HomeMy WebLinkAboutDWQ-2025-002807Rusty Webster
Webster Construction, LLC
1771 South State Road 32
Francis, UT 84036
Subject:Construction Storm Water Inspection at Francis City Hall, UPDES Permit No.UTRC08570, located in Francis, UT
Dear Mr. Webster,
On March 7, 2025,Shaunna Mills from the Utah Division of Water Quality (DWQ) performed a Notice of Termination (NOT) inspection on the subject site. DWQ performs NOT inspections on sites
which disturb greater than an acre of land, or less than an acre but are part of a larger common plan of development that have completed the active phase of construction to verify they
have met the conditions required to terminate coverage. A NOT had been submitted to notify DWQ of the completion of this project.As a result of the inspection, the site was found to
have met the requirements, and permit coverage has been terminated.
If you have any questions, please feel free to contact me at shaunnamills@utah.gov or 385-522-3238.
Sincerely,
Shaunna Mills
Construction Storm Water Inspector
Utah Division of Water Quality
CC: 1) Nathan Brooks - Summit County Health Department (nbrooks@summitcountyutah.gov)
UPDESSTORMWATERNOTICEOFTERMINATION INSPECTION FORM
BACKGROUNDINFORMATION
Site Name:
Francis City Hall
UPDES Permit #:
UTRC08570
Site Address:
2317 South Spring Hollow Road, Francis
Local Jurisdiction or County:
Summit County
Permit Effective Date:
Permit Expiration Date:
Total Project Area:
1.0 acres
Total Disturbed Area:
1.0 acres
Project Type:
Residential
OPERATOR CONTACT INFORMATION
NAMES
PHONE NUMBERS
E-MAIL
Operator:
Rusty Webster
435-783-6631
rwebsterconstruction@gmail.com
Onsite Facility Contact:
Important Contacts:
Important Contacts:
NOTICE OF TERMINATION (NOT) INSPECTION
Inspected By:
Shaunna Mills
Date of Evaluation:
March 7, 2025
Title/Organization: Construction Stormwater Inspector / DWQ
YES
NO
N/A
1.Hasthesiteachievedfinalstabilization?(>70%vegetativeand/ornon-vegetativecoverforalldisturbedareas)(CGP8.2.1.a,2.2.14.b;CPP1.7.1)*
Yes
2.Haveallconstructionmaterials,wasteandwastehandlingdevicesbeenremoved?(CGP8.2.1.b;CPP2.4)
Yes
3.Havealltemporarystormwatercontrolsbeenremoved?(CGP8.2.1.c)
Yes
4.Haveallpollutantsandpollutant-generatingactivitiesbeenremoved?(CGP8.2.1.d;CPP2.8,2.9)
Yes
5.Iflandscapingwillbecompletedbythehomeowner,havetemporarysedimentanderosioncontrolsbeeninstalled?(CGP8.2.4;CPP1.7.2)
Not Applicable
*ProvidecommentsforexceptionsunderCGP2.2.14.b(3)(aridconditions,restoredag.land,orareastoremaindisturbed).
COMMENTS:
All NOT requirements are complete.
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
Inspector:
Shaunna Mills
Construction Stormwater Inspector
Shaunna Mills
March 25, 2025
(Print Name)
(Title)
(Signature)
(Date)
Modified 08/24
UPDESSTORMWATERNOTICEOFTERMINATION
PHOTO LOG
Photo 1
Front view of the newly completed Francis City Hall.
Photo 2
Rear view of the newly completed Francis City Hall.
Photo 1
Inlet with BMPs removed.