HomeMy WebLinkAboutDAQ-2025-001548Clean Harbors Aragonite, LLC
I1600 North Aptus Road
Aragonite, UT 84029
435.884.8100
www.cleanharbors.com
Jlune 3,2024
Sent Via FedEx: 81829436 4230
I,TAH DEPABTMENT OF
EWIRONMENTAL OUALITY
JUN - 6 ?024
-p[aurd itx[iu'e'ta
DIVISION OF AIR QUALITY
Mr. Bryce Bird, Director
Division of Air Quality
Department of Environmental Quality
195 North 1950 West
Salt Lake City, Utah 84116
RE: Semi-Annual40 CFR 61 Subpart V and 40 CFR 63 Subpart DD Reports
Clean Harbors Aragonite, LLC
Title V Operating Permit #4500048004
Dear Mr. Bird,
In accordance with Title V Operating Permit Condition II.8.3.b.3 and requirements found in 40
CFR 6l .247(b) and 40 CFR 63.697(a)(5), Clean Harbors Aragonite, LLC is submitting the Semi-
Annual 40 CFR 6l Subpart V Report and 40 CFR 63 Subpart DD Pressure Relief Device
Periodic Report. These reports cover the time period from December 2023 through May 2024.
For the Semi Annual40 CFR 6l Subpart V Report the following information is addressed:
l. Process unit identification.
2. For each month during the semiannual reporting period,i. Number of valves for which leaks were detected as described in paragraph (b) of
Section VII of this condition.ii. Number of Valves for which leaks were not repaired as required in paragraph (b)
of Section VII of this condition.iii. Number of pumps for which leaks were detected a described in paragraph (b)
section III of this condition.iv. Number of pumps for which leaks were not repaired as required in paragraph (c)
section III of this condition.v. The facts that explain any delay in repairs and, where appropriate, why a process
unit shutdown was technically infeasible.
3. Dates of process unit shutdowns which occurred within the semiannual reporting period.
"People and Technologt Creating a Better Environment"
REVIEWEDInitials:Date: March 24, 2025Compliance Status: OKFile #: 10725 (B2)
4. Revisions to items reported according to paragraph (a) of 40 CFR 61.247 if changes have
occurred since initial report or subsequent revisions to the initial report.
5. The results of all performance tests and monitoring to determine compliance with no
detectable emissions with sections X and XI of this condition conducted within the
semiannual reporting period.
See the attached report with the required information.
For the 40 CFR 63 Subpart DD Pressure Relief Device Periodic Report the following
information is addressed :
1. Monitoring results during the monitoring period of pressure relief devices in off-site
material service subject to 63.961(c).
2. For pressure relief devices in gas/vapor service subject to 63.691(c)(2)(i) any instrument
reading of 500 ppm above background or greater detected 5 days after the pressure
release.
3. For pressure relief devices in off-site material service subject to 63.691(c)(3) any
pressure release to the atmosphere including:
a. The source, nafure, and cause of the pressure release.
b. Date, time, and duration of the pressure release.
c. An estimate of the quantity of HAP listed in Table I of this subpart emitted
during the pressure release and the method used for determining this quantity.
d. The actions taken to prevent this pressure release.
e. The measures adopted to prevent future such pressure releases.
See the attached report with the required information.
In accordance with Permit Condition I.K and Utah Administrative Code R307-415-5d,I certifr
under penalty of law that this document and all attachments were prepared under my direct
supervision in accordance with a system designed to assure that qualified personnel properly
gather and evaluate the information submitted. Based upon my inquiry of persons or persons who
manage the system, or those persons directly responsible for gathering the information submitted
is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of imprisonment
for known violations.
Should you have any questions concerning this matter, please call me at the number below.
Sincerely,7U-w
Kenneth Banks
Senior Environmental Compliance Manager
Clean Harbors Aragonite, LLC
11600 North Aptus Road
PO Box 1339
Grantsville, Utah 84029 -1339
(o) 435.884.8233
(c) 435.579.s193
B anks.kenneth@c leanharbors. com
www.cleanharbors.com
cc: Environmental Protection Agency, Region VIII, Air Permitting and Monitoring Branch
REVIEWEDInitials:Date: March 24, 2025Compliance Status: OKFile #: 10725 (B2)
Semi-Annual 40 CFR 61 Subpart V Report
Process Unit ldentification
A process unit is defined is 40 CFR 61.241 as:
"Process Unit means equipment assembled to produce a volatile hazardous air pollutant
(VHAP) or its derivates as intermediates or final products, or equipment assemble to use a
I/HAP in the production of a product. A process unit can operate independently if supplied with
sfficientfeed."
CHA does not operate any equipment that meets this definition.
Monitoring of Valves and Pumps
o December 2023
o Valves:No leaks were detected, as indicated by an instrument reading of 10,000
ppm or greater.
o Pumps: No leaks were detected as indicated by no visual leaks or instrument
readings of 10,000 ppm or greater.
January 2024
o Valves: No leaks were detected, as indicated by an instrument reading of 10,000
ppm or greater.
o Pumps: No leaks were detected as indicated by no visual leaks or instrument
readings of 10,000 ppm or greater.
Febrtary 2024
o Valves: Three (3) valves were found visually leaking and no delay in repairs was
needed.. A Manual Valve (SL-MVI36) was found to have a visual leak on
21812024. The valve was replaced, and bolts were re-torqued, and the leak
was repaire d on 219 12024.t A Manual Valve (SL-MV090) was found to have a visual leak on 21812024.
The valve was replaced, and the leak repaired on21912024.t A Manual Valve (7321-MV0l4) was found to have a visual leak on
212212024. The valve was repaired and connections tightened, and the leak
was repaire d on 2123 12024.
o Pumps: No leaks were detected as indicated by no visual leaks or instrument
readings of 10,000 ppm or greater.
March2024
o Valves: Valves:No leaks were detected, as indicated by an instrument reading of
10,000 ppm or greater.
o Pumps: No leaks were detected as indicated by no visual leaks or instrument
readings of 10,000 ppm or greater.
o April2024
o Valves: No leaks were detected, as indicated by an instrument reading of 10,000
ppm or greater.
o Pumps: No leaks were detected as indicated by no visual leaks or instrument
readings of 10,000 ppm or greater.
c }.Iay 2024
o Valves: No leaks were detected, as indicated by an instrument reading of 10,000
ppm or greater.
o Pumps: No leaks were detected as indicated by no visual leaks or instrument
readings of 10,000 ppm or greater
Dates of Process Shutdown
CHA does not have any equipment that meets the process unit definition so there are not any
process shutdown dates to report.
Revisions to items reported according to paragraph (a) of 40 CFR 61.247 since initial
report or revision.
There have been no revisions to items reported according to paragraph a) of 40 CFR 61.247
since the initial report or revision.
Results of all performance tests and monitoring to determine compliance with no
detectable emissions with sections X and XI.
CHA did not perform any performance tests to meet the alternative standards for valves as found
in section X and 40 CFR 61.243-1. CHA is still below 2Yo leaks detected for valves during the
semi-annual reporting period. The facility, however, monitors all valves on a quarterly basis.
40 CFR 63 Subpart DD Pressure Relief Device Periodic Report
Monitoring results during the monitoring period of pressure relief devices in off-site
material service subject to 63.961(c).
CHA has seven (7) pressure relief devices at the facility that meet this definition. These devices
are monitored quarterly using Method 21. Monitoring information can be found in the table
below:
For pressure relief devices in gas/vapor service subject to 63.691(cX2)(i) any instrument
reading of 500 ppm above background or greater detected 5 days after the pressure
release.
There were no pressure relief devices that had a reading of 500 ppm above background or greater
detected 5 days after a pressure release.
Pressure Release Information
There was no pressure releases for applicable pressure relief values during this period of time.
F. NVI RONMENTAL QUALITY
T,IIVISION OF AIR OUALITY
Tag Number lst 0uarter 2024 2nd Ouarter2024
Date Result (nom)Date Result (oom)
COR-DSOOl U412024 1.50 4/20/2024 0.80
FW-DS0Ol 211512024 0.00 51912024 1.80
FW-DS002 218t2024 1.80 41312024 1.40
HV-RDOOI 3129t2024 7.50 5/t/2024 1.90
HV-RDOO2 t/tt/2024 0.50 51912024 13.20
HV-RDOO3 Ut512024 0.70 51912024 1.20
SL-DSOO1 U2912024 1.90 sll/2024 1.50
REVIEWEDInitials:Date: March 24, 2025Compliance Status: OKFile #: 10725 (B2)