Loading...
HomeMy WebLinkAboutDERR-2025-002534Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name SHAROOZ INC Address 1689 S 1300 E SALT LAKE CITY, UT 84105 Contact SHAROOZ INC Phone Email None TANK LOCATION Name 17TH SOUTH TESORO #59 Address 1689 S 1300 E SALT LAKE CITY, UT 84105 A Operator THA IMRAN Phone (801) 512-9276 B Operator SAME Phone SAME Facility ID: 4001078 Inspection Date: 04/03/2025 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1/2 Gasoline Yes Steel Flex in Sump None None Yes No None None 2 - 3/4 Gasoline Yes Steel Flex in Sump None None Yes No None None TANK DETAILS Tank ID/Alt ID 1 / 1 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc May 2, 1971 / 10000 / East Substance Stored Gasoline / Regular Tank Material- Mod Impressed Current Cathodic Protection-None ATG INCON / TS-1001 with SCALD LTT Test Feb. 20, 2025 LLD Test Feb. 20, 2025 Pipe Material- Mod Bare Steel / Cathodically Protected Pipe type/STP Cont Pressurized / No STP Flex Connectors Combined Steel Flex CP LLD Model Vaporless LD2000 Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test June 16, 2022 CP Pipe Test June 16, 2022 Tank ID/Alt ID 2 / 2 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc May 2, 1971 / 10000 / West Substance Stored Gasoline / Premium Tank Material- Mod Impressed Current Cathodic Protection-None ATG INCON / TS-1001 with SCALD LTT Test Feb. 20, 2025 LLD Test Feb. 20, 2025 Pipe Material- Mod Bare Steel / Cathodically Protected Pipe type/STP Cont Pressurized / No STP Flex Connectors Combined Steel Flex CP LLD Model FE Petro MLD (blue) Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test June 16, 2022 CP Pipe Test June 16, 2022 INSPECTION COMMENTS 2025-04-03 Page 1 of 6 None 2025-04-03 Page 2 of 6 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?No Is the site unmanned?No C Operators trained?Yes Cathodic Protection Impressed current system is checked for proper operations at least every 60 days and the results of the last three checks are available? Yes The results of the last two cathodic protection tests are available (within six months of installation and every three years thereafter)? Yes Financial Responsibility Financial responsibility method is ok?Yes TANK RESPONSES Tank 1 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank 1 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. No ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 1 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 1 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 1 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 2 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 2 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes 2025-04-03 Page 3 of 6 Tank 1 ATG/IM Does the ATG system have a valid annual test?Yes Tank 2 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank 2 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. No ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 2 ATG/IM Does the ATG system have a valid annual test?Yes Tank 2 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes DISPENSER RESPONSES 2025-04-03 Page 4 of 6 Dispenser 3/4 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1/2 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes MONTHLY LEAK DETECTION MONITORING Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25 Tank 1 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 2 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS TANK 1 No Photos Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Comments:None TANK 2 No Photos Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Comments:None FACILITY No Photos Question:Monthly checklist available and complete? Comments:None 2025-04-03 Page 5 of 6 Prepared by fueloperator.com Inspection Information Inspector:Warner, Sean Record Created:April 3, 2025, 11:04 a.m. Inspection Date:April 3, 2025 2025-04-03 Page 6 of 6