!l (oFIF Nfn!t !coF oirl Jc(oF $ JcoF N$ JcoF Nrn !C(oF @rn l/coF L,'Ut(Eo--oft/,1I ?L.,o(1) -O -of(Ut/1u3=qa; dLL,(Eo't6Eb .! FE E-eOor.rr ,^t fE: fl >u=oiE.,H'E fi;= EorP rcE!'Fcc.9t(o68. Eri 6 otY!e !s Fg;: 5o 96- '; ED vi =o 9; Xi ba{ P,t7 d :, t^ OF.(E(!Lir c o tttO*^oJ -o Ec.r HA 6s .sp E d 3E f g EOYIC+I y.I' o LC.9 Uro- .oE g= EtrOY.Ub u(9 E9 ;E 2Oru-oPi.0 0i :E Ph ;v:=i^2\E2IE E E E H=..i=tY) qJ 6 (E! e'a Elt .!! (, .9O-crFF.=F .oN o co o Co (o cOJ E =UoE'o (E O)c o=o E o) =o o_ oo-(! o.F C, c.) E oE !c(o OrE oE o E (u f o o- oo-(! o (o c(u E =UoE c(o O) .C o.=co Eo l o oo-(! tr .9(! q) E (Jo! ! (E (,lc.C o.=co Eo q(u o- oo(I, Co (E OJ ElIoE ! (! olc'tro=o Eo l 7) o- oo-(! o (E (l) E)IJo! Ec(, (,l'-o.= o E (u f oLo- o (! (o o) E IJoEEcC,oC o.= o E (u = OJ o- oo.|! (! OJ EfUo:o EL(! O) 'tro.l o E (u (lJ oo-(! (! c) E L'o! !CC, ol 'tro.2 o E (l) o o- oo-(! No =o (9 N o oI No:,g (9 No =ou No =o(, NoloL(9 Nofo(, NofoL(9 No Jo (9 soN -:zCoF \0oNizc(! F N N -:zc(!F cn N -Yc(! F (osrN -rzc(!F t\$Nlzc(! F OlN -!zc(oF NNmlzC(oF cnNrn -szC(! F NN OEt'- <!roE.n=(oh d.=Lo.UEoo$u z z z z z z z OENl!l.o +-rn!(oh d,'=LOUEoo<'u z z z z z z z z z z z z z z z OJ _gL E lott z z z z z z z (U _gL Eoz z z z z z z z z z z z z z z z N c!At N N N c\l C\J c!C\J cv N N c!.\I N N cv a!N n,C\J AJ r€lsrn(\Inno UIL(!'t o) (o E fo o (!o- -oc(l., Olo ! ! lu-l c OJ OJN2(! C(E N- C OJooU oosfoN F (u (uN Ec(E vlNI =)d.vl Co oU Noo$oN F o) 0,,N E (! f|JFN@ $c! F qJ (U Ntc(o vlFo (E ld.tn(\tN(ocnN F o oN 6 (! Notlt o(! OJ 'o .E fd.ttt(or-l.orr)N F oN (!tr(! No o(! OJC'o .s fd.IAt-Nr.ornN IF c OJ oN 6 (! ! (o Eo,!c OJolxo fntJl c(uo-o !-o oEt(! E oc o -g fdtJl o o,)2(o Ef (, E OJu(Eo- E(! o) vt a,'>;63N(uo.:NS L,=f->ic(^o C o,) (uN.>t! (!) c(lt* OlI @sNoN F C OJ oN2(!c(! tttN-N Ol t-oa! IF C OJ L(uN G (E Olc ! CJ co E OJ N (uN Ec(! o .EIf, q., 6 o,) (u N E (! fd. t-o o(o F c(IJ o)N (!c(o anF qJ l! E oz{an@orno F 0,, (uN Ec(E a(\-o (o !trozorr1@o6oi c(l) (uN Ec(! f d) (t., _c Eoz @@OLAo F c OJ (UNt (! No O) lu Etoz coan@ol/'|o IF c(U oN Ec(E L Norn@ IF 0,, N 0.,N Ec(! -Va anOLA@ F c0, rn OJN '6 (! -v sol/)@ F c(IJ OJN Ec(I, (Uo. -o cttoU(o $ a! F q) oN Ecr!oU cooUc!ocnON F o) o,)N->G, C, No oooU (\JoN F 3c,C11.1qe.:l -c(l)iE-o-c O6L P L ,.8;(o3 A(lJtsuE9oJ o- 6ge 0,Eb-oE9.u(E=Ez.+NFo- P )U9tJ(9T EEoo-(! a tA goo)UPYo u(9r .E=u,:of)cI i:trOrgoc =C)o =bUtv-carlPa = EE!otO EEE eoP AEr6 =0J.ll3 E;E o-= +qtafYI EsLG'.g oF3 !:L\o1cu l9go lg u-lJor'=.0 6 E*_LO 9)d =U.=6Y9 ii Eb:(E(o egt6rltf, -s(l,a,ZP: i".r 3o 3g:O.95olg f 63 @N z z z z z z z z z z z z z z z z z z (\J (\J a\,1 l\l C\J N a\t Al N cq) (U N ECG, CqJo(U f,Ult Olsoo F tro) (uN Ec(! =G cq., a! Lo)N Ec(D ld. cc, rn (l)N E (E ld co OJN 6ct!vll- o) _q -cfotJt $rn@o<toIF co OJN Ec(o thN- o)(! E =ovlofY1@oso F Cq.) oN (!c(! =co o(! ! =ott @coo$o IF OJ oN Ec(o Noo (! =oVI @rn@o<toF C(, L(uN 6c(o No o)o E fLf cod NI l Ioble l5 Moinlenonce Vent Work Proclices subject to 963.648(c) This table summarizes monitoring required during the reporting period to demonstrate compliance. Maintenance Vents Reporting Period : 7 / tS / 2024 - L / 74 / 2025 Parameters:Work Practice Standards: One of the following work practice standards must be met Lower Explosive Limit For equipment which contain pyrophoric catalyst with no pure hydrogen supply available, the lower explosive limit (LEL) of the vapor in the equipment must be less than 20% at the time of atmospheric venting, except for one event per year not to exceed 35% [563.643(cXrXiv)] For all other equipment, the vapor in the equipment shall not exceed lo% at the time of atmospheric venting [563.643(cX1Xi)] Equipment Pressure lf there is no ability to measure the LEL of the vapor in the equipment, equipment pressure shall not exceed 5 psig at the time of atmospheric venting t563.643(cX lXii)I Mass of VOC Equipment served by the maintenance vent shall not be opened to the atmosphere if it contains more than 72lbs of VOC [563.643(cXlXiii)l Periods of Deviation from Work Practice Standards [$63.655(g)(13Xi)-(iv)l: None during reporting period MV ID Equipment Served by Vent Deviation Type Date of Opening Time of Opening Value (LEL, Pressure, or Mass VOC) at Opening Mass of OHAP Released No periods of deviation lbs lf utilizing the 5 psig vessel pressure option and active purging was initiated while the LEL was L0 percent or greater, provide the LEL of the vapors at the time active purging was initiated: MV ID LEL No applicable events % One-time Annual Period of Compliance with Pyrophoric Catalyst Exemption at 63.543(c)(i)(iv) When the LEL is >20% and <35% [963.655(gX13)]: None during reporting period MV ID Equipment Served bv Vent Date of Ooenins Time of Opening Value (LEL) at Opening Mass of OHAP Released No applicable events Enter date.lbs Toble l6 Flore combustion efficiency subjecl to 963.670 (b), (d), (e) ond (f) This table summarizes monitoring required during the reporting period to demonstrate compliance. Flare ID: North and South Reporting Period: 7 /15/2024 - 1 /14/2025 Smokeless Design Capacity: North: 8,830 ACFM South: 1,290 ACFM Parameters:Work Practice Standards/Operatinq Limits: Pilot Flame Presence Pilot flame must be present at all times when regulated material is routed to the flare, except for any event lasting less than 1 minute for any 1S-minute block period t563.670(b)l Flare Tip Velocity Flare tip velocity (V1;r) must be less than 60 ft/s t563.670(dX1)1, or V1;p must be less than 400 ft/s and also less than the maximum allowed flare tip velocity (V,",) when regulated material is routed to the flare for at least 15 minutes and the vent gas flow rate is less than the smokeless desiqn capacity l'563.670(dx2)l Combustion Zone Operating Limit Net heating value of flare combustion zone gas (NHV.,) must be at or above 270 British thermal units perstandard cubic feet (Btu/sc0 determined on a 1S-minute block period basis when requlated material is routed to the flare for at least 15-minutes l'563.670(e)l Periods of Deviation from Work Practice Standards - Report each 15 minute block period when there is a deviation of any of the above work practice standards or operating limits t563.655(g)(11Xi) and (iii)l:*See Attachment C for additional NHVcz Exceedance Events (if applicable) Event #Deviation Type Start Date Start Time End Date End Time NHV,stll NHVc.lll NHVo,,rtt 1 NHCcz < 270 Btu/sd 7 /17 /2024 0'l:45 7 /17 /2024 02:00 240 2 NHCcz < 270 Btu/scf 7/23/2024 05:30 7/23/2024 05:45 245 3 NHCcz < 270 Btu/scf 12/11/2024 00:15 12/11/2024 00:30 109 4 NHCcz < 270 Btu/scf 12/11/2024 02:30 12/11/2024 O2:45 139 5 NHCcz < 270 Btu/scf 12/11/2024 02:45 12/11/2024 03:00 126 6 NHCcz < 270 Btu/scl 12/11/2024 03:00 12/11/2024 03:15 69 Parameters:Operating Limits: Visible Emissions No visible emissions, except for periods not to exceed a total of 5 minutes during any 2 consecutive hours when the vent gas flow rate is less than the smokeless design capacity t553.670(c)l Periods of Deviation from Work Practice Standards tS63.655(gX1t)(ii)l:*Duplicate rows as needed for additional events Event #Deviation Type Start Date Start Time End Date End Time Cumulative Time of Visible Emissions (mins) 1 VEs > 5 minutes 7/16/2024 12:54 7/16/2024 14:54 8 min 45 sec 2 VEs > 5 minutes 7/23/2024 11:24 7/23/2024 13:24 8 min 15 sec 3 VEs > 5 minutes 9/4/2024 22:03 9/4/2024 22,,31 11 min 4 VEs > 5 minutes 9/s/2024 1 1:19 9/s/2024 1 1:30 5 min 15 sec 5 VEs > 5 minutes 9/s/2024 23:10 9/s/2024 24:00 20 min 30 sec 30 Flare lD: North and South 5 VEs > 5 minutes 11/25/2024 20:21 11/25/2024 22:21 21 mrn 7 VEs > 5 minutes 12/s/2024 02:07 12/5/2024 O4:O7 21 min 24 sec Attachment A Secondary Seal Gap Calculations NO SEAL GAP AREA COMPLIANCE EXCEPTIONS REQUIRING CALCULATIONS WERE FOUND DURING THE REPORTING PERIOD. Attachment B Primary Seal Gap Calculations NO SEAL GAP AREA COMPLIANCE EXCEPTIONS REQUIRING CALCULATIONS WERE FOUND DURING THE REPORTING UIAH DEPARI'MENT OF ENVIRONMENTAL QUALITY t, MAR 142025 I I orvrstoN oF AtR ouALlrYr_