HomeMy WebLinkAboutDWQ-2025-002306STATE OF UTAH
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WATER QUALITY
WATER QUALITY BOARD
P.O. BOX 144870
SALT LAKE CITY, UTAH 84114-4870
Ground Water Discharge Permit
Permit No. UGW010002
In compliance with the provisions of the Utah Water Quality Act, Title 19, Chapter 5, Utah Code Annotated 1953, as amended, the Act,
MANGO II-Milford, LLC – Skyline Complex Farms
111 E. Broadway STE 1250
Salt Lake City, Utah 84111
hereafter referred to as the Permittee, is granted a Ground Water Discharge Permit for the operation of hog production facilities at 42 existing farm sites southwest of Milford, Utah
at the Skyline Farm Complex. The farm sites are located in Sections 27, 28, 33, and 34, T. 29 S., R. 11 W., Salt Lake Base & Meridian, Sections 2, 3, 4, 5, 7, 8, 9, 10, 16, and 19, T.
30 S., R. 11 W., Salt Lake Base & Meridian, and Sections 3, 4, 9, and 10, T. 30 S., R. 12 W., Salt Lake Base & Meridian.
This permit is based on representation made by the Permittee and other information contained in the administrative record. It is the responsibility of the Permittee to read and understand
all provisions of this permit.
The facility shall be constructed and operated in accordance with conditions set forth in the permit and the Utah Administrative Rules for Ground Water Quality Protection (UAC R317-6).
This permit shall become effective on ________________, 2025.
This permit and authorization to operate shall expire at midnight on June 2nd, 2024.
Signed this _____ day of March x, 2025.
___________________________________________
John K. Mackey, P.E.
Director
TABLE OF CONTENTS
PART I SPECIFIC CONDITIONS 1
A. Ground Water Classification 1
B. Background Ground Water Quality 1
C. Ground Water Protection Levels 1
D. Best Available Technology (BAT) Standard 1
E. Compliance Monitoring Requirements 4
F. Non-Compliance Status 9
G. Reporting Requirements 11
H. Compliance Schedule 13
PART II MONITORING, RECORDING AND REPORTING REQUIREMENTS 14
A. Representative Sampling 14
B. Analytical Procedures 14
C. Penalties for Tampering 14
D. Reporting of Monitoring Results 14
E. Compliance Schedules 14
F. Additional Monitoring by the Permittee 14
H. Retention of Records 14
I. Twenty-four Hour Notice of Noncompliance Reporting 15
J. Other Noncompliance Reporting 15
K. Inspection and Entry 15
PART III COMPLIANCE RESPONSIBILITIES 16
A. Duty to Comply 16
B. Penalties for Violations of Permit Conditions 16
C. Need to Halt or Reduce Activity not a Defense 16
D. Duty to Mitigate 16
E. Proper Operation and Maintenance 16
PART IV GENERAL REQUIREMENTS 17
A. Planned Changes 17
B. Anticipated Noncompliance 17
C. Permit Actions 17
D. Duty to Reapply 17
E. Duty to Provide Information 17
F. Other Information 17
G. Signatory Requirements 17
H. Penalties for Falsification of Reports 18
I. Availability of Reports 18
J. Property Rights 18
K. Severability 19
L. Transfers 19
M. State Laws 19
N. Reopener Provision 19
APPENDIX I Farm and Monitoring Well Compliance Limit Summary
APPENDIX II Monitoring Well Locations
APPENDIX III Summary of Construction Details for Primary and Secondary Lagoons
Applicable MANGO II-Milford, LLC Skyline Farm Complex Operations Documents for this permit include but are not limited to:
Anaerobic Lagoon Systems Operation and Maintenance Manual (rev. 2015)
Spill Prevention and Response Manual (rev. 2015)
Sludge Disposal and Farm Closure Plan (rev. 2015)
Nutrient Management Plan for Land Application (rev. 2015)
Sampling and Analysis Plan (rev. 2015)
Manure Drying Program Plan (rev. 2013)
PART I SPECIFIC CONDITIONS
A. Ground Water Classification
Ground water class as defined in UAC R317-6-4 is indicated for each farm site in Appendix I. Ground water classification is determined through background ground water monitoring in the
monitoring wells associated with each farm site. At farm sites 41103, 41104, 41105, 41106, 41108, 41201, 41204, 41205, 41206, 41306, 41307, 41308, 41309, 41311, 41312, 41313, 41314,
41316, 41317, 41318, 41319, 41320, 41321, 41322, and 41323 ground water is classified as Class IA, Pristine Ground Water. Farm sites 41101, 41102, 41107, 41203, 41209, 41303, 41304,
41305, 41310, 41315 and 49170 are underlain by Class II, Drinking Water Quality Ground Water. Farm sites 41202, 41207, 41208, 41210, 41301, and 41302 are underlain by Class III, Limited
Use Ground Water.
B. Background Ground Water Quality
Ground water quality information is presented in Appendix I. All parameters in Appendix I are in units of mg/l, except pH. Background is defined as the mean concentration in the well
during the background monitoring period. For any new wells installed during the permit term, a formal determination of background water quality will be made after completion of accelerated
background monitoring as required in Part I.E.5.(c).
C. Ground Water Protection Levels
Ground water compliance limits for each farm site are presented in Appendix I. Protection levels are based on background sampling performed to date and on the requirements of R314-6-4
as required in Part I.E.5.(c) of this permit. Compliance limits are based on the greater of the protection level or the mean background plus twice the standard deviation.
D. Best Available Technology (BAT) Standard
The administration of this permit is founded on the use of best available technology (BAT), in accordance with the requirements of UAC R317-6-1.3.
Construction standards for the farm sites covered by this permit are detailed in the construction permits. The construction permits associated with each farm site are listed in Table
1.
TABLE 1 Construction Permits
Farm Sites
Construction Permit
41101, 41102, 41103, 41201, 41301
November 15, 1993 amended March 25, 1994
41202, 41203
March 17, 1995
41302, 41303, 41304, 41305
August 10, 1995
41204, 41205, 41206
October 27, 1995
41204, 41208
September 30, 1996
41209,41210
June 16, 1997
49170
49170 Expansion
March 31, 1998
September 16, 2005
41104, 41105, 41106
November 5, 1995
41306 through 41315
May 13, 1996
41107, 41108
April 1, 1997
41316 through 41323
July 1, 1997
These farm sites each have at least one primary lagoon and one containment basin for evaporation. The lagoon systems are sized to accept up to 1.8 cubic feet (for sow, finisher, and
boar stud farms) or 2.3 cubic feet (for nursery farms) of volume per live animal weight (LAW) in the primary lagoon and provide enough surface area for evaporation of water in the containment
basin. The primary lagoons and the containment basins are lined either with 12 inches of clay soil amended with bentonite or with a 40-mil high-density polyethylene (HDPE) flexible membrane
liner (FML). The liners, both clay and FML, are designed to yield a liner hydraulic permeability coefficient no greater than 1×10-7 cm/sec. The liner type, dimensions, maximum operating
depth, free board, liquid contact area, and operating volume of each primary and containment basin for each farm site are presented in the construction permits and construction permit
applications covering those units. This information is summarized in Appendix III. Only wastes from the hog-raising operations may be treated in the lagoons.
The hog waste is drained into primary anaerobic lagoons for treatment and storage. The hog waste from twenty-three finisher farm sites, as an option, can be collected and conveyed through
a Collection System to a Central Treatment Plant operated by a third party. The effluent from the Central Treatment plant is conveyed back to each existing primary lagoon of the finisher
farms. A diversion valve connection is installed to either allow the wastewater from the recharge pits to continue to flow into the existing anaerobic lagoon system, or to be diverted
into the buffer basins for treatment in the Central Treatment Plant.
Waste water from the lagoons may be land-applied as described below at the agronomic rate according to the most recently revised and approved version of the Nutrient Management Plan
for Land Application (NMP). For the purposes of this permit, the agronomic rate is defined as the rate where all available nitrogen is taken up by crops or other plants before it can
leach below the root zone, and where other waste constituents are applied at rates that do not cause ground or surface water pollution or plant toxicity incompatible with the intended
use of the land. Emergency waste generated as a result of significant spills, the cleanup of a contamination event, or the necessary removal of waste from the facility to allow the investigation
of a possible leak or to perform repairs may be land applied in accordance with the NMP.
Currently MANGO II-Milford, LLC has 42 operational farm sites for this permit, and each site has at least one primary lagoon where manure solids are collected and at least one secondary
evaporative lagoon (Appendix III). It may be necessary to remove accumulated solids from the bottom of each primary lagoon at the farm sites. Sludge storage volume is engineered for
approximately 20 years of accumulation. MANGO II-Milford, LLC has implemented a program to remove the solids from the lagoons and dry the manure on a drying pad constructed near the
lagoon. The manure is a nutrient source and the drying of the manure allows the nutrients to be sold and applied to local cropland at agronomic
rates. Drying pad construction will follow the engineering design approved by a licensed Professional Engineer with the Utah Division of Water Quality.
Performance Standard for Best Available Technology
Compliance with the requirements for use of best available technology (BAT) will be demonstrated by construction, maintenance and operation of the lagoon systems according to the construction
permits issued previously for the sites.
a. Liner - Performance of the clay or FML liner will be evaluated for compliance with the requirements of Part II.E of this permit. Liner integrity will be evaluated prior to
operation with the approved construction quality assurance/quality control (QA/QC) plans contained in the application for this permit.
The liner integrity must be maintained. Deterioration of materials or any other situation which prevents the liner from functioning according to the approved design shall constitute
non-compliance with this permit. After completion of construction, synthetic liners must remain in contact with the prepared soil base of the lagoons and containment basins, as provided
by liner slack and ballast when necessary to minimize billowing caused by the wind. Adequate slack and ballast when necessary will also be provided to minimize stresses and suspensions
of the liner at the toe of the dikes due to variations in ambient temperature and incident solar radiation. Any large suspensions or billowing of synthetic liner is considered a failure
of this performance standard. The formation of bulges or whales in the liner when the lagoons contain water is an indication of a leak in the liner. When whales form in the liner, the
liner must be repaired in an expeditious manner. Impact to the underlying soils must be assessed in conformance with the provisions detailed in the most recently revised and approved
version of the Spill Prevention and Response Plan.
b. Lagoons - The performance standard for anaerobic lagoons operation is based on operating and maintaining the lagoons in a manner consistent with the design criteria detailed in
the construction permits. The design of the primary lagoons is based on a total volumetric capacity of approximately 1.80 cubic feet per pound of LAW, consisting of 1.2 cubic foot for
treatment and 0.6 cubic foot for 20-year sludge accumulation for boars, sows, and finishing hogs. Total volumetric lagoon capacity for nursery pigs is based on 1.97 cubic feet per pound
of LAW for treatment and 0.29 cubic feet per pound of LAW for a 20-year sludge accumulation. The evaporation basins (secondary lagoons or containment basins) are designed to have a normal
operating depth with additional surface area needed to maintain a constant depth, at the same time of each year and evaporate the excess wastewater during each annual cycle. Construction
dimensions for each primary and secondary at each farm site are summarized in Appendix III.
The anaerobic lagoon system must be operated and maintained in accordance with the most recently revised and approved Anaerobic Lagoon Systems Operation and Maintenance Manual. Performance
of the anaerobic lagoons will be demonstrated by the monitoring specified in Part I.E.5.b.
c. Land Application - Land application is currently limited to the parcels of land contained in the West ½ of Section 27, North ½ of the North ½ of Section 28 and
the West ½ of Section 33, T. 29 S., R. 11 W., SLB&M. Land application of wastewater from the farm sites covered by this permit is not planned as a routine method of wastewater treatment,
but may be employed in an emergency situation. Any land application of wastes generated at any of the facilities covered by this permit must be performed in accordance with the most
recently revised and approved version of the Nutrient Management Plan for Land Application.
d. Manure Drying Pads - Manure drying pads at any of the facilities covered by this permit may not be performed on any parcel of land without first notifying and receiving the approval
of a DWQ engineer. Drying pad construction must be performed in accordance with the most recently revised and approved version of the Manure Drying Program Plan.
2. Closure Plan
Any lagoon system closure must be undertaken in compliance with the most recently revised and approved version of the Sludge Disposal and Farm Closure Plan that has been prepared by
the permittee.
Prior to closure of any lagoon or lagoon system, the permittee shall submit to the Director a site-specific closure plan for disposition of the liquids, solids and liner material of
the lagoon(s) to be closed. A plan for land application of the liquids and solids at appropriate agronomic rates, on-site or at manure drying pads, or other disposal methods, will be
submitted for approval by the Director. The lagoon liner material will be tested according to an approved testing plan to determine an appropriate means of disposal, which will not lead
to ground water contamination. The monitoring wells will continue to be sampled for a post closure monitoring period as determined by the Director.
E. Compliance Monitoring Requirements
The permittee is required to monitor ground water quality and source activities that could potentially impact the ground water quality. Monitoring shall be performed according to the
provisions of Part I.E.5 to assure compliance with the terms of this permit.
1. Compliance Monitoring Wells
The network of monitoring wells shall provide the ability to detect contamination in the uppermost groundwater aquifer, which could result from excess lagoon seepage. Under the provisions
of this permit, ground water contamination in the shallow aquifer under the lagoon sites would be a reason for the permittee to take remedial action before further degradation occurs.
Location of Monitoring Wells - The permittee has installed a monitoring well system at each existing farm site to establish the ground water gradient underlying each lagoon system and
to monitor ground water quality in both the upgradient and downgradient wells. The permittee will be required to drill additional wells if the ground water flow directions are different
than expected as revealed when the wells are drilled. The locations and status of the wells are described in Appendix II. Information for any new wells installed for the farm sites covered
under this permit shall be submitted to the Director and includes:
well identification,
latitude and longitude relative to NAD83,
hinge elevation, and
the well construction log.
b) Damage to Monitoring Wells - If a monitoring well is damaged or is otherwise rendered inadequate for its intended purpose or if a previous hydraulic gradient between two monitor
wells is reversed, the Director shall be notified in writing within five days of the permittee becoming aware of the condition.
c) Future Modification of Monitoring Well Network - If at any time the Director determines the monitoring well network to be inadequate due to a change in gradient or for any other
reason, the permittee shall submit within 30 days of receipt of notification a plan and compliance schedule to modify the monitoring well network.
2. Monitoring Period
The permittee shall conduct the monitoring detailed in Part I.E.5 for the term of the permit.
3. Monitoring Requirements
The permittee shall comply with the ground water standards, compliance limits listed in Appendix I of this permit, and other monitoring requirements contained in the Utah Ground Water
Quality Protection Regulations (UAC R317-6). The monitoring required in Part I.E.5 is based on compounds which may be discharged to ground water or may characterize ground water from
different sources and which may be sampled at monitoring wells. The ground water regulations also contain standards for contaminants such as metals, pesticides and volatile organic compounds.
Accordingly the permittee must not discharge these or any other contaminants, which could impair beneficial uses of the ground water, even though the permit does not require monitoring
for them.
4. Protection Levels and Compliance Limits
a) Application - The monitoring requirements listed below in Part I.E.5 apply to all upgradient and downgradient wells. The protection levels for indicator parameters are calculated
using the Ground Water Quality Protection Regulations (UAC R317-6-4), background water quality data, and historical well data.
b) Exceedance in Upgradient Well - If the compliance limits referenced in Part I.C are exceeded in any upgradient well, the permittee shall note the exceedance in the next semi-annual
monitoring report. If ground water elevations indicate that the well is no longer upgradient of the lagoon, or if ground water mounding has developed, the exceedance shall be treated
as a non-compliance event according to the provisions of Part I.F. As part of the resolution of the non-compliance situation, the permittee may be required to propose changes to the
monitoring plan for the site sufficient to demonstrate that ground water is not being polluted in violation of UAC R317-6.
5. Monitoring Details
a) Semi-annual Ground Water Quality Compliance Monitoring - Semi-annual ground water compliance monitoring shall be conducted by the permittee under the provisions of this permit.
Sample collection, handling and analysis shall be conducted in accordance with the most recently revised and approved version of the Sampling and Analysis Plan.
Unless revised by the Sampling and Analysis Plan, the field parameters to be measured during the semi-annual monitoring shall be: temperature, specific conductance, pH, and ground water
elevation. Ground water elevations shall be determined according to Part I.E.5.d.
Unless revised by the Sampling and Analysis Plan, the laboratory parameters to be measured during the semi-annual monitoring shall be: Nitrate plus Nitrite as Nitrogen, Bicarbonate,
Chloride, and Total Dissolved Solids (TDS).
The results of the semi-annual compliance monitoring shall be submitted to the Division of Water Quality along with supporting field data in the Semi-annual Ground Water Quality Monitoring
Report according to Part II.B accompanied by any supporting raw data.
b) Annual Monitoring - Annual compliance monitoring shall be conducted by the permittee under the provisions of this permit according to the most recently revised and approved version
of the Sampling and Analysis Plan, the Anaerobic Lagoon Systems Operation and Maintenance Manual, and the Sludge Disposal and Farm Closure Plan as indicated below.
Compliance Monitoring – In addition to the semi-annual Ground Water Compliance Monitoring, major ion sampling will be performed for one year (two semi-annual samples) from all wells
at three farm locations (41304, 41318, and 49170). Laboratory parameters to be measured for the annual monitoring, in addition to the semi-annual monitoring, shall be: sulfate, sodium,
potassium, magnesium, and calcium. Sample collection, handling and analysis shall be conducted in accordance with the most recently revised and approved version of the Sampling and Analysis
Plan.
Water Supply and Production Wells - All water supply and production wells supporting the activities at the farm sites covered by this permit shall be monitored annually for Nitrate
plus Nitrite as Nitrogen and Total Dissolved Solids (TDS). Sample collection, handling, and analysis shall be conducted in accordance with the most recently revised and approved version
of the Sampling and Analysis Plan. The analytical results and any supporting raw data shall be submitted to the Division of Water Quality with the next Semi-annual Ground Water Quality
Monitoring Report according to Part II.B
Lagoon Waste Water - The waste water from a representative operating primary manure lagoon at a nursery (41202), sow (41102), and finisher (41302) farm site in the Skyline Complex shall
be analyzed annually for
the following parameters: temperature, specific conductance, pH, nitrate plus nitrite as nitrogen, ammonia, total Kjeldahl nitrogen (TKN), sulfate, bromide, chloride, total dissolved
solids, sodium, potassium, calcium, magnesium, bicarbonate, carbonate, phosphorus, arsenic, barium, cadmium, chromium, copper, lead, mercury, selenium, silver, and zinc. Sample collection,
handling, and analysis shall be conducted in accordance with the most recently revised and approved version of the Sampling and Analysis Plan. Samples shall be taken in the late summer
when parameter concentrations should be at their yearly maximum. Analyses for nitrogen species shall be conducted at the same laboratory. Results of the wastewater monitoring accompanied
by any supporting raw data shall be submitted to the Division of Water Quality with the next Semi-annual Ground Water Quality Monitoring Report according to Part II.B.
Lagoon Sludge - Sludge sampling at the primary lagoon at a nursery (41202), sow (41102), and finisher (41302) farm site in the Skyline Complex shall be analyzed annually for the following
parameters: temperature, specific conductance, pH, nitrate plus nitrite as nitrogen, ammonia as nitrogen, total Kjeldahl nitrogen (TKN), sulfate, bromide, chloride, total dissolved
solids, sodium, potassium, calcium, magnesium, bicarbonate, carbonate, phosphorus, arsenic, barium, cadmium, chromium, copper, lead, mercury, selenium, silver, and zinc. Sample collection,
handling, and analysis shall be conducted according to the most recently revised and approved version of the Sludge Disposal and Farm Closure Plan. Samples shall be taken in the late
summer when parameter concentrations should be at their yearly maximum. The results of this sludge sampling accompanied by any supporting raw data shall be submitted to the Division
of Water Quality with the next Semi-annual Ground Water Quality Monitoring Report according to Part II.B.
Lagoon Performance Monitoring - Lagoon performance monitoring shall be conducted annually according to the most recently revised and approved version of the Anaerobic Lagoon Systems
Operation and Maintenance Manual. Samples will be analyzed for temperature, specific conductance, pH, nitrate plus nitrite as nitrogen, ammonia as nitrogen, total Kjeldahl nitrogen (TKN),
sulfate, bromide, chloride, total dissolved solids, sodium, potassium, calcium, magnesium, bicarbonate, carbonate, phosphorus, arsenic, barium, cadmium, chromium, copper, lead, mercury,
selenium, silver, and zinc. Results of the lagoon performance monitoring accompanied by any supporting raw data shall be submitted to the Division of Water Quality according to Part
II.C
Lagoon Sludge Profiling - Sludge profiling of all primary lagoons shall be conducted annually at one third of the farms to ensure that each primary lagoon has been profiled every three
years by the permittee according to the most recently revised and approved version of the Sludge Disposal and Farm Closure Plan. Samples will be analyzed for temperature, specific conductance,
pH, nitrate plus nitrite as nitrogen, ammonia as nitrogen, total Kjeldahl nitrogen (TKN), sulfate, bromide, chloride, total dissolved solids, sodium, potassium, calcium, magnesium,
bicarbonate, carbonate,
phosphorus, arsenic, barium, cadmium, chromium, copper, lead, mercury, selenium, silver, and zinc. The results of this profiling accompanied by any supporting raw data shall be submitted
to the Division of Water Quality according to Part II. D.
c) Background Ground Water Quality Monitoring - Background ground water quality has been established in the upgradient monitoring wells for all the farm sites covered by this permit
for the purpose of establishing protection levels and compliance limits. The samples were analyzed for the following parameters: temperature, specific conductance, pH, nitrate plus nitrite
as nitrogen, ammonia, bicarbonate, chloride, total dissolved solids (TDS), sodium, potassium, magnesium, calcium, carbonate, and sulfate. At least one sample from each downgradient monitor
well was also analyzed for all these parameters. If any additional upgradient or downgradient wells are installed, the permittee shall collect quarterly samples at equal time intervals
over a two-year period from each upgradient well and each downgradient well. The samples shall be analyzed for the parameters listed above. Sample collection, handling, and analysis
shall be conducted in accordance with the most recently revised and approved version of the Sampling and Analysis Plan. The results accompanied by any supporting raw data shall be submitted
to the Division of Water Quality with the next Semi-annual Ground Water Quality Monitoring Report according to Part II.B
d) Depth to Ground Water and Ground Water Elevation - Depth to ground water shall be measured to the nearest 0.01 foot, below the reference point at the top of the well casing. For
each monitoring well, the permittee shall submit a report to the Division of Water Quality accompanied by a surveyors report indicating the elevation, in feet above mean sea level to
the nearest 0.01 foot, of the reference point at the top of the well casing from which all ground water depths are measured.
Ground water elevations shall be measured semi-annually at all active monitoring wells at the farm sites covered by this permit. Ground water elevations shall be calculated by subtracting
the depth to ground water measurement from the elevation of the reference point at the top of the well casing and reported in feet above mean sea level to the nearest 0.01 foot. Ground
water elevation calculations for each semi-annual ground water sampling event shall be submitted with the Semi-annual Ground Water Quality Monitoring Report.
For the purpose of constructing ground water potentiometric surface contour maps, ground water elevation data shall be collected within 48 hours for each farm site and two months for
the entire Skyline Farm Complex. Ground water potentiometric contour maps shall be constructed from these data and submitted to the Division of Water Quality with the next Semi-annual
Ground Water Quality Monitoring Report according to Part I.G.
e) Laboratory Approval - All water analyses shall be performed by a laboratory certified by the State of Utah in accordance with the most recently revised and approved version of the
Sampling and Analysis Plan and the provisions of UAC R317-6-6.3.
f) Future Modification of Monitoring Plan - If the Director or permittee determine that hydrogeologic conditions at any farm site do not allow a direct comparison of upgradient and
downgradient ground water quality, the protection levels and compliance limits shall be established based on ground water quality in the down gradient well. In this event, the Director
shall direct the permittee to begin collection of background water quality data in the downgradient well according to Part I.E.5.c. Alternatively, the permittee may propose another method
of compliance monitoring within 90 days of the determination that upgradient-downgradient comparison is not possible.
F. Non-Compliance Status
1. Probable Out-of-Compliance Status - The permittee shall evaluate results of each ground water sampling event to determine any exceedance of the Ground Water Compliance Summary found
in Appendix 1. Upon determination that a Ground Water Protection Level has been exceeded at any downgradient compliance monitoring well, the permittee shall:
a. Immediately re-sample the monitoring well(s) found to be in probable out-of-compliance status for laboratory analysis of the exceeded protection level parameter(s). Submit the analytical
results thereof, and notify the Director of the probable out-of-compliance status within 30 days of the initial detection.
b. Upon exceedance of any one parameter listed in Part I.C for two consecutive sampling events, immediately implement an accelerated schedule of quarterly sampling analysis, consistent
with the requirements of this permit. This quarterly sampling will continue for at least two quarters or until the compliance status can be determined by the Director. Reports of the
results of this sampling will be submitted to the Director as soon as they are available, but not later than 30 days from each date of sampling.
2. Out-of-Compliance Status Based on Confirmed Exceedance of Permit Ground Water Protection Levels
a. Out of Compliance Status shall be defined as follows:
For parameters that have been defined as detectable in the background and for which protection levels have been established, out-of-compliance shall be defined as two consecutive samples
exceeding the protection level or compliance limit. Out of compliance status for exceedance of bicarbonate or chloride occurs only when their respective compliance limits are exceeded
and the compliance limit for total dissolved solids is also exceeded.
b. Notification and Accelerated Monitoring - upon determination by the permittee or the Director, in accordance with UAC R317-6-6.17, that an out-of-compliance status exists, the permittee
shall:
Verbally notify the Director of the out-of-compliance within 24 hours,
and provide written notice within 5 days of the detection, and
A written submission shall also be provided to the Director within five days of the time that the permittee becomes aware of the noncompliance. The written submission shall contain:
i) A description of the noncompliance and its cause;
ii) The period of noncompliance, including exact dates and times;
iii) The estimated time noncompliance is expected to continue if it has not been corrected; and,
iv) Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.
The permittee shall verbally report any noncompliance, which may endanger public health or the environment as soon as possible, but no later than 24 hours from the time the permittee
first became aware of the circumstances. The report shall be made to the Utah Department of Environmental Quality 24-hour number, (801) 536-4123.
Continue an accelerated schedule of quarterly ground water monitoring for at least two quarters and continue quarterly monitoring until the facility is brought into compliance as determined
by the Director.
c. Source and Contamination Assessment Study Plan - within 30 days after the written notice to the Director required in Part I.F. 2.b.1, above, the permittee shall submit an assessment
study plan and compliance schedule for:
i) Assessment of the source or cause of the contamination, and determination of steps necessary to correct the source, if the contamination is caused by facilities or activities for
which the permittee is responsible.
ii) Assessment of the extent of the ground water contamination and any potential dispersion.
iii) Evaluation of potential remedial actions to restore and maintain ground water quality, and ensure that the ground water standards will not be exceeded at the compliance monitoring
wells.
3. Out-of-Compliance Status Based Upon Failure To Maintain Best Available Technology - In the event that BAT monitoring indicates a violation of any of the construction or performance
standards outlined in Part I.D of this permit, the permittee shall submit to the Director a notification and description of the violation in accordance with Part II.I of this permit.
4. Failure to Maintain Best Available Technology Required by Permit
A facility will be determined to be in an out-of-compliance status if best available technology has failed or cannot be maintained according to the provisions required by this permit,
unless:
a. The Permittee has notified according to Part I.F.2, and
b. The failure was not intentional or was not caused by the Permittee's negligence, either in action or failure to act, and
c. The Permittee has taken adequate remedial measures in a timely manner or has developed an approvable remedial action plan and implementation schedule for restoration of best available
control technology, an equivalent control technology, or closure of the facility (implementation of an equivalent technology will require permit modification and re-issuance), and
d. The Permittee has demonstrated that any discharge of a pollutant from the facility is not in violation of the provisions of UCA 19-5-107.
5. Contingency Plan - If, after review of ground water monitoring data and other relevant information, the Director determines that use of any lagoon has caused an exceedance of ground
water compliance limits at any compliance monitoring point, the permittee shall conduct a Contamination Investigation to determine the extent and severity of contamination caused by
the lagoon and submit it for review by the Division of Water Quality within 45 days of determination of out-of-compliance status. After review of this report the Director may require
the permittee to develop a Corrective Action Plan to remediate the contamination. Actions taken under the plan may include emptying liquids and sludge from the leaking lagoon into one
of the other lagoons in the permittee farm complex, repairing or reconstructing the lagoon liner as needed, constructing temporary holding ponds lined with flexible membrane liners,
and developing wells for the purpose of extracting the contaminated ground water. Contaminated ground water may be stored in the lagoons or land applied according to the most recently
revised and approved Nutrient Management Plan for Land Application, if necessary and feasible.
Significant hog waste spills from the waste handling system must be addressed in compliance with the most recently revised and approved version of the Spill Prevention and Response
Manual has been prepared by the permittee. Minor spill events shall be reported with the next Semi-annual Ground Water Quality Monitoring Report according to Part II.B
G. Reporting Requirements
1. Semi-Annual Ground Water Monitoring - monitoring required in Part I.E.5 above shall be reported according to the schedule in Table 3 below, unless modified by the Director:
Table 3: Semi-Annual Compliance Monitoring Report Schedule
Monitoring Period
Report Due Date
January through June
August 1
July thru December
February 1
2. Water Level Measurements - water level measurements from ground water monitoring wells will be reported as measured depth to ground water from the surveyed casing measuring point,
and ground water elevations as converted by casing measuring point elevations.
3. Ground Water Quality Sampling - reporting will include:
Field Data Sheets - or copies thereof, including the field measurements, required in Part I.E.5.a above, or as listed in the most recently revised and approved Sampling and Analysis
Plan; well name/number, date and time, names of sampling crew, type of sampling pump or bail, volume of water purged before sampling, and any pertinent comments relating to sampling
conditions.
Laboratory Analytical Results - including date sampled, date received; and the results of analysis for each parameter, including: value or concentration, units of measurement, reporting
limit (minimum detection limit for the examination), analytical method, and the date of the analysis. The analytical methods and the method detection limits for every parameter must
conform to those specified in the most recently revised and approved version of the Sampling and Analysis Plan.
Well Construction - All data associated with newly installed compliance and monitoring wells will be provided to the Director. This information includes the well identification, latitude
and longitude relative to NAD83, well installation date, depth to ground water, and well construction information.
4) Water Supply and Production Well Report - The results of water supply and production well use throughout the Skyline Farm Complex, accompanied by any supporting raw data, shall be
submitted to the Division of Water Quality with the next Semi-annual Ground Water Quality Monitoring Report.
5) Lagoon Waste Water and Sludge Monitoring Report – The results of the annual lagoon waste water and sludge monitoring report accompanied by any supporting raw data shall be submitted
to the Division of Water Quality with the next Semi-annual Ground Water Quality Monitoring Report.
6) Noncompliance or Probable Noncompliance - Reporting requirements for noncompliance or probable noncompliance status shall be according to the provisions of Part I.F.
7) Electronic Filing Requirements - In addition to submittal of the hard copy data, above, the permittee will electronically submit all required ground water monitoring data (analytical
ground water results, water level measurements, water supply, lagoon waste water and sludge analytical results, sludge profile monitoring data, and the lagoon performance data) in the
electronic format specified by the Director. A hard copy of the required reports, including data analysis will be provided to the Director. In addition, a pdf version of the full report,
including analytical data, will be submitted through the DEQ Web Portal. All analytical data
and updated tables will be provided in xlsx format. The data may be submitted through the online DEQ Submission Portal at https://deq.utah.gov/water-quality/water-quality-electronic-submissions.
.
H. Compliance Schedule
There are no outstanding compliance items at the time of this permit issuance for UGW010002.
PART II MONITORING, RECORDING AND REPORTING REQUIREMENTS
A. Representative Sampling
Samples taken in compliance with the monitoring requirements established under Part I shall be representative of the monitored activity.
B. Analytical Procedures
Water sample analysis must be conducted according to test procedures specified under UAC R317-6-6.3.L, unless other test procedures have been specified in this permit.
C. Penalties for Tampering
The Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this permit shall, upon
conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than six months per violation, or by both.
D. Reporting of Monitoring Results
Monitoring results obtained during each reporting period specified in the permit, shall be submitted to the Director, Utah Division of Water Quality at the following address no later
than the 15th day of the month following the completed reporting period:
State of Utah
Division of Water Quality
P.O. Box 144870
Salt Lake City, Utah 84114-4870
Attention: Ground Water Protection Section
E. Compliance Schedules
Reports of compliance or noncompliance with, or any progress reports on interim and final requirements contained in any Compliance Schedule of this permit shall be submitted no later
than 14 days following each schedule date.
F. Additional Monitoring by the Permittee
If the permittee monitors any pollutant more frequently than required by this permit, using approved test procedures as specified in this permit, the results of this monitoring shall
be included in the calculation and reporting of the data submitted. Such increased frequency shall also be indicated.
G. Records Contents
Records of monitoring information shall include:
1. The date, exact place, and time of sampling or measurements:
2. The individual(s) who performed the sampling or measurements;
3. The date(s) and time(s) analyses were performed;
4. The individual(s) who performed the analyses;
5. The analytical techniques or methods used; and,
6. The results of such analyses.
H. Retention of Records
The permittee shall retain records of all monitoring information, including all calibration and maintenance records and copies of all reports required by this permit, and records of
all data used to complete the application for this permit, for a period of at least three years
from the date of the sample, measurement, report or application. This period may be extended by request of the Director at any time.
I. Twenty-four Hour Notice of Noncompliance Reporting
1. The permittee shall verbally report any noncompliance which may endanger public health or the environment as soon as possible, but no later than 24 hours from the time the permittee
first became aware of the circumstances. The report shall be made to the Utah Department of Environmental Quality 24-hour number, (801) 536-4123.
2. A written submission shall also be provided to the Director within five days of the time that the permittee becomes aware of the circumstances. The written submission shall contain:
a. A description of the noncompliance and its cause;
b. The period of noncompliance, including exact dates and times;
`
c. The estimated time noncompliance is expected to continue if it has not been corrected; and,
d. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.
3. Reports shall be submitted to the addresses in Part II.D, Reporting of Monitoring Results.
J. Other Noncompliance Reporting
Instances of noncompliance not required to be reported within 24 hours, shall be reported at the time that monitoring reports for Part II.D are submitted.
K. Inspection and Entry
The permittee shall allow the Director, or an authorized representative, upon the presentation of credentials and other documents as may be required by law, to:
1. Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of the permit;
2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit;
3. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this permit; and,
4. Sample or monitor at reasonable times, for the purpose of assuring permit compliance or as otherwise authorized by the Act, any substances or parameters at any location.
PART III COMPLIANCE RESPONSIBILITIES
A. Duty to Comply
The permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the Act and is grounds for enforcement action; for permit termination,
revocation and reissuance, or modification; or for denial of a permit renewal application. The permittee shall give advance notice to the Director of any planned changes in the permitted
facility or activity which may result in noncompliance with permit requirements.
B. Penalties for Violations of Permit Conditions
The Act provides that any person who violates a permit condition implementing provisions of the Act is subject to a civil penalty not to exceed $10,000 per day of such violation. Any
person who willfully or negligently violates permit conditions is subject to a fine not exceeding $25,000 per day of violation. Any person convicted under Section 19-5-115(2) of the
Act a second time shall be punished by a fine not exceeding $50,000 per day. Nothing in this permit shall be construed to relieve the permittee of the civil or criminal penalties for
noncompliance.
C. Need to Halt or Reduce Activity not a Defense
It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the
conditions of this permit.
D. Duty to Mitigate
The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this permit which has a reasonable likelihood of adversely affecting human health or
the environment.
E. Proper Operation and Maintenance
The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee
to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate laboratory controls and quality assurance procedures. This provision
requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions
of the permit.
PART IV GENERAL REQUIREMENTS
A. Planned Changes
The permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required when the alteration
or addition could significantly change the nature of the facility or increase the quantity of pollutants discharged.
B. Anticipated Noncompliance
The permittee shall give advance notice of any planned changes in the permitted facility or activity which may result in noncompliance with permit requirements.
C. Permit Actions
This permit may be modified, revoked and reissued, or terminated for cause. The filing of a request by the permittee for a permit modification, revocation and reissuance, or termination,
or a notification of planned changes or anticipated noncompliance, does not stay any permit condition.
D. Duty to Reapply
If the permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the permittee must apply for and obtain a permit renewal or extension.
The application should be submitted at least 180 days before the expiration date of this permit.
E. Duty to Provide Information
The permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing,
or terminating this permit, or to determine compliance with this permit. The permittee shall also furnish to the Director, upon request, copies of records required to be kept by this
permit.
F. Other Information
When the permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or any report to the
Director, it shall promptly submit such facts or information.
G. Signatory Requirements
All applications, reports or information submitted to the Director shall be signed and certified.
1. All permit applications shall be signed as follows:
a. For a corporation: by a responsible corporate officer;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively.
c. For a municipality, State, Federal, or other public agency: by either a principal executive officer or ranking elected official.
2. All reports required by the permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that person.
A person is a duly authorized representative only if:
a. The authorization is made in writing by a person described above and submitted to the Director, and,
b. The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of plant
manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters
for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.)
3. Changes to Authorization. If an authorization under Part IV.G.2 is no longer accurate because a different individual or position has responsibility for the overall operation of
the facility, a new authorization satisfying the requirements of Part IV.G.2 must be submitted to the Director prior to or together with any reports, information, or applications to
be signed by an authorized representative.
4. Certification. Any person signing a document under this section shall make the following certification:
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified
personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering
the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment for knowing violations."
H. Penalties for Falsification of Reports
The Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under
this permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction be punished by a fine of not more than $10,000 per violation, or by imprisonment
for not more than six months per violation, or by both.
I. Availability of Reports
Except for data determined to be confidential by the permittee, all reports prepared in accordance with the terms of this permit shall be available for public inspection at the offices
of the Director. As required by the Act, permit applications, permits, effluent data, and ground water quality data shall not be considered confidential.
J. Property Rights
The issuance of this permit does not convey any property rights of any sort, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of
personal rights, nor any infringement of federal, state or local laws or regulations.
K. Severability
The provisions of this permit are severable, and if any provision of this permit, or the application of any provision of this permit to any circumstance, is held invalid, the application
of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby.
L. Transfers
This permit may be automatically transferred to a new permittee if:
1. The current permittee notifies the Director at least 30 days in advance of the proposed transfer date;
2. The notice includes a written agreement between the existing and new permittee containing a specific date for transfer of permit responsibility, coverage, and liability between them;
and,
3. The Director does not notify the existing permittee and the proposed new permittee of his or her intent to modify, or revoke and reissue the permit. If this notice is not received,
the transfer is effective on the date specified in the agreement mentioned in paragraph 2 above.
M. State Laws
Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, penalties established pursuant
to any applicable state law or regulation under authority preserved by Section 19-5-117 of the Act.
N. Reopener Provision
This permit may be reopened and modified (following proper administrative procedures) to include the appropriate limitations and compliance schedule, if necessary, if one or more of
the following events occurs:
1. If new ground water standards are adopted by the Board, the permit may be reopened and modified to extend the terms of the permit or to include pollutants covered by new standards.
The permittee may apply for a variance under the conditions outlined in R317-6-6.4.D.
2. If alternative compliance mechanisms are required.
3. If subsequent ground water monitoring data reveals the background water quality values in Part I Table 1 are not accurate.
APPENDIX I
UGW010002 FARM AND MONITORING WELL COMPLIANCE LIMIT SUMMARY *
FARM
SYSTEM
NITRATE + NITRITE
(mg/L)
BICARBONATE
(mg/L)
CHLORIDE
(mg/L)
TOTAL DISSOLVED SOLIDS
(mg/L)
41101
2.5
162
263
1144
41102
2.5
313
358
1460
41103
2.5
151
80
600
41104
2.5
190
63
378
41105
2.5
188
63
349
41106
2.5
210
63
322
41107
2.5
194
112
658
41108
2.5
198
94
590
41201
2.5
250
100
826
41202
7
316
2800
8200
41203
12.5
576
698
2470
41204
2.5
510
63
400
41205
2.5
226
63
403
41206
2.5
202
63
399
41207
10
500
3500
14000
41208
5
500
1400
8314
41209
5
436
3378
8328
41210
10
1200
5061
16000
41301
5
517
3500
9151
41302
5
361
1821
5266
41303
2.5
162
727
2200
41304
2.5
437
727
2200
41305
2.5
225
727
2200
41306
2.5
226
63
405
41307
2.5
228
63
374
41308
2.5
194
84
599
41309
2.5
241
63
550
41310
2.7
191
151
758
41311
2.5
177
63
336
41312
2.5
189
99
519
41313
2.5
183
63
343
41314
5
167
63
393
41315
2.5
176
410
1425
41316
2.5
190
130
568
41317
2.5
195
93
569
41318
2.5
191
94
577
41319
2.5
242
70
499
41320
2.5
337
128
531
41321
2.5
186
114
541
41322
2.5
200
63
385
41323
2.5
177
114
498
49170
2.5
230
100
750
pH range for all farms is 6.5 – 8.5
*Ground water protection levels and compliance limits are established in accordance with R317-6-4.
Only the highest allowable value is shown in Appendix 1.
APPENDIX II
MONITORING WELL LOCATIONS
Farm Site
Well
Latitude
(North)
Longitude
(West)
Hinge Elevation
(feet – amsl)
Status
41101
41101MU2
38.237000
-113.102700
5030.1
active
41101MD2
38.238950
-113.099450
5027.0
active
41101MD3
38.239333
-113.100583
5027.7
active
41101MD4
38.238950
-113.100750
5026.8
active
41102
41102MU
38.247217
-113.078667
5021.5
active
41102MD2
38.263283
-113.098883
5023.2
active
41103
41103MU2
38.247217
-113.078667
5036.5
active
41103MD2
38.248783
-113.075000
5040.2
active
41103MD3
38.249016
-113.075950
5041.7
active
41104
41104MU
38.193967
-113.088583
5056.3
active
41104MD
38.195417
-113.085317
5057.4
active
41105
41105MU
38.200600
-113.089500
5053.3
active
41105MD2
38.202133
-113.086867
5054.0
active
41106
41106MU
38.208700
-113.089250
5051.1
active
41106MD2
38.210117
-113.086683
5052.5
active
41107
41107MU
38.216083
-113.201100
5073.8
active
41107MD
38.216783
-113.199050
5064.0
active
41108
41108MU
38.217517
-113.183817
5047.8
active
41108MU2
38.219417
-113.190467
5065.6
active
41108MU3
38.219433
-113.186017
5056.6
active
41108MD
38.220133
-113.181317
5051.6
active
41108MD2
38.217850
-113.181050
5044.9
active
41108MD3
38.218700
-113.180900
5046.2
active
41108MD4
38.217183
-113.181933
5043.7
active
41201
41201MU2
38.236217
-113.096017
5029.6
active
41201MD2
38.237600
-113.095700
5029.9
active
41201MD3
38.237250
-113.094883
5032.0
active
41202
41202MU
38.262783
-113.085300
5028.3
active
41202MD
38.263450
-113.084133
5027.2
active
41203
41203MU3
38.262667
-113.076283
5031.7
active
41203MD2
38.263583
-113.075200
5031.7
active
41204
41204MU
38.193283
-113.102250
5048.7
active
41204MD
38.194000
-113.099800
5049.9
active
41205
41205MU
38.200200
-113.102117
5045.4
active
41205MD
38.200783
-113.099717
5046.7
active
41206
41206MU
38.207750
-113.102033
5042.8
active
41206MD
38.208367
-113.099617
5044.7
active
41207
41207MU
38.219450
-113.128883
5021.7
active
41207MD
38.220283
-113.126950
5022.1
active
41208
41208MU
38.219500
-113.137133
5021.4
active
41208MD
38.160550
-113.136117
5020.7
active
41209
41209MU
38.207933
-113.128000
5027.5
active
41209MD
38.208600
-113.126433
5026.4
active
41210
41210MU
38.207067
-113.132900
5026.5
active
41210 MD
38.208550
-113.132917
5025.4
active
41301
41301MU2
38.247900
-113.102060
5029.4
active
41301MD2
38.250522
-113.100286
5029.2
active
41302
41302MU
38.256983
-113.102233
5016.5
active
41302MD
38.258283
-113.099050
5027.3
active
41303
41303MU
38.253710
-113.095883
5021.6
active
41303MD
38.254117
-113.092983
5023.9
active
41304
41304MU
38.253217
-113.088117
5027.2
active
41304MD
38.254083
-113.084967
5031.2
active
41304MD2
38.253917
-113.086533
5031.5
active
41304MD3
38.253333
-113.084950
5031.5
active
41304MD4
38.252750
-113.083917
5031.8
active
41305
41305MU
38.257500
-113.087067
5029.4
active
41305MD
38.259033
-113.085183
5030.2
active
41306
41306MU
38.219917
-113.103167
5037.4
active
41306MD2
38.221600
-113.100000
5037.0
active
41307
41307MU
38.221700
-113.092067
5042.3
active
41307MD2
38.221900
-113.091783
5043.0
active
41308
41308MU
38.221250
-113.085200
5045.3
active
41308MD2
38.220883
-113.085100
5047.2
active
41309
41309MU
38.227850
-113.093717
5039.4
active
41309MD2
38.228700
-113.090017
5037.3
active
41310
41310MU
38.227267
-113.084250
5042.0
active
41310MD2
38.228167
-113.081367
5042.8
active
41311
41311MU2
38.226750
-113.065450
5058.0
active
41311MD2
38.229483
-113.067950
5055.1
active
41312
41312MU2
38.227233
-113.057033
5068.8
active
41312MD2
38.228500
-113.058833
5065.4
active
41313
41313MU2
38.235150
-113.061650
5059.6
active
41313MD2
38.235883
-113.063700
5056.5
active
41314
41314MU2
38.234800
-113.047800
5077.7
active
41314MD2
38.235383
-113.050433
5074.2
active
41315
41315MU
38.224683
-113.110683
5030.9
active
41315MD
38.226300
-113.108833
5031.4
active
41316
41316MU
38.228517
-113.202867
5134.3
active
41316MD
38.226550
-113.199283
5128.6
active
41317
41317MU2
38.22396
-113.190117
5086.1
active
41317MD2
38.226267
-113.187250
5088.3
active
41317MD3
38.224500
-113.186355
5081.2
active
41318
41318MU2
38.225517
-113.179700
5076.8
active
41318MD2
38.226533
-113.177483
5075.4
active
41319
41319MU
38.234367
-113.198500
5183.7
active
41319MD
38.234483
-113.195200
5168.5
active
41320
41320MU
38.233800
-113.188150
5138.4
active
41320MD2
38.234967
-113.184817
5138.3
active
41320MD3
38.235294
-113.185300
5141.0
active
41320MD4
38.233917
-113.184327
5130.3
active
41321
41321MU
38.235067
-113.178800
5111.0
active
41321MD2
38.233467
-113.177500
5116.0
active
41322
41322MU
38.226233
-113.102967
5036.6
active
41322MD
38.227967
-113.098833
5036.9
active
41323
41323MU
38.214933
-113.109817
5034.9
active
41323MD
38.217917
-113.106883
5035.7
active
49170
49170MU
38.178700
-113.139083
5070.1
active
49170MU2
38.179047
-113.140231
5067.1
active
49170MD
38.179667
-113.137417
5059.5
active
49170MD2
38.179725
-113.139917
5065.5
active
APPENDIX III
SUMMARY OF LAGOON CONSTRUCTION DETAILS
Farm Site
Lagoon
Liner Type
Liquid Level Length, ft
Liquid Level Width, ft
Bottom Level Length, ft
Bottom Level Width, ft
Max. Liquid Depth, ft
Wetted Surface at Max. Liquid Depth, acres
Operating Volume at Max. Liquid Level Depth, cu. ft
41101
Primary
FML
350
350
200
200
25
2.9
1,937,500
Secondary
FML
215
251
125
161
15
1.3
535,226
Tertiary
FML
321
224
270
173
7
1.7
411,991
41102
Primary
Clay
350
350
200
200
25
2.9
1,937,500
Secondary
FML
334
373
239
278
15.8
2.9
1,485,224
41103
Primary
FML
350
350
200
200
25
2.9
1,937,500
Secondary
FML
215
251
125
161
15
1.3
535,226
Tertiary
FML
259
259
217
217
7
1.6
397,537
41104
Primary
FML
456
456
306
306
25
4.9
3,675,900
Secondary
FML
540
540
506
506
5.7
6.7
1,559,664
41105
Primary
FML
456
456
306
306
25
4.9
3,675,900
Secondary
FML
540
540
506
506
5.7
6.7
1,559,664
41106
Primary
FML
456
456
306
306
25
4.9
3,675,900
Secondary
FML
540
540
506
506
5.7
6.7
1,559,664
41107
Primary
FML
540
385
390
235
25
4.9
3,646,553
Secondary
FML
603
546
573
516
5
7.6
1,561,513
41108
Primary
FML
540
385
390
235
25
4.9
3,646,553
Secondary
FML
603
546
573
516
5
7.6
1,561,513
41201
Primary - North
FML
188
188
60
60
16.2
0.8
271,210
Primary - South
FML
191
191
140
140
8.5
0.9
234,659
Secondary
FML
158
158
116
116
7
0.6
132,412
41202
Primary
FML
197
197
47
47
25
0.9
418,975
Secondary
FML
193
193
139
139
9
0.9
250,191
41203
Primary
FML
197
197
47
47
25
0.9
418,975
Secondary
FML
193
193
139
139
9
0.9
250,191
41204
Primary
FML
231
231
81
81
25
1.3
655,275
Secondary
FML
270
270
236
236
5.7
1.7
365,400
41205
Primary
FML
231
231
81
81
25
1.3
655,275
Secondary
FML
270
270
236
236
5.7
1.7
365,400
41206
Primary
FML
231
231
81
81
25
1.3
655,275
Secondary
FML
270
270
236
236
5.7
1.7
365,400
41207
Primary
Clay
293
293
203
203
15
2
932,685
Secondary
Clay
293
145
263
115
5
0.9
180,961
41208
Primary
Clay
293
293
203
203
15
2
932,685
Secondary
Clay
293
145
263
115
5
0.9
180,961
41209
Primary
Clay
293
293
203
203
15
2
932,685
Secondary
FML
293
145
263
115
5
0.9
180,961
41210
Primary
Clay
293
293
203
203
15
2
932,685
Secondary
FML
293
145
263
115
5
0.9
180,961
49170
Primary – East
Clay
171
171
63
63
18
0.7
263,898
Secondary – East
FML
171
171
63
63
18
0.7
263,898
Primary – West
FML
91
91
53.8
53.8
6.2
0.2
33,214
Secondary - West
FML
91
91
53.8
53.8
6.2
0.2
33,214
41301
Primary
Clay
350
350
200
200
25
2.9
1,937,500
Secondary
FML
215
251
125
161
15
1.3
535,226
Tertiary
FML
268
268
226
226
7
1.7
428,092
41302
Primary
FML
360
360
210
210
25
3.1
2,077,500
Secondary
FML
309
309
267
267
7
2.2
581,637
41303
Primary
FML
360
360
210
210
25
3.1
2,077,500
Secondary
FML
309
309
267
267
7
2.2
581,637
41304
Primary
FML
360
360
210
210
25
3.1
2,077,500
Secondary
FML
309
309
267
267
7
2.2
581,637
41305
Primary
FML
360
360
210
210
25
3.1
2,077,500
Secondary
FML
309
309
267
267
7
2.2
581,637
41306
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
251
251
210
210
6.8
1.5
362,238
41307
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
251
251
210
210
6.8
1.5
362,238
41308
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
251
251
210
210
6.8
1.5
362,238
41309
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
251
251
210
210
6.8
1.5
362,238
41310
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
251
251
210
210
6.8
1.5
362,238
41311
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
251
251
210
210
6.8
1.5
362,238
41312
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
251
251
210
210
6.8
1.5
362,238
41313
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
251
251
210
210
6.8
1.5
362,238
41314
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
251
251
210
210
6.8
1.5
362,238
41315
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
251
251
210
210
6.8
1.5
362,238
41316
Primary
Clay
426
426
276
276
25
4.3
3,126,900
Secondary
FML
432
366
402
336
5
3.7
732,204
41317
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
432
366
402
336
5
3.7
732,204
41318
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
432
366
402
336
5
3.7
732,204
41319
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
432
366
402
336
5
3.7
732,204
41320
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
432
366
402
336
5
3.7
732,204
41321
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
432
366
402
336
5
3.7
732,204
41322
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
432
366
402
336
5
3.7
732,204
41323
Primary
FML
426
426
276
276
25
4.3
3,126,900
Secondary
FML
432
366
402
336
5
3.7
732,204