HomeMy WebLinkAboutDWQ-2025-003109
Date:
2-26-2025
Time:
2:00 pm
Facility:
Dalton Pig Farm
Permit #:
Address:
Circleville, UT
County:
Piute
Facility Representatives:
Jade Dalton
DWQ Representatives:
Woodrow Campbell
Reason for Inspection:
Final construction inspection of new Pond 2
Weather Conditions:
Brisk, breezy, sunny
CONSTRUCTION INSPECTION
General Comments: New Pond 2 has been completed. Clean water and rain water were in the bottom as ballast to keep liner down during wind events. The last photo shows a seam of
concern in the future. I mentioned this to Jade.
Closing Conference:
/Signature
Copy Sent to Facility
Yes
Woodrow Campbell, P.E.
Environmental Engineer
Groundwater Protection Permitting
Utah Division of Water Quality
wwcampbell@utah.gov
Photos
wwcampbell@utah.gov
Photos
Panoramic View of new pond
/
/
Close ups at various places around the pond
/
/
/
/
/
/
This is the photo in the NE corner that I mention to Jade to just keep an eye on this area because on the right side of the seam this could be an area of wekness