HomeMy WebLinkAboutDWQ-2024-007996Study Date: September 1, 2021 Last Saved: March 14, 2022 SANITARY SEWER IMPACT FEE FACILITIES PLAN CHAIR MIRANDA MENZIES TRUSTEES JON BINGHAM DON STEFANIK HENRY (BUD) HUCHEL PAM YOUNG SYSTEM MANAGER ROB THOMAS Prepared by: SIGNATURE DATE Sanitary Sewer Impact Fee Facilities Plan Contents R:\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\2021 WCWSID Sewer IFFP_2022-03-14.docx 968 Chambers St. #5 South Ogden, Utah 84403 Phone: (801) 476-0202 Info@gecivil.com TABLE OF CONTENTS Page No. EXECUTIVE SUMMARY – ........................................................................................................................... S-1 Certification of Compliance. ...................................................................................................................... S-4 CHAPTER 1 – INTRODUCTION … ............................................................................................................... 1-1 CHAPTER 2 – EXISTING SYSTEM... ............................................................................................................ 2-1 CHAPTER 3 – FUTURE GROWTH........ ....................................................................................................... 3-1 CHAPTER 4 –COLLECTION SYSTEM HYDRAULIC MODELING .................................. ................................. 4-1 CHAPTER 5 – CAPACITY ANALYSIS................................... ......................................................................... 5-1 Evaluation Criteria and Level of Service....................... ............................................................................. 5-1 Level of Service ..................................... ................................................................................................... 5-1 Excess Capacity / Capacity Analysis .................................. ....................................................................... 5-2 CHAPTER 6 – RECOMMENDED IMPROVEMENTS................ ..................................................................... 6-1 APPENDIX Page Content 1. SM1 - Sewer Master Plan 2. SM2 – Sewer Model Existing Sewer System - Pipes 3. SM3 - Sewer Model Existing Sewer System - Structures 4. SM4 – Injected Existing Flows 5. SM5 – Injected Future Flows 6. CP1 - Construction Projects 7. CP2 - Construction Projects 8. Thru 11. Table 1: Existing ERUs with Existing Infrastructure Model Results 12. Thru 15. Table 2: Existing ERUs with Improvements needed at Present Model Results 16. Thru 19. Table 3: Buildout ERUs with Improvements needed at Present Model Results 20. Thru 23. Table 4: Buildout ERUs with Improvements needed for Buildout Model Results 24. Project 1 Cost Estimate 25. Project 2 Cost Estimate 26. Project 3 Cost Estimate 27. Project 4 Cost Estimate 28. Project 5 Pond Cost Estimate 29. Project 5 Transmission Line and Pumping Facilities Cost Estimate Sanitary Sewer Impact Fee Facilities Plan Executive Summary Wolf Creek Water and Sewer PAGE S-1 Ex. LOS Date: September 1, 2021 Improvement District Last Saved: March 14, 2022 EXECUTIVE SUMMARY This Impact Fee Facility Plan (IFFP) is a document that considers the sanitary sewer collection needs, limited aspects of wastewater treatment, and treated effluent disposal within the Wolf Creek Water and Sewer Improvement District (WCWSID) boundary through buildout. The primary purpose of this plan is to identify projects that are growth related, or in other terms, impact fee eligible. Projects needed to address existing capacity deficiencies will also be identified. It is recommended where improvements are needed both at present to correct deficiencies and will also need further improvement to handle buildout conditions, that new sewer lines be constructed to buildout sizes. The IFFP will be completed following the requirements of Section 11-36a of Utah code, including level of service and excess capacity. The Impact Fee Analysis (IFA) will be completed in a separate document. SYSTEM GROWTH A hydraulic model of the existing and proposed future pipelines has been created to determine peak flows for existing and buildout conditions. The existing condition model consists of Equivalent Residential Units (ERUs) active at the time of the study. The buildout condition model consists of existing and future ERUs, based on platted parcels and current development master plans within the District boundary. The number of existing ERUs reported by the District at the time of the study is 1,114. This consists of 1,099 domestic and 15 commercial units. It is projected that 2,441 ERUs will be served by WCWSID at buildout. Only future development within the existing WCWSID boundary was considered in the projected ERUs. Peak flows were determined for each condition using existing and projected ERUs and then modeled to determine capacity usage in pipelines. Peak flows were based on 100 gallons per capita per day, 3 persons per household and a peaking factor of 2.5. The modeled flows closely reflect realized flows and are considered accurate.1 1 SCADA data available for the year 2020 indicates that the actual peak flow during the year (March) was 12% higher than the value calculated for use in the model. However, it appears that the peak flow is present due to inflow and infiltration of snowmelt and surface water (I&I). If the second highest peak (during the dry month of July when peak flows are more likely not affected by I&I), the recorded peak flow was 12% lower than the value calculated for use in the model. The District’s efforts to reduce or eliminate illegal discharges of roof drains, trench drains and sump drains have been met with success and it is anticipated that continued efforts will meet with success to drastically reduce I&I to the point where the calculated peak flows as mentioned in the body of this paragraph are substantially equal to actual peak flow rates. Sanitary Sewer Impact Fee Facilities Plan Executive Summary Wolf Creek Water and Sewer PAGE S-2 Ex. LOS Date: September 1, 2021 Improvement District Last Saved: March 14, 2022 HISTORICAL DATA Miscellaneous historical data are shown in the following table for informational reference. Table T-1, Miscellaneous Statistics, 2010-20212 Year Domestic Commercial Total ERUs 2021 1099 15 1114 2020 1084 15 1096 2019 1062 15 1077 2018 1014 15 1029 2017 965 15 980 2016 946 13 959 2015 943 13 956 2014 938 13 951 2013 932 13 945 2012 928 13 941 2011 923 13 936 2010 918 15 933 LEVEL OF SERVICE The collection system pipes, for both existing and future conditions, were evaluated using the depth to diameter ratio (d/D) under the design flow conditions. Pipe capacity is determined by d/D values. Pipes with d/D values less than the level of service value are considered to have excess capacity. Pipes found to have d/D values at or above the level of service will be considered for replacement. The design parameters for each ERU and the District’s desired level of service are listed in Table T-2. Table T-2, Design Parameters and Level of Service Description Value Design Sewer Flow Allowance per ERU (gpd) 300 Design Flow Peaking Factor 2.5 Sewer collection system Level of Service, Maximum Acceptable Depth (d) to Diameter (D) Ratio for Peak Flow conditions, (d/D) 0.75 2 Connection data provided by WCWSID Office Manager, October 8, 2021. Sanitary Sewer Impact Fee Facilities Plan Executive Summary Wolf Creek Water and Sewer PAGE S-3 Ex. LOS Date: September 1, 2021 Improvement District Last Saved: March 14, 2022 The SCADA system is an integral part of the wastewater treatment plant’s operation. It has had a useful life of over 10 years and its replacement is anticipated to also have a useful life of over 10 years. The District’s SCADA equipment is a public facility eligible for application of the impact fee law.3 Treated effluent disposal is currently accomplished by either land application during the high-demand irrigation season, or through infiltration in rapid infiltration basins adjacent to the treatment plant. WCWSID desires to raise the level of service in the category of treated effluent disposal. The District plans to construct a 90-AF pond near the Bridges development to collect treated effluent year-round for the benefit of disposal through land application during the irrigation season. A pump station and transmission line will also need to be constructed and are shown in concept on Map CP2 in the appendix, collectively referred to as the Bridges Pond project, Project 5. The Bridges Pond project is discussed in further detail in the District’s Secondary Water IFFP. The reader is referred to the Secondary Water System IFFP. Constructing the Bridges Pond will primarily benefit the secondary water system. Thus, most of the costs (90%) of said improvements are attributed to the secondary water system and will be paid through collection of secondary water impact fees. RECOMMENDED SYSTEM IMPROVEMENTS Collection System - The current WCWSID service area was divided into 4 main trunk lines and the system was evaluated. Most of the District has a relatively steep slope and has adequate capacity. The 4 main trunk lines modeled converge at the low end of the system and eventually flow to the treatment plant in one main line. Flows from the four trunk lines converge on the west side of Wolf Creek Drive and continue to the treatment plant on Willow Brook Lane. The existing system at the lower end is inadequately sized to provide the desired level of service for existing connections, requiring improvements at present. Additional improvements are needed to accommodate buildout conditions. The recommended projects (1 through 4) are shown in table T-3 on the following page. The wastewater treatment plant requires a new SCADA system. The District has received bids to supply the needed replacements. A portion of the cost of a new SCADA system will be covered by existing ERUs through user fees and the District’s general operating funds. Future ERUs will pay for a portion through impact fees. The recommended SCADA replacement is shown as Project 6 in table T-3 on the following page. Ten percent of the benefit of the Bridges Pond is attributable to the disposal portion of the sanitary sewer system. Establishing this year-round level of service for treated effluent disposal will be new to the District and the cost of establishing the level of service for existing ERUs on the sanitary sewer system cannot be paid for through the collection of impact fees. The cost of providing the year-round level of service to future ERUs, however, is impact fee eligible. The recommended Bridges Pond is shown as Project 5 in table T-3 on the following page. Note that sequence and timing of implementation of the recommended projects will be determined based on sequence and location of development and other factors determined by the District. 3 Per Utah Code, 11-36a-102(17). Sanitary Sewer Impact Fee Facilities Plan Executive Summary Wolf Creek Water and Sewer PAGE S-4 Ex. LOS Date: September 1, 2021 Improvement District Last Saved: March 14, 2022 Table T-3, Recommended Improvement Projects Project Priority Description Estimated Total Project Cost Impact Fee Eligible Portion 1 2 Project 1 – 10” and 12” lines in Willow Brook Lane and Bypass The Villages $324,916 $193,581 2 3 Project 2 – Upsize pipes 90 and 92 at the bottom of The Villages $129,629 $62,374 3 4 Project 3 – 10” line in Creek View Drive and Willow Brook Lane $962,550 100% 4 5 Project 4 – Upsize Pipe 36 crossing Wolf Creek Drive to 12” $191,086 $107,516 5 6 Bridge Pond – Impact Fee Eligible column shows that portion of costs attributable to benefitting the sewer system that may be paid for through impact fees (10% of total project cost is attributable to benefitting the sewer system and 53.9% of that 10% is impact fee eligible) $5,321,595 $286,834 6 1 SCADA system replacement - Portion of costs (53.9%) attributable to future ERUs that may be paid for through impact fees $200,000 $107,800 CERTIFICATION of Compliance with Utah State Code (11-36a-306(1)): To the extent the following items are addressed in the IFFP dated January 2022, Gardner Engineering certifies that the following impact fee facilities plan: 1. Includes only the costs of public facilities that are: a. allowed under the Impact Fees Act; and b. actually incurred; or c. projected to be incurred or encumbered within six years after the day on which each impact fee is paid; 2. Does not include: a. costs of operation and maintenance of public facilities; b. costs for qualifying public facilities that will raise the level of service for the facilities, through impact fees, above the level of service that is supported by existing residents; c. an expense for overhead, unless the expense is calculated pursuant to a methodology that is consistent with generally accepted cost accounting practices and the methodological standards set forth by the federal Office of Management and Budget for federal grant reimbursement; and 3. Complies in each and every relevant respect with the Impact Fees Act. Sanitary Sewer Impact Fee Facilities Plan Chapter 1 Wolf Creek Water and Sewer PAGE 1-1 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 CHAPTER 1 INTRODUCTION Gardner Engineering has been retained by Wolf Creek Water and Sewer Improvement District (WCWSID, District) to help prepare an Impact Fee Facilities Plan (IFFP) for the District’s sanitary sewer system. The primary purpose of this plan is to identify projects that are growth related or impact fee eligible. Projects needed to address existing capacity deficiencies will also be identified. It is recommended that new sewer lines be constructed to buildout sizes. The IFFP will be completed following the requirements of Section 11-36a of Utah code, including level of service and excess capacity. The Impact Fee Analysis (IFA) will be included in a separate document. Future growth within the District boundary has been estimated based on current development master plans. Revisions to this document may be necessary if major changes to planning or development occur. Tasks The following are general tasks to complete the IFFP: Task 1: Existing system mapping Task 2: Identify future development (current master planning and platted open lots) Task 3: Hydraulic model of main trunk lines (existing and buildout conditions) Task 4: Identify needed improvements to serve existing and future development Task 5: Prepare IFFP document summarizing results of model and recommended improvement. DEFINITIONS CFS Cubic feet per second d/D depth of flow / Diameter of Pipe Ratio ERU Equivalent Residential Units GPD gallons per day gpdpc gallons per day per capita MGD Million gallons per day I & I Infiltration and Inflow IFFP Impact Fee Facilities Plan WCWSID Wolf Creek Water and Sewer Improvement District Sanitary Sewer Impact Fee Facilities Plan Chapter 2 Wolf Creek Water and Sewer PAGE 2-1 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 CHAPTER 2 EXISTING SYSTEM The existing WCWSID boundary was evaluated in this document. The existing collection system mapping was completed by field survey and information provided by the District Manager. Existing system mapping is included in the appendix as Sheet SM1. The existing system consists of primarily of 8” sewer lines with some 10” sewer lines. Much of the developed area within the District is on the hillside and sloping towards the treatment plant. Most of the existing sewer lines have relatively steep slopes and capacity is not an issue. In the lower areas of the system, nearer the treatment plant, the slopes are flatter with decreased capacity. Visual representations of the existing system main trunk line pipes and manholes included in the hydraulic model created for analysis of the system’s capacity are included as SM2 and SM3 in the appendix (manholes are referred to as “Structures” in the model). There are three existing sewer lift stations within the existing sanitary sewer system. Two of them serve Phases 2 and 6 of the Eagle Ridge subdivision and the third services the Ridge Townhomes. The District manager indicated that all lift stations operate properly. WCWSID is currently working to identify and address inflow and infiltration (I&I) issues on the existing system. The District will continue to repair damaged pipes and manholes and work to eliminate illegal connections from sumps, roof drains, and foundation drains. This IFFP does not include evaluation of I&I. The district currently can only meter sewer flows as they enter the treatment plant. Additional metering in specific areas would be needed to complete a detailed study of I&I. The existing WCWSID treatment plant is located at 4820 East Willow Brook Lane. The Membrane Bioreactor sewer facility was constructed in 2008 to replace a sewer lagoon system. The plant is designed to treat waste from 2,500 ERUs. The current plant capacity is sized to serve all planned development within the existing WCWSID boundary. The plant site includes 2 backup storage ponds that can be used if the plant is temporarily inoperable or flows exceed the plant’s treatment capacity. The plant’s activities are electronically monitored and controlled through use of a Supervisory Control and Data Acquisition (SCADA) system. The SCADA system needs to be replaced, as it has become technologically outdated and is becoming obsolete. Additional evaluation of the treatment plant was not within the scope of this IFFP. Once treated to appropriate water quality, the treated effluent exits the plant for disposal. Treated effluent is currently disposed of by either infiltration or land application. Infiltration occurs in rapid infiltration basins located adjacent to the treatment plant. Land application occurs during periods of high irrigation demand by pumping the treated effluent to a pond on the 9th Hole, then the treated effluent gets re-pumped into the secondary water system. Land application occurs only during the irrigation season. A redundant method of disposal by land application is being considered by the District: year-round storage of treated effluent for use during the irrigation season as a supplement to other sources of water for the secondary system. The reader is referred to the District’s Secondary Water System IFFP for additional discussion of this method of treated effluent disposal. Sanitary Sewer Impact Fee Facilities Plan Chapter 3 Wolf Creek Water and Sewer PAGE 3-1 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 CHAPTER 3 FUTURE GROWTH The service area was evaluated using existing and buildout conditions. The existing condition has been evaluated using the number of existing sewer customers4, a.k.a existing Equivalent Residential Units (ERUs). An ERU is a unit of measurement used to refer to the sanitary sewer waste of both residential and non-residential development. The number of existing ERUs reported by the District at the time of the study is 1,114. This consists of 1,099 residential and 15 non-residential units. There are a number of lots within the District boundary that have been platted but are not currently sewer customers contributing flows to the system. These platted-but-unbuilt lots are considered in the buildout condition analysis. There are several areas within the WCWSID boundary that have been master planned but are not yet platted with lots. In 2014, Weber County reviewed a proposed development master plan for the Wolf Creek Resort. Information from that master plan was used to add future, unplatted developments to the number of platted-but-unbuilt lots5 to establish a future, “buildout” condition. It is estimated that an additional 1,305 ERUs will be added to the WCWSID sanitary sewer system before buildout. Buildout ERUs are summarized on Map SM5 in the appendix. The total number of estimated ERUs that will be served by the sewer treatment plant at buildout is 2,441. The sewer treatment plant is designed to treat waste from 2,500 ERUs. Dry weather sewer flows are flows from regular water usage from sewer customers. As mentioned in Chapter 2, above, the effects of I&I flows were not evaluated in this study. The District recognizes that I&I flows have a real impact on the sanitary sewer system’s operation and continues efforts to minimize or eliminate sources of I&I. Dry weather flows were used as the contributing flows from the estimated ERUs in both the existing and buildout modeled conditions. State Code requires that sewer systems be designed based on an annual average daily rate of flow of 100 gallons per capita per day unless there are data to indicate otherwise. This flow rate includes some allowance already for infiltration and inflow. The latest census data indicates an average household size of 3 people6. The flow was modeled using a peaking factor of 2.5 to account for estimated peaks experienced each day. The modeled peak flows closely match the realized peak flows (refer to Footnote 1 on Page S-1). Table 3-1, below, shows the diurnal curve7 from which the modeled peaking factor was derived. 4 It is significant to note that “existing” ERUs are physical units connected to the system at present. 5 Indicated by a comparative review of the most recent publicly available aerial photography in the area and Weber County’ s plat maps. 6 https://www.census.gov/quickfacts/webercountyutah; accessed 2022-01-10. 7 City of Saratoga Springs, Sewer Capital Facilities Plan, May 2014, Page 4-3. Sanitary Sewer Impact Fee Facilities Plan Chapter 3 Wolf Creek Water and Sewer PAGE 3-2 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 Table 3-1, Diurnal Curve Used in Modeling the Sanitary Sewer System HYDRAULIC MODEL TIME PATTERN HOUR RATIO OF AVERAGE DAY FLOW 0 0.80 1 0.60 2 0.40 3 0.30 4 0.20 5 0.25 6 0.30 7 0.45 8 0.64 9 1.10 10 1.70 11 2.50 12 2.00 13 1.60 14 1.40 15 1.25 16 1.10 17 1.05 18 1.15 19 1.33 20 1.09 21 0.97 22 0.90 23 0.92 24 0.80 Sanitary Sewer Impact Fee Facilities Plan Chapter 4 Wolf Creek Water and Sewer PAGE 4-1 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 CHAPTER 4 COLLECTION SYSTEM HYDRAULIC MODEL A computer model of the WCWSID system was developed to determine peak flows from the existing and future conditions. The modeling software used for this study was Autodesk Storm and Sanitary Analysis. Storm and Sanitary Analysis is an extension of Autodesk Civil 3D. The existing sewer mapping has historically been maintained in Civil 3D. Plan and profile data for the sewer system was imported into the analysis software to evaluate sewer flow conditions. For the purposes of this study, 4 major trunk lines were evaluated. These lines represent the main sewer flow for Wolf Creek Water and Sewer Improvement District. The major sewer mains and manholes (referred to in the model as Structures) included in the hydraulic model are shown in the appendix as Maps SM2 and SM3. Information on the physical characteristics of the pipes included in the model were collected and assembled by Gardner Engineering. Manhole rim elevations and inverts were collected by Gardner Engineering survey crew. Please refer to the model run results on Table 1 in the Appendix for data modeled for existing conditions. Estimated flows for both existing and buildout conditions were added to the model based on ERUs for each scenario. The existing system flows were added to the model at structure locations. Engineering judgement was used to reduce the number of manholes and pipes included in the model. Where slopes were clearly steep and the number of injecting ERUs were low, no pipes and manholes were modeled but flows from future development were instead added to major trunk lines as applicable. Sanitary Sewer Impact Fee Facilities Plan Chapter 5 Wolf Creek Water and Sewer PAGE 5-1 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 CHAPTER 5 CAPACITY ANALYSIS After development of the model, a capacity analysis of the system was completed. The analysis is used to identify areas in the system where peak flows exceed the pipe capacity level of service. LEVEL OF SERVICE The collection system, for both existing and future conditions, were evaluated based on the following level of service. The level of service used is listed in Table T-2. Pipes were evaluated using the depth to diameter ratio (d/D) under the design flow conditions. Pipe capacity is determined by d/D values. Pipes with d/D values less than the level of service value are considered to have excess capacity. Pipes found to have d/D values at or above the level of service will be considered for replacement. Table T-2, Level of Service Description Value Design Sewer Flow Allowance per ERU (gpd) 300 Design Flow Peaking Factor 2.5 Maximum Allowable Depth to Diameter Ratio for Peak Flow conditions for new design 0.75 The SCADA system is an integral part of the treatment plant’s operation. It has had a useful life of over 10 years and its replacement is anticipated to also have a useful life of over 10 years. The District’s SCADA equipment is a public facility eligible for application of the impact fee law.8 Treated effluent disposal is currently accomplished by either land application during the high-demand irrigation season, or through infiltration in rapid infiltration basins adjacent to the treatment plant. WCWSID desires to raise the level of service in the category of treated effluent disposal. The District plans to construct a 90-AF pond near the Bridges development to collect treated effluent year-round for the benefit of disposal through land application during the irrigation season. A pump station and transmission line will also need to be constructed and are shown in concept on Map CP1 in the appendix. Establishing this year-round level of service for treated effluent disposal will be new to the District and the cost of establishing the level of service for existing users cannot be paid for or reimbursed through the collection of sewer impact fees. The benefits, costs and impact fees related to this method of disposal are further discussed under the heading Disposal on Page 5-6. CAPACITY ANALYSIS Future development cannot pay to correct existing deficiencies in public utilities through the collection of impact fees. Existing deficiencies in the sewer collection system were identified through use of the hydraulic model established in the previous chapter. Note that pipes modeled to carry existing peak flows at depths of flow greater than the acceptable d/D level9 have been highlighted in Table 1 in the Appendix. The pipes identified in Table 1 were then increased in size until existing peak flows were carried at an acceptable d/D level. The pipes needed to correct existing deficiencies were then included 8 Per Utah Code, 11-36a-102(17). 9 Acceptable flow depth = d/D < 75%. Refer to Table T-2, above. Sanitary Sewer Impact Fee Facilities Plan Chapter 5 Wolf Creek Water and Sewer PAGE 5-2 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 in the model and the results of running the model with the existing ERU loading plus the upsized pipes is shown in Table 2, to show that existing flow capacity deficiencies in the model were corrected with the upsized pipes. Future development will be required to install new facilities as needed to extend sewer collection service to new areas. Future connections will use excess capacity in existing facilities and, in cases where existing facilities are not adequately sized to carry flows at 75% flow depth, the facilities will need to be upsized for buildout conditions. Excess Capacity (CFS)10 available for utilization by future connections in existing (or upsized, as described on the previous page) pipes was calculated as the difference between Design Flow 75% Capacity and Peak Flow (CFS). Table 2 in the Appendix shows the Excess Capacity (CFS) available for utilization by future connections in each analyzed Main Trunkline pipe section in terms of Equivalent ERU. The same process of determining deficiencies in the existing system was also employed to determine deficiencies between the improved existing system and the buildout conditions. The deficiencies are identified in Table 3. Necessary improvements were then incorporated into the model and Table 4 presents the model run output that demonstrates that buildout flow capacity deficiencies in the model were corrected with the upsized pipes. Trunk Line 1 Trunk Line 1 (represented with a bold yellow line on Maps SM2-5 and CP1&2 in the Appendix) is relatively steep and consists of large enough pipes above the point where waste from Trunk Line 2 flows into it, that there are no deficiencies under either existing or buildout conditions. Below the intersection of Trunk Line 2, there are both existing and buildout condition deficiencies. The existing condition deficiencies are highlighted on Table 1, shown corrected in Table 2 in the Appendix, and described below. Buildout condition deficiencies are highlighted on Table 3, shown corrected in Table 4 in the Appendix, and described below. Please refer to Map SM2 in the Appendix for a representation of model pipe locations. Existing Deficiencies: 1. After Trunk Line 3 intercepts Trunk Line 1 below The Villages, Pipes 90 and 92 are undersized for existing flows, as can be seen in the highlighted rows of Table 1 in the Appendix. The existing 8” pipes need to be 10” for existing conditions. As shown in Table 2, the Excess Capacity in Pipes 90 and 92 after being upsized to correct the existing deficiency is 437 ERUs. The calculated capacities of 10” lines, given the slopes of Pipes 90 and 92 is 1,088 ERUs11 at the standard 75% flow depth. Based on the total and excess capacities, approximately (437 ERUs excess capacity / 1,088 ERU capacity at 75% flow depth) 40% of the 10” line capacity would benefit future users. 2. Pipe 91 is undersized for existing ERUs, as noted on Table 1 in the Appendix. The existing 8” pipe needs to be 10” for existing conditions. As shown in Table 2, the Excess 10 Capitalized terms in this and Chapter refer to column headings in Tables 1-4 in the Appendix. 11 The Manning equation was used to calculate the flow passed by a 10” pipe with n=0.013, at 0.40% slope and a 75% flow depth, and the resulting flow was converted to Equivalent ERUs. Sanitary Sewer Impact Fee Facilities Plan Chapter 5 Wolf Creek Water and Sewer PAGE 5-3 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 Capacity in Pipe 91 after being upsized to correct the existing deficiency is 838 ERUs. The calculated capacity of a 10” line, given the slope of Pipes 91 is 1,970 ERUs at the standard 75% flow depth. Based on the total and excess capacities, approximately (838 ERUs excess capacity / 1,970 ERU capacity at 75% flow depth) 40%12 of the 10” line capacity would benefit future users. Buildout Deficiencies: 3. Pipes 8-10 below Trunk Line 2 along Creek View Drive need to be upsized to carry buildout flows. One hundred percent of the capacity required in Pipes 8-10 would benefit future connections. Pipe 93 in Willow Brook Lane, below Creek View Drive would necessarily be upsized to prevent a reduction in pipe size as waste flows downhill. One hundred percent of the capacity increase resulting from the Pipe 93 size increase would be due to future users requiring the upsize of Pipes 8-10. Upsizing of Pipes 8-10 and 93 is collectively referred to as Project 3. 4. Pipes through the Villages would also need to be upsized for buildout flows, but an alternative improvement is preferred by the District. The preferred alternative will avoid the acute angles of pipes in the Villages: Project 1. Project 1 would divert flows from Patio Springs and points above, as well as flows from Wolf Lodge into a new line in Willow Brook Lane. Project 1 is visually presented on Sheet CP-1 in the Appendix and is highlighted in the model output on Tables 2-4 in the Appendix. It is identified with Priority 2 after the SCADA system, because the Project would address not only the existing deficiency in Pipe 91 (Pipe 91 transmits flow from all customers into the final manhole before entering the treatment plant and is therefore critical to the entire District for immediate implementation), but would also redirect a significant portion of the District’s wastewater flows around the multiple sharp angles in the pipes’ flow paths present in The Villages development. Thus, Project 1 would correct the existing deficiency in Pipe 91 and provide immediate operational improvements while preparing for the buildout needs of the other pipes in the Project. The benefit of Project 1 is shared between existing and future users, and is addressed in the calculation of project costs, included as Page 24 in the Appendix. 5. Pipes 90-92 will need to be upsized further to meet buildout flows. Future users will utilize all the Excess Capacity identified in 1. and 2., above, plus additional capacity will be needed. The additional capacity provided by upsizing beyond what is needed at present will entirely be required by future customers. 12 43% calculated value, rounded down to 40% for the convenience of matching the excess capacities of Pipes 90 and 92. Sanitary Sewer Impact Fee Facilities Plan Chapter 5 Wolf Creek Water and Sewer PAGE 5-4 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 Trunk Line 2 Trunk Line 2 (represented with a bold blue-green line on Maps SM2-5 and CP1&2 in the Appendix) is relatively steep and consists of large enough pipes that there are no identified deficiencies in flow capacity. Trunk Line 3 Trunk Line 3 (represented with a bold blue line on Maps SM2-5 and CP1&2 in the Appendix) is relatively steep and consists of large enough pipes above the point where waste from Powder Canyon and Moose Hollow enter the collection system (on the east side Wolf Creek Drive, Structure 38 in the model, refer to Maps SM4 and SM5 in the Appendix), that there are no deficiencies under either existing or buildout conditions. Below Structure 38, there are both existing and buildout condition deficiencies. The identified existing condition deficiency is highlighted on Table 1, shown corrected in Table 2 in the Appendix, and described below. The identified buildout condition deficiency is highlighted on Table 3, shown corrected in Table 4 in the Appendix, and described below. Please refer to Map SM2 in the Appendix for a representation of model pipe locations. Existing Deficiency: 6. Below the point where Powder Canyon and Moose Hollow enter the collection (Structure 38), Pipe 36 in Trunk Line 3 is undersized for existing flows, as can be seen in the highlighted row of Table 1 in the Appendix. The existing 8” pipe needs to be 10” for existing conditions. As shown in Table 2, the Excess Capacity in Pipe 36 after being upsized to correct the existing deficiency is 455 ERUs. The calculated capacity of a 10” pipe, given the slope of Pipe 36 is 1,047 ERUs13 at the standard 75% flow depth. Based on the total and excess capacities, approximately (455 ERUs excess capacity / 1,047 ERU capacity at 75% flow depth) 40%14 of the 10” line capacity would benefit future users. Buildout Deficiency: 7. Pipe 36 will need to be upsized further to meet buildout flows. Future users will utilize all the Excess Capacity identified in 6., above, plus additional capacity will be needed. The additional capacity provided by upsizing beyond what is needed at present will entirely be required by future customers. Trunk Line 4 Trunk Line 4 (represented with a bold green line on Maps SM2-5 and CP1&2 in the Appendix) is relatively steep and consists of large enough pipes that there are no identified deficiencies in flow capacity. Trunk Line 4 has adequate capacity through buildout. 13 The Manning equation was used to calculate the flow passed by a 10” pipe with n=0.013, at 0.37% slope and a 75% flow depth, and the resulting flow was converted to Equivalent ERUs. 14 43% calculated value, rounded down to 40% for the convenience of matching the excess capacities of Pipes 90 and 92. Sanitary Sewer Impact Fee Facilities Plan Chapter 5 Wolf Creek Water and Sewer PAGE 5-5 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 Treatment The SCADA system in the treatment plant is an integral cog in the treatment plant’s operations. Changes in technology have made many components of the system unserviceable and therefore obsolete. Disposal Treated effluent disposal is currently accomplished by either land application during the high- demand irrigation season, or through infiltration in rapid infiltration basins adjacent to the treatment plant. WCWSID desires to raise the level of service in the category of treated effluent disposal. Doing so will serve two primary purposes, 1) provide a significant source of additional water to the secondary system for use during the irrigation season, and 2) provide a year-round redundant means of disposal. CAPACITY ANALYSIS SUMMARY The capacity analysis identifies the needed system improvements. Chapter 6 includes a detailed description of the recommended projects. Below is a summary of the analysis and recommended improvements on each trunk line modeled. Trunk Line 1 Pipes 8 - 10, and 93, identified as Project 3 on Map CP1 in the Appendix, need to be upsized to 10” to carry buildout flows. No upsizing in these pipes is necessary for existing customers. A detailed cost estimate for Project 3 is included as Page 26 in the Appendix. Pipes 90 and 92 must be upsized to 10” to carry existing flows and must be upsized to 12” to carry buildout flows. When the District upsizes Pipes 90 and 92, the installed pipes should be the size identified for buildout conditions. Upsizing Pipes 90 and 92 is collectively referred to as Project 2 which project is shown on Map CP1 in the Appendix. A detailed cost estimate for Project 2 is included as Page 25 in the Appendix. The value of the 10” pipe capacity needed at present is not impact fee eligible, so Page 25 includes both a total project cost estimate and an impact fee eligible project cost. Pipe 91 must be upsized to 10” to carry existing flows and must be upsized to 12” to carry buildout flows. As an alternative to upsizing lines through The Villages, WCWSID is considering the construction of lines in Willow Brook Lane to replace the 8” capacity in The Villages and route all upstream flows around the acute angles present in the sewer lines through The Villages. Upsizing Pipe 91, the installation of new lines in Willow Brook Lane, and the installation of a pipe to divert upstream flows around The Villages are collectively referred to as Project 1, which project is shown on Map CP1 in the Appendix. A detailed cost estimate for Project 1 is included as Page 24 in the Appendix. The value of the new 8” lines that would redirect or replace 8” capacity through The Villages is not impact fee eligible, nor is the value of the 10” Pipe 91 capacity needed at present, so Page 24 includes both a total project cost estimate and an impact fee eligible project cost. Sanitary Sewer Impact Fee Facilities Plan Chapter 5 Wolf Creek Water and Sewer PAGE 5-6 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 Trunk Line 2 Trunk Line 2 has adequate capacity through buildout. Trunk Line 3 Pipe 36 must be upsized to 10” to carry existing flows and must be upsized to 12” to carry buildout flows. When the District upsizes Pipe 36, the installed pipe should be the size identified for buildout conditions. Upsizing Pipe 36 is referred to as Project 4 which project is shown on Map CP1 in the Appendix. A detailed cost estimate for Project 4 is included as Page 27 in the Appendix. The value of the 10” pipe capacity needed at present is not impact fee eligible, so Page 27 includes both a total project cost estimate and an impact fee eligible project cost. Trunk Line 4 Trunk Line 4 has adequate capacity through buildout. Treatment The SCADA system in the treatment plant must be replaced due to changes in technology making the system increasingly obsolete. Replacement must be done to maintain the level of service for future users that existing users have: an operating wastewater treatment plant. Disposal It is estimated that the majority (90%) of the new Bridges Pond and related pump station and transmission line will benefit the secondary system, while approximately 10% of the projects’ benefits will be for the sanitary sewer system. Sanitary Sewer Impact Fee Facilities Plan Chapter 6 Wolf Creek Water and Sewer PAGE 6-1 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 CHAPTER 6 RECOMMENDED IMPROVEMENTS The capacity analysis identified areas where additional capacity is needed for both existing and future buildout conditions. To develop cost estimates, it is assumed that deficient pipes will be replaced with the necessary upsized lines. At the time of specific project design and construction, alternative options shall be evaluated such as parallel lines or improved alignments. The following recommended projects are shown in the Appendix as Maps CP1 and CP2. Project 1 Pipe 91 in Trunk Line 1 will need to be upsized to 12” to support future growth (identified as Pipe 1C on Map CP1). It is also recommended that instead of upsizing lines through the Villages PRUD, a new 8” line in Wolf Lodge Drive (identified as Pipe 1A) and 10” lines be installed in Willow Brook Lane (identified as Pipes 1B) connecting pipes 93 and 91. This will bypass pipes 94-99 through the subdivision. Pipe 94 will be abandoned. Table 6-1 includes the estimated impact fee eligible costs for the proposed Project 1. A detailed project cost estimate is presented on Page 24 of the Appendix. Table 6-1 Project 1 Description Estimated Cost Total Cost Project 1 – Willow Brook Lane/The Villages Bypass $324,916 Project 1 – Willow Brook Lane/The Villages Bypass: Impact Fee Eligible Costs $193,581 Project 2 The model indicates that the pipes below The Villages, running between Wolf Creek Drive and Willow Brook Lane (Pipes 92 and 90) will surcharge under existing conditions and is undersized. This section of pipe needs to be upsized to a 10” for existing conditions. We recommend that this pipe be upsized to a 12” to handle the anticipated flows under the future buildout condition. The cost for this project has been divided into total project cost and impact fee eligible cost. The impact fee eligible cost is the total project cost less the material cost for the 10” pipe that is needed for existing conditions. The table below gives an estimated cost of this project. A detailed project cost estimate is presented on Page 25 of the Appendix. Table 6-2 Project 2 Description Estimated Cost Total Cost Project 2 – Upsize Pipes 92 and 90 to 12” at bottom of The Villages $129,629 Impact Fee Eligible Project 2 – Portion of Total Cost $62,374 Sanitary Sewer Impact Fee Facilities Plan Chapter 6 Wolf Creek Water and Sewer PAGE 6-2 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 Project 3 Pipes 8, 9, 10, and 93 will need to be upsized to 10” to support future growth. The pipes running in Creek View Drive are around 20 feet deep and the upsizing of said lines is not the District’s preferred method of increasing capacity. However, efforts to secure an off-roadway easement to allow shallower bury depths have proven unsuccessful to date. It is assumed that these pipes will be upsized. This project is 100% impact fee eligible. A detailed project cost estimate is presented on Page 26 of the Appendix. Table 6-3 Project 3 Description Estimated Cost Project 3 – 10” line in Creek View Drive and Willow Brook Lane $962,550 Project 4 Pipe 36 on Trunk Line 3 runs under Wolf Creek Drive. The existing pipe can physically carry flows from existing ERUs, but existing flows would be above the standard 75% flow depth for determining pipeline capacity. Thus, Pipe has reached its capacity and a 10” pipe capacity is needed at present. A 12” pipe capacity is needed for buildout conditions. It is recommended that this section be upsized to 12” to handle future flows. Table 6-4 includes a summary of the estimated cost for the proposed 12” sewer under Wolf Creek Drive. A detailed project cost estimate is presented on Page 27 of the Appendix. Table 6-4 Project 4 Description Estimated Cost Total Cost Project 4 – Upsize Wolf Creek Drive crossing to 12” (Pipe 36) $191,086 Impact Fee Eligible Project 4 – Portion of Total Cost $107,516 Project 5 The Bridges Pond and associated pump station and pipeline costs have been developed in the District’s Secondary Water System IFFP and are restated here in Table 6-5. As indicated in Chapter 5, it is estimated that 10% of the total project costs are attributable to benefits received by the Sanitary Sewer System, and of that 10%, 53.9%15 is impact fee eligible. Table 6-5 Project 5 Description Estimated Cost Total Cost Total Cost (Bridges Pond, pump facility, transmission line) $5,321,595 Portion attributable to sewer Estimated 10% of total cost benefits sewer system $532,160 Impact Fee Eligible Portion (53.9%) of costs attributable to benefitting the sewer system that may be paid for through impact fees $286,834 15 1,114 existing ERUs / 2,419 buildout ERUs = 46.1% of the attributable project cost is to establish the Treated Effluent Disposal level of service to existing users and cannot be paid for through impact fees. The remaining 53.9% of the applicable project cost is to maintain the established level of service for future users and is impact fee eligible. Sanitary Sewer Impact Fee Facilities Plan Chapter 6 Wolf Creek Water and Sewer PAGE 6-3 Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 Project 6 The SCADA system in the wastewater treatment plant is becoming obsolete after 13 years of useful life and must be replaced to maintain the level of service that is provided to existing users. It is anticipated that the needed replacement SCADA system will likewise have a useful life of over 10 years. That portion of the SCADA system replacement that will serve existing users is not impact fee eligible. The table below gives an estimated cost of this project, based on bids received by District. Table 6-6 Project 6 Description Estimated Cost Total Cost Total Cost to replace the existing, unsupportable SCADA system $200,000 IF eligible Portion (53.9%) of costs attributable to benefitting the sewer system that may be paid for through impact fees $107,800 ---End of IFFP--- Sanitary Sewer Impact Fee Facilities Plan Appendix Wolf Creek Water and Sewer Ex. LOS Date: November 1, 2021 Improvement District Last Saved: March 14, 2022 Appendix Page Content 1. SM1 - Sewer Master Plan 2. SM2 – Sewer Model Existing Sewer System - Pipes 3. SM3 - Sewer Model Existing Sewer System - Structures 4. SM4 – Injected Existing Flows 5. SM5 – Injected Future Flows 6. CP1 - Construction Projects 7. CP2 - Construction Projects 8. Thru 11. Table 1: Existing ERUs with Existing Infrastructure Model Results 12. Thru 15. Table 2: Existing ERUs with Improvements needed at Present Model Results 16. Thru 19. Table 3: Buildout ERUs with Improvements needed at Present Model Results 20. Thru 23. Table 4: Buildout ERUs with Improvements needed for Buildout Model Results 24. Project 1 Cost Estimate 25. Project 2 Cost Estimate 26. Project 3 Cost Estimate 27. Project 4 Cost Estimate 28. Project 5 Pond Cost Estimate 29. Project 5 Transmission Line and Pumping Facilities Cost Estimate BB 30 2928 2726 25 24 23 SS SSS S S SS S S S S S S S S SS S S S S S S S S S S S S PS PS PS PS PS PS PS PS EXISTING PRESSURIZED SANITARY SEWER EXISTING SANITARY SEWER KEY FUTURE SANITARY SEWER SEWER LINES ARE 8" PVC UNLESS OTHERWISE NOTED PRESSURIZED SEWER LINES ARE 4" UNLESS OTHERWISE NOTED FUTURE PRESSURIZED SANITARY SEWER WOLF CREEK IMPROVEMENT DISTRICT BB SS SS S S S S S SS S S S S S S S S SS S S S S S S S S S S S S Pipe - (49) Pipe - (46) Pipe - (47) Pipe - (48) Pipe - (50) Pipe - (51) Pipe - (22) Pipe - (23) Pipe - (24) Pipe - (25) Pipe - (26) Pipe - (27) Pipe - (28) Pipe - (29) Pipe - (30) Pipe - (37) Pipe - (38) Pipe - (39) Pipe - (40) Pipe - (41) Pipe - (42) Pipe - (43) Pipe - (44) Pipe - (45) Pipe - (52) Pipe - (53) Pipe - (54) Pipe - (100) Pipe - (101) Pipe - (102) Pipe - (55) Pipe - (56) Pipe - (57) Pipe - (58) Pipe - (59) Pipe - (60) Pipe - (61) Pipe - (62) Pipe - (63) Pipe - (64) Pipe - (65) Pipe - (66) Pipe - (67) Pipe - (68) Pipe - (69) Pipe - (70) Pipe - (71) Pipe - (72) Pipe - (75) Pipe - (76) Pipe - (77) Pipe - (78) Pipe - (18) Pipe - (31) Pipe - (32) Pipe - (33) Pipe - (73) Pipe - (79) Pipe - (80) Pipe - (81) Pipe - (82) Pipe - (83) Pipe - (84) Pipe - (85) Pipe - (86) Pipe - (87) Pipe - (88) Pipe - (89) Pipe - (103) Pipe - (1) Pipe - (2) Pipe - (3) Pipe - (4) Pipe - (5) Pipe - (6) Pipe - (7) Pipe - (19) Pipe - (74) Pipe - (34) Pipe - (35) Pipe - (36) Pipe - (90) Pipe - (91) Pipe - (92) Pipe - (98) Pipe - (99) Pipe - (97) Pipe - (8) Pipe - (10) Pipe - (93) Pipe - (94) Pipe - (95) Pipe - (96) Pipe - (9) EXISTING PRESSURIZED SANITARY SEWER MODELED SEWER LINE 2 EXISTING SANITARY SEWER MODELED SEWER LINE 3 MODELED SEWER LINE 4 MODELED SEWER LINE 1 SewerLiftStation SewerLiftStation 30 29 28 27 26 25 24 23 BB 30 29 28 27 26 25 24 23 SS SS S S S SS S S S S S S S S SS S S S S S S S S S S S S SSSS SS SS STRUCTURE - (75) STRUCTURE - (78) STRUCTURE - (33) STRUCTURE - (2) STRUCTURE - (12) STRUCTURE - (9) STRUCTURE - (21) STRUCTURE - (26) STRUCTURE - (34) STRUCTURE - (38) STRUCTURE - (50) STRUCTURE - (56) STRUCTURE - (64) STRUCTURE - (73) STRUCTURE - (89) STRUCTURE - (94) STRUCTURE - (97) STRUCTURE - (40) STRUCTURE - (30) STRUCTURE - (77) STRUCTURE - (2) STRUCTURE - (3) STRUCTURE - (4) STRUCTURE - (5) STRUCTURE - (6) STRUCTURE - (7) STRUCTURE - (8) STRUCTURE - (12) STRUCTURE - (24) STRUCTURE - (25) STRUCTURE - (26) STRUCTURE - (27) STRUCTURE - (28) STRUCTURE - (29) STRUCTURE - (30) STRUCTURE - (31) STRUCTURE - (32) STRUCTURE - (33) STRUCTURE - (34) STRUCTURE - (3) STRUCTURE - (4) STRUCTURE - (5) STRUCTURE - (6) STRUCTURE - (7) STRUCTURE - (20) STRUCTURE - (8) STRUCTURE - (11) STRUCTURE - (10) STRUCTURE - (24) STRUCTURE - (25) STRUCTURE - (28) STRUCTURE - (29) STRUCTURE - (31) STRUCTURE - (32) STRUCTURE - (35) STRUCTURE - (36) STRUCTURE - (39) STRUCTURE - (47) STRUCTURE - (48) STRUCTURE - (49) STRUCTURE - (51) STRUCTURE - (52) STRUCTURE - (53) STRUCTURE - (54) STRUCTURE - (55) STRUCTURE - (57) STRUCTURE - (58) STRUCTURE - (59) STRUCTURE - (60) STRUCTURE - (61) STRUCTURE - (62) STRUCTURE - (63) STRUCTURE - (65) STRUCTURE - (66)STRUCTURE - (67) STRUCTURE - (68) STRUCTURE - (69) STRUCTURE - (70) STRUCTURE - (71) STRUCTURE - (72)STRUCTURE - (74) STRUCTURE - (76) STRUCTURE - (79) STRUCTURE - (80) STRUCTURE - (81) STRUCTURE - (82) STRUCTURE - (83) STRUCTURE - (84) STRUCTURE - (85) STRUCTURE - (86) STRUCTURE - (87) STRUCTURE - (88) STRUCTURE - (90) STRUCTURE - (91) STRUCTURE - (92) STRUCTURE - (93) STRUCTURE - (95) STRUCTURE - (96) STRUCTURE - (98) STRUCTURE - (99) STRUCTURE - (100) STRUCTURE - (101) STRUCTURE - (102) STRUCTURE - (103) STRUCTURE - (104) STRUCTURE - (105)STRUCTURE - (37) STRUCTURE - (41) STRUCTURE - (42) STRUCTURE - (43) STRUCTURE - (44) STRUCTURE - (45) STRUCTURE - (46) STRUCTURE - (27) 30 29 28 27 26 25 24 23 BB 30 29 28 27 26 25 24 23 SS SS S S S SS S S S S S S S S SS S S S S S S S S S S S S STRUCTURE - (2) STRUCTURE - (12) STRUCTURE - (9) STRUCTURE - (21) STRUCTURE - (26) STRUCTURE - (34) STRUCTURE - (38) STRUCTURE - (50) STRUCTURE - (56) STRUCTURE - (64) STRUCTURE - (73) STRUCTURE - (89) STRUCTURE - (97) STRUCTURE - (40) STRUCTURE - (39) WOLF CREEK WATER AND SEWER DISTRICT BOUNDARY ·EXISTING MODELED ERU'S - 1114 10 ERUS 38 ERUS 35 ERUS 33 ERUS 58 ERUS 66 ERUS 100 ERUS 62 ERUS 207 ERUS 75 ERUS 36 ERUS 164 ERUS 38 ERUS 62 ERUS 119 ERUS * * * * *The CFS value shown in thistable is the average daily flow.The diurnal curve shown onTable 3-1 of the IFFP was thenapplied to this average value. 30 29 28 27 26 25 24 23 BB 30 29 28 27 26 25 24 23 SS SS S S S SS S S S S S S S S SS S S S S S S S S S S S S STRUCTURE - (75) STRUCTURE - (78) STRUCTURE - (33) STRUCTURE - (2) STRUCTURE - (12) STRUCTURE - (9) STRUCTURE - (21) STRUCTURE - (26) STRUCTURE - (34) STRUCTURE - (38) STRUCTURE - (50) STRUCTURE - (56) STRUCTURE - (64) STRUCTURE - (73) STRUCTURE - (89) STRUCTURE - (97) STRUCTURE - (40) STRUCTURE - (39) STRUCTURE - (27) WOLF CREEK WATER AND SEWER DISTRICT BOUNDARY ·EXISTING MODELED ERU'S - 1114 ·TOTAL BUILD OUT ERU'S - 2441 EAGLE'S LANDING 97 ERU'S EAGLE RIDGE 41 ERUSFUTURE ERUS 19 TOTAL ERUS 60 231 ERUS FROM THE BRIDGES22 FUTURE ERUS TOTAL 253 ERUS EAGLE RIDGE/PATIO HOMES46 ERUS PATIO SPRINGS 35 ERUS PATIO SPRINGS 33 ERUS FROM BRIDGES 153 HIDDEN OAKS 20 TOTAL 173 ERUS FROM BRIDGES 31 ERUS EDEN ESCAPE 31FUTURE EAGLE CREST 56 TOTAL 118 FAIRWAYS44 ERUS FAIRWAY OAKS/PATIO SPRINGSWOLFCREEK 120 ERUS PARCEL 1080 ERU'S THE RETREAT WOLF RIDGE PH 3&4 WOLF STAR 104 ERUS RESORT HOTEL 257 ERUS TIMESHARECASCADE MOOSE HOLLOW 140 ERUS POWDER CANYON/MOOSE HOLLOW 168 ERUS THE RIDGE 48 ERUS ELK HORN TRAPPERS RIDGE 253 ERUS HIGHLANDS 141 ERUS WOLF CREEK VILLAGES 62 ERUS WOLF LODGE 209 ERUS EXISTING PRESSURIZED SANITARY SEWER MODELED TRUNK LINE 2 EXISTING SANITARY SEWER KEY FUTURE SANITARY SEWER MODELED TRUNK LINE 3 MODELED TRUNK LINE 4 FUTURE PRESSURIZED SANITARY SEWER MODELED TRUNK LINE 1 * * * * *The CFS value shown in thistable is the average daily flow.The diurnal curve shown onTable 3-1 of the IFFP was thenapplied to this average value. SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS S S SS SS SS SS SS SS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S Pipe - (32) Pipe - (33) Pipe - (103) Pipe - (7) Pipe - (19) Pipe - (34) Pipe - (35) Pipe - (36) Pipe - (90) Pipe - (91) Pipe - (92) Pipe - (98) Pipe - (99) Pipe - (97) Pipe - (8) Pipe - (10) Pipe - (93) Pipe - (94) Pipe - (95) Pipe - (96) Pipe - (9) PROJECT 1 PIPE 1A - INSTALL 171 FEET OF 8" SEWER PIPE 1B- INSTALL 780 FEET OF 10" SEWER PIPE 1C - INSTALL 276 FEET OF 12" SEWER ·8 NEW MANHOLES PROJECT 4 ·INSTALL 268 FEET OF 12" SEWER PROJECT 2 PROJECT4 PROJECT 3 ·INSTALL 1204 FEET OF 10" SEWER ·5 NEW MANHOLES PROJECT 2 ·INSTALL 322 FEET OF 12" SEWER PROJECT 3 EXISTING SEWER NOTE: PROJECT 1 - ABANDON PIPE 94 (ROUTES TRUNK LINES 1 AND 2 TO TREATMENT PLANT) PROJECT 6 NEW SCADA SYSTEM PIPE 1A (8") PIPES 1B (10") PIPE 1C (12") ABANDON EXISTING PIPES WITH PROJECT 1 ABANDON EXISTING PIPES WITH PROJECT 1 BB 30 29 28 27 26 25 24 23 PS PS PS PS PS PS PS PS PS PS PROJECT 5 90 ACRE-FT BRIDGES POND TRANSMISSION LINE AND PUMPING FACILITIES PS PS PS PS PS PS PS PS PS PS EXISTING PRESSURIZED SANITARY SEWER EXISTING SANITARY SEWER PS PROJECT 5 - INSTALL NEW 6" REUSE LINE FUTURE SANITARY SEWER FUTURE PRESSURIZED SANITARY SEWER Element From (Inlet) To (Outlet) Length Inlet Outlet Average Pipe Manning's Peak Design Max ID Node Node Invert Invert Slope Diameter Roughness Flow Flow Flow Depth / Elevation Elevation or Height 75% Total Depth Capacity Ratio (ft) (ft) (ft) (%) (inches) (cfs) (cfs) Pipe - (1) Structure - (2) Structure - (3) 315.66 5188.61 5173.74 4.7100 8.00 0.0130 0.29 2.40 0.22 2.11 1816 Pipe - (10) Structure - (11) Structure - (12) 208.64 5113.45 5112.88 0.2700 8.00 0.0130 0.38 0.57 0.56 0.19 167 Pipe - (100) Structure - (102) Structure - (103) 46.81 5171.21 5163.71 16.0200 8.00 0.0130 0.28 4.42 0.16 4.14 3569 Pipe - (101) Structure - (103) Structure - (104) 315.36 5154.97 5142.32 4.0100 8.00 0.0130 0.28 2.21 0.23 1.93 1665 Pipe - (102) Structure - (104) Structure - (105) 227.46 5142.32 5125.91 7.2100 8.00 0.0130 0.28 2.97 0.20 2.69 2315 Pipe - (103) Structure - (105) Structure - (36) 256.85 5125.91 5100.92 9.7300 8.00 0.0130 0.28 3.45 0.18 3.17 2729 Pipe - (18) Structure - (20) Structure - (21) 226.69 5133.48 5120.11 5.9000 8.00 0.0130 0.01 2.68 0.05 2.67 2304 Pipe - (19) Structure - (21) Structure - (9) 408.88 5120.11 5118.13 0.4800 8.00 0.0130 0.06 0.77 0.18 0.71 608 Pipe - (2) Structure - (3) Structure - (4) 201.49 5173.74 5165.54 4.0700 8.00 0.0130 0.29 2.23 0.23 1.94 1671 Pipe - (22) Structure - (24) Structure - (25) 237.53 5385.41 5356.94 11.9900 8.00 0.0130 0.00 3.83 0.00 3.83 3297 Pipe - (23) Structure - (25) Structure - (26) 212.78 5356.94 5324.91 15.0500 8.00 0.0130 0.00 4.29 0.00 4.29 3694 Pipe - (24) Structure - (26) Structure - (27) 339.92 5324.91 5288.09 10.8300 8.00 0.0130 0.08 3.64 0.09 3.56 3064 Pipe - (25) Structure - (27) Structure - (28) 174.20 5288.09 5271.82 9.3400 8.00 0.0130 0.09 3.38 0.11 3.29 2832 Pipe - (26) Structure - (28) Structure - (29) 446.81 5271.82 5236.43 7.9200 8.00 0.0130 0.09 3.11 0.11 3.02 2602 Pipe - (27) Structure - (29) Structure - (30) 193.84 5236.43 5225.01 5.8900 8.00 0.0130 0.09 2.68 0.12 2.59 2233 Pipe - (28) Structure - (30) Structure - (31) 343.12 5225.01 5197.31 8.0700 8.00 0.0130 0.09 3.14 0.11 3.05 2627 Pipe - (29) Structure - (31) Structure - (32) 189.59 5197.31 5187.22 5.3200 8.00 0.0130 0.09 2.55 0.12 2.46 2118 Pipe - (3) Structure - (4) Structure - (5) 301.42 5165.54 5151.61 4.6200 8.00 0.0130 0.29 2.37 0.22 2.08 1797 Pipe - (30) Structure - (32) Structure - (33) 220.14 5187.22 5163.74 10.6700 8.00 0.0130 0.09 3.61 0.10 3.52 3032 Pipe - (31) Structure - (33) Structure - (34) 259.43 5163.74 5147.39 6.3000 8.00 0.0130 0.09 2.77 0.12 2.68 2312 Pipe - (32) Structure - (34) Structure - (35) 346.66 5147.39 5120.73 7.6900 8.00 0.0130 0.33 3.06 0.21 2.73 2356 Pipe - (33) Structure - (35) Structure - (36) 374.27 5120.73 5100.92 5.2900 8.00 0.0130 0.33 2.54 0.23 2.21 1905 Pipe - (34) Structure - (36) Structure - (37) 386.25 5100.92 5091.61 2.4100 8.00 0.0130 0.61 1.72 0.39 1.11 952 Pipe - (35) Structure - (37) Structure - (38) 203.94 5091.61 5083.20 4.1200 8.00 0.0130 0.60 2.24 0.34 1.64 1415 Pipe - (36) Structure - (38) Structure - (39) 267.45 5083.20 5082.21 0.3700 8.00 0.0130 0.69 0.67 0.77 -0.02 -15 Pipe - (37) Structure - (40) Structure - (41) 251.41 5414.09 5384.20 11.8900 8.00 0.0130 0.05 3.81 0.07 3.76 3240 Pipe - (38) Structure - (41) Structure - (42) 226.84 5384.20 5363.03 9.3300 8.00 0.0130 0.05 3.37 0.08 3.32 2865 Pipe - (39) Structure - (42) Structure - (43) 272.87 5363.03 5328.06 12.8200 8.00 0.0130 0.05 3.96 0.07 3.91 3366 Pipe - (4) Structure - (5) Structure - (6) 205.89 5151.61 5145.60 2.9200 8.00 0.0130 0.29 1.89 0.25 1.60 1377 Pipe - (40) Structure - (43) Structure - (44) 167.40 5328.06 5307.72 12.1500 8.00 0.0130 0.05 3.85 0.07 3.80 3276 Pipe - (41) Structure - (44) Structure - (45) 215.57 5307.72 5278.76 13.4300 8.00 0.0130 0.05 4.05 0.07 4.00 3446 Pipe - (42) Structure - (45) Structure - (46) 317.78 5278.76 5253.08 8.0800 8.00 0.0130 0.05 3.14 0.08 3.09 2663 Pipe - (43) Structure - (46) Structure - (47) 160.91 5253.08 5250.39 1.6700 8.00 0.0130 0.05 1.43 0.12 1.38 1187 Pipe - (44) Structure - (47) Structure - (48) 199.78 5250.39 5225.19 12.6100 8.00 0.0130 0.05 3.92 0.07 3.87 3338 Pipe - (45) Structure - (48) Structure - (49) 352.90 5225.19 5195.91 8.3000 8.00 0.0130 0.05 3.18 0.08 3.13 2700 Excess Capacity (cfs) Equivalent ERU Table 1 - Existing ERUs with Existing Infrastructure Model Results \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\01 Existing Model.xlsx 1/4 Element From (Inlet) To (Outlet) Length Inlet Outlet Average Pipe Manning's Peak Design Max ID Node Node Invert Invert Slope Diameter Roughness Flow Flow Flow Depth / Elevation Elevation or Height 75% Total Depth Capacity Ratio (ft) (ft) (ft) (%) (inches) (cfs) (cfs) Excess Capacity (cfs) Equivalent ERU Table 1 - Existing ERUs with Existing Infrastructure Model Results Pipe - (46) Structure - (49) Structure - (50) 154.05 5195.91 5192.88 1.9700 8.00 0.0130 0.05 1.55 0.11 1.50 1293 Pipe - (47) Structure - (50) Structure - (51) 403.04 5192.88 5190.88 0.5000 8.00 0.0130 0.25 0.78 0.36 0.53 458 Pipe - (48) Structure - (51) Structure - (52) 301.21 5190.88 5189.33 0.5100 8.00 0.0130 0.24 0.79 0.36 0.55 473 Pipe - (49) Structure - (52) Structure - (53) 369.74 5189.33 5187.54 0.4800 8.00 0.0130 0.24 0.77 0.36 0.53 453 Pipe - (5) Structure - (6) Structure - (7) 197.89 5145.60 5136.46 4.6200 8.00 0.0130 0.29 2.37 0.22 2.08 1797 Pipe - (50) Structure - (53) Structure - (54) 364.85 5187.54 5185.83 0.4700 8.00 0.0130 0.24 0.76 0.37 0.52 446 Pipe - (51) Structure - (54) Structure - (55) 171.15 5185.83 5185.15 0.4000 8.00 0.0130 0.24 0.70 0.38 0.46 395 Pipe - (52) Structure - (55) Structure - (56) 394.33 5185.15 5183.72 0.3600 8.00 0.0130 0.24 0.66 0.39 0.42 364 Pipe - (53) Structure - (56) Structure - (57) 148.03 5183.72 5182.97 0.5100 8.00 0.0130 0.28 0.79 0.39 0.51 439 Pipe - (54) Structure - (57) Structure - (102) 125.31 5182.97 5171.77 8.9400 8.00 0.0130 0.28 3.30 0.19 3.02 2605 Pipe - (55) Structure - (58) Structure - (59) 78.09 5353.65 5351.44 2.8300 8.00 0.0130 0.00 1.86 0.00 1.86 1602 Pipe - (56) Structure - (59) Structure - (60) 79.76 5351.44 5348.36 3.8600 8.00 0.0130 0.00 2.17 0.00 2.17 1871 Pipe - (57) Structure - (60) Structure - (61) 50.67 5348.36 5345.34 5.9600 8.00 0.0130 0.00 2.70 0.00 2.70 2324 Pipe - (58) Structure - (61) Structure - (62) 134.87 5345.34 5335.93 6.9800 8.00 0.0130 0.00 2.92 0.00 2.92 2515 Pipe - (59) Structure - (62) Structure - (63) 199.52 5335.93 5318.38 8.8000 8.00 0.0130 0.00 3.28 0.00 3.28 2824 Pipe - (6) Structure - (7) Structure - (8) 196.20 5136.46 5132.78 1.8800 8.00 0.0130 0.29 1.51 0.28 1.22 1056 Pipe - (60) Structure - (63) Structure - (64) 102.43 5318.38 5310.20 7.9900 8.00 0.0130 0.00 3.12 0.00 3.12 2691 Pipe - (61) Structure - (64) Structure - (65) 113.82 5310.20 5305.60 4.0400 8.00 0.0130 0.07 2.22 0.11 2.15 1853 Pipe - (62) Structure - (65) Structure - (66) 359.27 5305.60 5289.81 4.4000 8.00 0.0130 0.07 2.32 0.11 2.25 1937 Pipe - (63) Structure - (66) Structure - (67) 75.66 5289.81 5285.25 6.0300 8.00 0.0130 0.07 2.71 0.11 2.64 2278 Pipe - (64) Structure - (67) Structure - (68) 161.58 5285.25 5276.06 5.6900 8.00 0.0130 0.07 2.64 0.11 2.57 2211 Pipe - (65) Structure - (68) Structure - (69) 282.17 5276.06 5259.23 5.9600 8.00 0.0130 0.07 2.70 0.11 2.63 2264 Pipe - (66) Structure - (69) Structure - (70) 246.38 5259.23 5245.93 5.4000 8.00 0.0130 0.07 2.57 0.11 2.50 2152 Pipe - (67) Structure - (70) Structure - (71) 27.43 5245.93 5243.26 9.7400 8.00 0.0130 0.07 3.45 0.09 3.38 2911 Pipe - (68) Structure - (71) Structure - (72) 230.76 5243.26 5232.46 4.6800 8.00 0.0130 0.07 2.39 0.11 2.32 1999 Pipe - (69) Structure - (72) Structure - (73) 121.35 5232.46 5229.86 2.1400 8.00 0.0120 0.07 1.75 0.13 1.68 1449 Pipe - (7) Structure - (8) Structure - (9) 415.38 5132.78 5118.13 3.5300 8.00 0.0130 0.29 2.08 0.24 1.79 1539 Pipe - (70) Structure - (73) Structure - (74) 195.39 5229.86 5227.92 0.9900 8.00 0.0130 0.15 1.10 0.23 0.95 818 Pipe - (71) Structure - (74) Structure - (75) 137.73 5227.92 5220.42 5.4500 8.00 0.0130 0.15 2.58 0.15 2.43 2093 Pipe - (72) Structure - (75) Structure - (76) 97.58 5220.42 5216.57 3.9500 8.00 0.0130 0.15 2.20 0.17 2.05 1763 Pipe - (73) Structure - (76) Structure - (77) 316.37 5216.57 5198.54 5.7000 8.00 0.0130 0.15 2.64 0.15 2.49 2144 Pipe - (74) Structure - (77) Structure - (2) 271.52 5198.54 5188.61 3.6600 8.00 0.0130 0.15 2.11 0.17 1.96 1692 Pipe - (75) Structure - (78) Structure - (79) 269.75 5168.38 5167.51 0.3200 10.00 0.0130 0.00 1.13 0.00 1.13 977 Pipe - (76) Structure - (79) Structure - (80) 227.13 5167.51 5158.75 3.8600 10.00 0.0130 0.00 3.94 0.00 3.94 3392 Pipe - (77) Structure - (80) Structure - (81) 266.01 5158.75 5142.32 6.1800 10.00 0.0130 0.00 4.98 0.00 4.98 4291 \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\01 Existing Model.xlsx 2/4 Element From (Inlet) To (Outlet) Length Inlet Outlet Average Pipe Manning's Peak Design Max ID Node Node Invert Invert Slope Diameter Roughness Flow Flow Flow Depth / Elevation Elevation or Height 75% Total Depth Capacity Ratio (ft) (ft) (ft) (%) (inches) (cfs) (cfs) Excess Capacity (cfs) Equivalent ERU Table 1 - Existing ERUs with Existing Infrastructure Model Results Pipe - (78) Structure - (81) Structure - (82) 171.03 5142.32 5141.53 0.4600 10.00 0.0130 0.00 1.36 0.00 1.36 1171 Pipe - (79) Structure - (82) Structure - (83) 272.69 5141.53 5140.84 0.2500 10.00 0.0130 0.00 1.00 0.00 1.00 863 Pipe - (8) Structure - (9) Structure - (10) 379.03 5118.13 5115.44 0.7100 8.00 0.0130 0.38 0.93 0.42 0.55 475 Pipe - (80) Structure - (83) Structure - (84) 398.23 5140.84 5139.85 0.2500 10.00 0.0130 0.00 1.00 0.00 1.00 863 Pipe - (81) Structure - (84) Structure - (85) 190.37 5139.85 5139.27 0.3000 10.00 0.0130 0.00 1.10 0.00 1.10 945 Pipe - (82) Structure - (85) Structure - (86) 317.93 5139.27 5138.63 0.2000 10.00 0.0130 0.00 0.90 0.00 0.90 772 Pipe - (83) Structure - (86) Structure - (87) 323.79 5138.63 5137.85 0.2400 10.00 0.0130 0.00 0.98 0.00 0.98 846 Pipe - (84) Structure - (87) Structure - (88) 402.79 5137.85 5136.84 0.2500 10.00 0.0130 0.00 1.00 0.00 1.00 863 Pipe - (85) Structure - (88) Structure - (89) 216.08 5136.84 5136.24 0.2800 10.00 0.0130 0.00 1.06 0.00 1.06 913 Pipe - (86) Structure - (89) Structure - (90) 168.63 5136.24 5135.57 0.4000 10.00 0.0130 0.01 1.27 0.07 1.26 1083 Pipe - (87) Structure - (90) Structure - (91) 272.44 5135.57 5135.23 0.1200 10.00 0.0130 0.01 0.69 0.08 0.68 589 Pipe - (88) Structure - (91) Structure - (92) 268.23 5135.23 5134.27 0.3600 10.00 0.0130 0.01 1.20 0.07 1.19 1027 Pipe - (89) Structure - (92) Structure - (20) 316.39 5134.27 5133.48 0.2500 10.00 0.0130 0.01 1.00 0.08 0.99 855 Pipe - (9) Structure - (10) Structure - (11) 382.52 5115.44 5113.45 0.5200 8.00 0.0130 0.38 0.80 0.46 0.42 359 Pipe - (90) Structure - (93) Structure - (94) 191.40 5081.69 5080.92 0.4000 8.00 0.0130 0.82 0.70 0.93 -0.12 -104 Pipe - (91) Structure - (94) Out-1Pipe - (91) 311.68 5080.62 5076.54 1.3100 8.00 0.0130 0.82 1.26 0.55 0.44 383 Pipe - (92) Structure - (39) Structure - (93) 129.91 5082.21 5081.69 0.4000 8.00 0.0130 0.82 0.70 1.00 -0.12 -104 Pipe - (93) Structure - (12) Structure - (96) 328.91 5112.88 5110.92 0.6000 8.00 0.0130 0.42 0.86 0.47 0.44 376 Pipe - (94) Structure - (96) Structure - (97) 112.47 5110.92 5110.26 0.5900 8.00 0.0130 0.42 0.85 0.47 0.43 369 Pipe - (95) Structure - (97) Structure - (98) 387.03 5110.26 5092.55 4.5800 8.00 0.0130 0.56 2.36 0.32 1.80 1555 Pipe - (96) Structure - (98) Structure - (99) 155.20 5092.55 5088.49 2.6200 8.00 0.0130 0.56 1.79 0.37 1.23 1059 Pipe - (97) Structure - (99) Structure - (100) 153.41 5088.49 5087.36 0.7400 8.00 0.0130 0.56 0.95 0.52 0.39 336 Pipe - (98) Structure - (100) Structure - (101) 79.59 5087.36 5085.05 2.9000 8.00 0.0130 0.56 1.88 0.36 1.32 1139 Pipe - (99) Structure - (101) Structure - (39) 119.36 5085.05 5082.21 2.3800 8.00 0.0130 0.56 1.70 0.37 1.14 986 Pipe - (91) Structure - (94) Out-1Pipe - (91) 311.68 5080.62 5076.54 1.3100 8.00 0.0130 1.32 1.26 0.78 -0.06 -48 Pipe - (91) Structure - (94) Out-1Pipe - (91) 311.68 5080.62 5076.54 1.3100 10.00 0.0130 1.32 2.29 0.52 0.97 838 See Table 1 Page 4 for notes concerning highlighted rows \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\01 Existing Model.xlsx 3/4 J31Cell: Dan White:Note: Pipe 36 can physically carry existing flows, but not at the design flow capacity of less than 75%, and so must be upsized to carry flows at the desired level of service. J91Cell: Dan White:Note: Pipe 90: Since the upstream Pipe 92 can only pass 0.82 CFS, that's all that Pipe 90 receives in the model. The reduced flow from Pipe 92 of 0.82 CFS is still over the 75% capacity of  Pipe 90, so it was tagged as over capacity. J92Cell: Dan White:Note: Pipe 91: This pipe only receives what can pass through Pipe 92 and 90.  Pipe 91 appears to be within capacity in this table because Pipe 92 is only allowed in the model to pass its  physical capacity of 0.82 cfs. See the two shaded Pipe 91 lines at the bottom of the table for analysis if Pipes 92 and 90 are upsized to handle existing flows  J93Cell: Dan White:Note: Pipe 92: Pipe 92 can't pass all the flow coming to it.  It receives 1.32 CFS (from Pipes 99 and 36, plus an injection at structure 39) and can only pass 0.82 CFS. J102Cell: Dan White:Note: Pipe 91 with 92 and 90 upsized: If Pipes 90 and 92 could pass all existing flows to pipe 91, this row of data shows that an 8" Pipe 91 would carry existing flows but not within the  standard 75% capacity, so it needs to be upsized to a 10".  See also Table 2. J103Cell: Dan White:Note: If 90 and 92 could pass all existing flows to pipe 91, it would take a 10" Pipe 91 to pass existing flows with the 75% capacity standard. \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\01 Existing Model.xlsx 4/4 Element From (Inlet) To (Outlet) Length Inlet Outlet Average Pipe Manning's Peak Design Max ID Node Node Invert Invert Slope Diameter Roughness Flow Flow Flow Depth / Elevation Elevation or Height 75% Total Depth Capacity Ratio (ft) (ft) (ft) (%) (inches) (cfs) (cfs) Pipe - (1) Structure - (2) Structure - (3) 315.66 5188.61 5173.74 4.7100 8.00 0.0130 0.29 2.40 0.22 2.11 1816 Pipe - (10) Structure - (11) Structure - (12) 208.64 5113.45 5112.88 0.2700 8.00 0.0130 0.38 0.57 0.56 0.19 167 Pipe - (100) Structure - (102) Structure - (103) 46.81 5171.21 5163.71 16.0200 8.00 0.0130 0.28 4.42 0.16 4.14 3569 Pipe - (101) Structure - (103) Structure - (104) 315.36 5154.97 5142.32 4.0100 8.00 0.0130 0.28 2.21 0.23 1.93 1665 Pipe - (102) Structure - (104) Structure - (105) 227.46 5142.32 5125.91 7.2100 8.00 0.0130 0.28 2.97 0.20 2.69 2315 Pipe - (103) Structure - (105) Structure - (36) 256.85 5125.91 5100.92 9.7300 8.00 0.0130 0.28 3.45 0.18 3.17 2729 Pipe - (18) Structure - (20) Structure - (21) 226.69 5133.48 5120.11 5.9000 8.00 0.0130 0.01 2.68 0.05 2.67 2304 Pipe - (19) Structure - (21) Structure - (9) 408.88 5120.11 5118.13 0.4800 8.00 0.0130 0.06 0.77 0.18 0.71 608 Pipe - (2) Structure - (3) Structure - (4) 201.49 5173.74 5165.54 4.0700 8.00 0.0130 0.29 2.23 0.23 1.94 1671 Pipe - (22) Structure - (24) Structure - (25) 237.53 5385.41 5356.94 11.9900 8.00 0.0130 0.00 3.83 0.00 3.83 3297 Pipe - (23) Structure - (25) Structure - (26) 212.78 5356.94 5324.91 15.0500 8.00 0.0130 0.00 4.29 0.00 4.29 3694 Pipe - (24) Structure - (26) Structure - (27) 339.92 5324.91 5288.09 10.8300 8.00 0.0130 0.08 3.64 0.09 3.56 3064 Pipe - (25) Structure - (27) Structure - (28) 174.20 5288.09 5271.82 9.3400 8.00 0.0130 0.09 3.38 0.11 3.29 2832 Pipe - (26) Structure - (28) Structure - (29) 446.81 5271.82 5236.43 7.9200 8.00 0.0130 0.09 3.11 0.11 3.02 2602 Pipe - (27) Structure - (29) Structure - (30) 193.84 5236.43 5225.01 5.8900 8.00 0.0130 0.09 2.68 0.12 2.59 2233 Pipe - (28) Structure - (30) Structure - (31) 343.12 5225.01 5197.31 8.0700 8.00 0.0130 0.09 3.14 0.11 3.05 2627 Pipe - (29) Structure - (31) Structure - (32) 189.59 5197.31 5187.22 5.3200 8.00 0.0130 0.09 2.55 0.12 2.46 2118 Pipe - (3) Structure - (4) Structure - (5) 301.42 5165.54 5151.61 4.6200 8.00 0.0130 0.29 2.37 0.22 2.08 1797 Pipe - (30) Structure - (32) Structure - (33) 220.14 5187.22 5163.74 10.6700 8.00 0.0130 0.09 3.61 0.10 3.52 3032 Pipe - (31) Structure - (33) Structure - (34) 259.43 5163.74 5147.39 6.3000 8.00 0.0130 0.09 2.77 0.12 2.68 2312 Pipe - (32) Structure - (34) Structure - (35) 346.66 5147.39 5120.73 7.6900 8.00 0.0130 0.33 3.06 0.21 2.73 2356 Pipe - (33) Structure - (35) Structure - (36) 374.27 5120.73 5100.92 5.2900 8.00 0.0130 0.33 2.54 0.23 2.21 1905 Pipe - (34) Structure - (36) Structure - (37) 386.25 5100.92 5091.61 2.4100 8.00 0.0130 0.61 1.72 0.39 1.11 952 Pipe - (35) Structure - (37) Structure - (38) 203.94 5091.61 5083.20 4.1200 8.00 0.0130 0.60 2.24 0.34 1.64 1415 Pipe - (36) Structure - (38) Structure - (39) 267.45 5083.20 5082.21 0.3700 10.000 0.0130 0.69 1.22 0.51 0.53 455 Pipe - (37) Structure - (40) Structure - (41) 251.41 5414.09 5384.20 11.8900 8.00 0.0130 0.05 3.81 0.07 3.76 3240 Pipe - (38) Structure - (41) Structure - (42) 226.84 5384.20 5363.03 9.3300 8.00 0.0130 0.05 3.37 0.08 3.32 2865 Pipe - (39) Structure - (42) Structure - (43) 272.87 5363.03 5328.06 12.8200 8.00 0.0130 0.05 3.96 0.07 3.91 3366 Pipe - (4) Structure - (5) Structure - (6) 205.89 5151.61 5145.60 2.9200 8.00 0.0130 0.29 1.89 0.25 1.60 1377 Pipe - (40) Structure - (43) Structure - (44) 167.40 5328.06 5307.72 12.1500 8.00 0.0130 0.05 3.85 0.07 3.80 3276 Pipe - (41) Structure - (44) Structure - (45) 215.57 5307.72 5278.76 13.4300 8.00 0.0130 0.05 4.05 0.07 4.00 3446 Pipe - (42) Structure - (45) Structure - (46) 317.78 5278.76 5253.08 8.0800 8.00 0.0130 0.05 3.14 0.08 3.09 2663 Pipe - (43) Structure - (46) Structure - (47) 160.91 5253.08 5250.39 1.6700 8.00 0.0130 0.05 1.43 0.12 1.38 1187 Pipe - (44) Structure - (47) Structure - (48) 199.78 5250.39 5225.19 12.6100 8.00 0.0130 0.05 3.92 0.07 3.87 3338 Pipe - (45) Structure - (48) Structure - (49) 352.90 5225.19 5195.91 8.3000 8.00 0.0130 0.05 3.18 0.08 3.13 2700 Excess Capacity (cfs) Equivalent ERU Table 2 - Existing ERUs with Improvements needed at Present Model Results \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\ 02 Existing modified.xlsx 1/4 Element From (Inlet) To (Outlet) Length Inlet Outlet Average Pipe Manning's Peak Design Max ID Node Node Invert Invert Slope Diameter Roughness Flow Flow Flow Depth / Elevation Elevation or Height 75% Total Depth Capacity Ratio (ft) (ft) (ft) (%) (inches) (cfs) (cfs) Excess Capacity (cfs) Equivalent ERU Table 2 - Existing ERUs with Improvements needed at Present Model Results Pipe - (46) Structure - (49) Structure - (50) 154.05 5195.91 5192.88 1.9700 8.00 0.0130 0.05 1.55 0.11 1.50 1293 Pipe - (47) Structure - (50) Structure - (51) 403.04 5192.88 5190.88 0.5000 8.00 0.0130 0.25 0.78 0.36 0.53 458 Pipe - (48) Structure - (51) Structure - (52) 301.21 5190.88 5189.33 0.5100 8.00 0.0130 0.24 0.79 0.36 0.55 473 Pipe - (49) Structure - (52) Structure - (53) 369.74 5189.33 5187.54 0.4800 8.00 0.0130 0.24 0.77 0.36 0.53 453 Pipe - (5) Structure - (6) Structure - (7) 197.89 5145.60 5136.46 4.6200 8.00 0.0130 0.29 2.37 0.22 2.08 1797 Pipe - (50) Structure - (53) Structure - (54) 364.85 5187.54 5185.83 0.4700 8.00 0.0130 0.24 0.76 0.37 0.52 446 Pipe - (51) Structure - (54) Structure - (55) 171.15 5185.83 5185.15 0.4000 8.00 0.0130 0.24 0.70 0.38 0.46 395 Pipe - (52) Structure - (55) Structure - (56) 394.33 5185.15 5183.72 0.3600 8.00 0.0130 0.24 0.66 0.39 0.42 364 Pipe - (53) Structure - (56) Structure - (57) 148.03 5183.72 5182.97 0.5100 8.00 0.0130 0.28 0.79 0.39 0.51 439 Pipe - (54) Structure - (57) Structure - (102) 125.31 5182.97 5171.77 8.9400 8.00 0.0130 0.28 3.30 0.19 3.02 2605 Pipe - (55) Structure - (58) Structure - (59) 78.09 5353.65 5351.44 2.8300 8.00 0.0130 0.00 1.86 0.00 1.86 1602 Pipe - (56) Structure - (59) Structure - (60) 79.76 5351.44 5348.36 3.8600 8.00 0.0130 0.00 2.17 0.00 2.17 1871 Pipe - (57) Structure - (60) Structure - (61) 50.67 5348.36 5345.34 5.9600 8.00 0.0130 0.00 2.70 0.00 2.70 2324 Pipe - (58) Structure - (61) Structure - (62) 134.87 5345.34 5335.93 6.9800 8.00 0.0130 0.00 2.92 0.00 2.92 2515 Pipe - (59) Structure - (62) Structure - (63) 199.52 5335.93 5318.38 8.8000 8.00 0.0130 0.00 3.28 0.00 3.28 2824 Pipe - (6) Structure - (7) Structure - (8) 196.20 5136.46 5132.78 1.8800 8.00 0.0130 0.29 1.51 0.28 1.22 1056 Pipe - (60) Structure - (63) Structure - (64) 102.43 5318.38 5310.20 7.9900 8.00 0.0130 0.00 3.12 0.00 3.12 2691 Pipe - (61) Structure - (64) Structure - (65) 113.82 5310.20 5305.60 4.0400 8.00 0.0130 0.07 2.22 0.11 2.15 1853 Pipe - (62) Structure - (65) Structure - (66) 359.27 5305.60 5289.81 4.4000 8.00 0.0130 0.07 2.32 0.11 2.25 1937 Pipe - (63) Structure - (66) Structure - (67) 75.66 5289.81 5285.25 6.0300 8.00 0.0130 0.07 2.71 0.11 2.64 2278 Pipe - (64) Structure - (67) Structure - (68) 161.58 5285.25 5276.06 5.6900 8.00 0.0130 0.07 2.64 0.11 2.57 2211 Pipe - (65) Structure - (68) Structure - (69) 282.17 5276.06 5259.23 5.9600 8.00 0.0130 0.07 2.70 0.11 2.63 2264 Pipe - (66) Structure - (69) Structure - (70) 246.38 5259.23 5245.93 5.4000 8.00 0.0130 0.07 2.57 0.11 2.50 2152 Pipe - (67) Structure - (70) Structure - (71) 27.43 5245.93 5243.26 9.7400 8.00 0.0130 0.07 3.45 0.09 3.38 2911 Pipe - (68) Structure - (71) Structure - (72) 230.76 5243.26 5232.46 4.6800 8.00 0.0130 0.07 2.39 0.11 2.32 1999 Pipe - (69) Structure - (72) Structure - (73) 121.35 5232.46 5229.86 2.1400 8.00 0.0120 0.07 1.75 0.13 1.68 1449 Pipe - (7) Structure - (8) Structure - (9) 415.38 5132.78 5118.13 3.5300 8.00 0.0130 0.29 2.08 0.24 1.79 1539 Pipe - (70) Structure - (73) Structure - (74) 195.39 5229.86 5227.92 0.9900 8.00 0.0130 0.15 1.10 0.23 0.95 818 Pipe - (71) Structure - (74) Structure - (75) 137.73 5227.92 5220.42 5.4500 8.00 0.0130 0.15 2.58 0.15 2.43 2093 Pipe - (72) Structure - (75) Structure - (76) 97.58 5220.42 5216.57 3.9500 8.00 0.0130 0.15 2.20 0.17 2.05 1763 Pipe - (73) Structure - (76) Structure - (77) 316.37 5216.57 5198.54 5.7000 8.00 0.0130 0.15 2.64 0.15 2.49 2144 Pipe - (74) Structure - (77) Structure - (2) 271.52 5198.54 5188.61 3.6600 8.00 0.0130 0.15 2.11 0.17 1.96 1692 Pipe - (75) Structure - (78) Structure - (79) 269.75 5168.38 5167.51 0.3200 10.00 0.0130 0.00 1.13 0.00 1.13 977 Pipe - (76) Structure - (79) Structure - (80) 227.13 5167.51 5158.75 3.8600 10.00 0.0130 0.00 3.94 0.00 3.94 3392 Pipe - (77) Structure - (80) Structure - (81) 266.01 5158.75 5142.32 6.1800 10.00 0.0130 0.00 4.98 0.00 4.98 4291 \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\ 02 Existing modified.xlsx 2/4 Element From (Inlet) To (Outlet) Length Inlet Outlet Average Pipe Manning's Peak Design Max ID Node Node Invert Invert Slope Diameter Roughness Flow Flow Flow Depth / Elevation Elevation or Height 75% Total Depth Capacity Ratio (ft) (ft) (ft) (%) (inches) (cfs) (cfs) Excess Capacity (cfs) Equivalent ERU Table 2 - Existing ERUs with Improvements needed at Present Model Results Pipe - (78) Structure - (81) Structure - (82) 171.03 5142.32 5141.53 0.4600 10.00 0.0130 0.00 1.36 0.00 1.36 1171 Pipe - (79) Structure - (82) Structure - (83) 272.69 5141.53 5140.84 0.2500 10.00 0.0130 0.00 1.00 0.00 1.00 863 Pipe - (8) Structure - (9) Structure - (10) 379.03 5118.13 5115.44 0.7100 10.00 0.0130 0.38 1.69 0.42 1.31 1127 Pipe - (80) Structure - (83) Structure - (84) 398.23 5140.84 5139.85 0.2500 10.00 0.0130 0.00 1.00 0.00 1.00 863 Pipe - (81) Structure - (84) Structure - (85) 190.37 5139.85 5139.27 0.3000 10.00 0.0130 0.00 1.10 0.00 1.10 945 Pipe - (82) Structure - (85) Structure - (86) 317.93 5139.27 5138.63 0.2000 10.00 0.0130 0.00 0.90 0.00 0.90 772 Pipe - (83) Structure - (86) Structure - (87) 323.79 5138.63 5137.85 0.2400 10.00 0.0130 0.00 0.98 0.00 0.98 846 Pipe - (84) Structure - (87) Structure - (88) 402.79 5137.85 5136.84 0.2500 10.00 0.0130 0.00 1.00 0.00 1.00 863 Pipe - (85) Structure - (88) Structure - (89) 216.08 5136.84 5136.24 0.2800 10.00 0.0130 0.00 1.06 0.00 1.06 913 Pipe - (86) Structure - (89) Structure - (90) 168.63 5136.24 5135.57 0.4000 10.00 0.0130 0.01 1.27 0.07 1.26 1083 Pipe - (87) Structure - (90) Structure - (91) 272.44 5135.57 5135.23 0.1200 10.00 0.0130 0.01 0.69 0.08 0.68 589 Pipe - (88) Structure - (91) Structure - (92) 268.23 5135.23 5134.27 0.3600 10.00 0.0130 0.01 1.20 0.07 1.19 1027 Pipe - (89) Structure - (92) Structure - (20) 316.39 5134.27 5133.48 0.2500 10.00 0.0130 0.01 1.00 0.08 0.99 855 Pipe - (9) Structure - (10) Structure - (11) 382.52 5115.44 5113.45 0.5200 8.00 0.0130 0.38 0.80 0.46 0.42 359 Pipe - (90) Structure - (93) Structure - (94) 191.40 5081.69 5080.92 0.4000 10.000 0.0130 0.76 1.27 0.75 0.51 437 Pipe - (91) Structure - (94) Out-1Pipe - (91) 311.68 5080.62 5076.54 1.3100 10.000 0.0130 1.32 2.29 0.52 0.97 838 Pipe - (92) Structure - (39) Structure - (93) 129.91 5082.21 5081.69 0.4000 10.000 0.0130 0.76 1.27 0.75 0.51 437 Pipe - (93) Structure - (12) Structure - (96) 328.91 5112.88 5110.85 0.6200 8.000 0.0130 0.42 0.87 0.47 0.45 388 Pipe - (95) Structure - (97) Structure - (98) 387.03 5110.26 5092.55 4.5800 8.000 0.0130 0.00 2.36 0.00 2.36 2038 Pipe - (96) Structure - (98) Structure - (99) 155.20 5092.55 5088.49 2.6200 8.000 0.0130 0.00 1.79 0.00 1.79 1541 Pipe - (97) Structure - (99) Structure - (100) 153.41 5088.49 5087.36 0.7400 8.000 0.0130 0.00 0.95 0.00 0.95 819 Pipe - (98) Structure - (100) Structure - (101) 79.59 5087.36 5085.05 2.9000 8.000 0.0130 0.00 1.88 0.00 1.88 1621 Pipe - (99) Structure - (101) Structure - (39) 119.36 5085.05 5082.21 2.3800 8.000 0.0130 0.00 1.70 0.00 1.70 1469 PIPE-123 SSMH8 Structure - (94) 258.91 5088.05 5080.62 2.8700 10.00 0.0130 0.56 3.39 0.26 2.83 2442 PIPE-127 SSMH14 SSMH10 198.00 5108.51 5101.00 3.7900 10.00 0.0130 0.56 3.90 0.24 3.34 2878 PIPE-128 Structure - (96) SSMH14 45.00 5110.72 5105.41 11.8000 10.00 0.0130 0.56 6.88 0.22 6.32 5447 PIPE-129 SSMH10 SSMH8 253.00 5100.90 5093.70 2.8500 10.00 0.0130 0.56 3.38 0.26 2.82 2432 NP-1 Structure - (97A) Structure - (96) 216.77 5123.68 5110.92 5.8900 8.00 0.0130 0.14 2.68 0.15 2.54 2190 Pipe - (36) Must upsize from 8.00 to  10.00 to adequately serve existing ERUs Pipe - (90) Must upsize from 8.00 to  10.00 to adequately serve existing ERUs Pipe - (91) Must upsize from 8.00 to  10.00 to adequately serve existing ERUs. 8" is surcharged 10" is >75% d/D. Pipe - (92) Must upsize from 8.00 to  10.00 to adequately serve existing ERUs Project 1 is needed to prevent the need to upsize through The Villages. See Table 2 Page 4 for notes concerning highlighted rows \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\ 02 Existing modified.xlsx 3/4 H31Cell: Dan White:Note: Pipe 36 needs to be upsized to 10" to carry existing flows at less than the established 75% flow depth H91Cell: Dan White:Note: Pipe 90 needs to be upsized to 10" to carry existing flows J91Cell: Dan White:Note: Pipe 90: Note that peak flow is less than the initial "existing" scenario, because in this model run, Project 1 has been installed to take all Trunkline 1 flows and all of the Wolf  Lodge flows H92Cell: Dan White:Note: Pipe 91 needs to be 10" to carry existing flows J92Cell: Dan White:Note: Pipe 91: note that this flow IS the same as the initial "existing" conditions run, even after adding Project 1 to the model, because it is the last pipe in the model and still captures  all modeled flows, regardless of the path taken to get to it. H93Cell: Dan White:Note: Pipe 92 needs to be 10" to carry existing flows J93Cell: Dan White:Note: Pipe 92: Note that peak flow is less than the initial "existing" scenario, because in this model run, Project 1 has been installed to take all Trunkline 1 flows and all of the Wolf  Lodge flows A100Cell: Dan White:Note: Pipes 123, 127, 128, 129, 97A were created in the model to represent Project 1. \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\ 02 Existing modified.xlsx 4/4 Element From (Inlet) To (Outlet) Length Inlet Outlet Average Pipe Manning's Peak Design Max ID Node Node Invert Invert Slope Diameter Roughness Flow Flow Flow Depth / Elevation Elevation or Height 0.75% Total Depth Capacity Ratio (ft) (ft) (ft) (%) (inches) (cfs) (cfs) Pipe - (1) Structure - (2) Structure - (3) 315.66 5188.61 5173.74 4.7100 8.00 0.0130 0.57 2.40 0.32 1.83 1575 Pipe - (10) Structure - (11) Structure - (12) 208.64 5113.45 5112.88 0.2700 8.00 0.0130 0.68 0.57 1.00 -0.11 -91 Pipe - (100) Structure - (102) Structure - (103) 46.81 5171.21 5163.71 16.0200 8.00 0.0130 0.51 4.42 0.22 3.91 3371 Pipe - (101) Structure - (103) Structure - (104) 315.36 5154.97 5142.32 4.0100 8.00 0.0130 0.51 2.21 0.31 1.70 1467 Pipe - (102) Structure - (104) Structure - (105) 227.46 5142.32 5125.91 7.2100 8.00 0.0130 0.51 2.97 0.27 2.46 2117 Pipe - (103) Structure - (105) Structure - (36) 256.85 5125.91 5100.92 9.7300 8.00 0.0130 0.51 3.45 0.25 2.94 2530 Pipe - (18) Structure - (20) Structure - (21) 226.69 5133.48 5120.11 5.9000 8.00 0.0130 0.37 2.68 0.24 2.31 1994 Pipe - (19) Structure - (21) Structure - (9) 408.88 5120.11 5118.13 0.4800 8.00 0.0130 0.42 0.77 0.50 0.35 298 Pipe - (2) Structure - (3) Structure - (4) 201.49 5173.74 5165.54 4.0700 8.00 0.0130 0.57 2.23 0.33 1.66 1430 Pipe - (22) Structure - (24) Structure - (25) 237.53 5385.41 5356.94 11.9900 8.00 0.0130 0.00 3.83 0.00 3.83 3297 Pipe - (23) Structure - (25) Structure - (26) 212.78 5356.94 5324.91 15.0500 8.00 0.0130 0.00 4.29 0.00 4.29 3694 Pipe - (24) Structure - (26) Structure - (27) 339.92 5324.91 5288.09 10.8300 8.00 0.0130 0.12 3.64 0.12 3.52 3030 Pipe - (25) Structure - (27) Structure - (28) 174.20 5288.09 5271.82 9.3400 8.00 0.0130 0.21 3.38 0.16 3.17 2729 Pipe - (26) Structure - (28) Structure - (29) 446.81 5271.82 5236.43 7.9200 8.00 0.0130 0.21 3.11 0.17 2.90 2498 Pipe - (27) Structure - (29) Structure - (30) 193.84 5236.43 5225.01 5.8900 8.00 0.0130 0.21 2.68 0.18 2.47 2130 Pipe - (28) Structure - (30) Structure - (31) 343.12 5225.01 5197.31 8.0700 8.00 0.0130 0.21 3.14 0.17 2.93 2524 Pipe - (29) Structure - (31) Structure - (32) 189.59 5197.31 5187.22 5.3200 8.00 0.0130 0.21 2.55 0.19 2.34 2015 Pipe - (3) Structure - (4) Structure - (5) 301.42 5165.54 5151.61 4.6200 8.00 0.0130 0.57 2.37 0.32 1.80 1555 Pipe - (30) Structure - (32) Structure - (33) 220.14 5187.22 5163.74 10.6700 8.00 0.0130 0.21 3.61 0.16 3.40 2929 Pipe - (31) Structure - (33) Structure - (34) 259.43 5163.74 5147.39 6.3000 8.00 0.0130 0.51 2.77 0.28 2.26 1950 Pipe - (32) Structure - (34) Structure - (35) 346.66 5147.39 5120.73 7.6900 8.00 0.0130 0.67 3.06 0.30 2.39 2063 Pipe - (33) Structure - (35) Structure - (36) 374.27 5120.73 5100.92 5.2900 8.00 0.0130 0.67 2.54 0.33 1.87 1612 Pipe - (34) Structure - (36) Structure - (37) 386.25 5100.92 5091.61 2.4100 8.00 0.0130 1.19 1.72 0.58 0.53 453 Pipe - (35) Structure - (37) Structure - (38) 203.94 5091.61 5083.20 4.1200 8.00 0.0130 1.19 2.24 0.49 1.05 907 Pipe - (36) Structure - (38) Structure - (39) 267.45 5083.20 5082.21 0.3700 10.00 0.0130 1.42 1.22 0.92 -0.20 -174 Pipe - (37) Structure - (40) Structure - (41) 251.41 5414.09 5384.20 11.8900 8.00 0.0130 0.17 3.81 0.14 3.64 3136 Pipe - (38) Structure - (41) Structure - (42) 226.84 5384.20 5363.03 9.3300 8.00 0.0130 0.17 3.37 0.14 3.20 2762 Pipe - (39) Structure - (42) Structure - (43) 272.87 5363.03 5328.06 12.8200 8.00 0.0130 0.17 3.96 0.13 3.79 3262 Pipe - (4) Structure - (5) Structure - (6) 205.89 5151.61 5145.60 2.9200 8.00 0.0130 0.57 1.89 0.36 1.32 1136 Pipe - (40) Structure - (43) Structure - (44) 167.40 5328.06 5307.72 12.1500 8.00 0.0130 0.17 3.85 0.14 3.68 3172 Pipe - (41) Structure - (44) Structure - (45) 215.57 5307.72 5278.76 13.4300 8.00 0.0130 0.17 4.05 0.13 3.88 3343 Pipe - (42) Structure - (45) Structure - (46) 317.78 5278.76 5253.08 8.0800 8.00 0.0130 0.17 3.14 0.15 2.97 2560 Pipe - (43) Structure - (46) Structure - (47) 160.91 5253.08 5250.39 1.6700 8.00 0.0130 0.17 1.43 0.22 1.26 1084 Pipe - (44) Structure - (47) Structure - (48) 199.78 5250.39 5225.19 12.6100 8.00 0.0130 0.17 3.92 0.13 3.75 3234 Pipe - (45) Structure - (48) Structure - (49) 352.90 5225.19 5195.91 8.3000 8.00 0.0130 0.17 3.18 0.15 3.01 2596 Excess Capacity (cfs) Equivalent ERU Table 3 - Buildout ERUs with Improvements needed at Present Model Results \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\ 03 Buildout modified existing pipes.xlsx 1/4 Element From (Inlet) To (Outlet) Length Inlet Outlet Average Pipe Manning's Peak Design Max ID Node Node Invert Invert Slope Diameter Roughness Flow Flow Flow Depth / Elevation Elevation or Height 0.75% Total Depth Capacity Ratio (ft) (ft) (ft) (%) (inches) (cfs) (cfs) Excess Capacity (cfs) Equivalent ERU Table 3 - Buildout ERUs with Improvements needed at Present Model Results Pipe - (46) Structure - (49) Structure - (50) 154.05 5195.91 5192.88 1.9700 8.00 0.0130 0.17 1.55 0.21 1.38 1190 Pipe - (47) Structure - (50) Structure - (51) 403.04 5192.88 5190.88 0.5000 8.00 0.0130 0.48 0.78 0.52 0.30 260 Pipe - (48) Structure - (51) Structure - (52) 301.21 5190.88 5189.33 0.5100 8.00 0.0130 0.47 0.79 0.52 0.32 275 Pipe - (49) Structure - (52) Structure - (53) 369.74 5189.33 5187.54 0.4800 8.00 0.0130 0.47 0.77 0.53 0.30 255 Pipe - (5) Structure - (6) Structure - (7) 197.89 5145.60 5136.46 4.6200 8.00 0.0130 0.57 2.37 0.32 1.80 1555 Pipe - (50) Structure - (53) Structure - (54) 364.85 5187.54 5185.83 0.4700 8.00 0.0130 0.47 0.76 0.54 0.29 248 Pipe - (51) Structure - (54) Structure - (55) 171.15 5185.83 5185.15 0.4000 8.00 0.0130 0.46 0.70 0.56 0.24 206 Pipe - (52) Structure - (55) Structure - (56) 394.33 5185.15 5183.72 0.3600 8.00 0.0130 0.46 0.66 0.58 0.20 175 Pipe - (53) Structure - (56) Structure - (57) 148.03 5183.72 5182.97 0.5100 8.00 0.0130 0.51 0.79 0.56 0.28 240 Pipe - (54) Structure - (57) Structure - (102) 125.31 5182.97 5171.77 8.9400 8.00 0.0130 0.51 3.30 0.26 2.79 2407 Pipe - (55) Structure - (58) Structure - (59) 78.09 5353.65 5351.44 2.8300 8.00 0.0130 0.00 1.86 0.00 1.86 1602 Pipe - (56) Structure - (59) Structure - (60) 79.76 5351.44 5348.36 3.8600 8.00 0.0130 0.00 2.17 0.00 2.17 1871 Pipe - (57) Structure - (60) Structure - (61) 50.67 5348.36 5345.34 5.9600 8.00 0.0130 0.00 2.70 0.00 2.70 2324 Pipe - (58) Structure - (61) Structure - (62) 134.87 5345.34 5335.93 6.9800 8.00 0.0130 0.00 2.92 0.00 2.92 2515 Pipe - (59) Structure - (62) Structure - (63) 199.52 5335.93 5318.38 8.8000 8.00 0.0130 0.00 3.28 0.00 3.28 2824 Pipe - (6) Structure - (7) Structure - (8) 196.20 5136.46 5132.78 1.8800 8.00 0.0130 0.57 1.51 0.40 0.94 814 Pipe - (60) Structure - (63) Structure - (64) 102.43 5318.38 5310.20 7.9900 8.00 0.0130 0.00 3.12 0.00 3.12 2691 Pipe - (61) Structure - (64) Structure - (65) 113.82 5310.20 5305.60 4.0400 8.00 0.0130 0.20 2.22 0.19 2.02 1741 Pipe - (62) Structure - (65) Structure - (66) 359.27 5305.60 5289.81 4.4000 8.00 0.0130 0.20 2.32 0.19 2.12 1825 Pipe - (63) Structure - (66) Structure - (67) 75.66 5289.81 5285.25 6.0300 8.00 0.0130 0.20 2.71 0.18 2.51 2166 Pipe - (64) Structure - (67) Structure - (68) 161.58 5285.25 5276.06 5.6900 8.00 0.0130 0.20 2.64 0.18 2.44 2099 Pipe - (65) Structure - (68) Structure - (69) 282.17 5276.06 5259.23 5.9600 8.00 0.0130 0.20 2.70 0.18 2.50 2152 Pipe - (66) Structure - (69) Structure - (70) 246.38 5259.23 5245.93 5.4000 8.00 0.0130 0.20 2.57 0.18 2.37 2040 Pipe - (67) Structure - (70) Structure - (71) 27.43 5245.93 5243.26 9.7400 8.00 0.0130 0.20 3.45 0.16 3.25 2799 Pipe - (68) Structure - (71) Structure - (72) 230.76 5243.26 5232.46 4.6800 8.00 0.0130 0.20 2.39 0.19 2.19 1887 Pipe - (69) Structure - (72) Structure - (73) 121.35 5232.46 5229.86 2.1400 8.00 0.0130 0.20 1.62 0.23 1.42 1220 Pipe - (7) Structure - (8) Structure - (9) 415.38 5132.78 5118.13 3.5300 8.00 0.0130 0.57 2.08 0.34 1.51 1298 Pipe - (70) Structure - (73) Structure - (74) 195.39 5229.86 5227.92 0.9900 8.00 0.0130 0.25 1.10 0.31 0.85 732 Pipe - (71) Structure - (74) Structure - (75) 137.73 5227.92 5220.42 5.4500 8.00 0.0130 0.25 2.58 0.20 2.33 2007 Pipe - (72) Structure - (75) Structure - (76) 97.58 5220.42 5216.57 3.9500 8.00 0.0130 0.39 2.20 0.27 1.81 1556 Pipe - (73) Structure - (76) Structure - (77) 316.37 5216.57 5198.54 5.7000 8.00 0.0130 0.39 2.64 0.25 2.25 1937 Pipe - (74) Structure - (77) Structure - (2) 271.52 5198.54 5188.61 3.6600 8.00 0.0130 0.43 2.11 0.29 1.68 1451 Pipe - (75) Structure - (78) Structure - (79) 269.75 5168.38 5167.51 0.3200 10.00 0.0130 0.31 1.13 0.33 0.82 709 Pipe - (76) Structure - (79) Structure - (80) 227.13 5167.51 5158.75 3.8600 10.00 0.0130 0.31 3.94 0.18 3.63 3124 \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\ 03 Buildout modified existing pipes.xlsx 2/4 Element From (Inlet) To (Outlet) Length Inlet Outlet Average Pipe Manning's Peak Design Max ID Node Node Invert Invert Slope Diameter Roughness Flow Flow Flow Depth / Elevation Elevation or Height 0.75% Total Depth Capacity Ratio (ft) (ft) (ft) (%) (inches) (cfs) (cfs) Excess Capacity (cfs) Equivalent ERU Table 3 - Buildout ERUs with Improvements needed at Present Model Results Pipe - (77) Structure - (80) Structure - (81) 266.01 5158.75 5142.32 6.1800 10.00 0.0130 0.30 4.98 0.16 4.68 4033 Pipe - (78) Structure - (81) Structure - (82) 171.03 5142.32 5141.53 0.4600 10.00 0.0130 0.30 1.36 0.30 1.06 912 Pipe - (79) Structure - (82) Structure - (83) 272.69 5141.53 5140.84 0.2500 10.00 0.0130 0.30 1.00 0.35 0.70 605 Pipe - (8) Structure - (9) Structure - (10) 379.03 5118.13 5115.44 0.7100 8.00 0.0130 1.03 0.93 0.91 -0.10 -85 Pipe - (80) Structure - (83) Structure - (84) 398.23 5140.84 5139.85 0.2500 10.00 0.0130 0.30 1.00 0.36 0.70 605 Pipe - (81) Structure - (84) Structure - (85) 190.37 5139.85 5139.27 0.3000 10.00 0.0130 0.30 1.10 0.34 0.80 687 Pipe - (82) Structure - (85) Structure - (86) 317.93 5139.27 5138.63 0.2000 10.00 0.0130 0.30 0.90 0.38 0.60 513 Pipe - (83) Structure - (86) Structure - (87) 323.79 5138.63 5137.85 0.2400 10.00 0.0130 0.30 0.98 0.36 0.68 587 Pipe - (84) Structure - (87) Structure - (88) 402.79 5137.85 5136.84 0.2500 10.00 0.0130 0.30 1.00 0.35 0.70 605 Pipe - (85) Structure - (88) Structure - (89) 216.08 5136.84 5136.24 0.2800 10.00 0.0130 0.30 1.06 0.35 0.76 655 Pipe - (86) Structure - (89) Structure - (90) 168.63 5136.24 5135.57 0.4000 10.00 0.0130 0.37 1.27 0.35 0.90 773 Pipe - (87) Structure - (90) Structure - (91) 272.44 5135.57 5135.23 0.1200 10.00 0.0130 0.37 0.69 0.42 0.32 279 Pipe - (88) Structure - (91) Structure - (92) 268.23 5135.23 5134.27 0.3600 10.00 0.0130 0.37 1.20 0.36 0.83 717 Pipe - (89) Structure - (92) Structure - (20) 316.39 5134.27 5133.48 0.2500 10.00 0.0130 0.37 1.00 0.40 0.63 544 Pipe - (9) Structure - (10) Structure - (11) 382.52 5115.44 5113.45 0.5200 8.00 0.0130 0.94 0.80 1.00 -0.14 -123 Pipe - (90) Structure - (93) Structure - (94) 191.40 5081.69 5080.92 0.4000 10.00 0.0130 0.84 1.27 0.56 0.43 368 Pipe - (91) Structure - (94) Out-1Pipe - (91) 311.68 5080.62 5076.54 1.3100 10.00 0.0130 1.32 2.29 0.60 0.97 838 Pipe - (92) Structure - (39) Structure - (93) 129.91 5082.21 5081.69 0.4000 10.00 0.0130 0.84 1.27 0.56 0.43 368 Pipe - (93) Structure - (12) Structure - (96) 328.91 5112.88 5101.85 3.3500 10.00 0.0130 0.73 3.67 0.45 2.94 2530 Pipe - (95) Structure - (97) Structure - (98) 387.03 5110.26 5092.55 4.5800 8.00 0.0130 0.00 2.36 0.00 2.36 2038 Pipe - (96) Structure - (98) Structure - (99) 155.20 5092.55 5088.49 2.6200 8.04 0.0130 0.00 1.81 0.00 1.81 1562 Pipe - (97) Structure - (99) Structure - (100) 153.41 5088.49 5087.36 0.7400 8.00 0.0130 0.00 0.95 0.00 0.95 819 Pipe - (98) Structure - (100) Structure - (101) 79.59 5087.36 5085.05 2.9000 8.00 0.0130 0.00 1.88 0.00 1.88 1621 Pipe - (99) Structure - (101) Structure - (39) 119.36 5085.05 5082.21 2.3800 8.00 0.0130 0.00 1.70 0.00 1.70 1469 PIPE-123 SSMH8 Structure - (94) 258.91 5088.05 5082.64 2.0900 10.00 0.0150 0.96 2.51 0.41 1.55 1336 PIPE-127 SSMH14 SSMH10 198.00 5108.51 5101.00 3.7900 10.00 0.0150 0.96 3.38 0.35 2.42 2085 PIPE-128 Structure - (96) SSMH14 45.00 5110.72 5108.41 5.1300 10.00 0.0150 0.97 3.93 0.32 2.96 2553 PIPE-129 SSMH10 SSMH8 253.00 5100.90 5093.70 2.8500 10.00 0.0150 0.96 2.93 0.38 1.97 1698 NP-1 SSMH-97A Structure - (96) 171.67 5123.68 5110.91 7.4400 8.00 0.0130 0.24 3.01 0.18 2.77 2390 \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\ 03 Buildout modified existing pipes.xlsx 3/4 J8Cell: Dan White:Note: Pipe 10 receives 1.03 CFS at buildout and can only pass the 0.68 CFS shown here.  Pipe 10  is surcharging under buildout ERUs and must be up upsized to handle BO flows.  See  Table 4. H31Cell: Dan White:Note: Pipe 36 needs to be upsized to 10" to carry existing flows at less than the established 75% flow capacity.  10" is not sufficient for buildout flows as flow depth at the buildout  number of ERUs exceeds the 75% flow capacity. See improvements identified in Table 4. J79Cell: Dan White:Note: Pipe 8: the existing 8" is over capacity at buildout flows. See Table 4 for required improvements. J90Cell: Dan White:Note: Pipe 9 does not have the capacity to pass the flow coming to it from Pipe 8.  Pipe 9 is surcharged at the 0.94 cfs shown here.  Pipe 9 should be upgraded to handle BO flows  and is corrected on Table 4. J91Cell: Dan White:Note: Pipe 90 is restricted in this model run from "seeing" all the flows that should be coming to it, because of the restriction in Pipe 36.  The undersized pipes are all corrected in  the next run, and required improvements are identified on Table 4. J92Cell: Dan White:Note: Pipe 91 is restricted in this model run from "seeing" all the flows that should be coming to it, because of the restrictions in Pipes 9 and 36.  The undersized pipes are all  corrected in the next run, and required improvements are identified on Table 4. J93Cell: Dan White:Note: Pipe 92 is restricted in this model run from "seeing" all the flows that should be coming to it, because of the restriction in Pipe 36.  The undersized pipes are all corrected in  the next run, and required improvements are identified on Table 4. A100Cell: Dan White:Note: Pipes 123, 127, 128, 129, 97A were created in the model to represent Project 1. \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\ 03 Buildout modified existing pipes.xlsx 4/4 Element From (Inlet) To (Outlet) Length Inlet Outlet Average Pipe Manning's Peak Design Max ID Node Node Invert Invert Slope Diameter Roughness Flow Flow Flow Depth / Elevation Elevation or Height 0.75% Total Depth Capacity Ratio (ft) (ft) (ft) (%) (inches) (cfs) (cfs) Pipe - (1) Structure - (2) Structure - (3) 315.66 5188.61 5173.74 4.7100 8.00 0.0130 0.57 2.40 0.32 1.83 1575 Pipe - (10) Structure - (11) Structure - (12) 208.64 5113.45 5112.88 0.2700 10.00 0.0130 1.03 1.04 0.74 0.01 9 Pipe - (100) Structure - (102) Structure - (103) 46.81 5171.21 5163.71 16.0200 8.00 0.0130 0.51 4.42 0.22 3.91 3371 Pipe - (101) Structure - (103) Structure - (104) 315.36 5154.97 5142.32 4.0100 8.00 0.0130 0.51 2.21 0.31 1.70 1467 Pipe - (102) Structure - (104) Structure - (105) 227.46 5142.32 5125.91 7.2100 8.00 0.0130 0.51 2.97 0.27 2.46 2117 Pipe - (103) Structure - (105) Structure - (36) 256.85 5125.91 5100.92 9.7300 8.00 0.0130 0.51 3.45 0.25 2.94 2530 Pipe - (18) Structure - (20) Structure - (21) 226.69 5133.48 5120.11 5.9000 8.00 0.0130 0.37 2.68 0.24 2.31 1994 Pipe - (19) Structure - (21) Structure - (9) 408.88 5120.11 5118.13 0.4800 8.00 0.0130 0.42 0.77 0.50 0.35 298 Pipe - (2) Structure - (3) Structure - (4) 201.49 5173.74 5165.54 4.0700 8.00 0.0130 0.57 2.23 0.33 1.66 1430 Pipe - (22) Structure - (24) Structure - (25) 237.53 5385.41 5356.94 11.9900 8.00 0.0130 0.00 3.83 0.00 3.83 3297 Pipe - (23) Structure - (25) Structure - (26) 212.78 5356.94 5324.91 15.0500 8.00 0.0130 0.00 4.29 0.00 4.29 3694 Pipe - (24) Structure - (26) Structure - (27) 339.92 5324.91 5288.09 10.8300 8.00 0.0130 0.12 3.64 0.12 3.52 3030 Pipe - (25) Structure - (27) Structure - (28) 174.20 5288.09 5271.82 9.3400 8.00 0.0130 0.21 3.38 0.16 3.17 2729 Pipe - (26) Structure - (28) Structure - (29) 446.81 5271.82 5236.43 7.9200 8.00 0.0130 0.21 3.11 0.17 2.90 2498 Pipe - (27) Structure - (29) Structure - (30) 193.84 5236.43 5225.01 5.8900 8.00 0.0130 0.21 2.68 0.18 2.47 2130 Pipe - (28) Structure - (30) Structure - (31) 343.12 5225.01 5197.31 8.0700 8.00 0.0130 0.21 3.14 0.17 2.93 2524 Pipe - (29) Structure - (31) Structure - (32) 189.59 5197.31 5187.22 5.3200 8.00 0.0130 0.21 2.55 0.19 2.34 2015 Pipe - (3) Structure - (4) Structure - (5) 301.42 5165.54 5151.61 4.6200 8.00 0.0130 0.57 2.37 0.32 1.80 1555 Pipe - (30) Structure - (32) Structure - (33) 220.14 5187.22 5163.74 10.6700 8.00 0.0130 0.21 3.61 0.16 3.40 2929 Pipe - (31) Structure - (33) Structure - (34) 259.43 5163.74 5147.39 6.3000 8.00 0.0130 0.51 2.77 0.28 2.26 1950 Pipe - (32) Structure - (34) Structure - (35) 346.66 5147.39 5120.73 7.6900 8.00 0.0130 0.67 3.06 0.30 2.39 2063 Pipe - (33) Structure - (35) Structure - (36) 374.27 5120.73 5100.92 5.2900 8.00 0.0130 0.67 2.54 0.33 1.87 1612 Pipe - (34) Structure - (36) Structure - (37) 386.25 5100.92 5091.61 2.4100 8.00 0.0130 1.19 1.72 0.58 0.53 453 Pipe - (35) Structure - (37) Structure - (38) 203.94 5091.61 5083.20 4.1200 8.00 0.0130 1.19 2.24 0.49 1.05 907 Pipe - (36) Structure - (38) Structure - (39) 267.45 5083.20 5082.21 0.3700 12.00 0.0130 1.39 1.98 0.58 0.59 510 Pipe - (37) Structure - (40) Structure - (41) 251.41 5414.09 5384.20 11.8900 8.00 0.0130 0.17 3.81 0.14 3.64 3136 Pipe - (38) Structure - (41) Structure - (42) 226.84 5384.20 5363.03 9.3300 8.00 0.0130 0.17 3.37 0.14 3.20 2762 Pipe - (39) Structure - (42) Structure - (43) 272.87 5363.03 5328.06 12.8200 8.00 0.0130 0.17 3.96 0.13 3.79 3262 Pipe - (4) Structure - (5) Structure - (6) 205.89 5151.61 5145.60 2.9200 8.00 0.0130 0.57 1.89 0.36 1.32 1136 Pipe - (40) Structure - (43) Structure - (44) 167.40 5328.06 5307.72 12.1500 8.00 0.0130 0.17 3.85 0.14 3.68 3172 Pipe - (41) Structure - (44) Structure - (45) 215.57 5307.72 5278.76 13.4300 8.00 0.0130 0.17 4.05 0.13 3.88 3343 Pipe - (42) Structure - (45) Structure - (46) 317.78 5278.76 5253.08 8.0800 8.00 0.0130 0.17 3.14 0.15 2.97 2560 Pipe - (43) Structure - (46) Structure - (47) 160.91 5253.08 5250.39 1.6700 8.00 0.0130 0.17 1.43 0.22 1.26 1084 Pipe - (44) Structure - (47) Structure - (48) 199.78 5250.39 5225.19 12.6100 8.00 0.0130 0.17 3.92 0.13 3.75 3234 Pipe - (45) Structure - (48) Structure - (49) 352.90 5225.19 5195.91 8.3000 8.00 0.0130 0.17 3.18 0.15 3.01 2596 Excess Capacity (cfs) Equivalent ERU Table 4 - Buildout ERUs with Improvements needed for Buildout Model Results \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\ 04 Buildout updated pipes.xlsx 1/3 Element From (Inlet) To (Outlet) Length Inlet Outlet Average Pipe Manning's Peak Design Max ID Node Node Invert Invert Slope Diameter Roughness Flow Flow Flow Depth / Elevation Elevation or Height 0.75% Total Depth Capacity Ratio (ft) (ft) (ft) (%) (inches) (cfs) (cfs) Excess Capacity (cfs) Equivalent ERU Table 4 - Buildout ERUs with Improvements needed for Buildout Model Results Pipe - (46) Structure - (49) Structure - (50) 154.05 5195.91 5192.88 1.9700 8.00 0.0130 0.17 1.55 0.21 1.38 1190 Pipe - (47) Structure - (50) Structure - (51) 403.04 5192.88 5190.88 0.5000 8.00 0.0130 0.48 0.78 0.52 0.30 260 Pipe - (48) Structure - (51) Structure - (52) 301.21 5190.88 5189.33 0.5100 8.00 0.0130 0.47 0.79 0.52 0.32 275 Pipe - (49) Structure - (52) Structure - (53) 369.74 5189.33 5187.54 0.4800 8.00 0.0130 0.47 0.77 0.53 0.30 255 Pipe - (5) Structure - (6) Structure - (7) 197.89 5145.60 5136.46 4.6200 8.00 0.0130 0.57 2.37 0.32 1.80 1555 Pipe - (50) Structure - (53) Structure - (54) 364.85 5187.54 5185.83 0.4700 8.00 0.0130 0.47 0.76 0.54 0.29 248 Pipe - (51) Structure - (54) Structure - (55) 171.15 5185.83 5185.15 0.4000 8.00 0.0130 0.46 0.70 0.56 0.24 206 Pipe - (52) Structure - (55) Structure - (56) 394.33 5185.15 5183.72 0.3600 8.00 0.0130 0.46 0.66 0.58 0.20 175 Pipe - (53) Structure - (56) Structure - (57) 148.03 5183.72 5182.97 0.5100 8.00 0.0130 0.51 0.79 0.56 0.28 240 Pipe - (54) Structure - (57) Structure - (102) 125.31 5182.97 5171.77 8.9400 8.00 0.0130 0.51 3.30 0.26 2.79 2407 Pipe - (55) Structure - (58) Structure - (59) 78.09 5353.65 5351.44 2.8300 8.00 0.0130 0.00 1.86 0.00 1.86 1602 Pipe - (56) Structure - (59) Structure - (60) 79.76 5351.44 5348.36 3.8600 8.00 0.0130 0.00 2.17 0.00 2.17 1871 Pipe - (57) Structure - (60) Structure - (61) 50.67 5348.36 5345.34 5.9600 8.00 0.0130 0.00 2.70 0.00 2.70 2324 Pipe - (58) Structure - (61) Structure - (62) 134.87 5345.34 5335.93 6.9800 8.00 0.0130 0.00 2.92 0.00 2.92 2515 Pipe - (59) Structure - (62) Structure - (63) 199.52 5335.93 5318.38 8.8000 8.00 0.0130 0.00 3.28 0.00 3.28 2824 Pipe - (6) Structure - (7) Structure - (8) 196.20 5136.46 5132.78 1.8800 8.00 0.0130 0.57 1.51 0.40 0.94 814 Pipe - (60) Structure - (63) Structure - (64) 102.43 5318.38 5310.20 7.9900 8.00 0.0130 0.00 3.12 0.00 3.12 2691 Pipe - (61) Structure - (64) Structure - (65) 113.82 5310.20 5305.60 4.0400 8.00 0.0130 0.20 2.22 0.19 2.02 1741 Pipe - (62) Structure - (65) Structure - (66) 359.27 5305.60 5289.81 4.4000 8.00 0.0130 0.20 2.32 0.19 2.12 1825 Pipe - (63) Structure - (66) Structure - (67) 75.66 5289.81 5285.25 6.0300 8.00 0.0130 0.20 2.71 0.18 2.51 2166 Pipe - (64) Structure - (67) Structure - (68) 161.58 5285.25 5276.06 5.6900 8.00 0.0130 0.20 2.64 0.18 2.44 2099 Pipe - (65) Structure - (68) Structure - (69) 282.17 5276.06 5259.23 5.9600 8.00 0.0130 0.20 2.70 0.18 2.50 2152 Pipe - (66) Structure - (69) Structure - (70) 246.38 5259.23 5245.93 5.4000 8.00 0.0130 0.20 2.57 0.18 2.37 2040 Pipe - (67) Structure - (70) Structure - (71) 27.43 5245.93 5243.26 9.7400 8.00 0.0130 0.20 3.45 0.16 3.25 2799 Pipe - (68) Structure - (71) Structure - (72) 230.76 5243.26 5232.46 4.6800 8.00 0.0130 0.20 2.39 0.19 2.19 1887 Pipe - (69) Structure - (72) Structure - (73) 121.35 5232.46 5229.86 2.1400 8.00 0.0130 0.20 1.62 0.23 1.42 1220 Pipe - (7) Structure - (8) Structure - (9) 415.38 5132.78 5118.13 3.5300 8.00 0.0130 0.57 2.08 0.34 1.51 1298 Pipe - (70) Structure - (73) Structure - (74) 195.39 5229.86 5227.92 0.9900 8.00 0.0130 0.25 1.10 0.31 0.85 732 Pipe - (71) Structure - (74) Structure - (75) 137.73 5227.92 5220.42 5.4500 8.00 0.0130 0.25 2.58 0.20 2.33 2007 Pipe - (72) Structure - (75) Structure - (76) 97.58 5220.42 5216.57 3.9500 8.00 0.0130 0.39 2.20 0.27 1.81 1556 Pipe - (73) Structure - (76) Structure - (77) 316.37 5216.57 5198.54 5.7000 8.00 0.0130 0.39 2.64 0.25 2.25 1937 Pipe - (74) Structure - (77) Structure - (2) 271.52 5198.54 5188.61 3.6600 8.00 0.0130 0.43 2.11 0.29 1.68 1451 Pipe - (75) Structure - (78) Structure - (79) 269.75 5168.38 5167.51 0.3200 10.00 0.0130 0.31 1.13 0.33 0.82 709 Pipe - (76) Structure - (79) Structure - (80) 227.13 5167.51 5158.75 3.8600 10.00 0.0130 0.31 3.94 0.18 3.63 3124 Pipe - (77) Structure - (80) Structure - (81) 266.01 5158.75 5142.32 6.1800 10.00 0.0130 0.30 4.98 0.16 4.68 4033 \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\ 04 Buildout updated pipes.xlsx 2/3 Element From (Inlet) To (Outlet) Length Inlet Outlet Average Pipe Manning's Peak Design Max ID Node Node Invert Invert Slope Diameter Roughness Flow Flow Flow Depth / Elevation Elevation or Height 0.75% Total Depth Capacity Ratio (ft) (ft) (ft) (%) (inches) (cfs) (cfs) Excess Capacity (cfs) Equivalent ERU Table 4 - Buildout ERUs with Improvements needed for Buildout Model Results Pipe - (78) Structure - (81) Structure - (82) 171.03 5142.32 5141.53 0.4600 10.00 0.0130 0.30 1.36 0.30 1.06 912 Pipe - (79) Structure - (82) Structure - (83) 272.69 5141.53 5140.84 0.2500 10.00 0.0130 0.30 1.00 0.35 0.70 605 Pipe - (8) Structure - (9) Structure - (10) 379.03 5118.13 5115.44 0.7100 10.00 0.0130 1.03 1.69 0.53 0.66 567 Pipe - (80) Structure - (83) Structure - (84) 398.23 5140.84 5139.85 0.2500 10.00 0.0130 0.30 1.00 0.36 0.70 605 Pipe - (81) Structure - (84) Structure - (85) 190.37 5139.85 5139.27 0.3000 10.00 0.0130 0.30 1.10 0.34 0.80 687 Pipe - (82) Structure - (85) Structure - (86) 317.93 5139.27 5138.63 0.2000 10.00 0.0130 0.30 0.90 0.38 0.60 513 Pipe - (83) Structure - (86) Structure - (87) 323.79 5138.63 5137.85 0.2400 10.00 0.0130 0.30 0.98 0.36 0.68 587 Pipe - (84) Structure - (87) Structure - (88) 402.79 5137.85 5136.84 0.2500 10.00 0.0130 0.30 1.00 0.35 0.70 605 Pipe - (85) Structure - (88) Structure - (89) 216.08 5136.84 5136.24 0.2800 10.00 0.0130 0.30 1.06 0.35 0.76 655 Pipe - (86) Structure - (89) Structure - (90) 168.63 5136.24 5135.57 0.4000 10.00 0.0130 0.37 1.27 0.35 0.90 773 Pipe - (87) Structure - (90) Structure - (91) 272.44 5135.57 5135.23 0.1200 10.00 0.0130 0.37 0.69 0.42 0.32 279 Pipe - (88) Structure - (91) Structure - (92) 268.23 5135.23 5134.27 0.3600 10.00 0.0130 0.37 1.20 0.36 0.83 717 Pipe - (89) Structure - (92) Structure - (20) 316.39 5134.27 5133.48 0.2500 10.00 0.0130 0.37 1.00 0.40 0.63 544 Pipe - (9) Structure - (10) Structure - (11) 382.52 5115.44 5113.45 0.5200 10.00 0.0130 1.03 1.44 0.59 0.41 357 Pipe - (90) Structure - (93) Structure - (94) 191.40 5081.69 5080.92 0.4000 12.00 0.0130 1.46 2.06 0.59 0.60 517 Pipe - (91) Structure - (94) Out-1Pipe - (91) 311.68 5080.62 5076.54 1.3100 12.00 0.0130 2.76 3.73 0.60 0.97 835 Pipe - (92) Structure - (39) Structure - (93) 129.91 5082.21 5081.69 0.4000 12.00 0.0130 1.45 2.06 0.59 0.61 526 Pipe - (93) Structure - (12) Structure - (96) 328.91 5112.88 5101.85 3.3500 10.00 0.0130 1.06 3.67 0.57 2.61 2246 Pipe - (95) Structure - (97) Structure - (98) 387.03 5110.26 5092.55 4.5800 8.00 0.0130 0.00 2.36 0.00 2.36 2038 Pipe - (96) Structure - (98) Structure - (99) 155.20 5092.55 5088.49 2.6200 8.00 0.0130 0.00 1.79 0.00 1.79 1541 Pipe - (97) Structure - (99) Structure - (100) 153.41 5088.49 5087.36 0.7400 8.00 0.0130 0.00 0.95 0.00 0.95 819 Pipe - (98) Structure - (100) Structure - (101) 79.59 5087.36 5085.05 2.9000 8.00 0.0130 0.00 1.88 0.00 1.88 1621 Pipe - (99) Structure - (101) Structure - (39) 119.36 5085.05 5082.21 2.3800 8.00 0.0130 0.00 1.70 0.00 1.70 1469 PIPE-123 SSMH8 Structure - (94) 258.91 5088.05 5082.64 2.0900 10.00 0.0150 1.30 2.51 0.49 1.21 1043 PIPE-127 SSMH14 SSMH10 198.00 5108.51 5101.00 3.7900 10.00 0.0150 1.30 3.38 0.41 2.08 1792 PIPE-128 Structure - (96) SSMH14 45.00 5110.72 5108.41 5.1300 10.00 0.0150 1.30 3.93 0.37 2.63 2268 PIPE-129 SSMH10 SSMH8 253.00 5100.90 5093.70 2.8500 10.00 0.0150 1.30 2.93 0.44 1.63 1405 NP-1 SSMH-97A Structure - (96) 171.67 5123.68 5110.91 7.4400 8.00 0.0130 0.24 3.01 0.18 2.77 2390 Pipe - (10) Must upsize from 8.00 to  10.00 to adequately serve buildout ERUs Pipe - (36) Must upsize from 10.00 to  12.00 to adequately serve buildout ERUs Upsize from 8" to 10" needed for existing conditions Pipe - (8) Must upsize from 8.00 to  10.00 to adequately serve buildout ERUs Pipe - (9) Must upsize from 8.00 to  10.00 to adequately serve buildout ERUs Pipe - (90) Must upsize from 10.00 to  12.00 to adequately serve buildout ERUs Upsize from 8" to 10" needed for existing conditions Pipe - (91) Must upsize from 10.00 to  12.00 to adequately serve buildout ERUs Upsize from 8" to 10" needed for existing conditions Pipe - (92) Must upsize from 10.00 to  12.00 to adequately serve buildout ERUs Upsize from 8" to 10" needed for existing conditions \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\ 04 Buildout updated pipes.xlsx 3/3 ITEM DESCRITPTION QUANTITY UNITS UNIT PRICE TOTAL 1 INSTALL NEW 8" DR 18 C900 PVC PIPE (Pipe 1A)171 LF $110.00 $18,810.00 2 INSTALL NEW 10" DR 18 C900 PVC PIPE (Pipes 1B)780 LF $130.00 $101,400.00 3 INSTALL NEW 12" DR 18 C900 PVC PIPE (Pipe 91 on Map SM2, Pipe 1C on Map CP1)276 LF $150.00 $41,400.00 4 MANHOLE 8 EA $7,500.00 $60,000.00 5 BY PASS PUMPING 1 LS $10,000.00 $10,000.00 6 ABANDON EXISTING 8"322 LF $20.00 $6,440.00 7 CONNECT TO EXISTING MANHOLE 3 EA $1,500.00 $4,500.00 8 ROAD BASE 160 TON $25.00 $4,002.00 9 ASPHALT TRENCH PATCH 411 TON $170.00 $69,806.25 10 2" MINUS GRANULAR BACKFILL 640 TON $25.00 $16,008.00 11 Pipe Zone Back Fill 636 TON $22.00 $13,992.00 12 Traffic control 1 LS $20,000.00 $20,000.00 SUB TOTAL $246,148.25 12% ENGINEERING $29,537.79 20% CONTINGENCY $49,229.65 TOTAL ESTIMATED PROJECT COST $324,915.69 ITEM DESCRITPTION QUANTITY UNITS UNIT PRICE TOTAL 2 Pipes 1B - PIPE COST DIFFERENCE BETWEEN 8" NEEDED AT PRESENT TO REPLACE THE 8" CAPACITY THROUGH THE VILLAGES AND 10" NEEDED FOR BUILDOUT: DR 18 C900 PVC PIPE 780 LF $32.50 $25,350.00 3 Pipe 1C - an upsize from 8" to 10" is needed at present. 60% of capacity of 10" line is to remedy existing deficiencies. 40% of 10" capacity is for future connections, thus 40% of the cost of the 10" line needed at present is impact fee eligible. 276 LF $52.00 $14,352.00 3 Pipe 1C - PIPE COST DIFFERENCE BETWEEN 10" NEEDED FOR EXISTING CONDITIONS AND 12" NEEDED FOR BUILDOUT 276 LF $37.50 $10,350.00 4 MANHOLE 8 EA $3,750.00 $30,000.00 5 BY PASS PUMPING 1 LS $5,000.00 $5,000.00 6 ABANDON EXISTING 8"322 LF $10.00 $3,220.00 7 CONNECT TO EXISTING MANHOLE 3 EA $750.00 $2,250.00 8 ROAD BASE 160 TON $12.50 $2,001.00 9 ASPHALT TRENCH PATCH 411 TON $85.00 $34,903.13 10 2" MINUS GRANULAR BACKFILL 640 TON $12.50 $8,004.00 11 Pipe Zone Back Fill 636 TON $11.00 $6,996.00 12 Traffic control 1 LS $10,000.00 $10,000.00 SUB TOTAL $152,426.13 6% ENGINEERING $18,291.14 15% CONTINGENCY $22,863.92 IMPACT FEE ELIGIBLE PORTION OF PROJECT COST $193,581.18 WOLF CREEK WATER AND SEWER IMPROVEMENT DISTRICT COST ESTIMATE PROJECT 1 10" and 12" LINES IN WILLOW BROOK LANE and BYPASS THE VILLAGES IMPACT FEE ELIGIBLE PORTION (marginal cost of pipe plus 1/2 of other costs) \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\COST ESTIMATE-2021.xlsx\PROJECT 1 24 ITEM DESCRITPTION QUANTITY UNITS UNIT PRICE TOTAL 1 INSTALL NEW 12" DR 18 C900 PVC PIPE 322 LF $150.00 $48,300.00 2 BY PASS PUMPING 1 LS $10,000.00 $10,000.00 3 ABANDON EXISTING 8"322 LF $20.00 $6,440.00 4 CONNECT TO EXISTING MANHOLE 2 EA $3,000.00 $6,000.00 5 Pipe Zone Back Fill 187 TON $22.00 $4,114.00 6 2" MINUS GRANULAR BACKFILL 934 TON $25.00 $23,350.00 SUB TOTAL $98,204.00 12% ENGINEERING $11,784.48 20% CONTINGENCY $19,640.80 TOTAL ESTIMATED PROJECT COST $129,629.28 ITEM DESCRITPTION QUANTITY UNITS UNIT PRICE TOTAL 3 An upsize from 8" to 10" is needed at present. 60% of capacity of 10" line is to remedy existing deficiencies. 40% of 10" capacity is for future connections, thus 40% of the cost of the 10" line needed at present is impact fee eligible. See Project 1 for 10" pipe cost estimate. 322 LF $52.00 $16,744.00 1 PIPE COST DIFFERENCE BETWEEN 10" NEEDED AT PRESENT AND 12" NEEDED FOR BUILDOUT: DR 18 C900 SEWER PIPE 322 LF $37.50 $12,075.00 2 BY PASS PUMPING 1 LS $5,000.00 $5,000.00 3 ABANDON EXISTING 8"322 LF $10.00 $3,220.00 4 CONNECT TO EXISTING MANHOLE 2 EA $1,500.00 $3,000.00 5 Pipe Zone Back Fill 187 TON $11.00 $2,057.00 6 2" MINUS GRANULAR BACKFILL 934 TON $12.50 $11,675.00 SUB TOTAL $53,771.00 6% ENGINEERING $3,226.26 10% CONTINGENCY $5,377.10 IMPACT FEE ELIGIBLE PORTION OF PROJECT COST $62,374.36 IMPACT FEE ELIGIBLE PORTION (marginal cost of pipe plus 1/2 of other costs) WOLF CREEK WATER AND SEWER IMPROVEMENT DISTRICT COST ESTIMATE PROJECT 2 UPSIZE PIPES 90 and 92 AT THE BOTTOM OF THE VILLAGES \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\COST ESTIMATE- 2021.xlsx\PROJECT 2 24 ITEM DESCRITPTION QUANTITY UNITS UNIT PRICE TOTAL 1 INSTALL NEW 12" DR 18 C900 PVC PIPE 1204 LF $200.00 $240,800.00 2 5' DIAMETER MANHOLE 5 EA $8,000.00 $40,000.00 3 ABANDON EXISTING 8"1204 LF $20.00 $24,080.00 4 BY PASS PUMPING 1 LS $10,000.00 $10,000.00 5 CONNECT TO EXISTING MANHOLE 2 EA $3,000.00 $6,000.00 6 ASPHALT TRENCH PATCH 861 TON $170.00 $146,346.20 7 ROAD BASE 1514 TON $25.00 $37,850.00 8 Pipe Zone Back Fill 699 TON $22.00 $15,378.00 9 2" MINUS GRANULAR BACKFILL 7550 TON $25.00 $188,750.00 10 Traffic Control 1 LS $20,000.00 $20,000.00 SUB TOTAL $729,204.20 12% ENGINEERING $87,504.50 20% CONTINGENCY $145,840.84 TOTAL CONSTRUCTION COST $962,549.54 WOLF CREEK WATER AND SEWER IMPROVEMENT DISTRICT COST ESTIMATE PROJECT 3 12" LINE IN CREEK VIEW DRIVE AND WILLOW BROOK LANE \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\COST ESTIMATE- 2021.xlsx\PROJECT 3 24 ITEM DESCRITPTION QUANTITY UNITS UNIT PRICE TOTAL 1 INSTALL NEW 12" DR 18 C900 PVC PIPE 268 LF $150.00 $40,200.00 2 BY PASS PUMPING 1 LS $10,000.00 $10,000.00 3 ABANDON EXISTING 8"268 LF $20.00 $5,360.00 4 CONNECT TO EXISTING MANHOLE 2 EA $1,500.00 $3,000.00 5 ROAD BASE 41 TON $25.00 $1,025.00 6 ASPHALT TRENCH PATCH 32 TON $170.00 $5,440.00 7 24" STEEL CASING 66 LF $800.00 $52,800.00 8 2" MINUS GRANULAR BACKFILL 777 TON $25.00 $19,430.00 9 Pipe Zone Back Fill 195 TON $22.00 $4,290.00 10 Traffic control 1 LS $20,000.00 $20,000.00 SUB TOTAL $141,545.00 15% ENGINEERING $21,231.75 20% CONTINGENCY $28,309.00 TOTAL CONSTRUCTION COST $191,085.75 ITEM DESCRITPTION QUANTITY UNITS UNIT PRICE TOTAL 3 An upsize from 8" to 10" is needed at present. 60% of capacity of 10" line is to remedy existing deficiencies. 40% of 10" capacity is for future connections, thus 40% of the cost of the 10" line needed at present is impact fee eligible. See Project 1 for 10" pipe cost estimate. 268 LF $52.00 $13,936.00 3 PIPE COST DIFFERENCE BETWEEN 10" NEEDED AT PRESENT AND 12" NEEDED FOR BUILDOUT: DR 18 C900 PVC PIPE 268 LF $37.50 $10,050.00 4 BY PASS PUMPING 1 LS $5,000.00 $5,000.00 5 ABANDON EXISTING 8" 268 LF $10.00 $2,680.00 6 CONNECT TO EXISTING MANHOLE 2 EA $750.00 $1,500.00 7 ROAD BASE 41 TON $12.50 $512.50 8 ASPHALT TRENCH PATCH 32 TON $85.00 $2,720.00 9 24" STEEL CASING 66 LF $400.00 $26,400.00 10 2" MINUS GRANULAR BACKFILL 777 TON $12.50 $9,715.00 11 Pipe Zone Back Fill 195 TON $11.00 $2,145.00 12 Traffic control 1 LS $10,000.00 $10,000.00 SUB TOTAL $84,658.50 6% ENGINEERING $10,159.02 15% CONTINGENCY $12,698.78 IMPACT FEE ELIGIBLE PORTION OF PROJECT COST $107,516.30 WOLF CREEK WATER AND SEWER IMPROVEMENT DISTRICT COST ESTIMATE PROJECT 4 UPSIZE PIPE (36) CROSSING WOLF CREEK DRIVE IMPACT FEE ELIGIBLE PORTION (marginal cost of pipe plus 1/2 of other costs) \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\COST ESTIMATE- 2021.xlsx\PROJECT_4 24 Item # Items QTY Unit Unit Cost Total 1 Geotechnical 1 LS $82,500.00 $82,500.00 Site Preparation 2 Mobilization and Demobilization 1 LS $52,800.00 $52,800.00 3 Surveying 1 LS $19,800.00 $19,800.00 4 Clearing, Grubbing 51,600 SY $1.38 $70,950.00 5 Excavation and Preparation 182,040 CY $3.58 $650,793.00 6 Storm Water Pollution Prevention 1 LS $13,200.00 $13,200.00 Facility Construction 7 Pond Access Road 1,200 TON $19.80 $23,760.00 8 Pumping Facilities to pump into distribution system 1 LS $200,000.00 $200,000.00 9 Re-vegetation 1 LS $13,200.00 $13,200.00 10 Embankment (Structural Fill import) 34,392 CY $8.25 $283,734.00 11 10^-7 cm/s or better lining system 17,040 CY $16.50 $281,160.00 12 Protection Layer (Rounded Cobble 6"minus-12" deep) 11,312 CY $33.00 $373,307.73 13 Dam Face Riprap 4,525 CY $33.00 $149,323.09 14 Inlet / Outlet Control Structure 1 EA $66,000.00 $66,000.00 15 Outlet Piping and Appurtenances 1 LS $26,400.00 $26,400.00 16 12" Transmission Line 2,800 $106.70 $298,760.00 CONSTRUCTION SUBTOTAL $2,605,687.83 17 Engineering (12% of Construction Costs) 1 LS $312,682.54 $312,682.54 18 Contingencies (20% of Construction Costs) 1 LS $521,137.57 $521,137.57 $833,820.10 Pond Total $3,439,507.93 $/AC-FT $38,216.75 Wolf Creek Water and Sewer Improvement District Preliminary Estimate of Probable Construction Cost, 90-AF Bridges Pond Exploration Engineering and Contingency R:\2319 - Wolf Creek Water and Sewer\1901-Irr. Master Plan\DOCUMENTS\IFFP\Cost Estimates\IFFP 2019 - Storage Facilities - Estimates.xlsx 28 Item # Items QTY Unit Unit Cost Total 1 8" C-900 DR18 PVC waterline 7,934 LF $90.00 $714,060.00 2 8" Gate Valve 4 EA $2,500.00 $10,000.00 3 Saw Cut Asphalt (Length in oil) 4,830 LF $1.50 $7,245.00 3 4" Asphalt (avg 10'W) 1,208 TON $150.00 $181,200.00 4 Trench Backfill (avg 3'D x 5'W) 8,034 TON $19.50 $156,663.00 5 Base Course (avg 8"D x 10'W) 5,367 TON $20.00 $107,340.00 6 Sand Bedding (avg 2.25'D x 3.5'W) 4,218 TON $25.00 $105,450.00 7 300 GPM x 227' TDH duplex pumpstation 1 LS $200,000.00 $200,000.00 CONSTRUCTION SUBTOTAL $1,481,958.00 8 Engineering (12% of Construction Costs) 1 LS $177,834.96 $177,834.96 9 Contingencies (15% of Construction Costs) 1 LS $222,293.70 $222,293.70 $400,128.66 PROJECT TOTAL $1,882,086.66 90-AF Bridges Pond: $/AC-FT $20,912.07 Wolf Creek Water and Sewer Improvement District Preliminary Estimate of Probable Construction Cost, Pump Station and Reuse Line IDENTIFIED AS PROJECT NUMBER 5 IN SEWER IFFP Engineering and Contingency \\ge-server2.local.gardnerengineering\Land_desktop\2319 - Wolf Creek Water and Sewer\2103 - IFFP Updates\Sewer IFFP\Updated 2021\Reuse water line estimate.xlsx 29