Loading...
HomeMy WebLinkAboutDAQ-2025-001546Clean Harbors Aragonite, LLC I1600 North Aptus Road Aragonite, UT 84029 435.884.8100 www.cleanharbors.com FedEx # 8182 l23l 4214 July 16,2024 Mr. Bryce Bird Division of Air Quality (DAQ) Department of Environmental Quality 195 North 1950 West P.O. Box 144880 salt Lake city, UT 84414-4880 RE: Semi-Annual Startup, Shutdowno and Malfunction Report Clean Harbors Aragonite, LLC Title V Operating Permit 4500048004 Dear Mr. Bird. UTAH DEPARIMENT OF ENVIRONMENTAL OUALITY JLit 'i i DIVISION OF AIR QUALIT/ In accordance with Title V Permit condition II.B.2.k.3(i), Clean Harbors Aragonite, LLC (CHA) is submitting the Semi-Annual Startup, Shutdown, and Malfunction Report for January through June of 2024. This report requires CHA to submit all startups, shutdowns, and malfunctions that occurred in the reporting period and include the number, duration, and a brief description of each occurrence. This information can be seen in Table l. All occurrences were handled consistent with the facility's Startup, Shutdown, and Malfunction Plan. Table 1:Shutdown. and Malfunctions SSMP Reason SSMP Cause Number Duration (hr:min:sec) Kiln Temperature Cutoff AWFCO - Infrared slagsed over.00:00:23 Smoke Blinds Infrareds 2 00:47:24 Incorrect Selected Readins 00:00:16 Drum Feed. Causins Flame Out 0l :07:00 Afterburner Temoerature Cutoff No Fuel (oump failures)2 07:36:00 Activated Carbon Air Flow Cutoff Plussed Line 2 00:00:15 Activated Carbon Feed Rate Cutoff Lost Feed Rate Issues 6 00:04:10 l't and 2'd Stage Low pH and 2"d Stage Rundown PH AWFCO - Feed Issues 00:46:00 pH Probes Fail 5 04: l5:00 I't and 2"d Stage Brine Flow Rate Power Outase 02:40:48 Mechanical Issues 00:05:00 High Combustion Zone Pressure Cutoff Buildup Fall l9 00:00:24 ID Fan Failure 2 00:00:50 Power Failure 3 00:05:38 Feed Issues l4 00:00:23 "People and Technologt Creating a Better Environment" REVIEWEDInitials:Date: March 24, 2025Compliance Status: OKFile #: 10725 (B2) SSMP Reason SSMP Cause Number Duration (hr:min:sec) Bashouse Pressure Drop/Opacitv Cutoff Pressure Transmitter Issues 5 00:00:58 High Instrument Span - Baghouse Inlet Pressure Bashouse Bas Failure I 00:00:59 Feed Issues 2 00:00:03 Mechanical Issues I 00:00:02 High Instrument Span - Activated Carbon Feed Rate Carbon Build Up Around Platform l0 00:06:40 Power Failure Utilify Power Loss (Loss to Control Board)l6:52:00 In accordance with Permit Condition I.K and Utah Administrative Code R307-415-5d, I certify under penalty of law that this document and all attachments were prepared under my direct supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based upon my inquiry of persons or persons who manage the system, or those persons directly responsible for gathering the information submitted is, to the best of my knowledge and beliel true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of imprisonment for known violations. William L. Simmons Facility GM III Clean Harbors Aragonite, LLC 11600 North Atpus Road PO Box 1339 Grantsville, Utah 84029-1339 (o) a35.844.8351 (c) 870.310.6029 simmons. william@cleanharbors. com www.cleanharbors.com