Loading...
HomeMy WebLinkAboutDDW-2025-002952 State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Tim Davis Executive Director DIVISION OF DRINKING WATER Nathan Lunstad, Ph.D., P.E. Director March 10, 2025 Mt. Tabby Improvement Group Inc. ℅ Michael Goodman 2729 East Durban Road Sandy, Utah 84093 Subject: Amended Enforcement Order Schedule – Mt Tabby Springs Subdivision UTAH07009 Dear Michael Goodman, According to the Stipulated Order to Disinfect issued on October 3, 2024, the Division of Drinking Water (DDW) has reviewed the plan submitted by Mt Tabby Improvement Group on December 26, 2024,to address the requirements for secondary disinfection at Mt Tabby Spring (WS001). Based on this review, DDW approves the submitted plan and, in accordance with the terms of the Order, hereby issues the attached Amended Enforcement Order Schedule. This amended schedule reflects the modifications, milestone dates, and final compliance date as proposed in the approved plan. As stipulated in the Order, this Amended Enforcement Order Schedule supersedes and replaces all previous schedules but does not alter the terms or obligations outlined in the original Order, which remains in full force and effect. Please review the attached schedule and ensure that all required actions are completed in accordance with the specified deadlines. If you have any questions or require further clarification, please contact Sarah Page at sepage@utah.gov or 385-272-5778.. Thank you for cooperating to ensure continued safety for the Mt. Tabby Springs drinking water system and its residents. Sincerely, Nathan Lunstad Ph.D., P.E.. Division of Drinking Water Enclosure: Amended Enforcement Order Schedule cc: Tim Davis, Utah Department of Environmental Quality, tim.davis@utah.gov Nathan Hall, P.E., Utah Department of Environmental Quality, nhall@utah.gov Joe Hadlock, Tri-County Health Department, jhadlock@tricountyhealthut.gov Bret Randall, Utah Attorney General’s Office. bfrandall@agutah.gov Christopher Brown, Environmental Protection Agency-Region 8, brown.christopher.t@epa.gov EQDWMonitoring, EQDWCOA, EQDWVSA, and EQDWFS Amended Stipulated Order to Treat Schedule UTAH07009 System Name: Mt Tabby Springs Subdivision System Number: UTAH07009 Administrative Contact: Michael Goodman Email: goomhy9824@yahoo.com Phone Number: 801-842-9675 Corrective Action Requirements and Due Dates Date of Issuance:______________________ Mt Tabby Spring, WS001 Item #1 Code Facility Deficiency Rule Citation S001 WS001 Unapproved Source In Service R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) Corrective Action Completion Due Date Submit documentation showing adequate secondary chlorination has been installed. August 1, 2025 Item #2 Code Facility Required Action Rule Citation S001 WS001 Secondary Disinfection R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) Corrective Action Completion Due Date Submit construction drawings and project notification form to DDW for plan approval. April 1, 2025 Item #3 Code Facility Required Action Rule Citation S001 WS001 Secondary Disinfection R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) Corrective Action Completion Due Date Request an Operating Permit for a new chlorination facility from the Division of Drinking Water. June 1, 2025 IT IS SO ORDERED AND AGREED. DIVISION OF DRINKING WATER By: Nathan Lunstad, Ph.D., P.E. Director DATE: March 10, 2025