March 20, 2024
Brent Arns
Environmental Engineer
Utah Department of Environmental Quality
Division of Drinking Water
P.O. Box 144830
Salt Lake City, Utah 84114-4830
Re: Request for Operating Permit for the Pilot Peak Waterline Phase 5 Project
System #23008, File #13374
Dear Brent,
In response to the letter of plan approval dated June 5, 2023 (attached), we would like to request an
operating permit for the Pilot Peak Waterline Phase 5 Project. The contractor, Saul Mendoza
Construction, has completed the construction, and the waterline has been pressure tested. The operating
permit check list is addressed below.
The following eight items address the conditions that must be met for compliance with Utah
Administrative Code R309-500 through 550 to receive an operating permit.
1.Certification of Rule Conformance by a PE that all conditions of Plan Approval were
accomplished, and if applicable, changes made during construction were in conformance with
rules R309-500 through 550.
Bowen Collins & Associates performed construction observation throughout the construction period.
Bowen, Collins & Associates certifies that, insofar as can be observed, all conditions of the plan
approval was met and all changes comply with R309-500 through 550.
2.As-built or record drawings incorporating all changes to approved plans and specifications (unless
no changes were made to the previously approved plans during construction).
The total length of pipe was increased from 972 linear feet to 1,488 linear feet, Station 360+90 to
station 346+03. No other changes were made during construction. All changes were installed in
conformance with the UAC rules.
3.Confirmation that as-built or record drawings have been received by the water system.
The as-built record drawings are attached to this letter for this project. This letter shall serve to
provide documentation that, for the Pilot Peak Waterline Phase 5 Project, the approved design
drawings were modified by Bowen, Collins & Associates per the reviewer’s and the construction
contractor’s redlined notes for the water improvements installation. The modified plans will serve as
the record drawings for the project. These plans have also been provided to the City for
documentation.
Pilot Peak Waterline Phase 5
Request for Operating Permit
March 20, 2024
Page 2
4.Satisfactory bacteriological samples as evidence of proper disinfection and flushing in accordance
with the appropriate ANSI/AWWA Standards:
☐ ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water Mains
Two consecutive sample sets at least 16 hours apart, none positive (every 1200 feet,
end-of-line, each branch)
☐ ANSI/AWWA C652-11 AWWA Standard for Disinfection of Water-Storage Facilities
One or more samples, none positive
☐ ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment Plants
Two consecutive samples per unit, none positive, no less than 30 minutes apart
☐ ANSI/AWWA C654-13 AWWA Standard for Disinfection of Wells
Two consecutive samples, none positive, no less than 30 minutes apart
This is a raw waterline that conveys water to a water treatment plant located at Leppy Pass.
Therefore no disinfection was performed. Proper flushing was accomplished in accordance with the
applicable standards.
5.Water quality data, where appropriate [For example, include raw and finished water data that
demonstrate satisfactory performance of the treatment facility; sample should be taken from a
storage tank for residual volatile organic compounds after tank interior re-coating; etc.]
Not applicable for this waterline.
6.If applicable, all other documentation that may have been required during the plan review process
Not applicable for this waterline.
7.If applicable, confirmation that the water system owner has received the O&M manual for the new
facility
Not applicable for this waterline.
8.If applicable, location data of new storage tank, treatment facility, or source
Location of the waterline is as shown on the record as-built drawings submitted with this operating
permit request.
This should address all requirements of plan approval for the project for the operating permit for the
portion of the project included in this request. Should you have any questions or require additional
information, you may contact me at (801) 495-2224.
Sincerely,
Bowen, Collins & Associates
Eric Neil, P.E.
Principal
c.c. Glenn Wadsworth – Wendover City Administrator
System Name:
System Number:
Address:
City, State, Zip:
Name:
Title:
Address:
City, State, Zip:
Phone No.:
E-mail Address:
Name:
Company:
Address:
City, State, Zip:
Phone No.:
E-mail Address:
Name:
Company:
Address:
City, State, Zip:
E-mail Address:
Name:
Duration (hrs):
1-Jun-23
eneil@bowencollins.com
R309-511-4(1)(a)(iii)
Draper, Utah 84020
154 E. 14075 S.
801-495-2224
Community Development Block Grant (HUD)
Phone No.:
8b. If YES, specify rule reference below [R309-511-4(1)(a)(i)-(iv)]:
Phone No.: 435-665-2345
Wendover, Utah Fire Department
9. State or Federal Agency Funding:
8a. Is the project exempt from the Hydraulic Model Report requirement? [see
R309-511-4(1)(a)(i) through (iv)]
[ERC = Equivalent Residential Connection; SRF = State Revolving Fund]
435-665-7771
7/1/2023
3. Professional Engineer (PE) Responsible for System Oversight (if
applicable)
4. Professional Engineer (PE) Responsible for Design of this Project
Begin Construction:
Complete Construction:
Bowen, Collins & Associates
7. Anticipated Construction Schedule (if applicable):
Advertise for Bids:
5. Local Fire Code Official & Required Fire Flow for Proposed Project
1-Mar-23
Draper, Utah 84020
801-495-2224
eneil@bowencollins.com
154 E. 14075 S.
2. Name and Address for Official Correspondence (Mayor, Public Works
Director, Administrative Contact, etc.)
Submit (preferably by email) the completed PNF with plans and specifications to DDW.
Email completed form & documents to ddwpnf@utah.gov or mail to: Utah Division of Drinking Water
P.O. Box 144830, Salt Lake City, Utah 84114-4830, (801) 536-4200
Wendover, Utah 84083
P.O. Box 430
1. Public Water System (PWS) Information
City of Wendover Utah
23008
Req'd flow (gpm):
Loan #
City, State, Zip: Wendover, Utah 84083
E-mail Address:N/A
PROJECT NOTIFICATION FORM (PNF)
Utah Division of Drinking Water (DDW)
Present No. of ERCs system is obligated to serve:
No. of ERCs this project will add:
1600Population Served:
6. Project Description (provide a unique facility name, location, and sufficient
details to specifically identify the project):
DDW - Plan Review File No.:
DDW - Date Received:
Please provide the following information for a proposed Public Drinking Water Project.
For a new public water system (PWS) also complete a New PWS Application Form (see DDW website).
1-Apr-23
gwadsworth@wendoverut.us
Bowen, Collins & Associates Bid Opening:
https://deq.utah.gov/drinking-water/plan-review-program-tools
Checklists for use in preparing plans for review by DDW are available at:
The Pilot Peak Waterline Phase 5 Project includes replacing 972 linear feet of 8-inch
pipeline with 14-inch class 53 ductile iron transmission pipeline with bonded joints
and test stations in the salt flat playa north of Wendover, Utah.
Wendover, Utah 84083
Eric Neil
Eric Neil
Glenn Wadsworth
P.O. Box 430
City Administrator
Yes No
Drinking Water Board (SRF or FSRF)
Community Impact Board (CIB)
None
Other (Specify)
DDW- Eng-0004 Page 1 of 1 3/22/2018