Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRC-2023-072116 - 0901a06881274dfc
State of Utah Mail - Fwd: FW: [EXTERNAL] Energy Solutions Class A Waste Phase 5 Cover Schedule - Week of September 11, 2… Deq submit <dwmrcsubmit@utah.gov> Fwd: FW: [EXTERNAL] Energy Solutions Class A Waste Phase 5 Cover Schedule - Week of September 11, 2023 1 message LLRW DWMRC <llrw@utah.gov>Tue, Sep 12, 2023 at 9:03 AM To: Deq submit <dwmrcsubmit@utah.gov> drc ---------- Forwarded message --------- From: Shauna L. Watkins <slwatkins@energysolutions.com> Date: Mon, Sep 11, 2023 at 4:34 PM Subject: FW: [EXTERNAL] Energy Solutions Class A Waste Phase 5 Cover Schedule - Week of September 11, 2023 To: LLrw@utah.gov <LLrw@utah.gov>, carlo Romano (cromano@utah.gov) <cromano@utah.gov> Cc: Curtis Kirk <ckirk@energysolutions.com>, Dave Booth <dbooth@energysolutions.com> Here is the updated weekly schedule. Sincerely, SHAUNA WATKINS Quality Assurance Specialist ENERGYSOLUTIONS LLC 299 South Main Street, Suite 1700 Salt Lake City, Utah 84111 O: 801-649-2072 C: 435-882-7841 slwatkins@energysolutions.com From: dcummings@brokenarrowusa.com <dcummings@brokenarrowusa.com> Sent: Monday, September 11, 2023 3:57 PM To: Todd L. Stewart <tlstewart@energysolutions.com>; Garrett Q. Dutson <gqdutson@energysolutions.com>; Shauna L. Watkins <slwatkins@energysolutions.com> Cc: Shane Martin <shanemartin39@yahoo.com>; kcummings@brokenarrowusa.com; Jared Bunn <jbunn@brokenarrowusa.com> Subject: [EXTERNAL] Energy Solutions Class A Waste Phase 5 Cover Schedule - Week of September 11, 2023 DRC-2023-072116 State of Utah Mail - Fwd: FW: [EXTERNAL] Energy Solutions Class A Waste Phase 5 Cover Schedule - Week of September 11, 2… EXTERNAL: This message is from a NON-EnergySolu ons sender, please ensure it is from a legitimate source. DO NOT click links or open attachments if sender is unknown or the message seems suspicious in any way. Good Afternoon All, Attached is the updated schedule for the CAW PH5 Cover Project. You’ll notice that we lost a few days due to removing sandbags and cover protection, but we expect to gain those days back as we move forward with the schedule. Regards, Dave David Cummings | SR. Vice President | Broken Arrow Inc. 8960 Clinton Landing Road | Lake Point | Utah | 84074 O: (801) 355-0527 | F: (801) 252-7501 | M: (435) 241-0010 3 attachments image001.jpg 8K 9/12/23, 9:41 AM State of Utah Mail - Fwd: FW: [EXTERNAL] Energy Solutions Class A Waste Phase 5 Cover Schedule - Week of September 11, 2… https://mail.google.com/mail/b/AEoRXRQ5a2w9uENiigJ-WQ2CEbdJEsZyEASBSnlhwDhlse4ay-Ql/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…3/3 image001.jpg 8K 2023 ES CAW PH5 Cover Sch Update 09.11.23.pdf 104K Energy Solutions / Class A West Final Cover Phase 5 Schedule 2023 Activity ID Activity Description Orig Dur Rem Dur Early Start Early Finish % 03 JUL 2023 10 AUG 2024 17 SEP 24 OCT 31 NOV 07 DEC 14 JAN 21 FEB 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 Project Duration Summary 100 Total Working Days 84 *71 *23AUG23 18DEC23 16 110 Total Calendar Days 118 *99 *23AUG23 18DEC23 16 Mobilization / Project Setup 200 Pre-Construction Meeting - Phase 5 0 0 10JUL23 A 100 210 Mobilization Project Support Equipment 5 0 15AUG23 18AUG23 100 220 Project Access Preparation / Safety Training 2 0 22AUG23 23AUG23 100 Radon Barrier Activities 300 Earthwork Duration - Phase 5 52 *33 *23AUG23 13OCT23 37 310 Radon Barrier 1x10-6 Clay Layer 13 5 23AUG23 15SEP23 65 320 Radon Barrier 5x10-8 (Top) Clay Layer 8 8 18SEP23 28SEP23 0 330 Radon Barrier 5x10-8 (Side Slope) Clay Layer 6 6 28SEP23 06OCT23 0 360 Finish Grading & Perimeter Ditch Clay Backfill 5 5 06OCT23 13OCT23 0 Filter and Protection Layers 400 Filter and Protection Duration - Phase 5 42 *42 *06OCT23 05DEC23 0 410 Type B Filter Zone Placement & Grading 10 10 06OCT23 20OCT23 0 420 Sacrificial Soil Placement & Grading 10 10 20OCT23 03NOV23 0 430 Type A Filter Zone Placement 7 7 02NOV23 13NOV23 0 440 Type B Rip Rap Placement & Grading 7 7 10NOV23 21NOV23 0 450 Type A Rip Rap Placement 6 6 21NOV23 29NOV23 0 460 Type A & Type B Rip Rap Tie-in and Access 4 4 29NOV23 05DEC23 0 Drainage Improvements / Haul Road Construction 500 Drainage and Access Improvements 7 *7 *05DEC23 14DEC23 0 510 Provide and Place 8 oz. Geotextile /3 3 05DEC23 08DEC23 0 520 Inspection / Haul Road W/30-30 Combi Grid 4 4 08DEC23 14DEC23 0 Clay Processing and Stockpiling Section 5 600 Clay Mining Processing & Stockpiling 34 *20 *22AUG23 06OCT23 42 610 Mine and Process Radon Barrier 1x10-6 Clay 5 2 22AUG23 12SEP23 65 620 Mine and Process Radon Barrier 5x10-8 Clay 15 15 15SEP23 *06OCT23 0 Completion & Certification 700 Project Cleanup & Demobilization 2 2 14DEC23 18DEC23 0 710 Project Completed & Accepted 0 0 18DEC23 0 Total Working Days Total Calendar Days Pre-Construction Meeting - Phase 5 Mobilization Project Support Equipment Project Access Preparation / Safety Training Earthwork Duration - Phase 5 Radon Barrier 1x10-6 Clay Layer Radon Barrier 5x10-8 (Top) Clay Layer Radon Barrier 5x10-8 (Side Slope) Clay Layer Finish Grading & Perimeter Ditch Clay Backfill Filter and Protection Duration - Phase 5 Type B Filter Zone Placement & Grading Sacrificial Soil Placement & Grading Type A Filter Zone Placement Type B Rip Rap Placement & Grading Type A Rip Rap Placement Type A & Type B Rip Rap Tie-in and Access Way Drainage and Access Improvements Provide and Place 8 oz. Geotextile / Sandbags Inspection / Haul Road W/30-30 Combi Grid Clay Mining Processing & Stockpiling Mine and Process Radon Barrier 1x10-6 Clay Layer Mine and Process Radon Barrier 5x10-8 Clay Layer Project Cleanup & Demobilization Project Completed & Accepted Early start point Early finish point Early bar Progress bar Critical bar Summary bar Progress point Critical point Summary point Start milestone point Finish milestone point Project Owner - Energy Solutions Contractor - Broken Arrow Inc. Date Revision Checked Approved 11SEP23 D.Cummings SM DC 05SEP23 D.Cummings SM DC 28AUG23 D.Cummings SM DC 18AUG23 D.Cummings SM DC Start date 10JUL23 Finish date 18DEC23 Data date 11SEP23 Run date 11SEP23 Page number 1A © Primavera Systems, Inc.