Loading...
HomeMy WebLinkAboutDERR-2025-002571Hong-lei Tao <htao@utah.gov> Re: Groundwater Sampling Report and WP&B for GW Sampling at Beaver Chevron Station, Utah 1 message Robinson, Gerald <Gerald.Robinson@arcadis.com>Fri, Oct 25, 2024 at 9:13 AM To: Hong-lei Tao <htao@utah.gov> Cc: "Amato, John" <John.Amato@chevron.com>, Michael Pecorelli <mpecorelli@utah.gov>, "Kroenke, Kimberly" <Kimberly.Kroenke@arcadis.com> Good morning, Hong-Lei, We were able to obtain two written quotes for this work, a verbal quote, and one company did not respond. The quotes are attached. The verbal quote from National EWP (Arizona based company) was as follows: $4000/day drilling, assumed four days, with no vacuum truck for hand clearing. There quote did not include mobilization or materials for well installation. I hope this meets your needs. Have a great weekend! Skip Gerald A. (Skip) Robinson | Project Manager Arcadis U.S., Inc. M: 412.735.2749 From: Hong-lei Tao <htao@utah.gov> Sent: Monday, October 21, 2024 5:13 PM To: Robinson, Gerald <Gerald.Robinson@arcadis.com> Cc: Amato, John <John.Amato@chevron.com>; Michael Pecorelli <mpecorelli@utah.gov> Subject: Re: Groundwater Sampling Report and WP&B for GW Sampling at Beaver Chevron Staon, Utah Arcadis Warning: Exercise cauon with email messages from external sources such as this message. Always verify the sender and avoid clicking on links or scanning QR codes unless certain of their authencity. Hi Gerald, Regarding this work plan, Utah DERR needs three bids for drilling subcontractors. Please email me three bids from the subcontractors by October 25, 2024, so that I could continue to process this work plan. Thanks. 4/8/25, 4:06 PM State of Utah Mail - Re: Groundwater Sampling Report and WP&B for GW Sampling at Beaver Chevron Station, Utah https://mail.google.com/mail/u/0/?ik=a09aa4868b&view=pt&search=all&permthid=thread-a:r-980323315456614789%7Cmsg-f:1813899316362481824&simpl=msg-f:1813899316362481824&mb=1 1/3 Hong-Lei Tao PST Fund Project Manager On Mon, Oct 14, 2024 at 2:27 PM Robinson, Gerald <Gerald.Robinson@arcadis.com> wrote: Good afternoon, Hong-Lei, Please see attached the work plan to install two additional wells at the subject release. The work plan is similar to the previously submitted plan. The well install is currently scheduled to begin on October 21, 2024. Please let me know if you have any questions or concerns regarding this submittal. Regards, Skip Gerald A. (Skip) Robinson | Project Manager Arcadis U.S., Inc. M: 412.735.2749 From: Hong-lei Tao <htao@utah.gov> Sent: Tuesday, April 9, 2024 6:05 PM To: Robinson, Gerald <Gerald.Robinson@arcadis.com>; Amato, John <John.Amato@chevron.com> Cc: Michael Pecorelli <mpecorelli@utah.gov> Subject: Groundwater Sampling Report and WP&B for GW Sampling at Beaver Chevron Staon, Utah Hi John and Gerald: I received your 2023 Groundwater Sampling Report dated 4/1/24. Thank you very much for your submittal. It appeared that dissolved petroleum contamination in MW-1 and MW-4 had rebounded. Therefore, it is not the right time to close Release ICY. There is still remaining contamination at the site that needs to be addressed. As you know, the extent of the dissolved plume at the northern site boundary has not been defined. A few years ago, you proposed a work plan to install three monitoring wells at the north boundary, but could not obtain an access agreement from the property owner. According to your sampling report, Mr. Leland Black now owns the former Chevron Station and the parcel located north of the station, and both parcels are operated as one gas station. As a matter of fact, there is a new dispenser island near your proposed well locations at the north boundary. Therefore, if you request installing three monitoring wells near the north boundary now, I think Mr. Black may agree with the additional investigation. There is a work plan & budget (WP&B) attached with your sampling report for additional groundwater sampling. Please send me a new, independent WP&B for additional investigation and GW sampling. If you have any questions and concerns, please feel free to contact me. Thank you very much for your help. -- Hong-Lei Tao, M.S. | PST Fund Project Manager 385.391.8138 (office) | 801.536.3598 (fax) 4/8/25, 4:06 PM State of Utah Mail - Re: Groundwater Sampling Report and WP&B for GW Sampling at Beaver Chevron Station, Utah https://mail.google.com/mail/u/0/?ik=a09aa4868b&view=pt&search=all&permthid=thread-a:r-980323315456614789%7Cmsg-f:1813899316362481824&simpl=msg-f:1813899316362481824&mb=1 2/3 195 North 1950 West, Salt Lake City, UT 84116 This email and any files transmitted with it are the property of Arcadis and its affiliates. All rights, including without limitation copyright, are reserved. This email contains information that may be confidential and may also be privileged. It is for the exclusive use of the intended recipient(s). If you are not an intended recipient, please note that any form of distribution, copying or use of this communication or the information in it is strictly prohibited and may be unlawful. If you have received this communication in error, please return it to the sender and then delete the email and destroy any copies of it. While reasonable precautions have been taken to ensure that no software or viruses are present in our emails, we cannot guarantee that this email or any attachment is virus free or has not been intercepted or changed. Any opinions or other information in this email that do not relate to the official business of Arcadis are neither given nor endorsed by it. -- Hong-Lei Tao, M.S. | PST Fund Project Manager 801.536.0036 (office) | 801.536.3598 (fax) 195 North 1950 West, Salt Lake City, UT 84116 This email and any files transmitted with it are the property of Arcadis and its affiliates. All rights, including without limitation copyright, are reserved. This email contains information that may be confidential and may also be privileged. It is for the exclusive use of the intended recipient(s). If you are not an intended recipient, please note that any form of distribution, copying or use of this communication or the information in it is strictly prohibited and may be unlawful. If you have received this communication in error, please return it to the sender and then delete the email and destroy any copies of it. While reasonable precautions have been taken to ensure that no software or viruses are present in our emails, we cannot guarantee that this email or any attachment is virus free or has not been intercepted or changed. Any opinions or other information in this email that do not relate to the official business of Arcadis are neither given nor endorsed by it. 2 attachments Cascade Quote Arcadis - Sonic MW Beaver, UT_7.19.2023.xlsm.pdf 120K Arcadis Beaver Utah Chevron.pdf 108K 4/8/25, 4:06 PM State of Utah Mail - Re: Groundwater Sampling Report and WP&B for GW Sampling at Beaver Chevron Station, Utah https://mail.google.com/mail/u/0/?ik=a09aa4868b&view=pt&search=all&permthid=thread-a:r-980323315456614789%7Cmsg-f:1813899316362481824&simpl=msg-f:1813899316362481824&mb=1 3/3