Loading...
HomeMy WebLinkAboutDWQ-2025-003109 Date: 2-26-2025 Time: 2:00 pm  Facility: Dalton Pig Farm Permit #:   Address: Circleville, UT County: Piute  Facility Representatives: Jade Dalton  DWQ Representatives: Woodrow Campbell  Reason for Inspection: Final construction inspection of new Pond 2  Weather Conditions: Brisk, breezy, sunny      CONSTRUCTION INSPECTION General Comments: New Pond 2 has been completed. Clean water and rain water were in the bottom as ballast to keep liner down during wind events. The last photo shows a seam of concern in the future. I mentioned this to Jade. Closing Conference: /Signature  Copy Sent to Facility Yes   Woodrow Campbell, P.E. Environmental Engineer Groundwater Protection Permitting Utah Division of Water Quality wwcampbell@utah.gov Photos wwcampbell@utah.gov Photos Panoramic View of new pond / / Close ups at various places around the pond / / / / / / This is the photo in the NE corner that I mention to Jade to just keep an eye on this area because on the right side of the seam this could be an area of wekness