Loading...
HomeMy WebLinkAboutDWQ-2025-002306STATE OF UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER QUALITY WATER QUALITY BOARD P.O. BOX 144870 SALT LAKE CITY, UTAH 84114-4870 Ground Water Discharge Permit Permit No. UGW010002 In compliance with the provisions of the Utah Water Quality Act, Title 19, Chapter 5, Utah Code Annotated 1953, as amended, the Act, MANGO II-Milford, LLC – Skyline Complex Farms 111 E. Broadway STE 1250 Salt Lake City, Utah 84111 hereafter referred to as the Permittee, is granted a Ground Water Discharge Permit for the operation of hog production facilities at 42 existing farm sites southwest of Milford, Utah at the Skyline Farm Complex. The farm sites are located in Sections 27, 28, 33, and 34, T. 29 S., R. 11 W., Salt Lake Base & Meridian, Sections 2, 3, 4, 5, 7, 8, 9, 10, 16, and 19, T. 30 S., R. 11 W., Salt Lake Base & Meridian, and Sections 3, 4, 9, and 10, T. 30 S., R. 12 W., Salt Lake Base & Meridian. This permit is based on representation made by the Permittee and other information contained in the administrative record. It is the responsibility of the Permittee to read and understand all provisions of this permit. The facility shall be constructed and operated in accordance with conditions set forth in the permit and the Utah Administrative Rules for Ground Water Quality Protection (UAC R317-6). This permit shall become effective on ________________, 2025. This permit and authorization to operate shall expire at midnight on June 2nd, 2024. Signed this _____ day of March x, 2025. ___________________________________________ John K. Mackey, P.E. Director TABLE OF CONTENTS PART I SPECIFIC CONDITIONS 1 A. Ground Water Classification 1 B. Background Ground Water Quality 1 C. Ground Water Protection Levels 1 D. Best Available Technology (BAT) Standard 1 E. Compliance Monitoring Requirements 4 F. Non-Compliance Status 9 G. Reporting Requirements 11 H. Compliance Schedule 13 PART II MONITORING, RECORDING AND REPORTING REQUIREMENTS 14 A. Representative Sampling 14 B. Analytical Procedures 14 C. Penalties for Tampering 14 D. Reporting of Monitoring Results 14 E. Compliance Schedules 14 F. Additional Monitoring by the Permittee 14 H. Retention of Records 14 I. Twenty-four Hour Notice of Noncompliance Reporting 15 J. Other Noncompliance Reporting 15 K. Inspection and Entry 15 PART III COMPLIANCE RESPONSIBILITIES 16 A. Duty to Comply 16 B. Penalties for Violations of Permit Conditions 16 C. Need to Halt or Reduce Activity not a Defense 16 D. Duty to Mitigate 16 E. Proper Operation and Maintenance 16 PART IV GENERAL REQUIREMENTS 17 A. Planned Changes 17 B. Anticipated Noncompliance 17 C. Permit Actions 17 D. Duty to Reapply 17 E. Duty to Provide Information 17 F. Other Information 17 G. Signatory Requirements 17 H. Penalties for Falsification of Reports 18 I. Availability of Reports 18 J. Property Rights 18 K. Severability 19 L. Transfers 19 M. State Laws 19 N. Reopener Provision 19 APPENDIX I Farm and Monitoring Well Compliance Limit Summary APPENDIX II Monitoring Well Locations APPENDIX III Summary of Construction Details for Primary and Secondary Lagoons Applicable MANGO II-Milford, LLC Skyline Farm Complex Operations Documents for this permit include but are not limited to: Anaerobic Lagoon Systems Operation and Maintenance Manual (rev. 2015) Spill Prevention and Response Manual (rev. 2015) Sludge Disposal and Farm Closure Plan (rev. 2015) Nutrient Management Plan for Land Application (rev. 2015) Sampling and Analysis Plan (rev. 2015) Manure Drying Program Plan (rev. 2013) PART I SPECIFIC CONDITIONS A. Ground Water Classification Ground water class as defined in UAC R317-6-4 is indicated for each farm site in Appendix I. Ground water classification is determined through background ground water monitoring in the monitoring wells associated with each farm site. At farm sites 41103, 41104, 41105, 41106, 41108, 41201, 41204, 41205, 41206, 41306, 41307, 41308, 41309, 41311, 41312, 41313, 41314, 41316, 41317, 41318, 41319, 41320, 41321, 41322, and 41323 ground water is classified as Class IA, Pristine Ground Water. Farm sites 41101, 41102, 41107, 41203, 41209, 41303, 41304, 41305, 41310, 41315 and 49170 are underlain by Class II, Drinking Water Quality Ground Water. Farm sites 41202, 41207, 41208, 41210, 41301, and 41302 are underlain by Class III, Limited Use Ground Water. B. Background Ground Water Quality Ground water quality information is presented in Appendix I. All parameters in Appendix I are in units of mg/l, except pH. Background is defined as the mean concentration in the well during the background monitoring period. For any new wells installed during the permit term, a formal determination of background water quality will be made after completion of accelerated background monitoring as required in Part I.E.5.(c). C. Ground Water Protection Levels Ground water compliance limits for each farm site are presented in Appendix I. Protection levels are based on background sampling performed to date and on the requirements of R314-6-4 as required in Part I.E.5.(c) of this permit. Compliance limits are based on the greater of the protection level or the mean background plus twice the standard deviation. D. Best Available Technology (BAT) Standard The administration of this permit is founded on the use of best available technology (BAT), in accordance with the requirements of UAC R317-6-1.3. Construction standards for the farm sites covered by this permit are detailed in the construction permits. The construction permits associated with each farm site are listed in Table 1. TABLE 1 Construction Permits   Farm Sites  Construction Permit   41101, 41102, 41103, 41201, 41301  November 15, 1993 amended March 25, 1994   41202, 41203  March 17, 1995   41302, 41303, 41304, 41305  August 10, 1995   41204, 41205, 41206  October 27, 1995  41204, 41208 September 30, 1996  41209,41210 June 16, 1997  49170 49170 Expansion March 31, 1998 September 16, 2005   41104, 41105, 41106  November 5, 1995   41306 through 41315  May 13, 1996   41107, 41108  April 1, 1997   41316 through 41323  July 1, 1997   These farm sites each have at least one primary lagoon and one containment basin for evaporation. The lagoon systems are sized to accept up to 1.8 cubic feet (for sow, finisher, and boar stud farms) or 2.3 cubic feet (for nursery farms) of volume per live animal weight (LAW) in the primary lagoon and provide enough surface area for evaporation of water in the containment basin. The primary lagoons and the containment basins are lined either with 12 inches of clay soil amended with bentonite or with a 40-mil high-density polyethylene (HDPE) flexible membrane liner (FML). The liners, both clay and FML, are designed to yield a liner hydraulic permeability coefficient no greater than 1×10-7 cm/sec. The liner type, dimensions, maximum operating depth, free board, liquid contact area, and operating volume of each primary and containment basin for each farm site are presented in the construction permits and construction permit applications covering those units. This information is summarized in Appendix III. Only wastes from the hog-raising operations may be treated in the lagoons. The hog waste is drained into primary anaerobic lagoons for treatment and storage. The hog waste from twenty-three finisher farm sites, as an option, can be collected and conveyed through a Collection System to a Central Treatment Plant operated by a third party. The effluent from the Central Treatment plant is conveyed back to each existing primary lagoon of the finisher farms. A diversion valve connection is installed to either allow the wastewater from the recharge pits to continue to flow into the existing anaerobic lagoon system, or to be diverted into the buffer basins for treatment in the Central Treatment Plant. Waste water from the lagoons may be land-applied as described below at the agronomic rate according to the most recently revised and approved version of the Nutrient Management Plan for Land Application (NMP). For the purposes of this permit, the agronomic rate is defined as the rate where all available nitrogen is taken up by crops or other plants before it can leach below the root zone, and where other waste constituents are applied at rates that do not cause ground or surface water pollution or plant toxicity incompatible with the intended use of the land. Emergency waste generated as a result of significant spills, the cleanup of a contamination event, or the necessary removal of waste from the facility to allow the investigation of a possible leak or to perform repairs may be land applied in accordance with the NMP. Currently MANGO II-Milford, LLC has 42 operational farm sites for this permit, and each site has at least one primary lagoon where manure solids are collected and at least one secondary evaporative lagoon (Appendix III). It may be necessary to remove accumulated solids from the bottom of each primary lagoon at the farm sites. Sludge storage volume is engineered for approximately 20 years of accumulation. MANGO II-Milford, LLC has implemented a program to remove the solids from the lagoons and dry the manure on a drying pad constructed near the lagoon. The manure is a nutrient source and the drying of the manure allows the nutrients to be sold and applied to local cropland at agronomic rates. Drying pad construction will follow the engineering design approved by a licensed Professional Engineer with the Utah Division of Water Quality. Performance Standard for Best Available Technology Compliance with the requirements for use of best available technology (BAT) will be demonstrated by construction, maintenance and operation of the lagoon systems according to the construction permits issued previously for the sites. a. Liner - Performance of the clay or FML liner will be evaluated for compliance with the requirements of Part II.E of this permit. Liner integrity will be evaluated prior to operation with the approved construction quality assurance/quality control (QA/QC) plans contained in the application for this permit. The liner integrity must be maintained. Deterioration of materials or any other situation which prevents the liner from functioning according to the approved design shall constitute non-compliance with this permit. After completion of construction, synthetic liners must remain in contact with the prepared soil base of the lagoons and containment basins, as provided by liner slack and ballast when necessary to minimize billowing caused by the wind. Adequate slack and ballast when necessary will also be provided to minimize stresses and suspensions of the liner at the toe of the dikes due to variations in ambient temperature and incident solar radiation. Any large suspensions or billowing of synthetic liner is considered a failure of this performance standard. The formation of bulges or whales in the liner when the lagoons contain water is an indication of a leak in the liner. When whales form in the liner, the liner must be repaired in an expeditious manner. Impact to the underlying soils must be assessed in conformance with the provisions detailed in the most recently revised and approved version of the Spill Prevention and Response Plan. b. Lagoons - The performance standard for anaerobic lagoons operation is based on operating and maintaining the lagoons in a manner consistent with the design criteria detailed in the construction permits. The design of the primary lagoons is based on a total volumetric capacity of approximately 1.80 cubic feet per pound of LAW, consisting of 1.2 cubic foot for treatment and 0.6 cubic foot for 20-year sludge accumulation for boars, sows, and finishing hogs. Total volumetric lagoon capacity for nursery pigs is based on 1.97 cubic feet per pound of LAW for treatment and 0.29 cubic feet per pound of LAW for a 20-year sludge accumulation. The evaporation basins (secondary lagoons or containment basins) are designed to have a normal operating depth with additional surface area needed to maintain a constant depth, at the same time of each year and evaporate the excess wastewater during each annual cycle. Construction dimensions for each primary and secondary at each farm site are summarized in Appendix III. The anaerobic lagoon system must be operated and maintained in accordance with the most recently revised and approved Anaerobic Lagoon Systems Operation and Maintenance Manual. Performance of the anaerobic lagoons will be demonstrated by the monitoring specified in Part I.E.5.b. c. Land Application - Land application is currently limited to the parcels of land contained in the West ½ of Section 27, North ½ of the North ½ of Section 28 and the West ½ of Section 33, T. 29 S., R. 11 W., SLB&M. Land application of wastewater from the farm sites covered by this permit is not planned as a routine method of wastewater treatment, but may be employed in an emergency situation. Any land application of wastes generated at any of the facilities covered by this permit must be performed in accordance with the most recently revised and approved version of the Nutrient Management Plan for Land Application. d. Manure Drying Pads - Manure drying pads at any of the facilities covered by this permit may not be performed on any parcel of land without first notifying and receiving the approval of a DWQ engineer. Drying pad construction must be performed in accordance with the most recently revised and approved version of the Manure Drying Program Plan. 2. Closure Plan Any lagoon system closure must be undertaken in compliance with the most recently revised and approved version of the Sludge Disposal and Farm Closure Plan that has been prepared by the permittee. Prior to closure of any lagoon or lagoon system, the permittee shall submit to the Director a site-specific closure plan for disposition of the liquids, solids and liner material of the lagoon(s) to be closed. A plan for land application of the liquids and solids at appropriate agronomic rates, on-site or at manure drying pads, or other disposal methods, will be submitted for approval by the Director. The lagoon liner material will be tested according to an approved testing plan to determine an appropriate means of disposal, which will not lead to ground water contamination. The monitoring wells will continue to be sampled for a post closure monitoring period as determined by the Director. E. Compliance Monitoring Requirements The permittee is required to monitor ground water quality and source activities that could potentially impact the ground water quality. Monitoring shall be performed according to the provisions of Part I.E.5 to assure compliance with the terms of this permit. 1. Compliance Monitoring Wells The network of monitoring wells shall provide the ability to detect contamination in the uppermost groundwater aquifer, which could result from excess lagoon seepage. Under the provisions of this permit, ground water contamination in the shallow aquifer under the lagoon sites would be a reason for the permittee to take remedial action before further degradation occurs. Location of Monitoring Wells - The permittee has installed a monitoring well system at each existing farm site to establish the ground water gradient underlying each lagoon system and to monitor ground water quality in both the upgradient and downgradient wells. The permittee will be required to drill additional wells if the ground water flow directions are different than expected as revealed when the wells are drilled. The locations and status of the wells are described in Appendix II. Information for any new wells installed for the farm sites covered under this permit shall be submitted to the Director and includes: well identification, latitude and longitude relative to NAD83, hinge elevation, and the well construction log. b) Damage to Monitoring Wells - If a monitoring well is damaged or is otherwise rendered inadequate for its intended purpose or if a previous hydraulic gradient between two monitor wells is reversed, the Director shall be notified in writing within five days of the permittee becoming aware of the condition. c) Future Modification of Monitoring Well Network - If at any time the Director determines the monitoring well network to be inadequate due to a change in gradient or for any other reason, the permittee shall submit within 30 days of receipt of notification a plan and compliance schedule to modify the monitoring well network. 2. Monitoring Period The permittee shall conduct the monitoring detailed in Part I.E.5 for the term of the permit. 3. Monitoring Requirements The permittee shall comply with the ground water standards, compliance limits listed in Appendix I of this permit, and other monitoring requirements contained in the Utah Ground Water Quality Protection Regulations (UAC R317-6). The monitoring required in Part I.E.5 is based on compounds which may be discharged to ground water or may characterize ground water from different sources and which may be sampled at monitoring wells. The ground water regulations also contain standards for contaminants such as metals, pesticides and volatile organic compounds. Accordingly the permittee must not discharge these or any other contaminants, which could impair beneficial uses of the ground water, even though the permit does not require monitoring for them. 4. Protection Levels and Compliance Limits a) Application - The monitoring requirements listed below in Part I.E.5 apply to all upgradient and downgradient wells. The protection levels for indicator parameters are calculated using the Ground Water Quality Protection Regulations (UAC R317-6-4), background water quality data, and historical well data. b) Exceedance in Upgradient Well - If the compliance limits referenced in Part I.C are exceeded in any upgradient well, the permittee shall note the exceedance in the next semi-annual monitoring report. If ground water elevations indicate that the well is no longer upgradient of the lagoon, or if ground water mounding has developed, the exceedance shall be treated as a non-compliance event according to the provisions of Part I.F. As part of the resolution of the non-compliance situation, the permittee may be required to propose changes to the monitoring plan for the site sufficient to demonstrate that ground water is not being polluted in violation of UAC R317-6. 5. Monitoring Details a) Semi-annual Ground Water Quality Compliance Monitoring - Semi-annual ground water compliance monitoring shall be conducted by the permittee under the provisions of this permit. Sample collection, handling and analysis shall be conducted in accordance with the most recently revised and approved version of the Sampling and Analysis Plan. Unless revised by the Sampling and Analysis Plan, the field parameters to be measured during the semi-annual monitoring shall be: temperature, specific conductance, pH, and ground water elevation. Ground water elevations shall be determined according to Part I.E.5.d. Unless revised by the Sampling and Analysis Plan, the laboratory parameters to be measured during the semi-annual monitoring shall be: Nitrate plus Nitrite as Nitrogen, Bicarbonate, Chloride, and Total Dissolved Solids (TDS). The results of the semi-annual compliance monitoring shall be submitted to the Division of Water Quality along with supporting field data in the Semi-annual Ground Water Quality Monitoring Report according to Part II.B accompanied by any supporting raw data. b) Annual Monitoring - Annual compliance monitoring shall be conducted by the permittee under the provisions of this permit according to the most recently revised and approved version of the Sampling and Analysis Plan, the Anaerobic Lagoon Systems Operation and Maintenance Manual, and the Sludge Disposal and Farm Closure Plan as indicated below. Compliance Monitoring – In addition to the semi-annual Ground Water Compliance Monitoring, major ion sampling will be performed for one year (two semi-annual samples) from all wells at three farm locations (41304, 41318, and 49170). Laboratory parameters to be measured for the annual monitoring, in addition to the semi-annual monitoring, shall be: sulfate, sodium, potassium, magnesium, and calcium. Sample collection, handling and analysis shall be conducted in accordance with the most recently revised and approved version of the Sampling and Analysis Plan. Water Supply and Production Wells - All water supply and production wells supporting the activities at the farm sites covered by this permit shall be monitored annually for Nitrate plus Nitrite as Nitrogen and Total Dissolved Solids (TDS). Sample collection, handling, and analysis shall be conducted in accordance with the most recently revised and approved version of the Sampling and Analysis Plan. The analytical results and any supporting raw data shall be submitted to the Division of Water Quality with the next Semi-annual Ground Water Quality Monitoring Report according to Part II.B Lagoon Waste Water - The waste water from a representative operating primary manure lagoon at a nursery (41202), sow (41102), and finisher (41302) farm site in the Skyline Complex shall be analyzed annually for the following parameters: temperature, specific conductance, pH, nitrate plus nitrite as nitrogen, ammonia, total Kjeldahl nitrogen (TKN), sulfate, bromide, chloride, total dissolved solids, sodium, potassium, calcium, magnesium, bicarbonate, carbonate, phosphorus, arsenic, barium, cadmium, chromium, copper, lead, mercury, selenium, silver, and zinc. Sample collection, handling, and analysis shall be conducted in accordance with the most recently revised and approved version of the Sampling and Analysis Plan. Samples shall be taken in the late summer when parameter concentrations should be at their yearly maximum. Analyses for nitrogen species shall be conducted at the same laboratory. Results of the wastewater monitoring accompanied by any supporting raw data shall be submitted to the Division of Water Quality with the next Semi-annual Ground Water Quality Monitoring Report according to Part II.B. Lagoon Sludge - Sludge sampling at the primary lagoon at a nursery (41202), sow (41102), and finisher (41302) farm site in the Skyline Complex shall be analyzed annually for the following parameters: temperature, specific conductance, pH, nitrate plus nitrite as nitrogen, ammonia as nitrogen, total Kjeldahl nitrogen (TKN), sulfate, bromide, chloride, total dissolved solids, sodium, potassium, calcium, magnesium, bicarbonate, carbonate, phosphorus, arsenic, barium, cadmium, chromium, copper, lead, mercury, selenium, silver, and zinc. Sample collection, handling, and analysis shall be conducted according to the most recently revised and approved version of the Sludge Disposal and Farm Closure Plan. Samples shall be taken in the late summer when parameter concentrations should be at their yearly maximum. The results of this sludge sampling accompanied by any supporting raw data shall be submitted to the Division of Water Quality with the next Semi-annual Ground Water Quality Monitoring Report according to Part II.B. Lagoon Performance Monitoring - Lagoon performance monitoring shall be conducted annually according to the most recently revised and approved version of the Anaerobic Lagoon Systems Operation and Maintenance Manual. Samples will be analyzed for temperature, specific conductance, pH, nitrate plus nitrite as nitrogen, ammonia as nitrogen, total Kjeldahl nitrogen (TKN), sulfate, bromide, chloride, total dissolved solids, sodium, potassium, calcium, magnesium, bicarbonate, carbonate, phosphorus, arsenic, barium, cadmium, chromium, copper, lead, mercury, selenium, silver, and zinc. Results of the lagoon performance monitoring accompanied by any supporting raw data shall be submitted to the Division of Water Quality according to Part II.C Lagoon Sludge Profiling - Sludge profiling of all primary lagoons shall be conducted annually at one third of the farms to ensure that each primary lagoon has been profiled every three years by the permittee according to the most recently revised and approved version of the Sludge Disposal and Farm Closure Plan. Samples will be analyzed for temperature, specific conductance, pH, nitrate plus nitrite as nitrogen, ammonia as nitrogen, total Kjeldahl nitrogen (TKN), sulfate, bromide, chloride, total dissolved solids, sodium, potassium, calcium, magnesium, bicarbonate, carbonate, phosphorus, arsenic, barium, cadmium, chromium, copper, lead, mercury, selenium, silver, and zinc. The results of this profiling accompanied by any supporting raw data shall be submitted to the Division of Water Quality according to Part II. D. c) Background Ground Water Quality Monitoring - Background ground water quality has been established in the upgradient monitoring wells for all the farm sites covered by this permit for the purpose of establishing protection levels and compliance limits. The samples were analyzed for the following parameters: temperature, specific conductance, pH, nitrate plus nitrite as nitrogen, ammonia, bicarbonate, chloride, total dissolved solids (TDS), sodium, potassium, magnesium, calcium, carbonate, and sulfate. At least one sample from each downgradient monitor well was also analyzed for all these parameters. If any additional upgradient or downgradient wells are installed, the permittee shall collect quarterly samples at equal time intervals over a two-year period from each upgradient well and each downgradient well. The samples shall be analyzed for the parameters listed above. Sample collection, handling, and analysis shall be conducted in accordance with the most recently revised and approved version of the Sampling and Analysis Plan. The results accompanied by any supporting raw data shall be submitted to the Division of Water Quality with the next Semi-annual Ground Water Quality Monitoring Report according to Part II.B d) Depth to Ground Water and Ground Water Elevation - Depth to ground water shall be measured to the nearest 0.01 foot, below the reference point at the top of the well casing. For each monitoring well, the permittee shall submit a report to the Division of Water Quality accompanied by a surveyors report indicating the elevation, in feet above mean sea level to the nearest 0.01 foot, of the reference point at the top of the well casing from which all ground water depths are measured. Ground water elevations shall be measured semi-annually at all active monitoring wells at the farm sites covered by this permit. Ground water elevations shall be calculated by subtracting the depth to ground water measurement from the elevation of the reference point at the top of the well casing and reported in feet above mean sea level to the nearest 0.01 foot. Ground water elevation calculations for each semi-annual ground water sampling event shall be submitted with the Semi-annual Ground Water Quality Monitoring Report. For the purpose of constructing ground water potentiometric surface contour maps, ground water elevation data shall be collected within 48 hours for each farm site and two months for the entire Skyline Farm Complex. Ground water potentiometric contour maps shall be constructed from these data and submitted to the Division of Water Quality with the next Semi-annual Ground Water Quality Monitoring Report according to Part I.G. e) Laboratory Approval - All water analyses shall be performed by a laboratory certified by the State of Utah in accordance with the most recently revised and approved version of the Sampling and Analysis Plan and the provisions of UAC R317-6-6.3. f) Future Modification of Monitoring Plan - If the Director or permittee determine that hydrogeologic conditions at any farm site do not allow a direct comparison of upgradient and downgradient ground water quality, the protection levels and compliance limits shall be established based on ground water quality in the down gradient well. In this event, the Director shall direct the permittee to begin collection of background water quality data in the downgradient well according to Part I.E.5.c. Alternatively, the permittee may propose another method of compliance monitoring within 90 days of the determination that upgradient-downgradient comparison is not possible. F. Non-Compliance Status 1. Probable Out-of-Compliance Status - The permittee shall evaluate results of each ground water sampling event to determine any exceedance of the Ground Water Compliance Summary found in Appendix 1. Upon determination that a Ground Water Protection Level has been exceeded at any downgradient compliance monitoring well, the permittee shall: a. Immediately re-sample the monitoring well(s) found to be in probable out-of-compliance status for laboratory analysis of the exceeded protection level parameter(s). Submit the analytical results thereof, and notify the Director of the probable out-of-compliance status within 30 days of the initial detection. b. Upon exceedance of any one parameter listed in Part I.C for two consecutive sampling events, immediately implement an accelerated schedule of quarterly sampling analysis, consistent with the requirements of this permit. This quarterly sampling will continue for at least two quarters or until the compliance status can be determined by the Director. Reports of the results of this sampling will be submitted to the Director as soon as they are available, but not later than 30 days from each date of sampling. 2. Out-of-Compliance Status Based on Confirmed Exceedance of Permit Ground Water Protection Levels a. Out of Compliance Status shall be defined as follows: For parameters that have been defined as detectable in the background and for which protection levels have been established, out-of-compliance shall be defined as two consecutive samples exceeding the protection level or compliance limit. Out of compliance status for exceedance of bicarbonate or chloride occurs only when their respective compliance limits are exceeded and the compliance limit for total dissolved solids is also exceeded. b. Notification and Accelerated Monitoring - upon determination by the permittee or the Director, in accordance with UAC R317-6-6.17, that an out-of-compliance status exists, the permittee shall: Verbally notify the Director of the out-of-compliance within 24 hours, and provide written notice within 5 days of the detection, and A written submission shall also be provided to the Director within five days of the time that the permittee becomes aware of the noncompliance. The written submission shall contain: i) A description of the noncompliance and its cause; ii) The period of noncompliance, including exact dates and times; iii) The estimated time noncompliance is expected to continue if it has not been corrected; and, iv) Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The permittee shall verbally report any noncompliance, which may endanger public health or the environment as soon as possible, but no later than 24 hours from the time the permittee first became aware of the circumstances. The report shall be made to the Utah Department of Environmental Quality 24-hour number, (801) 536-4123. Continue an accelerated schedule of quarterly ground water monitoring for at least two quarters and continue quarterly monitoring until the facility is brought into compliance as determined by the Director. c. Source and Contamination Assessment Study Plan - within 30 days after the written notice to the Director required in Part I.F. 2.b.1, above, the permittee shall submit an assessment study plan and compliance schedule for: i) Assessment of the source or cause of the contamination, and determination of steps necessary to correct the source, if the contamination is caused by facilities or activities for which the permittee is responsible. ii) Assessment of the extent of the ground water contamination and any potential dispersion. iii) Evaluation of potential remedial actions to restore and maintain ground water quality, and ensure that the ground water standards will not be exceeded at the compliance monitoring wells. 3. Out-of-Compliance Status Based Upon Failure To Maintain Best Available Technology - In the event that BAT monitoring indicates a violation of any of the construction or performance standards outlined in Part I.D of this permit, the permittee shall submit to the Director a notification and description of the violation in accordance with Part II.I of this permit. 4. Failure to Maintain Best Available Technology Required by Permit A facility will be determined to be in an out-of-compliance status if best available technology has failed or cannot be maintained according to the provisions required by this permit, unless: a. The Permittee has notified according to Part I.F.2, and b. The failure was not intentional or was not caused by the Permittee's negligence, either in action or failure to act, and c. The Permittee has taken adequate remedial measures in a timely manner or has developed an approvable remedial action plan and implementation schedule for restoration of best available control technology, an equivalent control technology, or closure of the facility (implementation of an equivalent technology will require permit modification and re-issuance), and d. The Permittee has demonstrated that any discharge of a pollutant from the facility is not in violation of the provisions of UCA 19-5-107. 5. Contingency Plan - If, after review of ground water monitoring data and other relevant information, the Director determines that use of any lagoon has caused an exceedance of ground water compliance limits at any compliance monitoring point, the permittee shall conduct a Contamination Investigation to determine the extent and severity of contamination caused by the lagoon and submit it for review by the Division of Water Quality within 45 days of determination of out-of-compliance status. After review of this report the Director may require the permittee to develop a Corrective Action Plan to remediate the contamination. Actions taken under the plan may include emptying liquids and sludge from the leaking lagoon into one of the other lagoons in the permittee farm complex, repairing or reconstructing the lagoon liner as needed, constructing temporary holding ponds lined with flexible membrane liners, and developing wells for the purpose of extracting the contaminated ground water. Contaminated ground water may be stored in the lagoons or land applied according to the most recently revised and approved Nutrient Management Plan for Land Application, if necessary and feasible. Significant hog waste spills from the waste handling system must be addressed in compliance with the most recently revised and approved version of the Spill Prevention and Response Manual has been prepared by the permittee. Minor spill events shall be reported with the next Semi-annual Ground Water Quality Monitoring Report according to Part II.B G. Reporting Requirements 1. Semi-Annual Ground Water Monitoring - monitoring required in Part I.E.5 above shall be reported according to the schedule in Table 3 below, unless modified by the Director: Table 3: Semi-Annual Compliance Monitoring Report Schedule Monitoring Period Report Due Date  January through June August 1   July thru December February 1   2. Water Level Measurements - water level measurements from ground water monitoring wells will be reported as measured depth to ground water from the surveyed casing measuring point, and ground water elevations as converted by casing measuring point elevations. 3. Ground Water Quality Sampling - reporting will include: Field Data Sheets - or copies thereof, including the field measurements, required in Part I.E.5.a above, or as listed in the most recently revised and approved Sampling and Analysis Plan; well name/number, date and time, names of sampling crew, type of sampling pump or bail, volume of water purged before sampling, and any pertinent comments relating to sampling conditions. Laboratory Analytical Results - including date sampled, date received; and the results of analysis for each parameter, including: value or concentration, units of measurement, reporting limit (minimum detection limit for the examination), analytical method, and the date of the analysis. The analytical methods and the method detection limits for every parameter must conform to those specified in the most recently revised and approved version of the Sampling and Analysis Plan. Well Construction - All data associated with newly installed compliance and monitoring wells will be provided to the Director. This information includes the well identification, latitude and longitude relative to NAD83, well installation date, depth to ground water, and well construction information. 4) Water Supply and Production Well Report - The results of water supply and production well use throughout the Skyline Farm Complex, accompanied by any supporting raw data, shall be submitted to the Division of Water Quality with the next Semi-annual Ground Water Quality Monitoring Report. 5) Lagoon Waste Water and Sludge Monitoring Report – The results of the annual lagoon waste water and sludge monitoring report accompanied by any supporting raw data shall be submitted to the Division of Water Quality with the next Semi-annual Ground Water Quality Monitoring Report. 6) Noncompliance or Probable Noncompliance - Reporting requirements for noncompliance or probable noncompliance status shall be according to the provisions of Part I.F. 7) Electronic Filing Requirements - In addition to submittal of the hard copy data, above, the permittee will electronically submit all required ground water monitoring data (analytical ground water results, water level measurements, water supply, lagoon waste water and sludge analytical results, sludge profile monitoring data, and the lagoon performance data) in the electronic format specified by the Director. A hard copy of the required reports, including data analysis will be provided to the Director. In addition, a pdf version of the full report, including analytical data, will be submitted through the DEQ Web Portal. All analytical data and updated tables will be provided in xlsx format. The data may be submitted through the online DEQ Submission Portal at https://deq.utah.gov/water-quality/water-quality-electronic-submissions. . H. Compliance Schedule There are no outstanding compliance items at the time of this permit issuance for UGW010002. PART II MONITORING, RECORDING AND REPORTING REQUIREMENTS A. Representative Sampling Samples taken in compliance with the monitoring requirements established under Part I shall be representative of the monitored activity. B. Analytical Procedures Water sample analysis must be conducted according to test procedures specified under UAC R317-6-6.3.L, unless other test procedures have been specified in this permit. C. Penalties for Tampering The Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this permit shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than six months per violation, or by both. D. Reporting of Monitoring Results Monitoring results obtained during each reporting period specified in the permit, shall be submitted to the Director, Utah Division of Water Quality at the following address no later than the 15th day of the month following the completed reporting period: State of Utah Division of Water Quality P.O. Box 144870 Salt Lake City, Utah 84114-4870 Attention: Ground Water Protection Section E. Compliance Schedules Reports of compliance or noncompliance with, or any progress reports on interim and final requirements contained in any Compliance Schedule of this permit shall be submitted no later than 14 days following each schedule date. F. Additional Monitoring by the Permittee If the permittee monitors any pollutant more frequently than required by this permit, using approved test procedures as specified in this permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted. Such increased frequency shall also be indicated. G. Records Contents Records of monitoring information shall include: 1. The date, exact place, and time of sampling or measurements: 2. The individual(s) who performed the sampling or measurements; 3. The date(s) and time(s) analyses were performed; 4. The individual(s) who performed the analyses; 5. The analytical techniques or methods used; and, 6. The results of such analyses. H. Retention of Records The permittee shall retain records of all monitoring information, including all calibration and maintenance records and copies of all reports required by this permit, and records of all data used to complete the application for this permit, for a period of at least three years from the date of the sample, measurement, report or application. This period may be extended by request of the Director at any time. I. Twenty-four Hour Notice of Noncompliance Reporting 1. The permittee shall verbally report any noncompliance which may endanger public health or the environment as soon as possible, but no later than 24 hours from the time the permittee first became aware of the circumstances. The report shall be made to the Utah Department of Environmental Quality 24-hour number, (801) 536-4123. 2. A written submission shall also be provided to the Director within five days of the time that the permittee becomes aware of the circumstances. The written submission shall contain: a. A description of the noncompliance and its cause; b. The period of noncompliance, including exact dates and times; ` c. The estimated time noncompliance is expected to continue if it has not been corrected; and, d. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. 3. Reports shall be submitted to the addresses in Part II.D, Reporting of Monitoring Results. J. Other Noncompliance Reporting Instances of noncompliance not required to be reported within 24 hours, shall be reported at the time that monitoring reports for Part II.D are submitted. K. Inspection and Entry The permittee shall allow the Director, or an authorized representative, upon the presentation of credentials and other documents as may be required by law, to: 1. Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of the permit; 2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit; 3. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this permit; and, 4. Sample or monitor at reasonable times, for the purpose of assuring permit compliance or as otherwise authorized by the Act, any substances or parameters at any location. PART III COMPLIANCE RESPONSIBILITIES A. Duty to Comply The permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the Act and is grounds for enforcement action; for permit termination, revocation and reissuance, or modification; or for denial of a permit renewal application. The permittee shall give advance notice to the Director of any planned changes in the permitted facility or activity which may result in noncompliance with permit requirements. B. Penalties for Violations of Permit Conditions The Act provides that any person who violates a permit condition implementing provisions of the Act is subject to a civil penalty not to exceed $10,000 per day of such violation. Any person who willfully or negligently violates permit conditions is subject to a fine not exceeding $25,000 per day of violation. Any person convicted under Section 19-5-115(2) of the Act a second time shall be punished by a fine not exceeding $50,000 per day. Nothing in this permit shall be construed to relieve the permittee of the civil or criminal penalties for noncompliance. C. Need to Halt or Reduce Activity not a Defense It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit. D. Duty to Mitigate The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this permit which has a reasonable likelihood of adversely affecting human health or the environment. E. Proper Operation and Maintenance The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate laboratory controls and quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of the permit. PART IV GENERAL REQUIREMENTS A. Planned Changes The permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required when the alteration or addition could significantly change the nature of the facility or increase the quantity of pollutants discharged. B. Anticipated Noncompliance The permittee shall give advance notice of any planned changes in the permitted facility or activity which may result in noncompliance with permit requirements. C. Permit Actions This permit may be modified, revoked and reissued, or terminated for cause. The filing of a request by the permittee for a permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance, does not stay any permit condition. D. Duty to Reapply If the permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the permittee must apply for and obtain a permit renewal or extension. The application should be submitted at least 180 days before the expiration date of this permit. E. Duty to Provide Information The permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit, or to determine compliance with this permit. The permittee shall also furnish to the Director, upon request, copies of records required to be kept by this permit. F. Other Information When the permittee becomes aware that it failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or any report to the Director, it shall promptly submit such facts or information. G. Signatory Requirements All applications, reports or information submitted to the Director shall be signed and certified. 1. All permit applications shall be signed as follows: a. For a corporation: by a responsible corporate officer; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively. c. For a municipality, State, Federal, or other public agency: by either a principal executive officer or ranking elected official. 2. All reports required by the permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that person. A person is a duly authorized representative only if: a. The authorization is made in writing by a person described above and submitted to the Director, and, b. The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.) 3. Changes to Authorization. If an authorization under Part IV.G.2 is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of Part IV.G.2 must be submitted to the Director prior to or together with any reports, information, or applications to be signed by an authorized representative. 4. Certification. Any person signing a document under this section shall make the following certification: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." H. Penalties for Falsification of Reports The Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than six months per violation, or by both. I. Availability of Reports Except for data determined to be confidential by the permittee, all reports prepared in accordance with the terms of this permit shall be available for public inspection at the offices of the Director. As required by the Act, permit applications, permits, effluent data, and ground water quality data shall not be considered confidential. J. Property Rights The issuance of this permit does not convey any property rights of any sort, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of federal, state or local laws or regulations. K. Severability The provisions of this permit are severable, and if any provision of this permit, or the application of any provision of this permit to any circumstance, is held invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby. L. Transfers This permit may be automatically transferred to a new permittee if: 1. The current permittee notifies the Director at least 30 days in advance of the proposed transfer date; 2. The notice includes a written agreement between the existing and new permittee containing a specific date for transfer of permit responsibility, coverage, and liability between them; and, 3. The Director does not notify the existing permittee and the proposed new permittee of his or her intent to modify, or revoke and reissue the permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in paragraph 2 above. M. State Laws Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, penalties established pursuant to any applicable state law or regulation under authority preserved by Section 19-5-117 of the Act. N. Reopener Provision This permit may be reopened and modified (following proper administrative procedures) to include the appropriate limitations and compliance schedule, if necessary, if one or more of the following events occurs: 1. If new ground water standards are adopted by the Board, the permit may be reopened and modified to extend the terms of the permit or to include pollutants covered by new standards. The permittee may apply for a variance under the conditions outlined in R317-6-6.4.D. 2. If alternative compliance mechanisms are required. 3. If subsequent ground water monitoring data reveals the background water quality values in Part I Table 1 are not accurate. APPENDIX I UGW010002 FARM AND MONITORING WELL COMPLIANCE LIMIT SUMMARY * FARM SYSTEM  NITRATE + NITRITE (mg/L)  BICARBONATE (mg/L)  CHLORIDE (mg/L) TOTAL DISSOLVED SOLIDS (mg/L)  41101 2.5 162 263 1144  41102 2.5 313 358 1460  41103 2.5 151 80 600  41104 2.5 190 63 378  41105 2.5 188 63 349  41106 2.5 210 63 322  41107 2.5 194 112 658  41108  2.5 198 94 590  41201 2.5 250 100 826  41202 7 316 2800 8200  41203 12.5 576 698 2470  41204 2.5 510 63 400  41205 2.5 226 63 403  41206 2.5 202 63 399  41207 10 500 3500 14000  41208 5 500 1400 8314  41209 5 436 3378 8328  41210  10 1200 5061 16000  41301 5 517 3500 9151  41302 5 361 1821 5266  41303 2.5 162 727 2200  41304 2.5 437 727 2200  41305 2.5 225 727 2200  41306 2.5 226 63 405  41307 2.5 228 63 374  41308 2.5 194 84 599  41309 2.5 241 63 550  41310  2.7 191 151 758  41311 2.5 177 63 336  41312 2.5 189 99 519   41313 2.5 183 63 343  41314 5 167 63 393  41315 2.5 176 410 1425  41316 2.5 190 130 568  41317 2.5 195 93 569  41318 2.5 191 94 577  41319 2.5 242 70 499  41320 2.5 337 128 531  41321 2.5 186 114 541  41322 2.5 200 63 385   41323 2.5 177 114 498  49170 2.5 230 100 750   pH range for all farms is 6.5 – 8.5 *Ground water protection levels and compliance limits are established in accordance with R317-6-4. Only the highest allowable value is shown in Appendix 1. APPENDIX II MONITORING WELL LOCATIONS Farm Site Well Latitude (North) Longitude (West) Hinge Elevation (feet – amsl) Status  41101 41101MU2 38.237000 -113.102700 5030.1 active   41101MD2 38.238950 -113.099450 5027.0 active   41101MD3 38.239333 -113.100583 5027.7 active   41101MD4 38.238950 -113.100750 5026.8 active  41102 41102MU 38.247217 -113.078667 5021.5 active   41102MD2 38.263283 -113.098883 5023.2 active  41103 41103MU2 38.247217 -113.078667 5036.5  active   41103MD2 38.248783 -113.075000 5040.2 active   41103MD3 38.249016 -113.075950 5041.7 active  41104 41104MU 38.193967 -113.088583 5056.3 active   41104MD 38.195417 -113.085317 5057.4 active  41105 41105MU 38.200600 -113.089500 5053.3 active   41105MD2 38.202133 -113.086867 5054.0 active  41106 41106MU 38.208700 -113.089250 5051.1 active   41106MD2 38.210117 -113.086683 5052.5 active  41107 41107MU  38.216083 -113.201100 5073.8 active   41107MD 38.216783 -113.199050 5064.0 active  41108 41108MU 38.217517 -113.183817 5047.8 active   41108MU2 38.219417 -113.190467 5065.6 active   41108MU3 38.219433 -113.186017 5056.6 active   41108MD 38.220133 -113.181317 5051.6 active   41108MD2 38.217850 -113.181050 5044.9 active   41108MD3 38.218700 -113.180900 5046.2 active   41108MD4 38.217183 -113.181933 5043.7 active  41201 41201MU2 38.236217 -113.096017 5029.6 active   41201MD2 38.237600 -113.095700 5029.9 active   41201MD3 38.237250 -113.094883 5032.0 active  41202 41202MU 38.262783 -113.085300 5028.3 active   41202MD 38.263450 -113.084133 5027.2 active  41203 41203MU3 38.262667 -113.076283 5031.7 active   41203MD2 38.263583 -113.075200 5031.7 active  41204 41204MU 38.193283 -113.102250 5048.7 active   41204MD 38.194000  -113.099800 5049.9 active  41205 41205MU 38.200200 -113.102117 5045.4 active   41205MD 38.200783 -113.099717 5046.7 active  41206 41206MU 38.207750 -113.102033 5042.8 active   41206MD 38.208367 -113.099617 5044.7 active  41207 41207MU 38.219450 -113.128883 5021.7 active   41207MD 38.220283 -113.126950 5022.1 active  41208 41208MU 38.219500 -113.137133 5021.4 active   41208MD 38.160550 -113.136117 5020.7 active   41209 41209MU 38.207933 -113.128000 5027.5 active   41209MD 38.208600 -113.126433 5026.4 active  41210 41210MU 38.207067 -113.132900 5026.5 active   41210 MD 38.208550 -113.132917 5025.4 active  41301 41301MU2 38.247900 -113.102060 5029.4 active   41301MD2 38.250522 -113.100286 5029.2 active  41302 41302MU 38.256983 -113.102233 5016.5 active   41302MD 38.258283 -113.099050 5027.3 active  41303 41303MU 38.253710 -113.095883  5021.6 active   41303MD 38.254117 -113.092983 5023.9 active   41304 41304MU 38.253217 -113.088117 5027.2 active   41304MD 38.254083 -113.084967 5031.2 active   41304MD2 38.253917 -113.086533 5031.5 active   41304MD3 38.253333 -113.084950 5031.5 active   41304MD4 38.252750 -113.083917 5031.8 active  41305 41305MU 38.257500 -113.087067 5029.4 active   41305MD 38.259033 -113.085183 5030.2 active  41306 41306MU 38.219917 -113.103167 5037.4 active   41306MD2 38.221600 -113.100000  5037.0 active  41307 41307MU 38.221700 -113.092067 5042.3 active   41307MD2 38.221900 -113.091783 5043.0 active  41308 41308MU 38.221250 -113.085200 5045.3 active   41308MD2 38.220883 -113.085100 5047.2 active  41309 41309MU 38.227850 -113.093717 5039.4 active   41309MD2 38.228700 -113.090017 5037.3 active  41310 41310MU 38.227267 -113.084250 5042.0 active   41310MD2 38.228167 -113.081367 5042.8 active  41311  41311MU2 38.226750 -113.065450 5058.0 active   41311MD2 38.229483 -113.067950 5055.1 active  41312 41312MU2 38.227233 -113.057033 5068.8 active   41312MD2 38.228500 -113.058833 5065.4 active  41313 41313MU2 38.235150 -113.061650 5059.6 active   41313MD2 38.235883 -113.063700 5056.5 active  41314 41314MU2 38.234800 -113.047800 5077.7 active   41314MD2 38.235383 -113.050433 5074.2 active  41315 41315MU 38.224683 -113.110683 5030.9  active   41315MD 38.226300 -113.108833 5031.4 active  41316 41316MU 38.228517 -113.202867 5134.3 active   41316MD 38.226550 -113.199283 5128.6 active  41317 41317MU2 38.22396 -113.190117 5086.1 active   41317MD2 38.226267 -113.187250 5088.3 active   41317MD3 38.224500 -113.186355 5081.2 active  41318 41318MU2 38.225517 -113.179700 5076.8 active   41318MD2 38.226533 -113.177483 5075.4 active  41319 41319MU  38.234367 -113.198500 5183.7 active   41319MD 38.234483 -113.195200 5168.5 active  41320 41320MU 38.233800 -113.188150 5138.4 active   41320MD2 38.234967 -113.184817 5138.3 active   41320MD3 38.235294 -113.185300 5141.0 active   41320MD4 38.233917 -113.184327 5130.3 active  41321 41321MU 38.235067 -113.178800 5111.0 active   41321MD2 38.233467 -113.177500 5116.0 active  41322 41322MU 38.226233 -113.102967 5036.6 active   41322MD 38.227967 -113.098833 5036.9 active  41323 41323MU 38.214933 -113.109817 5034.9 active   41323MD 38.217917 -113.106883 5035.7 active  49170 49170MU 38.178700 -113.139083 5070.1 active   49170MU2 38.179047 -113.140231 5067.1 active   49170MD 38.179667 -113.137417 5059.5 active   49170MD2 38.179725 -113.139917 5065.5 active   APPENDIX III SUMMARY OF LAGOON CONSTRUCTION DETAILS Farm Site Lagoon Liner Type Liquid Level Length, ft Liquid Level Width, ft Bottom Level Length, ft Bottom Level Width, ft Max. Liquid Depth, ft Wetted Surface at Max. Liquid Depth, acres Operating Volume at Max. Liquid Level Depth, cu. ft  41101 Primary FML 350 350 200 200 25 2.9 1,937,500   Secondary FML 215 251 125 161 15 1.3 535,226   Tertiary FML 321 224 270 173 7 1.7 411,991  41102 Primary Clay 350 350 200 200 25 2.9 1,937,500   Secondary  FML 334 373 239 278 15.8 2.9 1,485,224  41103 Primary FML 350 350 200 200 25 2.9 1,937,500   Secondary FML 215 251 125 161 15 1.3 535,226   Tertiary FML 259 259 217 217 7 1.6 397,537  41104 Primary FML 456 456 306 306 25 4.9 3,675,900   Secondary FML 540 540 506 506  5.7 6.7 1,559,664  41105 Primary FML 456 456 306 306 25 4.9 3,675,900   Secondary FML 540 540 506 506 5.7 6.7 1,559,664  41106 Primary FML 456 456 306 306 25 4.9 3,675,900   Secondary FML 540 540 506 506 5.7 6.7 1,559,664  41107 Primary FML 540 385 390 235 25 4.9 3,646,553    Secondary FML 603 546 573 516 5 7.6 1,561,513  41108 Primary FML 540 385 390 235 25 4.9 3,646,553   Secondary FML 603 546 573 516 5 7.6 1,561,513  41201 Primary - North FML 188 188 60 60 16.2 0.8 271,210   Primary - South FML 191 191 140 140 8.5 0.9 234,659   Secondary FML 158 158 116  116 7 0.6 132,412  41202 Primary FML 197 197 47 47 25 0.9 418,975   Secondary FML 193 193 139 139 9 0.9 250,191  41203 Primary FML 197 197 47 47 25 0.9 418,975   Secondary FML 193 193 139 139 9 0.9 250,191  41204 Primary FML 231 231 81 81 25 1.3 655,275   Secondary FML 270 270 236 236 5.7 1.7 365,400  41205 Primary FML 231 231 81 81 25 1.3 655,275   Secondary FML 270 270 236 236 5.7 1.7 365,400  41206 Primary FML 231 231 81 81 25 1.3 655,275   Secondary FML 270 270 236 236 5.7 1.7 365,400  41207 Primary Clay 293 293  203 203 15 2 932,685   Secondary Clay 293 145 263 115 5 0.9 180,961  41208 Primary Clay 293 293 203 203 15 2 932,685   Secondary Clay 293 145 263 115 5 0.9 180,961  41209 Primary Clay 293 293 203 203 15 2 932,685   Secondary FML 293 145 263 115 5 0.9 180,961   41210 Primary Clay 293 293 203 203 15 2 932,685   Secondary FML 293 145 263 115 5 0.9 180,961  49170 Primary – East Clay 171 171 63 63 18 0.7 263,898   Secondary – East FML 171 171 63 63 18 0.7 263,898   Primary – West FML 91 91 53.8 53.8 6.2 0.2 33,214   Secondary - West FML 91 91  53.8 53.8 6.2 0.2 33,214  41301 Primary Clay 350 350 200 200 25 2.9 1,937,500   Secondary FML 215 251 125 161 15 1.3 535,226   Tertiary FML 268 268 226 226 7 1.7 428,092  41302 Primary FML 360 360 210 210 25 3.1 2,077,500   Secondary FML 309 309 267 267 7 2.2 581,637  41303 Primary FML 360 360 210 210 25 3.1 2,077,500   Secondary FML 309 309 267 267 7 2.2 581,637  41304 Primary FML 360 360 210 210 25 3.1 2,077,500   Secondary FML 309 309 267 267 7 2.2 581,637  41305 Primary FML 360 360 210 210 25 3.1 2,077,500   Secondary FML 309  309 267 267 7 2.2 581,637  41306 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 251 251 210 210 6.8 1.5 362,238  41307 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 251 251 210 210 6.8 1.5 362,238  41308 Primary FML 426 426 276 276 25 4.3  3,126,900   Secondary FML 251 251 210 210 6.8 1.5 362,238  41309 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 251 251 210 210 6.8 1.5 362,238  41310 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 251 251 210 210 6.8 1.5 362,238  41311 Primary FML  426 426 276 276 25 4.3 3,126,900   Secondary FML 251 251 210 210 6.8 1.5 362,238  41312 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 251 251 210 210 6.8 1.5 362,238  41313 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 251 251 210 210 6.8  1.5 362,238  41314 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 251 251 210 210 6.8 1.5 362,238  41315 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 251 251 210 210 6.8 1.5 362,238  41316 Primary Clay 426 426 276 276 25 4.3 3,126,900   Secondary  FML 432 366 402 336 5 3.7 732,204  41317 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 432 366 402 336 5 3.7 732,204   41318 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 432 366 402 336 5 3.7 732,204  41319 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 432 366 402 336 5 3.7 732,204  41320 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 432 366  402 336 5 3.7 732,204  41321 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 432 366 402 336 5 3.7 732,204  41322 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 432 366 402 336 5 3.7 732,204  41323 Primary FML 426 426 276 276 25 4.3 3,126,900   Secondary FML 432 366 402 336 5 3.7 732,204