HomeMy WebLinkAboutDAQ-2025-0018601 DAQC-339-25 Site ID 10707 (B2) MEMORANDUM TO: FILE – LHOIST NORTH AMERICA – Grantsville Plant THROUGH: Harold Burge, Major Source Compliance Section Manager FROM: Robert Haynes, Environmental Scientist DATE: April 3, 2025 SUBJECT: Title V Annual Compliance Certification Receipt/Review, FRS ID # UT0000004904500005 REPORT RECEIVED/ DUE DATE: March 28, 2025/March 5, 2025 TITLE V PERMIT #: 4500005004 DATE OF LAST PERMIT REVISION: January 13, 2021 CERTIFICATION PERIOD: January 1, 2024 – December 31, 2024 FACILITY REPORTED COMPLIANCE STATUS: Continuous REPORT EVALUATION: • Was report submitted on time? No • Did report identify status of compliance for each condition? Yes • Was compliance status marked as continuous/intermittent for each condition? Yes • Did report identify method used to determine compliance with each condition? Yes • Was report signed and properly certified by responsible official? Yes • Were exceedances/excursions reported? No • Were deviations reported? No CURRENT RECOMMENDATION: The report was submitted 23 days after the due date. The company was contacted and made aware of this. No further action. Company report for January 1 – December 31, 2024, shows continuous compliance. ATTACHMENTS: Annual Compliance Certification Statement Annual Compliance Certification Report �Lhoist DEPARTMENT OFENVIRONMENTAL QUALITY MAR 2 8 2025 March 20. 2025 Mr Bryce Bird -Divisoo of Air Quality Director Utah Orv ,on of AJr Quality DIVISION OF AIR QUALJTy 195 North 1950 West Sal Lake City, UT 84116 RE: Lholst North America of Arizona, Inc. -Grantsville Plant Submittal of Annual Compliance Certification Dear Mr Bird. The Lhoist North Amenca of Arizona. Inc (LNA) owns and operates the Grantsville Plant pursuant to Title V Operating Permit No 4500005004 The purpose of this correspondence Is to provide the Annual Compliance Certrticatoo for the Reporting Penod of January 1 2024 through December 31 2024 as required by Cond 10n IL If you have any quesbons regarding this report, or rf you need any add, onal ,nformabon. please contact me at 725-309-3723 or by e-mail at John hewson@lho,st com Sincerely. � Regional Environmental Manager Certification Statement In accordance with Operating Permit Condlbon I K and UAC R307-415-5d, and based on 1nformabon and belief formed after reasonable inquiry, the sta ements and informabon In this document are true accurate,aad comp � I � ,,,_, / --, o.Z s-� ���� c;) 0 '/'�o< �urman _D_a_e ______ _ Regional Terminal Manager cc Duane Surman (L A) Environmental Protection Agency Reg1011 VIII Office of Enforcemen Compliance and Environmental Justice (mail code 8ENF) 1595 Wynkoop Street Denver CO 80202-1129 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments Notes I.General Provisions I.A Federal Enforcement All terms and conditions in this permit, including those provisions designed to limit the potential to emit, are enforceable by the EPA and citizens under the Clean Air Act of 1990 (CAA) except those terms and conditions that are specifically designated as "State Requirements". (R307-415-6b) Continuous No Action Required for Compliance Intermittent I.B Permitted Activity(ies) Except as provided in R307-415-7b(1), the permittee may not operate except in compliance with this permit. (See also Provision I.E, Application Shield) Continuous Records Review Intermittent I.C Duty to Comply I.C.1 The permittee must comply with all conditions of the operating permit. Any permit noncompliance constitutes a violation of the Air Conservation Act and is grounds for any of the following: enforcement action; permit termination; revocation and reissuance; modification; or denial of a permit renewal application. (R307-415-6a(6)(a)) Continuous Records Review Intermittent I.C.2 It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit. (R307-415-6a(6)(b)) Continuous Records Review Intermittent I.C.3 The permittee shall furnish to the Director, within a reasonable time, any information that the Director may request in writing to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit or to determine compliance with this permit. Upon request, the permittee shall also furnish to the Director copies of records required to be kept by this permit or, for information claimed to be confidential, the permittee may furnish such records directly to EPA along with a claim of confidentiality. (R307-415-6a(6)(e)) Continuous Records Review Intermittent I.C.4 This permit may be modified, revoked, reopened, and reissued, or terminated for cause. The filing of a request by the permittee for a permit modification, revocation and reissuance, or termination, or of a notification of planned changes or anticipated noncompliance shall not stay any permit condition, except as provided under R307-415-7f(1) for minor permit modifications. (R307-415-6a(6)(c)) Continuous Records Review Intermittent I.D Permit Expiration and Renewal I.D.1 This permit is issued for a fixed term of five years and expires on the date shown under "Enforceable Dates and Timelines" at the front of this permit. (R307-415-6a(2)) Continuous Records Review Intermittent Permit expies on January 13, 2026 Permit Term 1 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term I.D.2 Application for renewal of this permit is due on or before the date shown under "Enforceable Dates and Timelines" at the front of this permit. An application may be submitted early for any reason. (R307-415-5a(1)(c)) Continuous Records Review Intermittent Application due by July 13, 2025 I.D.3 An application for renewal submitted after the date listed in I.D.2 above shall be accepted for processing, but shall not be considered a timely application and shall not relieve the permittee of any enforcement actions resulting from submitting a late application. (R307-415-5a(5)) Continuous Records Review Intermittent I.D.4 Permit expiration terminates the permittee's right to operate unless a timely and complete renewal application is submitted and consistent with R307-415-7b (see also Provision I.E, Application Shield) and R307-415-5a(1)(c) (see also Provision I.D.2). (R307-415-7c(2)) Continuous Records Review Intermittent I.E Application Shield If the permittee submits a timely and complete application for renewal, the permittee's failure to have an operating permit will not be a violation of R307-415, until the Director takes final action of the permit renewal application. In such case, the terms and conditions of this permit shall remain in force until permit renewal or denial. This protection shall cease to apply if, subsequent to the completeness determination required pursuant to R307-415-7a(3), and as required by R307-415-5a(2), the applicant fails to submit by the deadline specified in writing by the Director any additional information identified as being needed to process the application. (R307-415-7b(2)) Continuous Records Review Intermittent I.F Severability In the event of a challenge to any portion of this permit, or if any portion of the permit is held invalid, the remaining permit conditions remain valid and in force. (R307-415-6a(5)) Continuous Records Review Intermittent I.G Permit Fee I.G.1 The permittee shall pay an annual emission fee to the Director consistent with R307-415-9. (R307-415-6a(7)) Continuous Records Review Intermittent Emission fees paid upon request I.G.2 The emission fee shall be due on October 1 of each calendar year or 45 days after the source receives notice of the amount of the fee, whichever is later. (R307-415-9(4)(a)) Continuous Records Review Intermittent Emission fees paid upon request I.H No Property Rights This permit does not convey any property rights of any sort, or any exclusive privilege. (R307-415-6a(6)(d)) Continuous No Action Required for Compliance Intermittent I.I Revision Exception No permit revision shall be required, under any approved economic incentives, marketable permits, emissions trading and other similar programs or processes for changes that are provided for in this permit (R307-415-6a(8)) Continuous Records Review Intermittent I.J Inspection and Entry 2 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term I.J.1 Upon presentation of credentials and other documents as may be required by law, the permittee shall allow the Director or an authorized representative to perform any of the following: I.J.1.a Enter upon the permittee's premises where the source is located or emissions related activity is conducted, or where records are kept under the conditions of this permit. (R307-415-6c(2)(a)) Continuous Records Review Intermittent Specific activities authorized upon request. I.J.1.b Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit. (R307-415- 6c(2)(b)) Continuous Records Review Intermittent Specific activities authorized upon request. I.J.1.c Inspect at reasonable times any facilities, equipment (including monitoring and air pollution control equipment), practice, or operation regulated or required under this permit. (R307-415- 6c(2)(c)) Continuous Records Review Intermittent Specific activities authorized upon request. I.J.1.d Sample or monitor at reasonable times substances or parameters for the purpose of assuring compliance with this permit or applicable requirements. (R307-415-6c(2)(d)) Continuous Records Review Intermittent Specific activities authorized upon request. I.J.2 Any claims of confidentiality made on the information obtained during an inspection shall be made pursuant to Utah Code Ann. Section 19-1-306. (R307-415-6c(2)(e)) Continuous Records Review Intermittent I.K Certification Any application form, report, or compliance certification submitted pursuant to this permit shall contain certification as to its truth, accuracy, and completeness, by a responsible official as defined in R307-415-3. This certification shall state that, based on information and belief formed after reasonable inquiry, the statements and information in the document are true, accurate, and complete. (R307-415-5d) Continuous Records Review Intermittent I.L Compliance Certification I.L.1 Permittee shall submit to the Director an annual compliance certification, certifying compliance with the terms and conditions contained in this permit, including emission limitations, standards, or work practices. This certification shall be submitted no later than the date shown under "Enforceable Dates and Timelines" at the front of this permit, and that date each year following until this permit expires. The certification shall include all of the following (permittee may cross reference this permit or previous reports): (R307-415-6c(5)) Continuous Records Review Intermittent The annual compliance certification for the 2023 reporting period was submitted to UDAQ on February 27, 2024. I.L.1.a The identification of each term or condition of this permit that is the basis of the certification; Continuous Records Review Intermittent 3 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term I.L.1.b The identification of the methods or other means used by the permittee for determining the compliance status with each term and condition during the certification period. Such methods and other means shall include, at a minimum, the monitoring and related recordkeeping and reporting requirements in this permit. If necessary, the permittee also shall identify any other material information that must be included in the certification to comply with section 113(c)(2) of the Act, which prohibits knowingly making a false certification or omitting material information; Continuous Records Review Intermittent I.L.1.c The status of compliance with the terms and conditions of the permit for the period covered by the certification, including whether compliance during the period was continuous or intermittent. The certification shall be based on the method or means designated in Provision I.L.1.b. The certification shall identify each deviation and take it into account in the compliance certification. The certification shall also identify as possible exceptions to compliance any periods during which compliance is required and in which an excursion or exceedance as defined under 40 CFR Part 64 occurred; and Continuous Records Review Intermittent I.L.1.d Such other facts as the Director may require to determine the compliance status. Continuous Records Review Intermittent I.L.2 The permittee shall also submit all compliance certifications to the EPA, Region VIII, at the following address or to such other address as may be required by the Director: (R307-415-6c(5)(d)) Environmental Protection Agency, Region VIII Office of Enforcement, Compliance and Environmental Justice (mail code 8ENF) 1595 Wynkoop Street Denver, CO 80202-1129 Continuous Records Review Intermittent The annual compliance certification for the 2023 reporting period was submitted to EPA on February 27, 2024. I.M Permit Shield I.M.1 Compliance with the provisions of this permit shall be deemed compliance with any applicable requirements as of the date of this permit, provided that: I.M.1.a Such applicable requirements are included and are specifically identified in this permit, or (R307-415-6f(1)(a)) Continuous No Action Required for Compliance Intermittent I.M.1.b Those requirements not applicable to the source are specifically identified and listed in this permit. (R307-415-6f(1)(b)) Continuous No Action Required for Compliance Intermittent I.M.2 Nothing in this permit shall alter or affect any of the following: I.M.2.a The emergency provisions of Utah Code Ann. Section 19-1-202 and Section 19-2-112, and the provisions of the CAA Section 303. (R307-415-6f(3)(a)) Continuous No Action Required for Compliance Intermittent 4 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term I.M.2.b The liability of the owner or operator of the source for any violation of applicable requirements under Utah Code Ann. Section 19-2-107(2)(g) and Section 19-2-110 prior to or at the time of issuance of this permit. (R307-415-6f(3)(b) Continuous No Action Required for Compliance Intermittent I.M.2.c The applicable requirements of the Acid Rain Program, consistent with the CAA Section 408(a). (R307-415-6f(3)(c)) Continuous No Action Required for Compliance Intermittent I.M.2.d The ability of the Director to obtain information from the source under Utah Code Ann. Section 19-2-120, and the ability of the EPA to obtain information from the source under the CAA Section 114. (R307-415-6f(3)(d)) Continuous Records Review Intermittent Specific activities authorized upon request. I.N Emergency Provision I.N.1 An "emergency" is any situation arising from sudden and reasonably unforeseeable events beyond the control of the source, including Acts of God, which situation requires immediate corrective action to restore normal operation, and that causes the source to exceed a technology-based emission limitation under this permit, due to unavoidable increases in emissions attributable to the emergency. An emergency shall not include noncompliance to the extent caused by improperly designed equipment, lack of preventive maintenance, careless or improper operation, or operator error. (R307-415-6g(1)) Continuous No Action Required for Compliance Intermittent I.N.2 An Emergency constitutes an affirmative defense to an action brought for noncompliance with such technology-based emission limitations if the affirmative defense is demonstrated through properly signed, contemporaneous operating logs, or other relevant evidence that: I.N.2.a An emergency occurred and the permittee can identify the causes of the emergency. (R307-415-6g(3)(a)) Continuous Records Review Intermittent I.N.2.b The permitted facility was at the time being properly operated. (R307-415-6g(3)(b)) Continuous Records Review Intermittent I.N.2.c During the period of the emergency the permittee took all reasonable steps to minimize levels of emissions that exceeded the emission standards, or other requirements in this permit. (R307-415-6g(3)(c)) Continuous Records Review Intermittent I.N.2.d The permittee submitted notice of the emergency to the Director within two working days of the time when emission limitations were exceeded due to the emergency. This notice must contain a description of the emergency, any steps taken to mitigate emissions, and corrective actions taken. This notice fulfills the requirement of Provision I.S.2.c below. (R307-415-6g(3)(d)) Continuous Records Review Intermittent 5 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term I.N.3 In any enforcement proceeding, the permittee seeking to establish the occurrence of an emergency has the burden of proof. (R307-415-6g(4)) Continuous Records Review Intermittent I.N.4 This emergency provision is in addition to any emergency or upset provision contained in any other section of this permit. (R307-415-6g(5)) Continuous No Action Required for Compliance Intermittent I.O Operational Flexibility Operational flexibility is governed by R307-415-7d(1). Continuous No Action Required for Compliance Intermittent I.P Off-Permit Changes Off-permit changes are governed by R307-415-7d(2). Continuous No Action Required for Compliance Intermittent I.Q Administrative Permit Amendments Administrative permit amendments are governed by R307-415- 7e. Continuous No Action Required for Compliance Intermittent I.R Permit Modifications Permit modifications are governed by R307-415-7f. Continuous No Action Required for Compliance Intermittent I.S Records and Reporting I.S.1 Records I.S.1.a The records of all required monitoring data and support information shall be retained by the permittee for a period of at least five years from the date of the monitoring sample, measurement, report, or application. Support information includes all calibration and maintenance records, all original strip- charts or appropriate recordings for continuous monitoring instrumentation, and copies of all reports required by this permit. (R307-415-6a(3)(b)(ii)) Continuous Records Review Intermittent I.S.1.b For all monitoring requirements described in Section II, Special Provisions, the source shall record the following information, where applicable: (R307-415-6a(3)(b)(i)) I.S.1.b.1 The date, place as defined in this permit, and time of sampling or measurement. Continuous Records Review Intermittent I.S.1.b.2 The date analyses were performed.Continuous Records Review Intermittent I.S.1.b.3 The company or entity that performed the analyses.Continuous Records Review Intermittent I.S.1.b.4 The analytical techniques or methods used.Continuous Records Review Intermittent I.S.1.b.5 The results of such analyses.Continuous Records Review Intermittent I.S.1.b.6 The operating condition as existing at the time of sampling or measurement. Continuous Records Review Intermittent I.S.1.c Additional recordkeeping requirements, if any, are described in Section II, Special Provisions. Continuous Records Review Intermittent I.S.2 Reports I.S.2.a Monitoring reports shall be submitted to the Director every six months, or more frequently if specified in Section II. All instances of deviation from permit requirements shall be clearly identified in the reports. (R307-415-6a(3)(c)(i)) Continuous Records Review Intermittent Semi-Annual monitoring reports were submitted to UDAQ on February 27, 2024 and August 30, 2024. 6 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term I.S.2.b All reports submitted to Provision I.S.2.a shall be certified by a responsible official in accordance with Provision I.K of this permit. (R307-415-6a(3)(c)(i)) Continuous Records Review Intermittent I.S.2.c The Director shall be notified promptly of any deviations from permit requirements including those attributable to upset conditions as defined in this permit, the probable cause of such deviations, and any corrective actions or preventative measures taken. Prompt, as used in this condition, shall be defined as written notification within the number of days shown under "Enforceable Dates and Timelines" at the front of this permit. Deviations from permit requirements due to breakdowns shall be reported in accordance with the provisions of R307-107. (R307- 415-6a(3)(c)(ii)). [R307-415-6a] Continuous Records Review Intermittent I.S.3 Notification Addresses I.S.3.a All reports , notification, or other submissions required by this permit to be submitted to the Director are to be sent to the following address or to such other address as may be required by the Director: Utah Division of Air Quality P.O. Box 144820 Salt Lake City, UT 84114-4820 Phone: 801-536-4000 Continuous Records Review Intermittent I.S.3.b All reports, notifications or other submissions required by this permit to be submitted to the EPA should be sent to one of the following addresses or to such other address as may be required by the Director: For annual compliance certification: Environmental Protection Agency, Region VIII Office of Enforcement, Compliance and Environmental Justice (mail code 8ENF) 1595 Wynkoop Street Denver, CO 80202-1129 For reports, notifications, or other correspondence related to permit modifications, applications, etc.: Environmental Protection Agency, Region VIII Air Permitting and Monitoring Branch (mail code 8ARD-PM) 1595 Wynkoop Street Denver, CO 80202-1129 Phone: 303-312-6927 Continuous Records Review Intermittent I.T Reopening for Cause 7 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term I.T.1 A permit shall be reopened and revised under any of the following circumstances: I.T.1.a New application requirements become applicable to the permittee and there is a remaining permit term of three or more years. No such reopening is required if the effective date of the requirement is later than the date on which this permit is due to expire, unless the terms and conditions of this permit have been extended pursuant to R307-415-7c(3), application shield. (R307- 415-7g(1)(a)) Continuous Records Review Intermittent I.T.1.b The Director or EPA determines that this permit contains a material mistake or that inaccurate statements were made in establishing emissions standards or other terms or conditions of this permit. (R307-415-7g(1)(c)) Continuous Records Review Intermittent I.T.1.c EPA or the Director determines that this permit must be revised or revoked to assure compliance with applicable requirements. (R307-415-7g(1)(d)) Continuous Records Review Intermittent I.T.1.d Additional applicable requirements are to become effective before the renewal date of this permit and are in conflict with existing permit conditions. (R307-415-7g(1)(e)) Continuous Records Review Intermittent I.T.2 Additional requirements, including excess emission requirements, become applicable to a Title IV affected source under the Acid Rain Program. Upon approval by EPA, excess emissions offset plans shall be deemed to be incorporated into this permit. (R307-415-7g(1)(b)) Continuous Records Review Intermittent I.T.3 Proceedings to reopen and issue a permit shall follow the same procedures as apply to initial permit issuance and shall affect only those parts of this permit for which cause to reopen exists. (R307-415-7g(2)) Continuous Records Review Intermittent I.U Inventory Requirements An emission inventory shall be submitted in accordance with procedures of R307-150, Emission Inventories. (R307-150) Continuous Records Review Intermittent I.V Title IV and Other, More Stringent Requirements Where an applicable requirement is more stringent than an applicable requirement of regulations promulgated under Title IV of the Act, Acid Deposition Control, both provisions shall be incorporated into this permit. (R307-415-6a(1)(b)) Continuous Records Review Intermittent II Special Provisions II.A Emission Unit(s) Permitted to Discharge Air Contaminants (R307-415-4(3)(a) and R307-415-4(4)) Continuous No Action Required for Compliance Intermittent II.A.1 Permitted Source Source-wide Continuous No Action Required for Compliance Intermittent II.A.2 LQ: Limestone Quarry All mining activities, including drilling & blasting, not otherwise specified. Continuous No Action Required for Compliance Intermittent 8 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.A.3 HRT: Haul Road Traffic Fugitive dust from traffic on unpaved haul roads between the quarry and the crushers. (Opacity survey to be completed from observation point C for this unit). Continuous No Action Required for Compliance Intermittent II.A.4 UROA: Unpaved Roads & Unpaved Operational Areas Fugitive dust from unpaved roads and unpaved operational areas and all disturbed surfaces or stripped areas. Continuous No Action Required for Compliance Intermittent II.A.5 Opacity-Fugitive Dust: Mining Activities Includes LQ, HRT, and UROA Continuous No Action Required for Compliance Intermittent II.A.6 CP-Jcrush: Primary Crusher Pre November 29, 1969 Jaw Crusher rated at approximately 200 tph. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.7 CP-Screen: Vibrating Screen Pre November 29, 1969 vibrating screen rated at approximately 300 tph. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.8 CP-Gcrush: Secondary Cone Crusher Pre November 29, 1969 gyratory cone crusher rated at approximately 125 tph. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.9 CP-Belt1 to CP-PriPile: Conveyor Drop Point 1 Material drop point from Belt 1 to primary storage pile. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.10 CP-Belt4 to CP-KilnPile: Conveyor Drop Point 2 Material drop point from Belt 4 to kiln storage pile. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.11 LSHE: Limestone Handling Equipment and Stockpiles Pre November 29, 1969, limestone handling equipment, including feed hopper, all equipment drops to stockpiles, and all stockpiles. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.12 LHHE: Lime and Quicklime Hydrate Handling Equipment Pre November 29, 1969, lime and hydrate handling equipment, including screw conveyors, bucket elevators, universal crusher, pugmill, dribble tubes, portable and reclaim hoppers, gravity chutes, hammermill, mixers, pumps, and collector. (Opacity survey to be completed from observation point A or B for this unit). Continuous No Action Required for Compliance Intermittent II.A.13 LS: Limestone and Lime Screening Pre November 29, 1969, all screens, other than 4 x 8 vibrating screen (K-Screen), that handle limestone and lime. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent 9 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.A.14 BINS: Bins Pre November 29, 1969, product storage bins (FL-2Bin, FL-3Bin, FL-6Bin to FL-10Bin, BL-4Bin, BL-5Bin), dust bin (K-DBin1), chat bin (CP-Cbin), stone bin (K-Sbin), waste bin (FL-Wbin), surge bin (H-Sbin), and out-of-spec bin. (Opacity survey to be completed from observation point A or B for this unit). Continuous No Action Required for Compliance Intermittent II.A.15 10-1, FL1Bin: 500 Ton Storage Bin 500 ton storage bin controlled by baghouse (DC-1QS). (Opacity survey to be completed from observation point B for this unit). Continuous No Action Required for Compliance Intermittent II.A.16 10-4, H-3Silo: 120 ton Storage Silo 120 ton storage silo for second bagger line. Continuous No Action Required for Compliance Intermittent II.A.17 10-2, K-DBin2: 25 Ton Storage Bin 25 ton dust storage bin controlled by baghouse (DC-8KD). (Opacity survey to be completed from observation point B for this unit). Continuous No Action Required for Compliance Intermittent II.A.18 Sbin: 2 Ton Storage Bin 2 ton dust storage bin (2 ton dust bin has not been installed to date). Continuous No Action Required for Compliance Intermittent II.A.19 10-3, K-PnTrn: Pneumatic Dust Transfer System Pneumatic dust transfer system located between dust bins (K- DBin1 & K-DBin2) controlled by a baghouse (DC-6KD). (Opacity survey to be completed from observation point B for this unit). Continuous No Action Required for Compliance Intermittent II.A.20 DS1RK: Rotary Kiln Rotary kiln with electro dry scrubber (DS-1RK), cyclone, gravel bed, and electro grid. The kiln may be fired on natural gas, fuel oil, on or off-site generated on-spec used oil, or tire derived fuel (TDF) only. A 100 hp gasoline-fired auxiliary kiln shaft motor is used for backup powering of the kiln during outages. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.21 K-Screen: Vibrating Screen 4 x 8 vibrating screen within rotary kiln system. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.22 HBH-1HY: Hydrator Pressure hydrator with emissions controlled by a baghouse (HBH- 1HY). An existing, 7 MMBtu/hr natural gas-fired process heater provides heat to the baghouse as needed to keep steam from condensing on the bags. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent 10 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.A.23 DC-1QS: Baghouse #1 Baghouse controlling emissions from front lime handling system product bins (FL-1Bin, FL-9Bin, & FL-10Bin), and universal crusher (FL-Ucrush). (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.24 DC-2QP: Baghouse #2 Baghouse controlling emissions from front lime handling system bins (FL-2Bin, FL-3Bin, FL-8Bin), screens, and belt conveyors; back lime handling system product bins (BL-4Bin, BL-5Bin); and hydrate system surge bin (H-Sbin). (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.25 DC-3HB: Baghouse #3 Baghouse controlling emissions from hydrate system screw conveyors, bucket elevators, separators (H-1Sprtr & H-2Sprtr), and hydrate bagger. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.26 DC-4LO: Baghouse #4 Baghouse controlling emissions from back lime handling system loadout rotary screen, rail loadout & screw conveyor, and hydrate system bulk loadout. (Opacity survey to be completed from observation point B for this unit). Continuous No Action Required for Compliance Intermittent II.A.27 DC-5LO: Baghouse #5 Baghouse controlling emissions from back lime handling system transfer point belt conveyor, and hydrate system bulk loadout screw conveyor. (Opacity survey to be completed from observation point B for this unit). Continuous No Action Required for Compliance Intermittent II.A.28 CTP-CPBelt1: Conveyor Transfer Point 9 Conveyor transfer point to CP-Belt1. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.29 CTP-CPBelt2: Conveyor Transfer Point 10 Conveyor transfer point to CP-Belt2. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.30 CTP-CPBelt2: Conveyor Transfer Point 11 Conveyor transfer point from CP-Belt2. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.31 CTP-CPBelt4: Conveyor Transfer Point 12 Conveyor transfer point to CP-Belt4. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.32 CTP-CPBelt5: Conveyor Transfer Point 13 Conveyor transfer point to CP-Belt5. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.33 CTP-CPBelt5: Conveyor Transfer Point 14 Conveyor transfer point from CP-Belt5. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.34 CTP-CPBelt3: Conveyor Transfer Point 15 Conveyor transfer point to CP-Belt3. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent 11 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.A.35 CTP-CPBelt3: Conveyor Transfer Point 16 Conveyor transfer point from CP-Belt3. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.36 CTP-KBelt: Conveyor Transfer Point 17 Conveyor transfer point to K-Belt. This unit is not included in opacity surveys due to its location being underground. No unit- specific applicable requirements. Continuous No Action Required for Compliance Intermittent II.A.37 CTP-KBelt: Conveyor Transfer Point 18 Conveyor transfer points from K-Belt, includes two transfer points. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.38 CTP-FLBelt1: Conveyor Transfer Point 19 Conveyor transfer points to FL-Belt1, includes three transfer points. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.39 CTP-FLBelt1: Conveyor Transfer Point 20 Conveyor transfer point from FL-Belt1. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.40 CTP-FLBelt2: Conveyor Transfer Point 21 Conveyor transfer point to FL-Belt2. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.41 CTP-FLBelt2: Conveyor Transfer Point 22 Conveyor transfer points from FL-Belt2, includes two transfer points. (Opacity survey to be completed from observation point A for this unit). Continuous No Action Required for Compliance Intermittent II.A.42 CTP-BLBelt: Conveyor Transfer Point 23 Conveyor transfer points to BL-Belt, includes eight transfer points. (Opacity survey to be completed from observation point B for this unit). Continuous No Action Required for Compliance Intermittent II.A.43 CTP-BLBelt: Conveyor Transfer Point 24 Conveyor transfer points from BL-Belt, includes two transfer points. (Opacity survey to be completed from observation point B for this unit). Continuous No Action Required for Compliance Intermittent II.A.44 CTP-HBelt1: Conveyor Transfer Point 25 Conveyor transfer points to H-Belt1. This unit is not included in the opacity surveys due to its location being inside of a building. No unit-specific applicable requirements. Continuous No Action Required for Compliance Intermittent II.A.45 CTP-HBelt1: Conveyor Transfer Point 26 Conveyor transfer points from H-Belt1. This unit is not included in the opacity surveys due to its location being inside of a building. No unit-specific applicable requirements. Continuous No Action Required for Compliance Intermittent II.A.46 CTP-HBelt2: Conveyor Transfer Point 27 Conveyor transfer points to H-Belt2. This unit is not included in the opacity surveys due to its location being inside of a building. No unit-specific applicable requirements. Continuous No Action Required for Compliance Intermittent 12 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.A.47 CTP-HBelt2: Conveyor Transfer Point 28 Conveyor transfer points from H-Belt2. This unit is not included in the opacity surveys due to its location being inside of a building. No unit-specific applicable requirements. Continuous No Action Required for Compliance Intermittent II.A.48 CTP-Bagger: Conveyor Transfer Point 29 Conveyor transfer point to belt conveyor from bagger. This unit is not included in the opacity surveys due to it only carries bagged material. No unit-specific applicable requirements. Continuous No Action Required for Compliance Intermittent II.A.49 CTP-Palletizer: Conveyor Transfer Point 30 Conveyor transfer point from belt conveyor to palletizer. This unit is not included in the opacity surveys due to its location being inside of a building. No unit-specific applicable requirements. Continuous No Action Required for Compliance Intermittent II.A.50 Opacity-10: 10 Percent Opacity Units Includes units II.A.15 through II.A.17, II.A.19, and II.A.56. Continuous No Action Required for Compliance Intermittent II.A.51 Opacity-20: 20 Percent Opacity Units Includes units II.A.20, II.A.22-27, and all other emission units not otherwise assigned. Continuous No Action Required for Compliance Intermittent II.A.52 Opacity: Aggregate Processing Units Includes all crushers, screens, and conveyors in units II.A.6-8, II.A.12-13, II.A.21, and II.A.28-49. Continuous No Action Required for Compliance Intermittent II.A.53 TANKS: Petroleum Storage Tanks 10,000 gal. fuel oil, 1,000 gal. gasoline, 1,000-gal. used oil, and 10,000 gal. diesel fuel. 40 CFR 63 Subpart CCCCCC applies to the gasoline storage tank. Continuous No Action Required for Compliance Intermittent II.A.54 DC-7SC: Baghouse #7 Baghouse that was installed but never been operated. Listed for informational purposes only. Continuous No Action Required for Compliance Intermittent II.A.55 DC-9HY: Baghouse #9 Baghouse used to blow clean air into the kiln. Listed for informational purposes only. Continuous No Action Required for Compliance Intermittent II.A.56 10-5, DC-10FF: Baghouse #10 Baghouse controlling emissions from second bagging line, including a bagger (Bagger-2), 120 ton silo (H-3Silo), belt conveyor (H-Belt3) and screw conveyor (H-Screw22). (Visible emission observations shall be taken from observation position A). Continuous No Action Required for Compliance Intermittent II.A.57 MISC: Miscellaneous Emissions Emission sources such as painting, laboratory, acetylene combustion, parts cleaners, comfort heaters, sandblasting, portable compression emergency backup pony motor, and trash pump. Continuous No Action Required for Compliance Intermittent 13 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.A.58 NESHAP-SI RICE: NESHAP Stationary RICE Existing emergency stationary spark ignition (SI) reciprocating internal combustion engines (RICE), as defined in 40 CFR 63 Subpart ZZZZ, constructed or reconstructed before June 12, 2006. This unit includes the 100 hp gasoline-fired auxiliary kiln shaft motor for backup powering of the kiln during outages. Continuous No Action Required for Compliance Intermittent II.B Requirements and Limitations The following emission limitations, standards, and operations limitations apply to the permitted facility as indicated: II.B.1 Conditions on permitted source (Source-wide) II.B.1.a Condition: At all times, including periods of startup, shutdown, and malfunction, the permittee shall, to the extent practicable, maintain and operate any permitted plant equipment, including associated air pollution control equipment, in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Director which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. [Origin: DAQE-AN0707015-06]. [R307-401-8] Continuous Records Review Intermittent II.B.1.a.1 Monitoring: Records required for this permit condition will serve as monitoring. Continuous Records Review Intermittent II.B.1.a.2 Recordkeeping: Permittee shall document activities performed to assure proper operation and maintenance. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent II.B.1.a.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent II.B.1.b Condition: The permittee shall comply with the applicable requirements for recycling and emission reduction for class I and class II refrigerants pursuant to 40 CFR 82, Subpart F - Recycling and Emissions Reduction. [Origin: 40 CFR 82 Subpart F]. [40 CFR 82.150(b)] Continuous Records Review Intermittent II.B.1.b.1 Monitoring: The permittee shall certify, in the annual compliance statement required in Section I of this permit, its compliance status with the requirements of 40 CFR 82, Subpart F. Continuous Records Review Intermittent 14 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.1.b.2 Recordkeeping: All records required in 40 CFR 82, Subpart F shall be maintained consistent with the requirements of Provision S.1 in Section I of this permit. Continuous Records Review Intermittent II.B.1.b.3 Reporting: All reports required in 40 CFR 82, Subpart F shall be submitted as required. There are no additional reporting requirements except as outlined in Section I of this permit. Continuous Records Review Intermittent II.B.1.c Condition: The permittee shall comply with the applicable requirements for servicing of motor vehicle air conditioners pursuant to 40 CFR 82, Subpart B - Servicing of Motor Vehicle Air Conditioners. [Origin: 40 CFR 82 Subpart B]. [40 CFR 82.30(b)] Continuous Records Review Intermittent II.B.1.c.1 Monitoring: The permittee shall certify, in the annual compliance statement required in Section I of this permit, its compliance status with the requirements of 40 CFR 82, Subpart B. Continuous Records Review Intermittent II.B.1.c.2 Recordkeeping: All records required in 40 CFR 82, Subpart B shall be maintained consistent with the requirements of Provision S.1 in Section I of this permit. Continuous Records Review Intermittent II.B.1.c.3 Reporting: All reports required in 40 CFR 82, Subpart B shall be submitted as required. There are no additional reporting requirements except as outlined in Section I of this permit. Continuous Records Review Intermittent II.B.1.d Condition: Sulfur content of any fuel oil burned shall be no greater than 0.85 lbs/MMBtu heat input. [Origin: DAQE-AN0707015-06]. [R307-203- 1, R307-401-8] Continuous Records Review Intermittent Fuel oil not consumed during reporting period 15 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.1.d.1 Monitoring: The following specifications shall be recorded for each purchase of fuel: weight percent sulfur, gross heating value (Btu per unit volume), and density. All specifications shall be ascertained in accordance with methods of American Society for Testing and Materials. Sulfur content in lbs/MMBtu shall be determined by the following equation: S lbs/MMBtu = [(Weight percent sulfur/100) x Density (lb/gal)] / [(gross heating value (Btu/gal)) x (1 MMBtu/1,000,000 Btu)] The permittee may obtain the above specifications by testing each purchase of fuel in accordance with the required methods; by inspection of the specifications provided by the vendor for each purchase of fuel; or by inspection of summary documentation of the fuel sulfur content from the vendor, provided that the above specifications are available from the vendor for each purchase if requested. Continuous Records Review Intermittent No fuel oil purchased during reporting period II.B.1.d.2 Recordkeeping: Results of monitoring shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent No fuel oil purchased during reporting period II.B.1.d.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent No fuel oil purchased during reporting period II.B.1.e Condition: [State-only Requirement] Unless otherwise specified in this permit, opacity of visible emissions caused by fugitive dust shall not exceed 10% at the property boundary, and 20% onsite. Opacity shall not apply when the wind speed exceeds 25 miles per hour if the permittee has implemented, and continues to implement, the accepted fugitive dust control plan and administers one or more of the following contingency measures: (1) Pre-event watering; (2) Hourly watering; (3) Additional chemical stabilization; (4) Cease or reduce fugitive dust producing operations to the extent practicable. [Origin: R307-309]. [R307-309-5] Continuous Records Review Intermittent 16 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.1.e.1(a) Monitoring: An opacity survey of haul road traffic and mobile equipment in operational areas shall be performed on a monthly basis in accordance with procedures similar to 40 CFR 60, Appendix A, Method 9. The opacity determinization shall be performed as follows: The requirement for observations to be made at 15- second intervals over a six minute period shall not apply. Six points, distributed along the length of the haul road or in the operational area shall be chosen either by the permittee or by the Director or his/her representative. An opacity reading shall be made at each point when a vehicle passes the selected points. Opacity readings shall be made one-half the vehicle length or greater behind the vehicle and at approximately one-half the height of the vehicle or greater. The accumulated six readings shall be averaged for the compliance value. If operations have been suspended on roads and other operational areas, monitoring is not required. Continuous Records Review Intermittent II.B.1.e.1(b) Monitoring: An opacity observation from stationary sources shall be conducted from each of the pre-determined observation locations (A, B, or C) on a monthly basis in accordance with 40 CFR 60, Appendix A, Method 9 on the emission unit of this defined group or units, that appears to have the highest opacity. If the highest unit does not exceed the opacity limitation, no further observations of any other emission units of this group will be required. If this unit exceeds the opacity limitation, the emission unit with the next highest opacity shall be observed until an emission unit of this group does not exceed the opacity limitation. All emission units not observed shall be considered to not exceed the opacity limitation. If operation of an affected emission unit has been suspended, monitoring is not required. Continuous Records Review Intermittent II.B.1.e.1(c)Wind speed shall be measured by an anemometer. Continuous Records Review Intermittent II.B.1.e.1(d) Opacity observations of fugitive dust from any source shall be measured at the densest point of the plume. Continuous Records Review Intermittent 17 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.1.e.2 Recordkeeping: If wind speeds are measured to establish an exception from the above visible emissions limits, records of the administered contingency measures and the wind speed measurements shall be maintained. Records required by the most recently approved fugitive dust control plan shall be maintained in accordance with the plan. The permittee shall record the date of each visual opacity survey and keep a list of the emission points checked during the visual opacity survey. The permittee shall also keep a log of the following information for each observed visual emission: date and time visual emissions observed, emission point location and description, time and date of opacity test, and percent opacity. Records shall be kept of all data required by 40 CFR 60, Appendix A, Method 9. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records that demonstrate compliance with this condition shall be available to the Director upon request. [R307-309-12]. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent II.B.1.e.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent II.B.1.f Condition: The permittee shall submit a fugitive dust control plan to the Director in accordance with R307-309-6. Activities regulated by 307-309 shall not commence before the fugitive dust control plan is approved by the Director. At a minimum, the fugitive dust control plan shall include the requirements in R307-309-6(4) as applicable, and the information required in R307-309-6(5). [Origin: R307-309]. [R307-309-5(2), R307-309-6] Continuous Records Review Intermittent Revised Fugitive Dust Plan submitted on June 17, 2019. II.B.1.f.1 Monitoring: Adherence to the most recently approved fugitive dust control plan shall be monitored to demonstrate that appropriate measures are being implemented to control fugitive dust. Continuous Records Review Intermittent II.B.1.f.2 Recordkeeping: Records that demonstrate compliance with this condition and records required by the most recently approved fugitive dust control plan shall be maintained in accordance with the plan and section I.S.1 of this permit. Records shall be available to the Director upon request. [R307-309-12] Continuous Records Review Intermittent 18 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.1.f.3 Reporting: If site modifications are made that result in changes to fugitive dust emissions, the permittee shall submit an updated fugitive dust control plan as required by R307-309-6(3). There are no additional reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent II.B.1.g Condition: If the permittee owns, operates or maintains a new or existing material storage, handling or hauling operation, the permittee shall prevent, to the maximum extent possible, and in accordance with R307-309-6, material from being deposited onto any paved road other than a designated deposit site. If materials are deposited that may create fugitive dust on a public or private road, the permittee shall clean the road promptly. [Origin: R307- 309]. [R307-309-7] Continuous Records Review Intermittent II.B.1.g.1 Monitoring: Records required for this permit condition will serve as monitoring. Continuous Records Review Intermittent II.B.1.g.2 Recordkeeping: Records that demonstrate compliance with this condition and records required by the most recently approved fugitive dust control plan shall be maintained in accordance with the plan and section I.S.1 of this permit. Continuous Records Review Intermittent II.B.1.g.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent II.B.1.h(i) Condition: If the permittee is responsible for construction or maintenance of any existing road or has a right-of-way easement or possesses the right to use the same whose activities result in fugitive dust from the road, the permittee shall minimize fugitive dust to the maximum extent possible and in accordance with R307-309-6. If materials are deposited that may create fugitive dust on a public or private paved road, the permittee shall clean the road promptly. Continuous Records Review Intermittent II.B.1.h(ii) Condition: Unpaved Roads. If the permittee is responsible for construction or maintenance of any new or existing unpaved road, the permittee shall prevent, to the maximum extent possible, the deposit of material from the unpaved road onto any intersecting paved road during construction or maintenance. If materials are deposited that may create fugitive dust on a public or private paved road, the permittee shall clean the road promptly. [Origin: R307-309]. [R307-309-9] Continuous Records Review Intermittent 19 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.1.h.1 Monitoring: Records required for this permit condition will serve as monitoring. Continuous Records Review Intermittent II.B.1.h.2 Recordkeeping: Records that demonstrate compliance with the condition and records required by the most recently approved fugitive dust control plan shall be maintained in accordance with the plan and section I.S.1 of this permit. Continuous Records Review Intermittent II.B.1.h.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent II.B.1.i(i) Condition: For all solvent cleaning operations, the permittee shall not use solvent products with a VOC content greater than the amounts specified in Table 1 of R307-304-5. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.i(ii) Condition: As an alternative to the limits in Table 1 and for all general miscellaneous cleaning operations, the permittee may use a cleaning material with a VOC composite vapor pressure no greater than 8 mm Hg at 20 degrees Celsius. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.i(iii) Condition: The permittee shall store used applicators and shop towels in closed fireproof containers. These requirements do not apply to the exemptions listed in R307-304-3. [Origin: R307-304]. [R307-304] Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.i.1 Monitoring: Records required for this permit condition will serve as monitoring. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.i.2 Recordkeeping: The permittee shall maintain records demonstrating compliance with this condition. Records shall include the VOC content or composite vapor pressure of the solvent product applied. Records shall be maintained in accordance with Provision I.S.1 of this permit and shall be available to the director upon request. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.i.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.j(i) Condition: Except as provided in (ii) below, visible emissions from abrasive blasting operation shall not exceed 20% opacity except for an aggregate period of three minutes in any one hour. Continuous Records Review Intermittent No abrasive blasting conducting during reporting period. 20 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.1.j(ii) Condition: If the abrasive blasting operation complies with the performance standards in R307-306-6, visible emissions from the operation shall not exceed 40% opacity, except for an aggregate period of 3 minutes in any one hour. [Origin: R307-306]. [R307-306-4] Continuous Records Review Intermittent No abrasive blasting conducting during reporting period. II.B.1.j.1(a) Monitoring: Visible emissions shall be measured quarterly using EPA Method 9, or other EPA-approved testing method, as acceptable to the Director, if the affected emission unit was operated during the quarter. Visible emissions from intermittent sources shall use procedures similar to Method 9, but the requirement for observations to be made at 15 second intervals over a six-minute period shall not apply. Continuous Records Review Intermittent No abrasive blasting conducting during reporting period. II.B.1.j.1(b) Monitoring: Visible emissions from unconfined blasting shall be measured at the densest point of the emission after a major portion of the spent abrasive has fallen out, at a point not less than five feet nor more than twenty-five feet from the impact surface from any single abrasive blasting nozzle. Continuous Records Review Intermittent No abrasive blasting conducting during reporting period. II.B.1.j.1(c) Monitoring: An unconfined blasting operation that uses multiple nozzles shall be considered a single source unless it can be demonstrated by the permittee that each nozzle, measured separately, meet the emission and performance standards provided in R307-306-4. Continuous Records Review Intermittent No abrasive blasting conducting during reporting period. II.B.1.j.1(d) Monitoring: Emissions from confined blasting shall be measured at the densest point after the air contaminant leaves the enclosure. Continuous Records Review Intermittent No abrasive blasting conducting during reporting period. II.B.1.j.2 Recordkeeping: Results of monitoring and records of all data required by 40 CFR 60, Appendix A, Method 9 shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent No abrasive blasting conducting during reporting period. II.B.1.j.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent No abrasive blasting conducting during reporting period. II.B.1.k Condition: The permittee shall ensure that the following conditions are met for each degreasing operation: II.B.1.k(i) Condition: A cover shall be installed which shall remain closed except during actual loading, unloading or handling of parts cleaner. The cover shall be designed so that it can be easily operated with one hand if: Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. 21 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.1.k(i)(a) Condition: the volatility of the solvent is greater than 2 kPa (15 mm Hg or 0.3 psi) measured at 38 degrees C (100 degrees F), Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.k(i)(b) Condition: the solvent is agitated, or Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.k(i)(c) Condition: the solvent is heated. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.k(ii) Condition: An internal draining rack for cleaned parts shall be installed on which parts shall be drained until all dripping ceases. If the volatility of the solvent is greater than 4.3 kPa (32 mm Hg at 38 degrees C (100 degrees F)), the drainage facility must be internal, so that parts are enclosed under the cover while draining. The drainage facility may be external for applications where an internal type cannot fit into the cleaning system. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.k(iii) Condition: Waste or used solvent shall be stored in covered containers. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.k(iv) Condition: Tanks, containers and all associated equipment shall be maintained in good operating condition and leaks shall be repaired immediately or the degreaser shall be shutdown. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.k(v) Condition: Written procedures for the operation and maintenance of the degreasing equipment shall be permanently posted in an accessible and conspicuous location near the equipment. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.k(vi) Condition: If the solvent volatility is greater than 4.3 kPa (33 mm Hg or 0.6 psi) measured at 38 degrees C (100 degrees F), or if solvent is heated above 50 degrees C (120 degrees F), then one of the following control devices shall be used: II.B.1.k(vi)(a) Condition: freeboard that gives a freeboard ratio greater than 0.7; Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.k(vi)(b) Condition: water cover if the solvent is insoluble in and heavier than water; or Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.k(vi)(c) Condition: other systems of equivalent control, such as a refrigerated chiller or carbon adsorption. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.k(vii) Condition: If used, the solvent spray shall be a solid fluid stream at a pressure which does not cause excessive splashing and may not be a fine, atomized or shower type spray. [Origin: R307-335-4]. [R307-335-4] Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. 22 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.1.k.1 Monitoring: Visual inspections shall be made monthly to demonstrate compliance with this condition. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.k.2 Recordkeeping: Results of monthly inspections, the solvent VOC content applied, and the physical characteristics that demonstrate compliance with R307-335 shall be recorded and maintained as described in Provisions I.S.1 of this permit. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.k.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Solvent based cleaners not used during reporting period. II.B.1.l(i) Condition: The permittee shall not supply any adhesive, sealant, adhesive primer or sealant primer with a VOC content in excess of the limits in Table 1 of R307-342-5 and that was manufactured on or after September 1, 2014. Continuous Records Review Intermittent II.B.1.l(ii) Condition: The permittee shall not supply any adhesive, sealant, adhesive primer or sealant primer with a VOC content in excess of the limits specified in Table 1 of R307-342-5 unless an add-on control device as specified in R307-342-8 is used or unless the adhesive, sealant, adhesive primer or sealant primer was manufactured before September 1, 2014. Continuous Records Review Intermittent II.B.1.l(ii) Condition: The VOC content limits in Table 1 of R307-342-5 for adhesives applied to particular substrates shall apply as specified in R307- 342-5(4). Continuous Records Review Intermittent II.B.1.l(iv) Condition: The permittee shall comply with the additional standards and work practices contained in R307-342-6 and R307-342-7, as applicable. Continuous Records Review Intermittent II.B.1.l(v) Condition: These requirements do not apply if exempted in accordance with R307-342-3. The requirements of R307-342 do not apply to the following: Continuous Records Review Intermittent II.B.1.l(v)(a) Condition: Adhesives, sealants, adhesive primers or sealant primers that are sold or supplied by the manufacturer or supplier in containers with net volume of 16 fluid ounces or less or that have a net weight of one pound or less, except plastic cement welding adhesives and contact adhesives; Continuous Records Review Intermittent II.B.1.l(v)(b) Condition: Contact adhesives that are sold or supplied by the manufacturer or supplier in containers with a net volume of one gallon or less; Continuous Records Review Intermittent II.B.1.l(v)(c) Condition: Aerosol adhesives and primers dispensed from aerosol spray cans; Continuous Records Review Intermittent 23 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.1.l(v)(d) Condition: Commercial and industrial operations if the total VOC emissions from all adhesives, sealants, adhesive primers and sealant primers used at the source are less than 200 pounds per calendar year; Continuous Records Review Intermittent II.B.1.l(v)(e) Condition: The use of any adhesives, sealants, adhesive primers, sealant primers, cleanup solvents and surface preparation solvents, provided the total volume of noncomplying adhesives, sealants, primers, cleanup and surface preparation solvents applied facility- wide does not exceed 55 gallons per rolling 12-month period. [Origin: R307-342]. [307-342] Continuous Records Review Intermittent II.B.1.l.1 Monitoring: Records required for this permit condition will serve as monitoring. Continuous Records Review Intermittent II.B.1.l.2(a) Recordkeeping: For operations that are not exempt under R307-342-3, the permittee shall maintain records demonstrating compliance as specified in R307-342-7(2). Continuous Records Review Intermittent II.B.1.l.2(b) Recordkeeping: If an exemption is claimed pursuant to R307-342-3 the permittee shall record and maintain operational records sufficient to demonstrate compliance. (R307-342-3-(7)). Continuous Records Review Intermittent II.B.1.l.2 Recordkeeping: Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent II.B.1.l.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent II.B.1.m Condition: Except as provided in R307-361-4, the permittee shall not supply, solicit for application, or apply within the counties in R307-361-2 any architectural coating with a VOC content in excess of the corresponding limit specified in Table 1 of R307-361-5. The permittee shall comply with the additional standards and work practices contained in R307-361-5, as applicable. [Origin: R307- 361]. [R307-361] Continuous Records Review Intermittent No architectural coatings applied during reporting period. II.B.1.m.1 Monitoring: Compliance shall be demonstrated as specified in R307-361-8. Continuous Records Review Intermittent No architectural coatings applied during reporting period. II.B.1.m.2 Recordkeeping: Records demonstrating compliance with this condition shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent No architectural coatings applied during reporting period. II.B.1.m.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent No architectural coatings applied during reporting period. II.B.2 Conditions on Opacity-Fugitive Dust: Mining Activities 24 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.2.a Condition: All unpaved roads, other unpaved operational areas that are used by mobile equipment shall be water sprayed and/or chemically treated to control fugitive dust. Treatment shall be of sufficient frequency and quantity to minimize fugitive dust as necessary to meet opacity limitations. All disturbed surfaces or stripped areas shall be controlled by watering or other means until the areas developed surfaces that are not susceptible to wind erosion or are reclaimed. The opacity shall not exceed 20 percent. The permittee is not required to apply water to surfaces during freezing conditions. If chemical treatment is to be used, the plan shall be pre-approved by the Director. [Origin: DAQE- AN0707015-06]. [R307-401-8] Continuous Records Review Intermittent II.B.2.a.1 Monitoring: In lieu of opacity monitoring, daily hours of operation of the water truck(s), and the days when chemical dust suppressants were applied to the areas shall be monitored. If operations have been suspended on unpaved roads and other unpaved operational areas, daily monitoring is not required. Continuous Records Review Intermittent II.B.2.a.2 Recordkeeping: Records of all fugitive dust control measures utilized shall be made on a basis appropriate to ensure fugitive dust was minimized. Records shall include the volume of water applied and location of applications, or the type of chemical dust suppressant applied and location of applications. The methods used to control disturbed or stripped areas shall be recorded as they occur, and include dates and times, the types of control used, volume, and locations. If operations have been suspended on unpaved roads and other unpaved operational areas, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent II.B.2.a.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent II.B.2.b Condition: In addition to the requirements under R307-309-1 through R307- 309-6, the permittee shall minimize fugitive dust as an integral part of site preparation, mining activities, and reclamation operations. Fugitive dust control shall include the measures specified in R307-309-10(3), as applicable. [Origin: R307-309-10]. [R307-309-10] Continuous Records Review Intermittent 25 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.2.b.1 Monitoring: Adherence to the most recently approved fugitive dust control plan shall be monitored to demonstrate that appropriate measures are being implemented to control fugitive dust from mining activities. Continuous Records Review Intermittent II.B.2.b.2 Recordkeeping: Records that demonstrate compliance with this condition and records required by the most recently approved fugitive dust control pan shall be maintained in accordance with the plan and section I.S.1 of this permit. Continuous Records Review Intermittent II.B.2.b.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent II.B.3 Conditions on DS1RK: Rotary Kiln II.B.3.a Condition: Effective upon source startup, emissions of PM from the kiln shall not exceed: II.B.3.a(i) 30.98 lbs/hour and 0.24 grain/dscf. [Origin: DAQE-AN0707015-06]. [R307-401-8] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.a(ii) 0.12 lbs/ton of stone feed (tsf) (3-hr rolling average) [State-only Requirement] [Origin: SIP Section IX.H.12.c]. {SIP Section IX.H.12.c] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.a.1 Monitoring: Stack testing shall be performed as specified below: II.B.3.a.1(a) Monitoring: Frequency. An initial compliance test shall be performed as soon as possible and in no case later than 180 days after startup. Subsequent compliance testing shall be performed at least once annually based upon the date of the last compliance test. The source may also be tested at any time if directed by the Director. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.a.1(b) Monitoring: Notification. At least 30 days before the test, the source shall notify the Director of the date, time, and place of testing and provide a copy of the test protocol. The source shall attend a pretest conference if determined necessary by the Director. The permittee shall notify the Director at least 30 days before a regularly schedule stack test is required, if unit operations have been suspended. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.a.1(c) Monitoring: Methods. 26 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.a.1(c)(1) Monitoring: Sample Location - 40 CFR 60, Appendix A, Method 1 or 1A, or other EPA-approved testing method acceptable to the Director shall be used to select the location of the sampling port and the number of traverse points. Mine Safety and Health Administration (MSHA) approvable access shall be provided to the test location. Sampling sites shall be located at the outlet of the control device(s) and prior to any release to atmosphere. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.a.1(c)(2) Monitoring: 40 CFR 60, Appendix A, Method 2, 2A, 2C, 2D, 2F, 2G or other EPA- approved testing method acceptable to the Director shall be used to determine velocity and volumetric flow rate. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.a.1(c)(3) Monitoring: 40 CFR 60, Appendix A, Method 3, 3A, 3B, or other EPA-approved testing method acceptable to the Director shall be used to conduct gas molecular weight analysis. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.a.1(c)(4) Monitoring: 40 CFR 60, Appendix A, Method 4, or other EPA-approved testing method acceptable to the Director shall be used to measure the moisture content of the stack gas. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.a.1(c)(5) Monitoring: The permittee shall measure PM emissions using 40 CFR 60, Appendix A, Method 5 or 5D, as specified in 40 CFR 63 Subpart AAAAA, Table 5, number 5 or 6 as applicable. The permittee shall conduct three separate test runs for each performance test. Each test run shall last at least 1 hour. Continuous Records Review Intermittent Source did not operate during reporting period. 27 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.a.1(d) Monitoring: Calculations. To determine mass emission rates (lb/hr, etc.) the pollutant concentration as determined by the appropriate methods above shall be multiplied by the volumetric flow rate and any necessary conversion factors determined by the Director to give the results in the specified units of the emission limitation. The emission rate of particulate matter (lb/tsf) from each lime kiln shall be computer for each run using the following equation. E = CkQk/PK Where: E = Emission rate of PM, pounds per ton (lb/ton) of stone feed. Ck = Concentration of PM in the kiln effluent, grain/dry standard cubic feet (gr/dscf) Qk = Volumetric flow rate of kiln effluent gas, dry standard cubic feet per hour (dscf/hr) P = Stone feed rate, tons per hour (ton/hr) K = Conversion factor, 7000 grains per pound (grains/lb) Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.a.1(e) Monitoring: Production Rate During Testing. The production rate during all compliance testing shall be no less than 90% of the maximum production achieved in the previous three (3) years. If the desired production rate is not achieved at the time of the test, the maximum production rate shall be 110% of the tested achieved rate, but not more than the maximum allowable production rate. This new allowable maximum production rate shall remain in effect until successfully tested at a higher rate. The permittee shall request a higher production rate when necessary. Testing at no less than 90% of the higher rate shall be conducted. A new maximum production rate (110% of the new rate) will then be allowed if the test is successful. This process may be repeated until the maximum allowable production rate is achieved. The permittee shall determine the mass rate of stone feed to the kiln during the kiln PM emissions test using any suitable device. The measuring device used shall be accurate to within ±5 percent of the mass rate of stone feed over its operating range. The permittee shall calibrate and maintain the device according to manufacturer's instructions. Continuous Records Review Intermittent Source did not operate during reporting period. 28 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.a.2 Recordkeeping: Results of all stack testing shall be recorded and maintained in accordance with the associated test method. Any information used to determine compliance shall be recorded for all periods when the source is in operation. Any or all of these records shall be made available to the Director upon request. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.a.3 Reporting: The results of stack testing shall be submitted to the Director within 60 days of completion of the testing. Reports shall clearly identify results as compared to permit limits and indicate compliance status. There are no additional reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b Condition: Emissions of PM10 shall be no greater than 24.78 lbs/hour and no greater than 0.19 grain/dscf. [Origin: DAQE-AN0707015-06]. [R307-401-8] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(a) Monitoring: Stack testing shall be performed as specified below: II.B.3.b.1(a)(1) Monitoring: Frequency. Emissions shall be tested every three years. Except as specified in II.B.3.b.1.b) below, if unit operations have been suspended when a regularly scheduled stack test is required, emissions shall be tested within 180 days of resuming operation. The source may also be tested at any time if directed by the Director. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(a)(2) Monitoring: Notification. At least 30 days before the test, the source shall notify the Director of the date, time, and place of testing and provide a copy of the test protocol. The source shall attend a pretest conference is determined necessary by the Director. The permittee shall notify the Director at least 30 days before a regularly scheduled stack test is required, if unit operations have been suspended. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(a)(3) Monitoring: Methods II.B.3.b.1(a)(3)(a) Monitoring: Sample Location - the emission point shall conform to the requirements of 40 CFR 60, Appendix A, Method 1, and Mine Safety and Health Administration (MSHA) approved access shall be provided to the test location. Continuous Records Review Intermittent Source did not operate during reporting period. 29 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.b.1(a)(3)(b) Monitoring: The following methods shall be used to measure filterable particulate emissions: 40 CFR 51, Appendix M, Method 201 or 201A, or other EPA-approved testing method, as acceptable to the Director. If other approved testing methods are used which cannot measure the PM10 fraction of the filterable particulate emissions, all of the filterable particulate emissions shall be considered PM10. The filterable particulate emissions shall be used for compliance demonstration. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(a)(3)(c) Monitoring: The following methods shall be used to measure condensable particulate emissions: 40 CFR 51, Appendix M, Method 202, or other EPA-approved testing method, as acceptable to the Director. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(a)(3)(d) Monitoring: The condensable particulate emissions shall not be used for compliance demonstration, but shall be used for inventory purposes. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(a)(4) Monitoring: Calculations. To determine mass emission rates (lb/hr, etc.) the pollutant concentration as determined by the appropriate methods above shall be multiplied by the volumetric flow rate and any necessary conversion factors determined by the Director to give the results in the specified units of the emission limitation. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(a)(5) Monitoring: Production Rate During Testing. The production rate during all compliance testing shall be no less than 90% of the maximum production achieved in the previous three (3) years. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(b) Monitoring: Within 150 days of either the final permit issuance date or resumption of unit operation, whichever is later, the permittee shall perform a stack test, as required in a) above, while concurrently monitoring the three indicators below. The permittee shall use the test data to justify the appropriateness of the excursion level for each indicator. Within 180 days of either the final permit issuance date or resumption of unit operation, whichever is later, the permittee shall monitor three indicator as specified below to provide reasonable assurance of compliance with the PM10 emission limitation. Continuous Records Review Intermittent Source did not operate during reporting period. 30 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.b.1(b)(1) Monitoring: Measurement Approach: (a) Indicator No. 1: Inlet gas temperature of the electro-dry scrubber shall be measured using a thermocouple. (b) Indicator No. 2: Filter media level shall be monitored with a media sensor. (c) Indicator No. 3: Electrostatic grid voltage shall be measured with a voltmeter. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(b)(2) Monitoring: Indicator Range: Excursions are defined for each of the three indicators as follows. Each excursions triggers an inspection, corrective action, and a reporting requirement. (a) Indicator No. 1: An excursion is defined an average hourly inlet gas temperature less than 355 degrees F. (b) Indicator No. 2: An excursion is defined as the media sensor not detecting the presence of filter media four times during a one- hour block period. (c) Indicator No. 3: An excursion is defined an average hourly voltage less than 5,000 volts. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(b)(3) Monitoring: Performance Criteria: II.B.3.b.1(b)(3)(a) Monitoring: Data Representativeness: 1) Indicator No. 1: A thermocouple shall be installed at the scrubber inlet. The thermocouple shall have a minimum accuracy of +/- 1 percent of range or +/- 3.5 degrees F at 350 degrees F. 2) Indicator No. 2: A filter media sensor shall be installed eight inches from the top of the filter media chamber to detect the presence of filter media. 3) Indicator No. 3: The voltmeter shall measure voltage across the cylindrical grid. The voltmeter shall have a minimum accuracy of +/- 29 volts. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(b)(3)(b) Monitoring: QA/QC Practices and Criteria: 1) Indicator No. 1: The thermocouple shall be calibrated according to the manufacturer's instructions or at least annually. 2) Indicator No. 2: The media sensor shall be checked annually with media above and below sensor level to verify it is responding correctly. 3) Indicator No. 3: The voltmeter shall be calibrated according to the manufacturer's instructions or at least annually. Continuous Records Review Intermittent Source did not operate during reporting period. 31 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.b.1(b)(3)(c) Monitoring: Monitoring Frequency: 1) Indicator No. 1: Temperature shall be measured at least four times per hour. 2) Indicator No. 2: Filter media sensor output shall be observed at least four times per hour. 3) Indicator No. 3: Voltage shall be measured at least four times per hour. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(b)(3)(d) Monitoring: Data Collection Procedure: 1) Indicator No. 1: The permittee shall collect and record four or more temperature measurements equally spaced over each hour and average the values over a one-hour period for comparison to the indicator range. 2) Indicator No. 2: The permittee shall observe and record filter media sensor output at four equally spaced intervals during each one-hour period for comparison to the indicator range. 3) Indicator No. 3: The permittee shall collect and record four or more voltage measurements equally spaced over each hour and average the values over a one-hour period for comparison to the indicator range. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(b)(3)(e) Monitoring: Averaging Period: 1) Indicator No. 1: One-hour block 2) Indicator No. 2: N/A 3) Indicator No.3: One-hour block Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.1(c) Monitoring: During the stack test required in II.B.3.b.1.a) above, the permittee shall acquire new test data to evaluate or update the excursion values for the three indicators. Any resultant changes to the monitoring shall be address in accordance with 40 CFR 64.7(e). Continuous Records Review Intermittent Source did not operate during reporting period. 32 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.b.2 Recordkeeping: Results of all stack testing shall be recorded and maintained in accordance with the associated test method and Provision S.1 in Section I of this permit. The permittee shall maintain records of test data from the most recent stack test and any calculations used to evaluate or revise the indicator range and excursion level. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. In addition to the recordkeeping requirement described in Provision I.S.1 of this permit, the permittee shall maintain a file of the occurrence and duration of any excursion, corrective actions taken, and any other supporting information required to be maintained under 40 CFR 64 (such as data used to document the adequacy of monitoring, or records of monitoring maintenance or corrective actions). Instead of paper records, the permittee may maintain records on alternative media, such as microfilm, computer files, magnetic tape disks, or microfiche, provided that the use of such alternative media allows for expeditious inspection and review, and does not conflict with other applicable recordkeeping requirements. (40 CFR 64.9(b)) Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.3 Reporting: Within 165 days of either the final permit issuance date or resumption of unit operation, whichever is later, the permittee shall submit to the Director the results of the performance test required in II.B.3.b.1.b) and the test data used to justify the appropriateness of the excursion level for each of the three indicators. In addition to the reporting requirements in Provision I.S.2 of this permit, Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.3(a) Reporting: Monitoring reports shall include, at a minimum, the following information as applicable: II.B.3.b.3(a)(1) Reporting: Summary information of the number, duration and cause (including unknown cause, if applicable) of excursions or exceedances, as applicable, and the corrective actions taken; (40 CFR 64.9(a)(2)(i)) Continuous Records Review Intermittent Source did not operate during reporting period. 33 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.b.3(a)(2) Reporting: Summary information of the number, duration and cause (including unknown cause, if applicable) for monitor downtime incidents (other than downtime associated with zero and span or other daily calibration checks, if applicable). (40 CFR 64.9(a)(2)(ii)) Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.b.3(b) Reporting: The results of stack testing required in II.B.3.b.1.a) shall be submitted to the Director within 60 days of completion of the testing. Reports shall clearly identify results as compared to permit limits and indicate compliance status. Reports shall include test data and any calculations used to evaluate or revise the indicator range and excursion level. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.c Condition: Effective upon source startup, emissions of NOx from the kiln shall not exceed: II.B.3.c(i) 75.00 lbs/hr and 650.00 ppm [Origin: DAQE-AN0707015-06]. [R307-401-8] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.c(ii) 56 lbs/hr (3-hr rolling average) [State-only Requirement] [Origin: SIP Section IX.H.12.c] [SIP Section IX.H.12.c] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.c.1 Monitoring: Stack testing shall be performed as specified below: II.B.3.c.1(a) Monitoring: Frequency. An initial compliance test shall be performed as soon as possible and in no case later than 180 days after startup. Subsequent compliance testing shall be performed at least once annually based upon the date of the last compliance test. The source may also be tested at any time if directed by the Director. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.c.1(b) Monitoring: Notification. At least 30 days before the test, the source shall notify the Director of the date, time, and place of testing and provide a copy of the test protocol. The source shall attend a pretest conference if determined necessary by the Director. The permittee shall notify the Director at least 30 days before a regularly scheduled stack test is required, if unit operations have been suspended. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.c.1(c) Monitoring: Methods II.B.3.c.1(c)(1) Monitoring: Sample Location - The emission point shall be designed to conform to the requirements of 40 CFR 60, Appendix A, Method 1, or other EPA-approved testing method acceptable to the Director. Mine Safety and Health Administration (MSHA) approvable access shall be provided to the test location. Continuous Records Review Intermittent Source did not operate during reporting period. 34 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.c.1(c)(2) Monitoring: 40 CFR 60, Appendix A, Method 7E, or other EPA-approved testing method, as acceptable to the Director, shall be used to determine the pollutant emission rate. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.c.1(c)(3) Monitoring: 40 CFR 60, Appendix A, Method 2, 19, or other EPA-approved testing method acceptable to the Director shall be used to determine the volumetric flow rate. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.c.1(d) Monitoring: Calculations. To determine mass emission rates (lb/hr, etc.) the pollutant concentration as determined by the appropriate methods above shall be multiplied by the volumetric flow rate and any necessary conversion factors determined by the Director to give the results in the specified units of the emission limitation. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.c.1(e) Monitoring: Production Rate During Testing. The production rate during all compliance testing shall be no less than 90% of the maximum production achieved in the previous three (3) years. If the desired production rate is not achieved at the time of the test, the maximum production rate shall be 100% of the tested achieved rate, but not more than the maximum allowable production rate. The new allowable maximum production rate shall remain in effect until successfully tested at a higher rate. The permittee shall request a higher production rate when necessary. Testing at no less than 90% of the higher rate shall be conducted. A new maximum production rate (100% of the new rate) will then be allowed if the test is successful. This process may be repeated until the maximum allowable production rate is achieved. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.c.2 Recordkeeping: Results of all stack testing shall be recorded and maintained in accordance with the associated test method. Any information used to determine compliance shall be recorded for all periods when the source is in operation. Any or all of these records shall be made available to the Director upon request. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. 35 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.c.3 Reporting: The results of stack testing shall be submitted to the Director within 60 days of completion of the testing. Reports shall clearly identify results as compared to permit limits and indicate compliance status. There are no additional reporting requirements for this provision except those specified in Section 1 of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.d Condition: Production of quicklime shall be no greater than 12.5 tons per hour annual average and no greater than 100,000 tons per rolling 12 month total. [Origin: DAQE-AN0707015-06]. [R307-401-8] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.d.1 Monitoring: For the annual production limit, within the first 25 days of each month, a 12-month rolling total shall be determined using the records from the previous 12-months. For the hourly limitation, within the first 25 days of each month, the recorded production values shall be divided by the operating hours for the previous 12 months and compared to the limitation. The production and operating hours shall be recorded on a daily basis for all periods of operation. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.d.2 Recordkeeping: Records of production and operating hours shall be kept on a daily basis in accordance with Provision I.S.1 of this permit, for all periods of operation. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.d.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. 36 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.e Condition: The concentration of contaminants or parameters in any used oil fuel burned in the Kiln shall not exceed the following levels: Arsenic 5 ppm by weight, Cadmium 2 ppm by weight, Chromium 10 ppm by weight, Lead 100 ppm by weight, Total Halogens 1,000 ppm by weight, Sulfur 0.5 percent by weight, and Flash Point not less than 100 degrees F. Used oil exceeding any of the above contaminants shall not be burned until the permittee has submitted and received approval of a modeling analysis of the projected emissions for each contaminant, from the Director. The modeling analysis shall show in each case that the resulting concentration of contaminant in the ambient air does not exceed the TLV/100 value for the given contaminant. Any used oil fuel that contains more than 1,000 ppm by weight of total halogens shall be considered a hazardous waste and shall not be burned in the kiln. [Origin: DAQE-AN0707015-06]. [R307-401-8] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.e.1 Monitoring: The permittee shall maintain test certification data for each load of used oil fuel received. Certification shall be either by permittee testing or test reports provided by the used oil fuel vendor. The used oil fuel shall be tested for halogen content by ASTM Method D-808-81, EPA Method 8240 or Method 8260 before used oil fuel is transferred to a holding tank or burned. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.e.2 Recordkeeping: Records of used oil fuel consumption and the test reports shall be kept for all periods when the plant is in operation. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.e.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.f Condition: The permittee shall not allow, cause or permit the emissions of visible contaminants from the gasoline engine. [Origin: R307-305- 3(2)]. [R307-305-3(2)] Continuous Records Review Intermittent Source did not operate during reporting period. 37 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.f.1 Monitoring: A monthly visual opacity survey shall be conducted while the unit is operating by an individual trained on the observation procedures of 40 CFR 60, Appendix A, Method 9. If any visible emissions other than condensed water vapor are observed from an emission point, an opacity determination of that emission point shall be performed in accordance with 40 CFR 52.128, Appendix A, Method 203C within 24 hours of the initial visual opacity survey or upon startup if the unit must be shutdown for maintenance. If the operation of an affected emission unit has been suspended, monitoring is not required. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.f.2 Recordkeeping: The permittee shall record the date of each visual opacity survey. The permittee shall also keep a log of the following information for each observed visual emission: date and time visual emissions observed, emission point location and description, time and date of opacity test, and the results of the opacity monitoring. Records shall be kept of all data required by 40 CFR 52.128, Appendix A, Method 203C. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.f.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.g Condition: Effective upon source startup, SNCR technology shall be installed on the kiln. Startup/shutdown provisions for SNCR technology shall be as follows: Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.g(i) Condition: No ammonia or urea injection during startup until the combustion gases existing the kiln reach the temperature when NOX reduction is effective, and Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.g(ii) Condition: No ammonia or urea injection during shutdown. [Origin: SIP Section IX.H.12.c]. [SIP Section IX.H.12.c] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.g.1 Monitoring: Records required for this permit condition will serve as monitoring. Continuous Records Review Intermittent Source did not operate during reporting period. 38 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.g.2 Recordkeeping: The permittee shall keep records documenting installation of the SNCR technology on the kiln and the required temperature range of the exit gases when NOX reduction is effective. Records of ammonia or urea injection shall be documented in an operating log. The operations log shall include all periods of startup/shutdown, subsequent beginning and ending times of ammonia or urea injection, and the exit temperature of the combustion gases. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records demonstrating compliance with this condition shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.g.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.h Condition: Effective upon source startup: II.B.3.h(i) Condition: Emissions of PM2.5 (filterable + condensable) from the kiln shall not exceed 1.5 lbs/ton of stone feed (3-hr rolling average), and Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.h(ii) Condition: Kiln emissions shall be exhausted through a baghouse during all periods of operation, including startup and shutdown. [Origin: SIP Section IX.H.12.c]. [SIP Section IX.H.12.c] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.h.1 Monitoring: Effective upon source startup, a baghouse control technology shall be installed and operating on the kiln. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.h.1 Monitoring: Stack testing shall be performed as specified below: Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.h.1(a) Monitoring: Frequency: An initial compliance test shall be performed as soon as possible and in no case later than 180 days after startup. Subsequent compliance testing shall be performed at least once annually based upon the date of the last compliance test. The source may also be tested at any time if directed by the Director. Continuous Records Review Intermittent Source did not operate during reporting period. 39 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.h.1(b) Monitoring: Notification: At least 30 days before the test, the source shall notify the Director of the date, time, and place of testing and provide a copy of the test protocol. The source shall attend a pretest conference if determined necessary by the Director. The permittee shall notify the Director at least 30 days before regularly scheduled stack test is required, if unit operations have been suspended. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.h.1(c) Monitoring: Methods. II.B.3.h.1(c)(1) Monitoring: Sample Location - The emission point shall be designed to conform to the requirements of 40 CFR 60, Appendix A, Method 1, or other EPA-approved testing method acceptable to the Director. Mine Safety and Health Administration (MSHA) approved access shall be provided to the test location. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.h.1(c)(2) Monitoring: 40 CFR 51, Appendix M, 201a and 202, or other EPA-approved testing methods acceptable to the Director. The back half condensables shall be used for compliance demonstrations as well as for inventory purposes. If a method other than 201a is used, the portion of the front half of the catch considered PM2.5 shall be based on information in Appendix B of the fifth edition of the EPA document, AP-42, or other data acceptable to the Director. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.h.1(c)(3) Monitoring: 40 CFR 60, Appendix A, Method 2, 19, or other EPA-approved testing method acceptable to the Director shall be used to determine the volumetric flow rate. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.h.1(d) Monitoring: Calculations. To determine mass emission rates (lb/hr, etc.) the pollutant concentration as determined by the appropriate methods above shall be multiplied by the volumetric flow rate and any necessary conversion factors determined by the Director to give the results in the specified units of the emission limitation. Continuous Records Review Intermittent Source did not operate during reporting period. 40 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.3.h.1(e) Monitoring: Production Rate During Testing. The production rate during all compliance testing shall be no less than 90% of the maximum production achieved in the previous three (3) years. If the desired production rate is not achieved at the time of the test, the maximum production rate shall be 110% of the tested achieved rate, but not more than the maximum allowable production rate. The new allowable maximum production rate shall remain in effect until successfully tested at a higher rate. The permittee shall request a higher production rate when necessary. Testing at no less than 90% of the higher rate shall be conducted. A new maximum production rate (110% of the new rate) will then be allowed if the test is successful. This process may be repeated until the maximum allowable production rate is achieved. The permittee shall determine the mass rate of stone feed to the kiln during the kiln PM2.5 emissions test using any suitable device. The measuring device used shall be accurate to within +/- 5 percent of the mass rate of stone feed over its operating range. The permittee shall calibrate and maintain the device according to manufacturer's instructions. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.h.2 Recordkeeping: Results of all stack testing shall be recorded and maintained in accordance with the associated test method. Any information used to determine compliance shall be recorded for all periods when the source is in operation. Any or all of these records shall be made available to the Director upon request. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.3.h.3 Reporting: The results of stack testing shall be submitted to the Director within 60 days of completion of the testing. Reports shall clearly identify results as compared to permit limits and indicate compliance status. There are no additional reporting requirements for this provision except this specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4 Conditions on HBH-1HY: Hydrator II.B.4.a Condition: Emissions of TSP shall be no greater than 1.65 lbs/hour and no greater than 0.075 grain/dscf. [Origin: DAQE-AN0707015-06]. [R307-401-8] Continuous Records Review Intermittent Source did not operate during reporting period. 41 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.4.a.1 Monitoring: Stack testing shall be performed as specified below: II.B.4.a.1(a) Monitoring: Frequency. Emissions shall be tested every three years. If unit operations have been suspended when a regularly scheduled stack test is required, emissions shall be tested within 180 days of resuming operations. Tests may also be required at the direction of the Director. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.a.1(b) Monitoring: Notification. At least 30 days before the test, the source shall notify the Director of the date, time, and place of testing and provide a copy of the test protocol. The source shall attend a pretest conference if determined necessary by the Director. The permittee shall notify the Director at least 30 days before a regularly schedule stack test is required, if unit operations have been suspended. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.a.1(c) Monitoring: Methods II.B.4.a.1(c)(1) Monitoring: Sample Location - the emission point shall conform to the requirements of 40 CFR 60, Appendix A, Method 1, and Mine Safety and Health Administration (MSHA) approved access shall be provided to the test location. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.a.1(c)(2) Monitoring: Sample Method - 40 CFR 60. Appendix A, Method 5 shall be used to determine the particulate matter concentration. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.a.1(d) Monitoring: Calculations. To determine mass emission rates (lb/hr, etc.) the pollutant concentration as determined by the appropriate methods above shall be multiplied by the volumetric flow rate and any necessary conversion factors determined by the Director to give the results in the specified units of the emission limitation. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.a.1(e) Monitoring: Production Rate During Testing. The production rate during all compliance testing shall be no less than 90% of the maximum production achieved in the previous three (3) years. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.a.2 Recordkeeping: Results of all stack testing shall be recorded and maintained in accordance with the associated test method. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision 1.S.1 of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. 42 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.4.a.3 Reporting: The results of stack testing shall be submitted to the Director within 60 days of completion of the testing. Reports shall clearly identify results as compared to permit limits and indicate compliance status. There are no additional reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.b Condition: Emissions of PM10 shall be no greater than 1.32 lbs/hour and no greater than 0.060 grain/dscf. [Origin: DAQE-AN0707015-06]. [R307-401-8] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.b.1 Monitoring: Stack testing shall be performed as specified below: II.B.4.b.1(a) Monitoring: Frequency. Emissions shall be tested every three years. If unit operations have been suspended when a regularly scheduled stack test is required, emissions shall be tested within 180 days of resuming operations. The source may also be tested at any time if directed by the Director. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.b.1(b) Monitoring: Notification. At least 30 days before the test, the source shall notify the Director of the date, time, and place of testing and provide a copy of the test protocol. The source shall attend a pretest conference if determined necessary by the Director. The permittee shall notify the Director at least 30 days before a regularly scheduled stack test is required, if unit operations have been suspended. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.b.1(c) Monitoring: Methods II.B.4.b.1(c)(1) Monitoring: Sample Location - the emission point shall conform to the requirements of 40 CFR 60, Appendix A, Method 1, and Mine Safety and Health Administration (MSHA) approved access shall be provided to the test location. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.b.1(c)(2) Monitoring: The following methods shall be used to measure filterable particulate emissions: 40 CFR 51, Appendix M, Method 201 or 201A, or other EPA-approved testing method, as acceptable to the Director. If other approved testing methods are used which cannot measure the PM10 fraction of the filterable particulate emissions, all of the filterable particulate emissions shall be considered PM10. The filterable particulate emissions shall be used for compliance demonstration. Continuous Records Review Intermittent Source did not operate during reporting period. 43 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.4.b.1(c)(3) Monitoring: The following methods shall be used to measure condensable particulate emissions: 40 CFR 51, Appendix M, Method 202, or other EPA-approved testing method as acceptable to the Director. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.b.1(c)(4) Monitoring: The condensable particulate emissions shall not be used for compliance demonstration, but shall be used for inventory purposes. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.b.1(d) Monitoring: Calculations. To determine mass emission rates (lb/hr, etc.) the pollutant concentration as determined by the appropriate methods above shall be multiplied by the volumetric flow rate and any necessary conversion factors determined by the Director to give the results in the specified units of the emission limitation. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.b.1(e) Monitoring: Production Rate During Testing. The production rate during all compliance testing shall be no less than 90% of the maximum production achieved in the previous three (3) years. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.b.2 Recordkeeping: Results of all stack testing shall be recorded and maintained in accordance with the associated test method. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.b.3 Reporting: The results of stack testing shall be submitted to the Director within 60 days of completion of the testing. Reports shall clearly identify results as compared to permit limits and indicate compliance status. There are no additional reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.c Condition: Production of hydrate shall be no greater than 126,000 tons per rolling 12-month total. [Origin: DAQE-AN0707015-06]. [R307-401- 8] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.c.1 Monitoring: Within the first 25 days of each month, a 12-month rolling total shall be determined using records from the previous 12 months. Production shall be recorded on a daily basis for all periods of operation. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.c.2 Recordkeeping: Records of production and operating hours shall be kept on a daily basis in accordance with Provision I.S.1 of this permit, for all periods of operation. Continuous Records Review Intermittent Source did not operate during reporting period. 44 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.4.c.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.d Condition: Differential pressure across the fabric filter of this baghouse shall be maintained between 0.5 inches to 6.0 inches water gauge. [Origin: DAQE-AN0707015-06]. [R307-401-8] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.d.1 Monitoring: Baghouse pressure drop shall be monitored daily with a pressure gauge when the baghouse is operating. If the pressure differential is outside the range, then the cause shall be investigated and corrective measures taken within two hours of discovering the exceedance, to restore the pressure differential to within range. The pressure gauge shall be located such that an inspector / operator can safety read the indicator at any time. The reading shall be accurate to within plus or minus 6.0% of the reading. The instrument shall be calibrated against a primary standard annually. If operation of the affected emission unit has been suspended, monitoring is not required. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.d.2 Recordkeeping: Results of pressure drop readings shall be recorded. Records shall be maintained of any excursions from the given range, the corrective action taken to restore the pressure differential to within the range, and the time intervals involved. If operation of the affected emission unit has been suspended, the permittee shall record in a log the date the operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.4.d.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.5 Conditions on Opacity-10: 10 Percent Opacity Units II.B.5.a Condition: Visible emissions shall not exceed 10 percent opacity. [Origin: DAQE-AN0707015-06]. [R307-401-8] Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. 45 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.5.a.1 Monitoring: An opacity observation shall be conducted from each of the pre- determined observation locations (A, B, or C) on a monthly basis in accordance with 40 CFR 60, Appendix A, Method 9 on the emission unit of this defined group of units, that appears to have the highest opacity. If the highest unit does not exceed the opacity limitation, no further observations of any other emission units of this group will be required. If this unit exceeds the opacity limitation, the emission unit with the next highest opacity shall be observed until an emission unit of this group does not exceed the opacity limitation. All emission units not observed shall be considered to not exceed the opacity limitation. If operation of an affected emission unit has been suspended, monitoring is not required. Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. II.B.5.a.2 Recordkeeping: The permittee shall record the date of each visual opacity survey and keep a list of the emission points checked during the visual opacity survey. The permittee shall also keep a log of the following information for each observed visual emission: date and time visual emissions observed, emission point location and description, time and date of opacity test, and percent opacity. Records shall be kept of all data required by 40 CFR 60, Appendix A, Method 9. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. II.B.5.a.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. II.B.6 Conditions on Oapcity-20: 20 Percent Opacity Units II.B.6.a Condition: Visible emissions shall be no greater than 20 percent opacity. [Origin: R307-305-3, DAQE-AN0707015-06]. [R307-305-3(1), R307- 401-8] Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. 46 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.6.a.1 Monitoring: An opacity observation shall be conducted from each of the pre- determined observation locations (A, B, or C) on a monthly basis in accordance with 40 CFR 60, Appendix A, Method 9 on the emission unit of this defined group of units, that appears to have the highest opacity. If the highest unit does not exceed the opacity limitation, no further observations of any other emission units of this group will be required. If this unit exceeds the opacity limitation, the emission unit with the next highest opacity shall be observed until and emission unit of this group does not exceed the opacity limitation. All emission units not observed shall be considered to not exceed the opacity limitation. If operation of an affected emission unit has been suspended, monitoring is not required. Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. II.B.6.a.2 Recordkeeping: The permittee shall record the date of each visual opacity survey and keep a list of the emission points checked during the visual opacity survey. The permittee shall also keep a log of the following information for each observed visual emission: date and time visual emissions observed, emission point location and description, time and date of opacity test, and percent opacity. Records shall be kept of all data required by 40 CFR 60, Appendix A, Method 9. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. II.B.6.a.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. II.B.7 Conditions on Opacity: Aggregate Processing Units II.B.7.a Condition: Visible emissions shall not exceed 12 percent opacity from each crusher. [Origin: R307-312]. [R307-312-4] Continuous Records Review Intermittent 47 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.7.a.1 Monitoring: An opacity observation shall be conducted from each of the pre- determined observation locations (A, B, or C) on a monthly basis in accordance with 40 CFR 60, Appendix A, Method 9 on the emission unit of this defined group of units, that appears to have the highest opacity. If the highest unit does not exceed the opacity limitation, no further observations of any other emission units of this group will be required. If this unit exceeds the opacity limitation, the emission unit with the next highest opacity shall be observed until an emission unit of this group does not exceed the opacity limitation. All emission units not observed shall be considered to not exceed the opacity limitation. The duration of the Method 9 observations shall be 30 minutes (five six-minute averages). Compliance shall be based on the average of the five six-minute averages. The duration of the Method 9 may be reduced to 6 minutes (one six-minute average) if the first six-minute average is below the limit. If operation of an affected emission unit has been suspended, monitoring is not required. Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. II.B.7.a.2 Recordkeeping: The permittee shall record the date of each visual opacity survey and keep a list of the emission points checked during the visual opacity survey. The permittee shall also keep a log of the following information for each observed visual emission: date and time visual emissions observed, emission point location and description, time and date of opacity test, and percent opacity. Records shall be kept of all data required by 40 CFR 60, Appendix A, Method 9. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. II.B.7.a.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. II.B.7.b Condition: Visible emissions shall not exceed 7 percent opacity from each screen or each conveyor transfer point. [Origin: R307-312]. [R307- 312-4] Continuous Records Review Intermittent 48 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.7.b.1 Monitoring: An opacity observation shall be conducted from each of the pre- determined observation locations (A, B, or C) on a monthly basis in accordance with 40 CFR 60, Appendix A, Method 9 on the emission unit of this defined group of units, that appears to have the highest opacity. If the highest unit does not exceed the opacity limitation, no further observations of any other emission units of this group will be required. If this unit exceeds the opacity limitation, the emission unit with the next highest opacity shall be observed until an emission unit of this group does not exceed the opacity limitation. All emission units not observed shall be considered to not exceed the opacity limitation. The duration of the Method 9 observations shall be 30 minutes (five six-minute averages). Compliance shall be based on the average of the five six-minute averages. The duration of the Method 9 may be reduced to 6 minutes (one six-minute average) if the first six-minute average is below the limit. If operation of an affected emission unit has been suspended, monitoring is not required. Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. II.B.7.b.2 Recordkeeping: The permittee shall record the date of each visual opacity survey and keep a list of the emission points checked during the visual opacity survey. The permittee shall also keep a log of the following information for each observed visual emission: date and time visual emissions observed, emission point location and description, time and date of opacity test, and percent opacity. Records shall be kept of all data required by 40 CFR 60, Appendix A, Method 9. If operation of an affected emission unit has been suspended, the permittee shall record in a log the date operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. II.B.7.b.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Opacity observations completed on those sources that were operational during the reporting period. II.B.8 Conditions on TANKS: Petroleum Storage Tanks 49 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term Condition: For the gasoline storage tank: The permittee shall not allow gasoline to be handled in a manner that would result in vapor release to the atmosphere for extended periods of time. Measures to be taken include, but are not limited to, the following: i) Minimize gasoline spills; ii) Clean up spills expeditiously as practicable; iii) Cover all open gasoline containers and all gasoline storage tank fill-pipes with a gasketed seal when not in use; iv) Minimize gasoline sent to open waste collection systems that collect and transport gasoline to reclamation and recycling devices, such as oil/water separators. At all times, the permittee shall operate and maintain any affected emission unit, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. Determination of whether such operation and maintenance procedures are being used will be based on information available which may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source. Continuous Records Review Intermittent The permittee shall comply with the applicable provisions in 40 CFR 63.1-15 as identified in Table 3 of 40 CFR 63 Subpart CCCCCC. [Origin: 40 CFR 63 Subpart CCCCCC]. [40 CFR 63.11111(b), 40 CFR 63.11115, 40 CFR 63.11116, 40 CFR 63.11130] Continuous Records Review Intermittent II.B.8.a.1 Monitoring: Records required for this permit condition will serve as monitoring. Additionally, the permittee shall comply with the applicable general provisions in 40 CFR 63.1.-15 as identified in Table 3 of 40 CFR Subpart CCCCCC. [40 CFR 63.11130] Continuous Records Review Intermittent II.B.8.a 50 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.8.a.2 Recordkeeping: The permittee shall keep records demonstrating monthly throughput is less than the 10,000 gallon threshold level. Records shall be available within 24 hours of a request by the Director to document gasoline throughput in the affected emission unit. [40 CFR 63.11111(e), 40 CFR 63.11116(b)] The permittee shall keep records of the occurrence and duration of each malfunction of operation (i.e., process equipment) or the air pollution control and monitoring equipment. Records shall be kept of actions taken during periods of malfunction to minimize emissions, including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation. [40 CFR 63.11115(b), 40 CFR 63.11125(d)] The permittee shall comply with the applicable general provisions in 40 CFR 63.1-15 as identified in Table 3 of 40 CFR 63 Subpart CCCCCC. [40 CFR 63.11130] Documentation shall be kept that demonstrates compliance with this provision. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent II.B.8.a.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent II.B.8.b Condition: For the gasoline storage tank: The permittee shall maintain records of the average monthly storage temperature, the type of liquid, throughput quantities, and the maximum true vapor pressure for each tank containing a petroleum liquid with a true vapor pressure greater than 7.0 kPa (1.0 psia). [Origin: R307-327- 4]. [R307-327-4] Continuous Records Review Intermittent Document is maintained II.B.8.b.1 Monitoring: Records required for this permit condition will serve as monitoring. Continuous Records Review Intermittent II.B.8.b.2 Recordkeeping: Records of the average monthly storage temperature, the type of liquid, throughput quantities, and the maximum true vapor pressure shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent II.B.8.b.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent II.B.9 Conditions on 10-5, DC-10FF: Baghouse #10 51 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.9.a Condition: Differential pressure across the fabric filter of this baghouse shall be maintained between 0.5 inches to 6.0 inches water gauge. [Origin: DAQE-AN0707015-06]. [R307-401-8] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.9.a.1 Monitoring: Baghouse pressure drop shall be monitored daily with a pressure gauge when the baghouse is operating. If the pressure differential is outside the range, then the cause shall be investigated and corrective measures taken within two hours of discovering the exceedance, to restore the pressure differential within the range. The pressure gauge shall be located such that an inspector/operator can safely read the indicator at any time. The reading shall be accurate to within plus or minus 6.0% of the reading. The instrument shall be calibrated against a primary standard annually. If operation of the affected emissions unit has been suspended, monitoring is not required. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.9.a.2 Recordkeeping: Results of pressure drop readings shall be recorded. Records shall be maintained of any excursions from the given range, the corrective action taken to restore the pressure differential to within the range, and the time intervals involved. If operation of the affected emission unit has been suspended, the permittee shall record in a log the date the operations are suspended and the date operations are resumed. Records shall be maintained in accordance with Provision I.S.1 of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.9.a.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.10 Conditions on NESHAP-SI RICE: NESHAP Stationary SI RICE II.B.10.a Condition: The permittee shall comply with the following at all times for each emergency affected emission unit: II.B.10.a.(i) Condition: The permittee shall operate the affected emission unit to the requirements in 40 CFR 63.6640(f). In order for the engine to be considered an emergency stationary RICE under 40 CFR 63 Subpart ZZZZ, any operation other than as described in 40 CFR 63.6640(f) is prohibited. If the engine is not operated in accordance with 40 CFR 63.6640(f), it will not be considered an emergency engine and shall meet all requirements for non- emergency engines. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.10.a.(i)(a) Condition: There is no time limit on the use of emergency stationary RICE in emergency situations. Continuous Records Review Intermittent Source did not operate during reporting period. 52 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.10.a.(i)(b) Condition: Emergency stationary RICE may be operated for any combination of the purposes specified in 40 CFR 63.6240(f)(2) for a maximum of 100 hours per calendar year. Any operation for non- emergency situations as allowed by 40 CFR 63.6240(f)(4) counts as part of the 100 hours per calendar year allowed by this paragraph. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.10.a.(i)(b)(i) Condition: Emergency stationary RICE may be operated for maintenance checks and readiness testing, provided that the tests are recommended by Federal, State, or local government, the manufacturer, the vendor, the regional transmission organization or equivalent balancing authority and transmission operator, or the insurance company associated with the engine. A petition for approval of additional hours to be used for maintenance checks and readiness testing is not required if the permittee maintains records indicating that Federal, State, or local standards require maintenance and testing of emergency RICE beyond 100 hours per calendar year. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.10.a.(i)(c) Condition: The permittee may operate the affected emission unit up to 50 hours per calendar year in non-emergency situations as specified in 40 CFR 63.6640(f)(4). Continuous Records Review Intermittent Source did not operate during reporting period. II.B.10.a.(ii) Condition: The permittee shall meet the following requirements at all times, except during periods of startup: II.B.10.a.(ii)(a) Condition: Change oil and filter every 500 hours of operation or annually, whichever comes first; Continuous Records Review Intermittent Source did not operate during reporting period. II.B.10.a.(ii)(b) Condition: Inspect spark plugs every 1,000 hours of operation or annually, whichever comes first, and replace as necessary; Continuous Records Review Intermittent Source did not operate during reporting period. II.B.10.a.(ii)(c) Condition: Inspect all hoses and belts every 500 hours of operation or annually, whichever comes first, and replace as necessary. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.10.a.(ii) Condition: During periods of startup, the permittee shall minimize the engine's time spent at idle and minimize the engine's startup time to a period needed for appropriate and safe loading of the engine, not to exceed 30 minutes, after which time the non- startup emission limitations apply. Continuous Records Review Intermittent Source did not operate during reporting period. 53 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.10.a.(iii) Condition: The permittee shall comply with the applicable general provisions in 40 CFR 63.1-15 as identified in Table 8 of 40 CFR 63 Subpart ZZZZ. [Origin: 40 CFR 63 Subpart ZZZZ]. [40 CFR 63.6595(a)(1), 40 CFR 63.6603(a), 40 CFR 63.6605(a), 40 CFR 63.6625(h), 40 CFR 63.6640(f), 40 CFR 63.6665, 40 CFR 63 Subpart ZZZZ Table 2d, 40 CFR 63 Subpart ZZZZ Table 8] Continuous Records Review Intermittent Source did not operate during reporting period. Monitoring: The permittee shall install a non-resettable hour meter if one is not already installed. [40 CFR 63.6625(f)] If in an emergency engine is operating during an emergency and it is not possible to shut down the engine in order to perform the management practice requirements on the required schedule, or if performing the management practice on the required schedule would otherwise pose an unacceptable risk under Federal, State, or local law, the management practice can be delayed until the emergency is over or the unacceptable risk under Federal, State, or local law has abated. The management practice shall be performed as soon as practicable after the emergency has ended or the unacceptable risk under Federal, State, or local law has abated. [40 CFR 63 Subpart ZZZZ Table 2d Footnote 2] The permittee shall demonstrate continuous compliance by operating and maintaining the stationary RICE and after- treatment control device (if any) according to the manufacturer's emission-related written operation and maintenance instructions or develop and follow their own maintenance plan which must provide to the extent practicable for the maintenance and operation of the engine in a manner consistent with good air pollution control practice for minimizing emissions. [40 CFR 63.6625(e), 40 CFR 63.6640(a), 40 CFR 63 Subpart ZZZZ Table 6] The permittee has the option of utilizing an oil analysis program in order to extend the specified oil change requirement in accordance with 40 CFR 63.6625(j). The permittee shall comply with the applicable general provisions in 40 CFR 63.1-15 as identified in Table 8 of 40 CFR 63 Subpart ZZZZ. [40 CFR 63.665]. II.B.10.a.1 Continuous Records Review Intermittent Source did not operate during reporting period. 54 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term Recordkeeping: The permittee shall keep the records describe in 40 CFR 63.6655(a)(1)-(5) as applicable. [40 CFR 63.6655(a)] For each affected emission unit that does not meet the standard applicable non-emergency engines, the permittee shall keep records of the hours of operation of the engine that are recorded through the non-resettable hour meter. The permittee shall document how many hours are spent for emergency operation, including what classified the operation as emergency and how many hours are spent for non-emergency operation. If the engine is used for the purposes specified in 40 CFR 63.6640(f)(4)(ii), the permittee shall keep records of the notification of the emergency situation, and the date, start time, and end time of engine operation for these purposes. [40 CFR 63.6655(f)] If additional hours are to be used for maintenance checks and readiness testing, the permittee shall maintain records indicating that Federal, State, or local standard require maintenance and testing emergency RICE beyond 100 hours per calendar year. [40 CFR 63.6640(f)(2)(i)] The permittee shall keep records that demonstrate continuous compliance with each applicable operating limitation [including, but not limited to, the manufacturer's emission-related operation and maintenance instructions or the permittee-developed maintenance plan]. [40 CFR 63.6655(d), 40 CFR 63 Subpart ZZZZ Table 6] Records of the maintenance conducted shall be kept in order to demonstrate that the permittee operated and maintained the affected emission unit and after-treatment control device (if any) according to their own maintenance plan. [40 CFR 63.6655(e)] The permittee shall comply with the applicable general provisions in 40 CFR 63.1-15 as identified in Table 8 of 40 CFR 63 Subpart ZZZZ. [40 CFR 63.6665] Records shall be maintained in accordance with 40 CFR 63.6660 and Provision I.S.1 if this permit. II.B.10.a.2 Continuous Records Review Source did not operate during reporting period. Intermittent 55 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.B.10.a.3 Reporting: The permittee shall report any failure to perform the management practice on the schedule required and the Federal, State, or local law under which the risk was deemed unacceptable. [40 CFR 63 Subpart ZZZZ Table 2d Footnote 2] The permittee shall comply with the applicable general provisions in 40 CFR 63.1-15 as identified in 40 CFR 63 Subpart ZZZZ Table 8. [40 CFR 63.6665] The permittee shall also report each instance in which it did not meet the applicable requirements in Table 8. [40 CFR 63.6640(e)] There are no additional reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.10.b Condition: At all times, the permittee shall operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. The general duty to minimize emissions does not require the permittee to make any further efforts to reduce emissions if levels required by this standard have been achieved. Determination of whether such operation and maintenance procedures are being used will be based on information available to the Administrator which may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source. [Origin: 40 CFR 63 Subpart ZZZZ]. [40 CFR 63.6595(a)(1), 40 CFR 63.6605(b)] Continuous Records Review Intermittent Source did not operate during reporting period. II.B.10.b.1 Monitoring: Records required for this permit condition will serve as monitoring. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.10.b.2 Recordkeeping: The permittee shall keep records described in 40 CFR 63.6655(a)(1)-(5) as applicable. [40 CFR 63.6655(a)] The permittee shall document activities performed to assure proper operation and maintenance. Records shall be maintained in accordance with 40 CFR 63.6660 and Provision I.S.1 of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.B.10.b.3 Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. Continuous Records Review Intermittent Source did not operate during reporting period. II.C Emission Trading (R307-415-6a(10)) Not applicable to this source. 56 of 57 Lhoist North America of Arizona, Inc. Grantsville Plant (Permit No. 4500005004) Annual Compliance Certification Reporting Period: January 1, 2023 through December 31, 2023 Permit Condition Compliance Status (Intermittent / Continuous) Method of Determining Compliance Data Type (Intermittent / Continuous)Comments NotesPermit Term II.D Alternative Operating Scenarios (R307-415-6a(9)) Not applicable to this source. III Permit Shield The following requirements have been determined to be not applicable to this source in accordance with Provision I.M, Permit Shield: III.A - 40 CFR 60, Subpart Kb (Standards or Performance for Volatile Organic Liquid Storage Vessels) This regulation is not applicable to the TANKS: Petroleum Storage Tanks for the following reason(s): The four tanks are each below the tank size threshold of 10,566 gallons. [Last updated November 13, 2020] IV Acid Rain Provisions This source is not subject to Title IV. This section is not applicable. 57 of 57