Loading...
HomeMy WebLinkAboutDDW-2025-003324ttOSISKO DEVELOPMENT lintpr pnject WAlE RMAULI.NQ_REPOJI For the month of: February 2025 System: Tintic Consolidated Water System ID: UTAH251BO Water Source: Helper City (UTAHO4004) Chlorine Chlorine Residual Total Load Haulage Residual after Before UnLoading, HauLed water coUforni + received by Entry No. Date Water Provider loading, ppm ppm: volume, gal: E coli (initials): Waste & Water 1 2/27/2025 Logistics 1.0 1.0 7200 Absent MO Report prepared by: Name: Moriah Ott Title: Environmental & Permitting Compliance SpeciaList Signature: Date: 3/i o /cz..c f\OSISKO W__ DEVELOPMENT tnhic P'oject For the month of: February 2025 System: Tintic Consolidated Water System ID: UTAH2S1SS Disinfectant type: Sodium Hypochiorite WATER TREATMENTREPORT Hypochlorite Post-Treatment Water Solution Sodium HypochLorite Chlorine Residualat Entry No. Date Time Storage Tank Location Treated, gal Addition, mL Concentration Entry Point, ppm Initials No chlorine treatments completed on storage tanks in the month of Februaiy. Report prepared by: Name: Moriah Ott Title: Environmental & Permitting CompLiance Specialist Signature: /t/t41}.,fii. c9b( Date: