Loading...
HomeMy WebLinkAboutDAQ-2025-001902Yr.*sl"lJF"g"s.r Huntington Power Plant 8 miles west of Huntington, Utah on Hwy. 3l P.O. Box 680 Huntington, Utah 84528 March7,2025 Mr. Bryce Bird, Director Utah Department of Environmental Quality Division of Air Quality 195 North 1950 West P.O. Box 144820 Salt Lake City, UT 84114-4820 RE: Outage Notification, Unit 2, Huntington Power Plant (Title V Permit #1501001005) Dear Mr. Bird: As required by ll.B.1.f.3c of the Huntington Plant Title V operating permit, the purpose of this letter is to inform you of a boiler unit outage at the PacifiCorp, Huntington Power Plant. Boiler Unit 2 was removed from service on Wednesday, March 5h, al8.22 PM to replace stator filters. The maintenance was performed, and stable operation achieved at 12:05 AM on Friday, March 7th,2025. Please see the attached Maintenance Outage Report for details. I am authorized to make this submission on behalf of the owners and operators of the affected source or affected units for which the submission is made. I certify under penalty of law that I have personally examined, and am familiar with, the statements and information submitted in this document and all its attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certify that the statements and information are to the best of my knowledge and believe true, accurate, and complete. I am aware that there are significant penalties for submitting false statements and information, or omitting statements and information, including the possibility of fine or imprisonment. For further information on this outage contact Terry Guthrie, Hunter and Huntington Plant Environmental Manager, a|435-68743?4. ,n",Jftok (( DEPARTMEN?-6;- ENVIRONi,ENTAL OdUrY MAR 2 8 2025 Dllsot oF An ot,^uw REVIEWED Initials JBR Date 4/8/2025 Comp Status Meets File # 10238 Blue 2 outage Enclosure: U2 Maintenance Outage Report - PacifiCorp, Huntington Plant Terry Guthrie - Hunter and Huntington Plant Environmential Manager Scarlet Lewis - Environmential Services - NTO 210 Russ \Mllson - Huntington Plant Files Outage Report, Huntington Plant Boiler Unit #2 Stator Filter Change Date:31512025 Date Time Descriotion 3t5t2025 l0:06 AM Unit load lowered in anticipation of outage Shutdown beginr 315/2025 8:22PM BFO Down-time begins 3ts/2025 12:44PM Stopped producing electricity 3/6t2025 l:03 PM BFI Start-up begins- 316/2025 7:34PM Started producing electricity 3t6/2025 l0:19 PM <10% heat input from fuel oil BFO 3/612025 l0:19 PM 3 coal mills in service 31712025 l2:05 AM Stable operation (<10% heat input from oil, 3 coal mills in service, baghouse temps >200 degrees)Start-up ends BFO - Boiler Fire Out BFI - Boiler Fire In All times shown are in Mountain Standard Time.DEPARTMENT OF E}{VIRONMENTAT OIruITY l',lAR 2 8 202s DMSTON OF AtR qr rrw Boiler Operating Hours -During Trip Outage UNIT# Outage Start Date: Outage End Date: Outage Description: Start Date 3/5/2025 3/6/2025 Start Time (BFI) 0:00 19:34 End Date 3/5/2025 3/6/2025 Boiler Opr. Hrs. End Time (BFO) Duration (hrs) Daily Total 20:22 20.37 20.37 23:59 4.42 4.42 Total: 24.8