DAQC-311-25
Site ID 13098 (B1)
Cassidy Ovard
Quality Crushing
956 South Canyon Drive
Cedar City, Utah 84720
Dear Mr. Ovard:
Re: Quality Crushing – Temporary Relocation/Operation, Notice of Intent – Emery County
Your Notice of Intent dated March 17, 2025, to relocate portable aggregate equipment to the
temporary project located northwest on UT-31 toward the 200 West/North Loop Road, near
Huntington, Utah, was received by the Utah Division of Air Quality (DAQ) and has been
reviewed.
The following equipment has been approved for operation for this temporary project:
500 TPH jaw crusher
300 TPH screen
Two 400 TPH screens
400 TPH cone crusher
400 TPH impact crusher
700 kW generator
The above equipment has been approved for temporary projects in the State of Utah by the
Approval Order (AO) DAQE-AN130980008-18 dated May 2, 2018. Approval is granted to
relocate and operate this equipment at the new location for a period not to exceed 180 operational
days. As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this
temporary site may be for up to 180 working days in any calendar year not to exceed 365
consecutive days, starting from the initial relocation date. Approval is subject to the conditions of
the dust control plan submitted for this location and the above portable AO. Hours of operation
shall be held to 12 hours each day. The maximum production rate shall be held to the requested
500 tons per hour. Emissions for this project have been estimated at the following:
/ % Û á Û Ù Û Þ
DAQC-311-25
Page 2
Pollutant gram/sec lbs/hr lbs/24 hr tons/yr
PM10 1.97 15.67 156.71 12.22
SOx 0.78 6.16 61.56 4.80
NOx 5.15 40.91 409.11 31.91
CO 1.36 10.75 107.54 8.39
VOC 0.21 1.68 16.83 1.31
The owner/operator shall maintain records of the actual operation hours, days, and production
rate, of the above referenced equipment at this relocation site and have the ability to submit the
information to the DAQ upon the request of representatives of the director. Please make certain
that the plant operator is aware of all the location specific requirements for this site and the
conditions of the aforementioned AO.
NSPS Subpart OOO requires that initial Method 9 observations be performed for all applicable
portable crushers, screens, and attached conveyors. Subpart OOO also mandates that all crushers
constructed, modified, or reconstructed on or after April 22, 2008, which are not enclosed, must
install spray bars on the equipment and keep maintenance records to ensure proper spray bar
operations.
Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary
project. Please refer to Utah DEQ Water Quality’s current storm water construction requirements
for additional information.
This approval for relocation in no way releases the owner or operator from any liability for
compliance with all other applicable federal, state, and local regulations including the UAC.
If you have any questions regarding this relocation authorization or the temporary relocation
process please contact Susan Weisenberg at (385) 306-6512.
Sincerely,
Jay P. Morris
Assistant Director
JPM:SW:rh
Enclosure: Submitted Temporary Relocation Form
Map and Distance Correspondence
cc: Southeast Utah Health Department
4 * - - $ . — - A F v A ? A D @ @ w A G ˜
Susan Weisenberg <sweisenberg@utah.gov>
Portable/Temporary Relocation Form
1 message
noreply@qemailserver.com <noreply@qemailserver.com>Mon, Mar 17, 2025 at 4:49 PM
Reply-To: trigger@qemailserver.com
To: sweisenberg@utah.gov
Susan/Chad:
Site # -- Quality Crushing has requested a Temporary Relocation. Please see the information below. Any attachments
can be access by clicking on the links.
Recipient Data:
Time Finished: 2025-03-17 16:49:40 MDT
IP: 207.135.242.180
ResponseID: R_33d1IIBLzvROOzL
Link to View Results: Click Here
URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/2_
z0Ynf4xVWqfxkov5L7lhxfAXwVICC-8OdF0gEmssJ26luXDhBCTBOwU8ItFKZtG2Ibm4M47WIjh5i0iTfx4GFR2xSw
S5G1pPsC7yEm4Z7ahndW-5UxLRfkmBSs57pB5K8GUbqLpQ8M0xAN3XYkZ3zTpmKfZgGZwdxtN0gVUUcqb
FX4XTUStFwWPHoGl8HIYIEeoh0Du1ajr7Zxs4mIeRSv_yNy6BhqpxQVLjfnCQ5c4T0hFSU0F6ALlw_
0jo2e9xhqv8fIIKnBQEp3r2ZcBQ41UwCeg2dUHDqZ59w4_xMFX1MQtWNXy4YUUzlIPRgJfkGQVpYRAM5LwWdskOKPIg
Response Summary:
Please fill out the information below:
Contact Person: Cassidy Ovard
Company Name: Quality Crushing
Mailing Address: 956 South Canyon Drive
City: Cedar City
Zip: 84720
Phone Number: 4354219103
Email: qualitycrushing@yahoo.com
Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea...
Yes
All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo...
2124B0BFAE
Briefly give directions to the site and/or physical address:
Head NW on UT-31 W toward N 200 W/N loop road.
Proposed Relocation Information:
Closest City Huntington
County Emery
UTM X Coordinates 499083.64
UTM Y Coordinates 4356257.91
Approximate distance to the nearest house/business 440 yards
UTM X Coordinates to nearest house/business 498914.92
UTM Y Coordinates to nearest house/business 4356063.06
Does this site currently have a permit with DAQ?
Unknown
3/24/25, 5:48 PM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1826857600973144555%7Cmsg-f:1826883410966238433&s…1/2
Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX)
(DAQE-AN0130980003-08)
Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine...
1
Equipment Type Generator
Make/Model 700 kw
2
Equipment Type Jaw Crusher
Design Capacity 500 tph
3
Equipment Type Screen
Design Capacity 300 tph
4
Equipment Type Screen
Design Capacity 400 tph
5
Equipment Type Screen
Design Capacity 400 tph
6
Equipment Type Cone Crusher
Design Capacity 400 tph
7
Equipment Type Impact Crusher
Design Capacity 400 tph
Please attach a site diagram showing the equipment layout and general site dimensions for this re...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_bBY8pHmjFtkio5H
Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for...
No
Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re...
Total Hours of operation per 24 hr period 12
Starting time of operation (am/pm) 7:00 am
Ending time of operation (am/pm) 7:00 pm
Maximum hourly production rate for project 500 tph
Expected startup date 03/24/2025
Expected completion date 03/01/2025
What type of application is this for?
New Application
In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_V4kim4um4uAbKvL
Owner/Operator Representative:
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_11jR0r9GDdu6cvx
3/24/25, 5:48 PM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1826857600973144555%7Cmsg-f:1826883410966238433&s…2/2
Susan Weisenberg <sweisenberg@utah.gov>
Re: Temporary relocation permit for Quality Crushing - Huntington pit
1 message
Gene Henrie <qualitycrushing@yahoo.com>Tue, Mar 18, 2025 at 2:57 PM
To: Susan Weisenberg <sweisenberg@utah.gov>
Hi Susan,
Yes, sorry about that. 2026 is the correct date. I was looking at a map when I submitted that form. The structure looks like
a shed and some silos, and possibly a house. I was measuring from the very edge of the gravel pit to the structure. I'll
attach a map of it so you can verify. Let me know if I can do anything else to help.
Thanks,
Cass
3/24/25, 5:46 PM State of Utah Mail - Re: Temporary relocation permit for Quality Crushing - Huntington pit
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1826951138933067532%7Cmsg-f:1826966945121441904&s…1/3
On Tuesday, March 18, 2025 at 02:08:43 PM MDT, Susan Weisenberg <sweisenberg@utah.gov> wrote:
Hello, I am now processing your relocation request to the Huntington site. Your relocation form states that the equipment
is located 440 yards away from the nearest house/business. Because that distance is quite close, can you give me more
information about what this nearest structure is? Also, your form states that the completion date is March 1, 2025. Can I
assume 2026? Thanks
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
---------- Forwarded message ---------
From: Susan Weisenberg <sweisenberg@utah.gov>
Date: Tue, Mar 18, 2025 at 1:51 PM
3/24/25, 5:46 PM State of Utah Mail - Re: Temporary relocation permit for Quality Crushing - Huntington pit
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1826951138933067532%7Cmsg-f:1826966945121441904&s…2/3
Subject: Re: Temporary relocation permit for Quality Crushing - Huntington pit
To: Gene Henrie <qualitycrushing@yahoo.com>
I did receive your submission, see the attached copy. I've also attached your current portable AO. If you look at this 2018
permit it references all of the equipment in the most generic terms possible so that you don't have to match up specific
equipment identifiers anymore. Just as a heads up, the DAQ will soon issue a portable equipment Rule that will eliminate
the requirement to identify a specific portable AO. Instead we will just reference the new Rule requirement on the
relocation letters and will not worry about where each piece of equipment comes from.
In the meantime, I will reference your 2018 AO on this relocation letter to Huntington. I will let you know if I need any more
information regarding this specific project. Thanks
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
On Tue, Mar 18, 2025 at 10:46 AM Gene Henrie <qualitycrushing@yahoo.com> wrote:
Hi Susan,
I hope you're doing well and having a good week.
Yesterday, I submitted a temporary relocation request for a pit near Huntington, Utah. I just wanted to follow up and
make sure I did that correctly or see if I needed to do anything else.
Thanks,
Cassidy Ovard
(435) 421-9103
Quality Crushing
3/24/25, 5:46 PM State of Utah Mail - Re: Temporary relocation permit for Quality Crushing - Huntington pit
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1826951138933067532%7Cmsg-f:1826966945121441904&s…3/3
Susan Weisenberg <sweisenberg@utah.gov>
Re: Temporary relocation permit for Quality Crushing - Huntington pit
1 message
Gene Henrie <qualitycrushing@yahoo.com>Thu, Mar 20, 2025 at 2:43 PM
To: Susan Weisenberg <sweisenberg@utah.gov>
Hi Susan,
We believe that's the closest structure that is inhabited. It's roughly 3/4 of a mile from where Quality Crushing is going to
set up. Let me know if I can help with anything else or if you have any other questions.
Thanks,
Cass
On Wednesday, March 19, 2025 at 11:53:54 AM MDT, Susan Weisenberg <sweisenberg@utah.gov> wrote:
Thanks, that is very useful information. The purpose of getting the distance information on the nearest house/business is
to estimate an emissions impact. Please provide a distance for the nearest building that typically has people inside if
possible.
Susan Weisenberg,
3/24/25, 5:56 PM State of Utah Mail - Re: Temporary relocation permit for Quality Crushing - Huntington pit
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1826951138933067532%7Cmsg-f:1827147287144664165&s…1/2
Environmental Scientist
Office: 385-306-6512
On Wed, Mar 19, 2025 at 11:50 AM Gene Henrie <qualitycrushing@yahoo.com> wrote:
Hi Susan,
I had Gene drive over to that structure yesterday afternoon to see exactly what it was. He said it looks like it's been
abandoned. He was going to check with the pit's owners to see if he could get any more information on it.
Thanks,
Cass
On Tuesday, March 18, 2025 at 01:51:20 PM MDT, Susan Weisenberg <sweisenberg@utah.gov> wrote:
I did receive your submission, see the attached copy. I've also attached your current portable AO. If you look at this
2018 permit it references all of the equipment in the most generic terms possible so that you don't have to match up
specific equipment identifiers anymore. Just as a heads up, the DAQ will soon issue a portable equipment Rule that will
eliminate the requirement to identify a specific portable AO. Instead we will just reference the new Rule requirement on
the relocation letters and will not worry about where each piece of equipment comes from.
In the meantime, I will reference your 2018 AO on this relocation letter to Huntington. I will let you know if I need any
more information regarding this specific project. Thanks
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
On Tue, Mar 18, 2025 at 10:46 AM Gene Henrie <qualitycrushing@yahoo.com> wrote:
Hi Susan,
I hope you're doing well and having a good week.
Yesterday, I submitted a temporary relocation request for a pit near Huntington, Utah. I just wanted to follow up and
make sure I did that correctly or see if I needed to do anything else.
Thanks,
Cassidy Ovard
(435) 421-9103
Quality Crushing
3/24/25, 5:56 PM State of Utah Mail - Re: Temporary relocation permit for Quality Crushing - Huntington pit