Loading...
HomeMy WebLinkAboutDAQ-2025-001922FIIJEtrTFI NUCOR CORPORAT'ON NUCOR STEEL UTAH FROM: DATE: DEPARTMENT OF ENVIRONMENTAL OUALITY t,lAR 25 2025 DIV]SION OF AIR OUAUTVMONITORING REPORT Executive Secretary, Utah Air Quality Board Nucor Steel Monitoring Report for Permit # 300002004 March 1,8,2025 In accordance with Operating Permit provision I.S.2.a, and Utah Administrative Code (UAC) R307-415- 6a(3)(c)(i), the following monitoring report is submitted. This report covers the period from 09-01-2024 For the indicated reporting period: E tr to 02-28-2025 There were no deviations from permit requirements. Attached is a list of permit requirements for which there were deviations. The list includes the information required by Operating Permit provision I.S.2.a, UAC R307-a I s-6a(3)(c)(i). In lieu of attaching the above list, deviation reports submitted in accordance with permit provision I.S.2.c, and UAC R307-415-6a(3)(c)(ii) are referenced below. In accordance with Operating Permit provision I.K. and UAC R307-415-5d, and based on information and beli after re4gqpable inquiryJ certifu that the statements and information in this document are true, ible Official for the Source March 18.2025 Date Adam Zewe- V.P. - General Manaser Name and Title of Responsible Official PO BOX 1OO PLYMOUTH. UIAH 84].JO PHONT 435 458 2 ]I]O FAX 4I5 453 2309 WWW,NUCORBAR,COM B-2-10008