Loading...
HomeMy WebLinkAboutDERR-2025-002393Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name SHIVWITS BAND OF PAIUTES INDIAN TRIBE OF UTAH Address 5861 W OLD HWY 91 IVINS, UT 84738 Contact SHIVWITS BAND OF PAIUTES INDIAN TRIBE OF UTAH Phone Email msumma80@gmail.com TANK LOCATION Name SHIVWITS CONVENIENCE MARKET Address 5861 W OLD HWY 91 IVINS, UT 84738 A Operator MINNETTE SUMMA Phone (435) 231-0188 B Operator SAME Phone SAME Facility ID: 6001004 Inspection Date: 03/27/2025 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 13/14 Gas/Diesel Yes Steel Flex in Sump Nov. 6, 2013 Nov. 6, 2013 Yes No June 7, 2022 None 2 - 15/16 Gas/Diesel Yes Steel Flex in Sump April 25, 2016 None Yes No June 7, 2022 None 3 - 11/12 Gas/Diesel Yes Steel Flex in Sump April 25, 2016 None Yes No Aug. 17, 2022 None 4 - 9/10 Gas/Diesel Yes Steel Flex in Sump July 21, 2022 July 21, 2022 Yes No Aug. 17, 2022 None 5 - 7/8 Gas/Diesel Yes Steel Flex in Sump July 21, 2022 July 21, 2022 Yes No Aug. 17, 2022 None 6 - 5/6 Gas/Diesel Yes Steel Flex in Sump July 21, 2022 July 21, 2022 Yes No Aug. 17, 2022 None 7 - 3/4 Gas/Diesel Yes Steel Flex in Sump July 21, 2022 July 21, 2022 Yes No Aug. 17, 2022 None 8 - 1/2 Gas/Diesel Yes Steel Flex in Sump July 21, 2022 July 21, 2022 Yes No Aug. 17, 2022 None TANK DETAILS Tank ID/Alt ID 1 / 1 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc Nov. 13, 2013 / 20000 / North Substance Stored Gasoline / Regular Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-350 Interstitial Monitor LTT Test None LLD Test Dec. 26, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Vaporless LD2000 Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeInterstitialDblWalled CP Tank Test None CP Pipe Test None 2025-03-28 Page 1 of 12 Tank ID/Alt ID 2 / 2A E-Gen/AST No / No Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc Nov. 6, 2013 / 12000 / Southwest Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-350 Interstitial Monitor LTT Test None LLD Test Dec. 26, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Vaporless LD2000 Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeInterstitialDblWalled CP Tank Test None CP Pipe Test None Tank ID/Alt ID 3 / 2B E-Gen/AST No / No Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc Nov. 6, 2013 / 8000 / Southeast Substance Stored Gasoline / Premium Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-350 Interstitial Monitor LTT Test None LLD Test Dec. 26, 2024 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Vaporless LD2000 Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeInterstitialDblWalled CP Tank Test None CP Pipe Test None Tank ID/Alt ID 4 / 3 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc March 16, 2016 / 10000 / Single - Separate excavation Substance Stored Diesel / Off-road Diesel Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-350 Interstitial Monitor LTT Test None LLD Test Dec. 26, 2024 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Vaporless LD2000 Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeInterstitialDblWalled CP Tank Test None CP Pipe Test None 2025-03-28 Page 2 of 12 Tank ID/Alt ID 5 / 4A E-Gen/AST No / No Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc July 21, 2022 / 10000 / North Substance Stored Gasoline / Regular Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-350 Interstitial Monitor LTT Test None LLD Test Dec. 26, 2024 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Vaporless LD2000 Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeInterstitialDblWalled CP Tank Test None CP Pipe Test None Tank ID/Alt ID 6 / 4B E-Gen/AST No / No Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc July 21, 2022 / 8000 / South Substance Stored Gasoline / Non-Ethanol Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-350 Interstitial Monitor LTT Test None LLD Test Dec. 26, 2024 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Vaporless LD2000 Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeInterstitialDblWalled CP Tank Test None CP Pipe Test None INSPECTION COMMENTS None 2025-03-28 Page 3 of 12 FACILITY RESPONSES Financial Responsibility Financial responsibility method is ok?Yes The above accurately represents the facility's release detection records Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?Yes Is the site unmanned?Yes Is a sign posted in a conspicuous area giving the name and telephone number of a person in case of an emergency and if the station is manned part of the time, are C operators trained? Yes Does the site have emergency shutoff device?Yes TANK RESPONSES Tank 1 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank 1 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 1 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 1 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 2A Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes 2025-03-28 Page 4 of 12 Tank 1 ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 1 ATG/IM Does the ATG system have a valid annual test?Yes Does the Containment Sump have a valid 3-year test?Yes Tank 2A Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank 2A Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 2A Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 2B Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 2B Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 2B Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 3 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 3 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes 2025-03-28 Page 5 of 12 Tank 2A ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 2A ATG/IM Does the ATG system have a valid annual test?Yes Does the Containment Sump have a valid 3-year test?Yes Tank 2B Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank 3 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 4A Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 4A Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 4A Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 4B Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 4B Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 4B Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes 2025-03-28 Page 6 of 12 Tank 2B ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 2B ATG/IM Does the ATG system have a valid annual test?Yes Does the Containment Sump have a valid 3-year test?Yes Tank 3 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes 2025-03-28 Page 7 of 12 Tank 3 ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 3 ATG/IM Does the ATG system have a valid annual test?Yes Does the Containment Sump have a valid 3-year test?Yes Tank 4A Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes 2025-03-28 Page 8 of 12 Tank 4A ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 4A ATG/IM Does the ATG system have a valid annual test?Yes Does the Containment Sump have a valid 3-year test?Yes Tank 4B Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes 2025-03-28 Page 9 of 12 Tank 4B ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 4B ATG/IM Does the ATG system have a valid annual test?Yes Does the Containment Sump have a valid 3-year test?Yes DISPENSER RESPONSES Dispenser 15/16 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 9/10 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 13/14 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 11/12 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes 2025-03-28 Page 10 of 12 Dispenser 5/6 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1/2 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 7/8 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 3/4 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes MONTHLY LEAK DETECTION MONITORING Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 4 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 5 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 6 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass NON-COMPLIANCE ITEMS All items are in compliance. 2025-03-28 Page 11 of 12 Prepared by fueloperator.com Inspection Information Inspector:Perdue, Laura Record Created: March 28, 2025, 10:08 a.m. Inspection Date:March 27, 2025 2025-03-28 Page 12 of 12