Loading...
HomeMy WebLinkAboutDDW-2024-006987 154 East 14075 South Draper, Utah 84020 Tel: (801) 495-2224 Fax: (801) 495-2225 March 20, 2024 Brent Arns Environmental Engineer Utah Department of Environmental Quality Division of Drinking Water P.O. Box 144830 Salt Lake City, Utah 84114-4830 Re: Request for Operating Permit for the Pilot Peak Waterline Phase 5 Project System #23008, File #13374 Dear Brent, In response to the letter of plan approval dated June 5, 2023 (attached), we would like to request an operating permit for the Pilot Peak Waterline Phase 5 Project. The contractor, Saul Mendoza Construction, has completed the construction, and the waterline has been pressure tested. The operating permit check list is addressed below. The following eight items address the conditions that must be met for compliance with Utah Administrative Code R309-500 through 550 to receive an operating permit. 1.Certification of Rule Conformance by a PE that all conditions of Plan Approval were accomplished, and if applicable, changes made during construction were in conformance with rules R309-500 through 550. Bowen Collins & Associates performed construction observation throughout the construction period. Bowen, Collins & Associates certifies that, insofar as can be observed, all conditions of the plan approval was met and all changes comply with R309-500 through 550. 2.As-built or record drawings incorporating all changes to approved plans and specifications (unless no changes were made to the previously approved plans during construction). The total length of pipe was increased from 972 linear feet to 1,488 linear feet, Station 360+90 to station 346+03. No other changes were made during construction. All changes were installed in conformance with the UAC rules. 3.Confirmation that as-built or record drawings have been received by the water system. The as-built record drawings are attached to this letter for this project. This letter shall serve to provide documentation that, for the Pilot Peak Waterline Phase 5 Project, the approved design drawings were modified by Bowen, Collins & Associates per the reviewer’s and the construction contractor’s redlined notes for the water improvements installation. The modified plans will serve as the record drawings for the project. These plans have also been provided to the City for documentation. Pilot Peak Waterline Phase 5 Request for Operating Permit March 20, 2024 Page 2 4.Satisfactory bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA Standards: ☐ ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water Mains Two consecutive sample sets at least 16 hours apart, none positive (every 1200 feet, end-of-line, each branch) ☐ ANSI/AWWA C652-11 AWWA Standard for Disinfection of Water-Storage Facilities One or more samples, none positive ☐ ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment Plants Two consecutive samples per unit, none positive, no less than 30 minutes apart ☐ ANSI/AWWA C654-13 AWWA Standard for Disinfection of Wells Two consecutive samples, none positive, no less than 30 minutes apart This is a raw waterline that conveys water to a water treatment plant located at Leppy Pass. Therefore no disinfection was performed. Proper flushing was accomplished in accordance with the applicable standards. 5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.] Not applicable for this waterline. 6.If applicable, all other documentation that may have been required during the plan review process Not applicable for this waterline. 7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility Not applicable for this waterline. 8.If applicable, location data of new storage tank, treatment facility, or source Location of the waterline is as shown on the record as-built drawings submitted with this operating permit request. This should address all requirements of plan approval for the project for the operating permit for the portion of the project included in this request. Should you have any questions or require additional information, you may contact me at (801) 495-2224. Sincerely, Bowen, Collins & Associates Eric Neil, P.E. Principal c.c. Glenn Wadsworth – Wendover City Administrator System Name: System Number: Address: City, State, Zip: Name: Title: Address: City, State, Zip: Phone No.: E-mail Address: Name: Company: Address: City, State, Zip: Phone No.: E-mail Address: Name: Company: Address: City, State, Zip: E-mail Address: Name: Duration (hrs): 1-Jun-23 eneil@bowencollins.com R309-511-4(1)(a)(iii) Draper, Utah 84020 154 E. 14075 S. 801-495-2224 Community Development Block Grant (HUD) Phone No.: 8b. If YES, specify rule reference below [R309-511-4(1)(a)(i)-(iv)]: Phone No.: 435-665-2345 Wendover, Utah Fire Department 9. State or Federal Agency Funding: 8a. Is the project exempt from the Hydraulic Model Report requirement? [see R309-511-4(1)(a)(i) through (iv)] [ERC = Equivalent Residential Connection; SRF = State Revolving Fund] 435-665-7771 7/1/2023 3. Professional Engineer (PE) Responsible for System Oversight (if applicable) 4. Professional Engineer (PE) Responsible for Design of this Project Begin Construction: Complete Construction: Bowen, Collins & Associates 7. Anticipated Construction Schedule (if applicable): Advertise for Bids: 5. Local Fire Code Official & Required Fire Flow for Proposed Project 1-Mar-23 Draper, Utah 84020 801-495-2224 eneil@bowencollins.com 154 E. 14075 S. 2. Name and Address for Official Correspondence (Mayor, Public Works Director, Administrative Contact, etc.) Submit (preferably by email) the completed PNF with plans and specifications to DDW. Email completed form & documents to ddwpnf@utah.gov or mail to: Utah Division of Drinking Water P.O. Box 144830, Salt Lake City, Utah 84114-4830, (801) 536-4200 Wendover, Utah 84083 P.O. Box 430 1. Public Water System (PWS) Information City of Wendover Utah 23008 Req'd flow (gpm): Loan # City, State, Zip: Wendover, Utah 84083 E-mail Address:N/A PROJECT NOTIFICATION FORM (PNF) Utah Division of Drinking Water (DDW) Present No. of ERCs system is obligated to serve: No. of ERCs this project will add: 1600Population Served: 6. Project Description (provide a unique facility name, location, and sufficient details to specifically identify the project): DDW - Plan Review File No.: DDW - Date Received: Please provide the following information for a proposed Public Drinking Water Project. For a new public water system (PWS) also complete a New PWS Application Form (see DDW website). 1-Apr-23 gwadsworth@wendoverut.us Bowen, Collins & Associates Bid Opening: https://deq.utah.gov/drinking-water/plan-review-program-tools Checklists for use in preparing plans for review by DDW are available at: The Pilot Peak Waterline Phase 5 Project includes replacing 972 linear feet of 8-inch pipeline with 14-inch class 53 ductile iron transmission pipeline with bonded joints and test stations in the salt flat playa north of Wendover, Utah. Wendover, Utah 84083 Eric Neil Eric Neil Glenn Wadsworth P.O. Box 430 City Administrator Yes No Drinking Water Board (SRF or FSRF) Community Impact Board (CIB) None Other (Specify) DDW- Eng-0004 Page 1 of 1 3/22/2018